My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CITY OF COSTA MESA (2)
Clerk
>
Contracts / Agreements
>
C
>
CITY OF COSTA MESA (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 9:31:14 AM
Creation date
3/22/2018 1:57:33 PM
Metadata
Fields
Template:
Contracts
Company Name
CITY OF COSTA MESA
Contract #
A-2018-031
Agency
Public Works
Council Approval Date
2/20/2018
Expiration Date
12/31/2022
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PRIMARY IMPLEMENTATION <br />The following is an outline of the scope of services for Fairview Road PROJECT Primary <br />Implementation. <br />1) Project Administration <br />CITY shall provide general project administration, environmental processing, and quality control. <br />The City of Santa Ana ("Santa Ana") shall provide support project management services for the <br />project Intersections located within their jurisdiction and assist in maintaining the Fairview Road <br />PROJECT schedule. <br />a) Data Collection <br />The CITY will assemble with the assistance of Santa Ana the necessary data to understand <br />the existing traffic conditions for the Fairview Road PROJECT and Its respective traffic <br />signal operations. This shall Include, at minimum, the following: <br />• All data, documents, plans, photos, etc. related to each Fairview Road <br />PROJECT Intersection within the past two years; <br />• Local agency timing preferences or policies for all modes of travel and special <br />Intersection treatments; and <br />• Manual and Machine Traffic counts for highway links and intersections for <br />weekday and weekend time periods for all modes of travel. Special 72 -hour <br />video counts will be conducted along the corridor with established special <br />modal use. <br />b) Field Reviews <br />CITY shall conduct Fairview Road PROJECT field reviews to verify collected data Including <br />geometric layout, inventory of existing traffic signal control and communications, and any <br />and all factors that Impact or affect signal progressions. <br />2) Signal Synchronization Timing <br />CITY shall develop a signal synchronization model using Synchro and Sim Traffic 8.0 and Tru — <br />Traftic 9.0 to verify the operation of existing timing and then produce and evaluate potential <br />timing changes that would improve or refine the corridor traffic flows through improved <br />optimized signal operations. Santa Ana shall be involved in the review and validation of the <br />recommended signal timing. The OCTA Corridor Synchronization Performance Index (CSPI) <br />combines Average Speed, Stops per Mile, and Greens per Red (number of Intersections <br />successfully traversed on a Green Light vs. Stopped by a Red Light) into a composite index. <br />The CSPI shall be the defined metric in this evaluation. <br />The CITY shall utilize the approved Optimized Signal Timing and Implement the timing into the <br />central and field controller systems and provide Fine Tuning services. The After Study Travel <br />Time Runs shall be performed and the Before to After comparison CSPI shall then be <br />determined. <br />3) Before and After Studies and Reports <br />CITY shall conduct real-time floating car "runs" in each direction during the planned (Before) <br />and implemented (After) time periods of Fairview Road PROJECT traffic signal synchronization. <br />Summary reports shall be prepared by CITY in coordination with Santa Ana to identify <br />improvements in metrics from the Before to After conditions. The Before and After Study shall <br />constitute the Fairview Road PROJECT Final Report. <br />Additionally, this report shall document improvements accomplished and recommend <br />procedures for continuing maintenance, surveillance, and evaluation of the coordinated signal <br />system. <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.