Laserfiche WebLink
<V-1-OLTAIC <br />Project #:73-727.4 <br />PROVISIONS FOR FUTURE GROWTH <br />• New electrical equipment will support up to three (3) additional charging ports for future use. <br />PARKING MODIFICATIONS <br />• Supply and mounting of two (2) bollards with new concrete pad for station protection, <br />• Stenciling/marking "EV CHARGING ONLY" for two (2) EV parking spaces. <br />• Supply and mounting of two (2) concrete incased sign posts with EV parking signs. <br />RELATED CONSTRUCTION WORK <br />• Core drilling. <br />Trenching and/or pneumatic boring, approximately +100' <br />• Placement of EMT, approximately +10'. <br />• Concrete work for EV structural pad. <br />• Concrete work and strut for new electrical panel located outdoors. <br />INITIALS DATE <br />vtd2o vo'cc ["ata Is I Vol Lai,, D'vl.lO'r 1 1"631 Palz Drrve, Barden Grove, CA 92841 `1111L DltO 111111,111, 17 Mj,, <br />