My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-12-18 PC MINUTES
Clerk
>
Minutes
>
Planning Commission
>
2018
>
03-12-18 PC MINUTES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2018 4:03:24 PM
Creation date
3/27/2018 4:03:16 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />PLANNING COMMISSION MINUTES March 12, 2018 <br /> ABSTAIN: None (0) <br /> ABSENT: Alderete (1) <br /> <br />*Motion fails by 2:4 (Alderete absent) <br /> <br />4. VARIANCE NO. 2018-03 TO ALLOW THE CONSTRUCTION OF A SINGLE-FAMILY <br />RESIDENCE AND DETACHED GARAGE WITH REDUCTIONS IN REQUIRED LOT <br />SIZE, LOT FRONTAGE, PARKING, SETBACKS, AND MODIFIED LOT COVERAGE <br />LOCATED AT 123 NORTH JACKSON STREET <br /> <br />Legal notice published in the Orange County Reporter on March 2, 2018 and notices <br />mailed on March 2, 2018. <br /> <br />Case Planner Guevara provided a presentation which included a description of the project, <br />project background and project analysis. The applicant spoke in support of the matter. <br />Chairman McLoughlin opened the Public Hearing. There were no speakers and the <br />hearing was closed. <br /> <br />MOTION: Adopt a resolution approving Variance No. 2018-03. <br /> <br />MOTION: Bacerra SECOND: Verino <br />VOTE: AYES: Bacerra, Contreras-Leo, McLoughlin, Mendoza, Nguyen <br />Verino (6) <br /> NOES: None (0) <br /> ABSTAIN: None (0) <br /> ABSENT: Alderete (1) <br /> <br /> <br />***END OF BUSINESS CALENDAR*** <br /> <br /> <br />COMMENTS <br /> <br />5. STAFF COMMENTS: None. <br /> <br /> <br />6. PLANNING COMMISSION MEMBER COMMENTS: <br /> <br />All commissioners expressed condolences for the passing of Hassan Haghani, former <br />Executive Director of Planning & Building Agency. <br /> <br />Commissioner Mendoza: <br />• Requested construction timeline be provided for proposed projects. <br /> <br />Commissioner Bacerra
The URL can be used to link to this page
Your browser does not support the video tag.