Laserfiche WebLink
Recent Developments <br />DWRapproved CA WaterFixin July 2017 <br />• <br />9000 cfs, two tunnels, and three intakes <br />– <br />October 2017 MWDBoard approved financing <br />• <br />options <br />February 2018 DWRannounced two-stage <br />• <br />construction option <br />Stage 1: two intake structures, one tunnel, 6000 <br />• <br />cfspumps station <br />Stage 2: one intake structure, one tunnel, 3,000 <br />• <br />cfspump station <br /> <br />