Laserfiche WebLink
0LTA IC <br />Project 4;73-727.4 <br />Santa Ana Zoo <br />Location: 1801 East Chestnut Avenue <br />Santa Ana, CA 92701 <br />NJPA #: 051017 -CPI <br />CHARGING UNIT MOUNTING TYPEIsl: BOLLARD <br />TOTAL# OF PARKING FOR EV: Two (2) <br />Price Breakdown: <br />Electrical/Construction, Labor and Material $17,295.00 <br />EVCS Unit(s) and Service(s) $7,355.00 <br />Total Price: $24,650.00 (tax included) <br />Electrical/Construction. Labor and Material Includes: <br />Proposal consists of project management and site planning, engineering and designing for any necessary <br />permit acquisitions. <br />o Permit acquisitions also include the plan checking, and inspection processes (not including <br />actual plan check fee, permitting and/or inspection fees) as required by the authorities having <br />jurisdiction. <br />Perform Site Validation survey (SVS) as required by ChargePoint, Inc, prior to activation of units. SVS fee <br />to ChargePoint, Inc. discounted when using ChargePoint, Inc. Certified Installers. <br />o Standard electrical power consistency evaluation: circuit breaker and electrical panel evaluation. <br />o Cellular network communications test: test for consistency of cellular signal strength. <br />o Charging station evaluation: consistent voltage, amperage, ground, network communication. <br />ELECTRICAL EQUIPMENT UPGRADE <br />Supply and installation of new 125A electrical panel for EV charging units. Materials and installation to <br />meet NEC, building department requirements, and if enforced, by building department. <br />o Concrete structural work for new electrical panel to be located outdoors. <br />CHARGING UNIT INSTALLATION <br />Installation and commissioning of one (1) charging unit to meet NEC requirements <br />Supply and installation of two (2) 40A circuit breakers for EVCS overcurrent protection, <br />o Utilization of new electrical panel to supply two (2) 30A circuits to new charging unit. <br />o From the electrical par l(a) to new charging stations, the new electrical conductors: #8 and #10 <br />ground wires. <br />-1s- <br />Video VuII.c Darh Co arhun c ri o a V ;IW¢ Dnp ion 1 12681 Pala Dive GaidenCirove LA 924,11 Pnnl rlli11)!.1, 17I,iiR <br />