Laserfiche WebLink
Stage 1 <br />Two intake stucture <br />• <br />Single tunnel <br />• <br />6,000 cfs <br />• <br />MWDshare will be 47% of SWP <br />• <br />MWDshare of total project 31.6% equals to <br />• <br />$5.3Billion <br />Monthly Household cost is $2.40 <br />• <br /> <br />