Project No. 156825: Westminster Ave from Harbor Blvd to Clinton St
<br />Construction Contract
<br />Construction Contract City of Sana Ana
<br />City of Garden Grove
<br />Construction Contact
<br />S 1,399,000.00 S 964,130.30
<br />City
<br />of Santa Ana
<br />City 0 Garden Grove
<br />Item Description
<br />Quantity Unit
<br />Unit Price
<br />Amoum
<br />Quantity
<br />Amman
<br />Quantity
<br />Quantity
<br />Amount
<br />I Unclassified Excavation
<br />1,171
<br />CY
<br />S 60.00 $
<br />70,260.00
<br />1,021
<br />$ 61,260.00
<br />150
<br />S
<br />9,000.00
<br />2 AC Pavement (Asphalt Concrete)
<br />2,745
<br />TN
<br />S 70.00 $
<br />192,150.00
<br />2,414
<br />S 168,980.00
<br />331
<br />$
<br />23,170.00
<br />3 Asphalt Rubber Hot Mix(ARHM)
<br />2,560
<br />TN
<br />S 79.00 $
<br />202,240.00
<br />2,160
<br />S 170,640.00
<br />400
<br />$
<br />31,600.00
<br />4 Cold Mill (T-3")
<br />166,785
<br />SF
<br />S 0.24 $
<br />40,028.40
<br />141,285
<br />S 33,908.40
<br />25.500
<br />S
<br />6,120.00
<br />5 Cashed Miscellaneous Base (CMB)
<br />40
<br />TN
<br />S 100.00 $
<br />41000.00
<br />20
<br />S 2,000.00
<br />20
<br />S
<br />2,000.00
<br />6 PCC Sidewalk (T=4')
<br />2,000
<br />SF
<br />S 5.50 $
<br />11,000.00
<br />1,405
<br />S 7,727.50
<br />595
<br />$
<br />3,272.50
<br />7 PCC Driveway Approach (T=8")
<br />118
<br />SF
<br />$ 12.00 $
<br />1,416.00
<br />100
<br />5 1,200.00
<br />is
<br />S
<br />216.00
<br />8 PCC Curb Ramp
<br />2,425
<br />SF
<br />$ 10.00 $
<br />24,250.00
<br />1,425
<br />$ 14,250.00
<br />11000
<br />S
<br />10 000.00
<br />9 Concrete Bus Pad
<br />S 10.00 $
<br />SF
<br />$ 12.00 S
<br />$
<br />20,000.00
<br />$
<br />S
<br />S
<br />9 Concrete Bus Pad
<br />10 PCC Cub and Gutter (Type A-2-8)
<br />415
<br />LF
<br />$ 30.00 $
<br />12,450.00
<br />400
<br />$ 12,000.00
<br />IS
<br />S
<br />450.00
<br />H PCC Curb (Type B -I)
<br />585
<br />I LF I
<br />$ 16.00 $
<br />17,550.00
<br />285
<br />$
<br />8,550.00
<br />S
<br />S
<br />12 PCC Cross -Gutter (Anerial Strect)
<br />200
<br />SF
<br />$ 12.00 $
<br />2,400.00
<br />4,800.00
<br />$
<br />200
<br />$
<br />2,400.00
<br />13 PCC Grinding
<br />40
<br />LF
<br />$ 25.00 $
<br />1,000.00
<br />36
<br />$ 900.00
<br />4
<br />$
<br />100.00
<br />14 PCC Pattern Stomped Concrete
<br />$
<br />SF
<br />S 20.00 $
<br />60
<br />LF
<br />$
<br />1,500.00
<br />S
<br />$
<br />15 Root Shave
<br />1
<br />EA
<br />S 500.00 $
<br />500.00
<br />1
<br />$ 500.00
<br />$ 20.00 $
<br />$
<br />195
<br />16 Ado 'oat Water Valve Frame and Cover to Finished Grade
<br />30
<br />EA
<br />S 850.00 $
<br />25,500.00
<br />16
<br />$ 13,600.00
<br />14
<br />S
<br />11,900.00
<br />17 Adjust Sewer and Drainage Manhole to Finished Gade
<br />11
<br />EA
<br />5 800.00 S
<br />8,800.00
<br />11
<br />S 8,800.00
<br />39
<br />$
<br />S 850.00 S
<br />18 Adjust Water Meter Fmmc and Cover to Finished Grade
<br />15
<br />EA
<br />$ 800.00 $
<br />24
<br />$
<br />$
<br />17 Adjust Sewer and Dmins a Manhole to Finished Grade
<br />$
<br />EA
<br />19 Adjust Survey Monument to Finished Gmde
<br />24,800.00
<br />EA
<br />$ 800.00 $
<br />16,000.00
<br />11
<br />$
<br />8,800.00
<br />$
<br />4
<br />20 Furnish and Insall New R6 Pullbox
<br />$ 800.00 S
<br />EA
<br />S 800.00 $
<br />$
<br />$
<br />S
<br />S
<br />19 Adjust Survey Movurrent to Finished Gadc
<br />21 Fumish and Insall Cast -in Place ADA Truncated Dome Panel
<br />EA
<br />EA
<br />S 700.00 S
<br />3
<br />$
<br />4
<br />S
<br />3,200.00
<br />22 Famish and Install Traffic Loops Type E
<br />9
<br />EA
<br />$ 250.00 $
<br />2,250.00
<br />9
<br />S 2,250.00
<br />2,400.00
<br />S
<br />S
<br />23 Famish and Install Traffic Loops Type D
<br />22
<br />EA
<br />$ 250.00 $
<br />5,500.00
<br />22
<br />S 5,500.00
<br />S
<br />S
<br />2
<br />24 Temporary Construction Sign
<br />5
<br />EA
<br />$ 900.00 S
<br />4,500.00
<br />2
<br />S 1,800.00
<br />3
<br />$
<br />2700.00
<br />25 Signing and Striping
<br />0.5
<br />LS
<br />S 38,500.00 $
<br />19,250.00
<br />0.25
<br />$ 9,625.00
<br />0.25
<br />$
<br />9,625.00
<br />26 Traffic Control and Tragic Control Plan
<br />0.5
<br />LS
<br />$ 51,940.00 $
<br />25,970.00
<br />0.25
<br />$ 12,985.00
<br />0.25
<br />S
<br />12,985.00
<br />27 Pro'ect Advertising Sign
<br />2
<br />EA
<br />S 1200.00 S
<br />2,400.00
<br />1
<br />$ 1,200.00
<br />1
<br />$
<br />1,200.00
<br />28 us utton
<br />7
<br />EA
<br />$ 600.00 S
<br />1,800.00
<br />3
<br />S 1,800.00
<br />0.5
<br />$
<br />$ 51,940.00 S
<br />ons roc ion contract
<br />0.25
<br />S
<br />12,985.00
<br />0.25
<br />S
<br />12 985.00
<br />27 Pro, AdvertisingSign
<br />S
<br />126 738.50
<br />Contingency(Mo)
<br />1,200.00
<br />1
<br />S
<br />600.00
<br />1
<br />S 53,093.00
<br />600.00
<br />S
<br />12,674.00
<br />Construction Engineering (15%)
<br />S 600.00 $
<br />S
<br />$ 79,639.00
<br />$
<br />S
<br />19,011.00
<br />Design Eman"
<br />$
<br />741,335.60
<br />S
<br />S
<br />S
<br />12,674.00
<br />SUB=TOTAL
<br />$ 663,657.90
<br />43,320.00
<br />$
<br />171,097.50
<br />Project No. 18-6902: Westminster Ave from Clinton St to Fairview St
<br />Construction Contract
<br />Construction Contract City of Sana Ana
<br />City of Garden Grove
<br />Construction Contact
<br />S 1,399,000.00 S 964,130.30
<br />City
<br />of Santa Ana
<br />City ofGatden Grove
<br />It.. Description
<br />Quantity Unit
<br />Unit Price
<br />AmouN
<br />Quantity
<br />$
<br />Amount
<br />Quantity
<br />S 1,205,163.30
<br />Amount
<br />1 Unclassified Excavation
<br />1,029
<br />CY
<br />$ 60.00 $
<br />61,740.00
<br />790
<br />S
<br />47,400.00
<br />239
<br />S
<br />14,340.00
<br />2 AC Pavement (Asphalt Concrete)
<br />2,555
<br />TN
<br />5 70.00 $
<br />178,850.00
<br />1,615
<br />S
<br />113,050.00
<br />940
<br />S
<br />65,800A0
<br />3 Asphalt Rubber Hot Mix (ARHM)
<br />2,540
<br />TN
<br />S 79.00 $
<br />200,660.00
<br />1,260
<br />S
<br />99,540.00
<br />1,280
<br />S
<br />101.120.00
<br />4 Cold Mill (T-3")
<br />187,215
<br />SF
<br />S 0.24 $
<br />44,931.60
<br />86,085
<br />$
<br />20,660.40
<br />101,130
<br />S
<br />24,271.20
<br />5 Cmshed Miscellaneous Base (CMB)
<br />10
<br />TN
<br />$ 100.00 $
<br />1,000.00
<br />5
<br />$
<br />500.00
<br />5
<br />S
<br />500.00
<br />6 PCC Sidewalk (T=4")
<br />3,000
<br />SF
<br />S 5.50 S
<br />16,500.00
<br />1,600
<br />$
<br />8,800.00
<br />1,400
<br />$
<br />7,700.00
<br />7 PCC DrivewayApproach (T=8')
<br />482
<br />SF
<br />$ 12.00 $
<br />5,784.00
<br />482
<br />$
<br />5,784.00
<br />$
<br />8 PCC Curb Ramp
<br />2,575
<br />SF
<br />S 10.00 $
<br />25,750.00
<br />2,000
<br />$
<br />20,000.00
<br />575
<br />S
<br />5,750.00
<br />9 Concrete Bus Pad
<br />1,100
<br />SF
<br />$ 12.00 $
<br />13,200.00
<br />1,100
<br />$
<br />13,200.00
<br />$
<br />10 PCC Cub and Gutter (Type A-2-8)
<br />585
<br />LF
<br />$ 30.00 $
<br />17,550.00
<br />285
<br />$
<br />8,550.00
<br />300
<br />S
<br />9.000.00
<br />11 PCC Curb (Type B-1)
<br />300
<br />LF
<br />$ 16.00 S
<br />4,800.00
<br />195
<br />$
<br />3,120.00
<br />105
<br />S
<br />1,680.00
<br />12 PCC Cross-Guner(Arterial Street)
<br />2,800
<br />SF
<br />$ 12.00 S
<br />33600.00
<br />1,845
<br />S
<br />22,140.00
<br />955
<br />$
<br />11,460.00
<br />13 PCC Grinding
<br />60
<br />LF
<br />$ 25.00 S
<br />1,500.00
<br />60
<br />$
<br />1,500.00
<br />$
<br />14 PCC Pattern Smmed Concrete
<br />300
<br />SF
<br />$ 20.00 $
<br />6,000.00
<br />195
<br />$
<br />3,900.00
<br />105
<br />S
<br />2,100.00
<br />15 Root Shave
<br />4
<br />EA
<br />S 500.00 $
<br />2,000.00
<br />4
<br />$
<br />2,000.00
<br />S
<br />16 Adjust Water Valve Frame and Cover to Finished Gmde
<br />39
<br />EA
<br />S 850.00 S
<br />33,150.00
<br />15
<br />$
<br />12,750.00
<br />24
<br />$
<br />20400.00
<br />17 Adjust Sewer and Dmins a Manhole to Finished Grade
<br />31
<br />EA
<br />$ 800.00 $
<br />24,800.00
<br />20
<br />S
<br />16,000.00
<br />11
<br />S
<br />8,800.00
<br />18 Adjust Water Meter Fame and Cover to Finished Grade
<br />4
<br />EA
<br />$ 800.00 S
<br />3,200.00
<br />$
<br />4
<br />S
<br />3,200.00
<br />19 Adjust Survey Movurrent to Finished Gadc
<br />4
<br />EA
<br />$ 800.00 S
<br />3,200.00
<br />3
<br />4
<br />S
<br />3,200.00
<br />20Fumishandlnstall NewOPullbox
<br />6
<br />EA
<br />$ 800.00 S
<br />4,800.00
<br />3
<br />S
<br />2,400.00
<br />3
<br />S
<br />2,400.00
<br />21 Furnish and Insall Cast -in Pace ADA Truncated Dome Panel
<br />2
<br />EA
<br />$ 700.00 S
<br />11400.00
<br />S
<br />2
<br />$
<br />1,400.00
<br />22 Punish and Install Tattic Loops Type E
<br />7
<br />EA
<br />S 250.00 S
<br />1,750.00
<br />7
<br />$
<br />1,750.00
<br />S
<br />23 Furnish and Insall Traffic Loops Type D
<br />17
<br />EA
<br />$ 250.00 $
<br />4,250.00
<br />17
<br />$
<br />4,250.00
<br />S
<br />24 Temporary Construction Si
<br />5
<br />EA
<br />S 900.00 $
<br />4,500.00
<br />3
<br />$
<br />2,700.00
<br />2
<br />S
<br />1 800.00
<br />25 Signing and Striping0.5
<br />LS
<br />$ 78,500.00 $
<br />19,250.00
<br />0.25
<br />$
<br />9,625.00
<br />015
<br />S
<br />9,625.00
<br />26 Traffic Control and Traffic Control Plan
<br />0.5
<br />LS
<br />$ 51,940.00 S
<br />25,970.00
<br />0.25
<br />S
<br />12,985.00
<br />0.25
<br />S
<br />12 985.00
<br />27 Pro, AdvertisingSign
<br />1
<br />EA
<br />$ 1200.00 S
<br />1,200.00
<br />1
<br />S
<br />600.00
<br />1
<br />$
<br />600.00
<br />28 Push Button
<br />EA
<br />S 600.00 $
<br />S
<br />$
<br />Construction Contact
<br />$
<br />741,335.60
<br />S
<br />433204.40
<br />S
<br />706,!31.20
<br />Contingency (10%)
<br />$
<br />43,320.00
<br />S
<br />30,813.00
<br />CDoe nstmcto
<br />64,981.00
<br />46,219.00
<br />sign EngvE%)
<br />$
<br />S
<br />30,813.00
<br />SUB -TOTAL
<br />S
<br />541,505.40
<br />S
<br />415,976.20
<br />TOTAL
<br />20A-16
<br />Construction Contract City of Sana Ana
<br />City of Garden Grove
<br />Construction Contact
<br />S 1,399,000.00 S 964,130.30
<br />S 434,869.70
<br />Contingency (10%)
<br />$ 96,413.00
<br />S 43,487.00
<br />Construction Engineering (15%)
<br />S 144,620.00
<br />S 65,230.00
<br />Design Engmeering(10%)
<br />$
<br />S 43,487.00
<br />TOTAL
<br />S 1,205,163.30
<br />5 587,073.70
<br />20A-16
<br />
|