Laserfiche WebLink
CITY OF SANTA ANA ADDENDUM ONE <br />PROPOSAL <br />PROJECT NO. 11-6740: BRISTOL STREET IMPROVEMENTS AND WIDENING FROM <br />WASHINGTON AVENUE TO 17TH STREET <br />PROJECT NO. 17-6472: BRISTOL STREET WATER MAIN IMPROVEMENTS FROM <br />WASHINGTON AVENUE TO 17TH STREET <br />PROJECT NO. 17-6473: BRISTOL STREET SEWER MAIN IMPROVEMENTS FROM <br />WASHINGTON AVENUE TO 17TH STREET <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />PROJECT 17-6472 WATER MAIN IMPROVEMENTS <br />85. <br />12" AWWA C900 (DR14) <br />LF <br />1735 <br />$ <br />$ <br />P.V.C. Water Main <br />1%0— <br />'&5 5U-) - <br />86. <br />Construct 1" Water Service per City Std. Plan <br />EA <br />3 <br />$ <br />$ <br />1401 <br />e7 f <br />90,R 00 <br />86a <br />Temporary Water Service <br />EA <br />3 <br />$ <br />$ <br />5g0D <br />9ugo.., <br />87. <br />6" Fire Line Connection Including 6" RWGV <br />EA <br />1 <br />$ <br />$ <br />imc�' <br />iapots-_ <br />88. <br />8" Fire Line Connection Including 8" RWGV <br />EA <br />1 <br />$ <br />$ <br />1147000 <br />/700- <br />89. <br />New Fire IIydrant Assembly, Including Gate <br />EA <br />5 <br />$ <br />$ '7(e co ` <br />Valve and Lateral Pipe <br />15vco -� <br />I� <br />90. <br />12" Resilient Wedge Gate Valve <br />EA <br />8 <br />$ <br />$ <br />22 e Elz7 ` <br />2C)-6C)o "- <br />91. <br />CCTV Inspection of Existing Sewer Main (to <br />LF <br />1500 <br />$ <br />$ <br />be left in place) Adjacent to New Water Main <br />LJ ...- <br />II <br />b <br />92. <br />CCTV Inspection of Existing Sewer Laterals <br />EA <br />10 <br />$ <br />$ <br />(to be left in place) Adjacent <br />30F3 <br />to New Water Main <br />93. <br />Vertical Offset* <br />EA <br />2 <br />$ <br />$ <br />94. <br />Remove Existing Water Main* <br />LF <br />1000 <br />$ <br />$�- <br />95. <br />Combination Air Valves* <br />EA <br />3 <br />$ <br />$ <br />(As Needed) <br />rz3>X.) <br />co <br />96. <br />Imported Backfill Material* <br />CY <br />200 <br />$ <br />$ <br />(As Needed) <br />39 - <br />-7!900'- <br />96a. <br />Potholing (As Needed)* <br />EA <br />40 <br />$ <br />$ <br />1(1900- <br />96b. <br />Additional Trenching Costs to Install Water <br />LF <br />200 <br />$ <br />$ <br />Pipeline 18"-30" Deeper (Total 54" to 66" <br />a <br />cover)(As-Needed)* <br />I <br />PROJECT 17-6473 SEWER MAIN IMPROVEMENTS <br />97. <br />Constrict 8" PVC Sewer Main <br />LF <br />452 <br />$ <br />$ <br />98. <br />Construct 48" Concrete Manhole <br />EA <br />3 <br />$ <br />$ <br />99. <br />Bypass Pumping Existing Sewer Flow <br />LS <br />1 <br />$ <br />$ <br />`) oco <br />P-6 of P-22 <br />9O <br />