My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - ROAD MAINTENANCE CIP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
04/17/2018
>
55A - ROAD MAINTENANCE CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2018 6:48:04 PM
Creation date
4/12/2018 6:42:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
4/17/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-ROJECT TITLE: <br />1st Street Slurry Resurfacing: City Limit to <br />Newhope Street <br />oROJECT CATEGORY: <br />Street improvements <br />Arterial Sheet RehatA6tahon <br />CT DESCRIPTION: <br />bn of slurry seal to madway and <br />nent/installalion of missing ordamaged curbs, <br />Sidewalks. driveway approaches, and <br />air ramps within the segment <br />PROJECT NEED. <br />The City's Pavement Management Program has been <br />developed to identify the preventative maintenance <br />requirements for the City's street network The <br />application of a surface seal to straefs with <br />improvements constructed in the last 10 years will <br />ensure a high level of service for years to come <br />PROJECT COSTS FY 18/19 FY 1920 FY 2021 FY 2122 FY 2223 FY 23/24 FY 2x25 <br />Construction i536,00C <br />En,ncr,. 0 $51,000 _ <br />TOTAL $687,000 <br />PROJECT FUNDS FY 18/19 FY 19/20 FY 2021 FY 2122 FV 2223 FY 2324 FY 24/25 <br />RMRA $687.000 <br />TOTAL $887,000 <br />AGENCY: DIVISION: CONTACT'. DATE: <br />Public Works Agency Design Engineenng Jason Gabriel, Principal Civil Engineer 12 -Mar -2018 <br />55A-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.