My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CITY OF COSTA MESA (2)
Clerk
>
Contracts / Agreements
>
C
>
CITY OF COSTA MESA (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 9:31:14 AM
Creation date
3/22/2018 1:57:33 PM
Metadata
Fields
Template:
Contracts
Company Name
CITY OF COSTA MESA
Contract #
A-2018-031
Agency
Public Works
Council Approval Date
2/20/2018
Expiration Date
12/31/2022
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4). Engineering Design. Review, and Procurement/Construction — Support Infrastructure <br />Santa Ana shall provide sufficient staffing to provide Engineering Design Review of design <br />documentation. If design documentation Is provided by the PARTICIPATING AGENCY for <br />Fairview Road PROJECT, the Engineering Design Review requirement shall be satisfied. <br />Purchase and construction/installation of the requested traffic signal infrastructure and <br />upgrades, software, licenses, or other components as approved in the application shall be by <br />the CITY in the name of and for the end user Santa Ana. The CITY shall work with the Santa <br />Ana to coordinate design, identification of applicable standards/specifications, purchasing <br />and/or installation of the required signal Improvements. Design and other technical support to <br />implement the upgrades shall be subject to the designated cost estimate. The budget for these <br />improvements is fixed to the approved budget and will be subject to revised scope or additional <br />contributions. The highest priority improvements shall be those that are required to optimize <br />signal timing. Santa Ana shall waive all fees for permits and inspections and shall provide <br />sufficient professional staffing to provide construction support and inspection services to <br />Fairview Road PROJECT. <br />PROJECT TRAFFIC SIGNAL SYNCHRONIZATION — ON GOING MAINTENANCE AND <br />MONITORING <br />For a period of two (2) years (24 months), from the date of Fairview Road PROJECT <br />acceptance, CITY shall provide for On Going Maintenance and Monitoring of Fairview Road <br />PROJECT. This shall include the observation of corridor and system intersection operations to <br />maintain Fairview Road PROJECT integrity. CITY will make observations and provide <br />recommended changes to Santa Ana for approval and implementation. CITY shall also provide <br />resources for maintenance and repair of any Fairview Road PROJECT installed infrastructure <br />for the same time period. Santa Ana shall provide sufficient staffing for assistance in <br />administration of this task. <br />PROJECT MATCH <br />Upon Issuance of a Notice to Proceed to the Consultant, CITY can Issue an invoice to Santa <br />Ana for up to 80% of the cash match as identified below. <br />AGENCY <br />CASH <br />CASH OR IN-KIND <br />TOTAL <br />City of Costa Mesa <br />$169,789 <br />$36,387 <br />$206,176 <br />City of Santa Ana <br />$209,806 <br />$7,806 <br />$217,612 <br />TOTAL <br />$379,595 <br />$44,193 <br />$423,788 <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.