My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - ROAD MAINTENANCE CIP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
04/17/2018
>
55A - ROAD MAINTENANCE CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2018 6:48:04 PM
Creation date
4/12/2018 6:42:58 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
4/17/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'ROJECT TITLE: <br />McFadden Avenue Rehabilitation Fairview <br />Street to Raitt Street <br />aROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />w <br />. <br />CITY OF SANTA ANA FY 18119 <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />CT DESCRIPTION: <br />ouctionhesudacing or existing pavement and <br />nent6nstallation ot missing or damaged. curbs. <br />sidewalks, dnveway approaches. and <br />'air ramps within this segment of roadway <br />PROJECT COSTS FY 16119 FY 1920 <br />cWst dwn 61140615 <br />En9meenrg 599.325 <br />TOTAL 990,325 $1.140,675 <br />)JECT NEED. <br />City's Pavement Management Pmgram has been <br />ibped m identify total defamed maintenance <br />irements for the City's adenal network and to move <br />nd preventative maintenance. <br />FY 2021 FY 2122 FY 2223 FY 2320 FY 2025 <br />PROJECT FUNDS R 1819 FY 1920 FY 2021 FY 2122 FY 22123 FY 2324 FY 2485 <br />RMRa 690,325 61,140.fi]5 <br />TOTAL 690,326 11,140,8]6 <br />Public Works Agency Design Engineenng Jason Gabriel, Principal Civil Engineer 12 -Mar -2018 <br />E <br />55A-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.