My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLACEWORKS, INC - 2018
Clerk
>
Contracts / Agreements
>
P
>
PLACEWORKS, INC - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2020 10:32:33 AM
Creation date
4/25/2018 3:09:00 PM
Metadata
Fields
Template:
Contracts
Company Name
PLACEWORKS, INC
Contract #
A-2017-265-24
Agency
PLANNING & BUILDING
Council Approval Date
10/3/2017
Expiration Date
10/2/2020
Insurance Exp Date
7/1/2021
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. ENVIRONMENTAL SERVICES <br />The breadth of our environmental consulting services Includes the following; <br />California Environmental Quality Act Documentation <br />Environmental Impact Reports (EIRs) <br />Mitigated Negative Declarations (MNDs) <br />Exemptions <br />Mitigation Monitoring Programs <br />Findings/Resolutions <br />Third -Party CEQA Adequacy Review <br />Litigation Support <br />National Environmental Policy Act Documentation <br />• Environmental Impact Statements(EISs) <br />Environmental Assessments (EAs) <br />• Findings of No Significant Impact (FONSIs) <br />Site Investigation/DTSC Compliance <br />• Phase I and Phase II Environmental Site Assessments <br />• Preliminary Environmental Assessments (PEA) <br />• Remedial Investigation/FeaslbilityStudies (RI/FS) <br />• Environmental Information Management <br />Geologic/Hydrologlc Characterization <br />• Soil, Soil Vapor and Groundwater Sampling & <br />Assessment <br />Remedial Engineering Design <br />• Feasibility Studies <br />• Remedial Action and Removal Action Plans, and <br />Closure Reports <br />• Methane Mitigation Design & Engineering <br />• Remedial Program Design, Implementation & <br />Monitoring <br />CCR Title 5 Risk Assessments <br />Health Risk Assessments (Toxic Air Emissions) <br />• Geohazard Studies <br />• Railroad Risk Studies <br />Pipeline/Water Storage Tank Risk Studies <br />• Dam Inundation Studies <br />• EMF (Electro Magnetic Field) Management Plans <br />SFPD (School Facilities Planning Division) Self - <br />Certification Forms <br />Safe Routes to School <br />B. TECHNICAL STUDIES <br />Technical Analysis <br />Air Quality Assessments and Dispersion Modeling <br />Greenhouse Gas Evaluations <br />Climate Action Plans/Greenhouse Gas Reduction Plans <br />Noise Assessments, Mapping and Monitoring <br />Vibration Assessments <br />• Traffic Studies <br />Hydrology Studies <br />Water Quality Studies <br />Biological Resource Assessments/Permits <br />• Light and Glare Studies <br />• Visual impacts/Simulations <br />Regulatory Compliance and Safety <br />Facility/Site Audits <br />^ Permits/Approvals Acquisition <br />Hazardous Waste Characterization and Management <br />SWPPPS/WQMPs <br />SPCCPs <br />NPDES Monitoring and Permits <br />Air Permits <br />= CDFW/Corps Permitting <br />• Regulatory Agency Interface and Strategy <br />Support Services <br />• Outdoor Educational Planning Services <br />• Entitlement Processing <br />• General Plan Amendments <br />^ Zoning Changes <br />• Conditional Use Permits <br />• Master Planning <br />• Feasibility Studies <br />• Site Planning and Design <br />• Grading/Feasibility Studies <br />• Geographic Information System (GIS) Mapping <br />• Demographic Studies and Reports <br />• Surplus Schools <br />• Community Outreach/PublicParticipation <br />Hearing Coordination and Support <br />• Graphics/Media Support <br />• Spanish Interpreters/Translation <br />• CEQAScopingMeetings <br />• DTSC Public Participation Process <br />• Staff Services, On-Call/Temporary Staff Placement <br />Technical services provided by PlaceWorks are listed In 'A. Environmental Services' above, The following provides more <br />detall about our technical services as referenced in Section III, Part B —Technical Studies of the RFP, <br />Air Quality/Greenhouse Gas Emissions Studies and Health Risk Assessments <br />PlaceWorks stays on top of the changing climate of air quality, health risk, GHG modeling, and their thresholds. We have a <br />strong technical grasp of modeling tools and protocols available for quantifying air quality and GHG emissions, Including <br />EMFAC (and EMFAC2014), CalEEMod, ISCST3/AERMOD, HARP, Off -Road (Including off -road source categories), Caline, <br />10 CITY OF SANTA ANA PLANNING DIVISION I PROPOSAL TO PROVIDE ENVIRONMENTAL AND PLANNING SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.