Laserfiche WebLink
Project No. 156825: Westminster Ave from Harbor Blvd to Clinton St <br />Construction Contract <br />Construction Contract City of Sana Ana <br />City of Garden Grove <br />Construction Contact <br />S 1,399,000.00 S 964,130.30 <br />City <br />of Santa Ana <br />City 0 Garden Grove <br />Item Description <br />Quantity Unit <br />Unit Price <br />Amoum <br />Quantity <br />Amman <br />Quantity <br />Quantity <br />Amount <br />I Unclassified Excavation <br />1,171 <br />CY <br />S 60.00 $ <br />70,260.00 <br />1,021 <br />$ 61,260.00 <br />150 <br />S <br />9,000.00 <br />2 AC Pavement (Asphalt Concrete) <br />2,745 <br />TN <br />S 70.00 $ <br />192,150.00 <br />2,414 <br />S 168,980.00 <br />331 <br />$ <br />23,170.00 <br />3 Asphalt Rubber Hot Mix(ARHM) <br />2,560 <br />TN <br />S 79.00 $ <br />202,240.00 <br />2,160 <br />S 170,640.00 <br />400 <br />$ <br />31,600.00 <br />4 Cold Mill (T-3") <br />166,785 <br />SF <br />S 0.24 $ <br />40,028.40 <br />141,285 <br />S 33,908.40 <br />25.500 <br />S <br />6,120.00 <br />5 Cashed Miscellaneous Base (CMB) <br />40 <br />TN <br />S 100.00 $ <br />41000.00 <br />20 <br />S 2,000.00 <br />20 <br />S <br />2,000.00 <br />6 PCC Sidewalk (T=4') <br />2,000 <br />SF <br />S 5.50 $ <br />11,000.00 <br />1,405 <br />S 7,727.50 <br />595 <br />$ <br />3,272.50 <br />7 PCC Driveway Approach (T=8") <br />118 <br />SF <br />$ 12.00 $ <br />1,416.00 <br />100 <br />5 1,200.00 <br />is <br />S <br />216.00 <br />8 PCC Curb Ramp <br />2,425 <br />SF <br />$ 10.00 $ <br />24,250.00 <br />1,425 <br />$ 14,250.00 <br />11000 <br />S <br />10 000.00 <br />9 Concrete Bus Pad <br />S 10.00 $ <br />SF <br />$ 12.00 S <br />$ <br />20,000.00 <br />$ <br />S <br />S <br />9 Concrete Bus Pad <br />10 PCC Cub and Gutter (Type A-2-8) <br />415 <br />LF <br />$ 30.00 $ <br />12,450.00 <br />400 <br />$ 12,000.00 <br />IS <br />S <br />450.00 <br />H PCC Curb (Type B -I) <br />585 <br />I LF I <br />$ 16.00 $ <br />17,550.00 <br />285 <br />$ <br />8,550.00 <br />S <br />S <br />12 PCC Cross -Gutter (Anerial Strect) <br />200 <br />SF <br />$ 12.00 $ <br />2,400.00 <br />4,800.00 <br />$ <br />200 <br />$ <br />2,400.00 <br />13 PCC Grinding <br />40 <br />LF <br />$ 25.00 $ <br />1,000.00 <br />36 <br />$ 900.00 <br />4 <br />$ <br />100.00 <br />14 PCC Pattern Stomped Concrete <br />$ <br />SF <br />S 20.00 $ <br />60 <br />LF <br />$ <br />1,500.00 <br />S <br />$ <br />15 Root Shave <br />1 <br />EA <br />S 500.00 $ <br />500.00 <br />1 <br />$ 500.00 <br />$ 20.00 $ <br />$ <br />195 <br />16 Ado 'oat Water Valve Frame and Cover to Finished Grade <br />30 <br />EA <br />S 850.00 $ <br />25,500.00 <br />16 <br />$ 13,600.00 <br />14 <br />S <br />11,900.00 <br />17 Adjust Sewer and Drainage Manhole to Finished Gade <br />11 <br />EA <br />5 800.00 S <br />8,800.00 <br />11 <br />S 8,800.00 <br />39 <br />$ <br />S 850.00 S <br />18 Adjust Water Meter Fmmc and Cover to Finished Grade <br />15 <br />EA <br />$ 800.00 $ <br />24 <br />$ <br />$ <br />17 Adjust Sewer and Dmins a Manhole to Finished Grade <br />$ <br />EA <br />19 Adjust Survey Monument to Finished Gmde <br />24,800.00 <br />EA <br />$ 800.00 $ <br />16,000.00 <br />11 <br />$ <br />8,800.00 <br />$ <br />4 <br />20 Furnish and Insall New R6 Pullbox <br />$ 800.00 S <br />EA <br />S 800.00 $ <br />$ <br />$ <br />S <br />S <br />19 Adjust Survey Movurrent to Finished Gadc <br />21 Fumish and Insall Cast -in Place ADA Truncated Dome Panel <br />EA <br />EA <br />S 700.00 S <br />3 <br />$ <br />4 <br />S <br />3,200.00 <br />22 Famish and Install Traffic Loops Type E <br />9 <br />EA <br />$ 250.00 $ <br />2,250.00 <br />9 <br />S 2,250.00 <br />2,400.00 <br />S <br />S <br />23 Famish and Install Traffic Loops Type D <br />22 <br />EA <br />$ 250.00 $ <br />5,500.00 <br />22 <br />S 5,500.00 <br />S <br />S <br />2 <br />24 Temporary Construction Sign <br />5 <br />EA <br />$ 900.00 S <br />4,500.00 <br />2 <br />S 1,800.00 <br />3 <br />$ <br />2700.00 <br />25 Signing and Striping <br />0.5 <br />LS <br />S 38,500.00 $ <br />19,250.00 <br />0.25 <br />$ 9,625.00 <br />0.25 <br />$ <br />9,625.00 <br />26 Traffic Control and Tragic Control Plan <br />0.5 <br />LS <br />$ 51,940.00 $ <br />25,970.00 <br />0.25 <br />$ 12,985.00 <br />0.25 <br />S <br />12,985.00 <br />27 Pro'ect Advertising Sign <br />2 <br />EA <br />S 1200.00 S <br />2,400.00 <br />1 <br />$ 1,200.00 <br />1 <br />$ <br />1,200.00 <br />28 us utton <br />7 <br />EA <br />$ 600.00 S <br />1,800.00 <br />3 <br />S 1,800.00 <br />0.5 <br />$ <br />$ 51,940.00 S <br />ons roc ion contract <br />0.25 <br />S <br />12,985.00 <br />0.25 <br />S <br />12 985.00 <br />27 Pro, AdvertisingSign <br />S <br />126 738.50 <br />Contingency(Mo) <br />1,200.00 <br />1 <br />S <br />600.00 <br />1 <br />S 53,093.00 <br />600.00 <br />S <br />12,674.00 <br />Construction Engineering (15%) <br />S 600.00 $ <br />S <br />$ 79,639.00 <br />$ <br />S <br />19,011.00 <br />Design Eman" <br />$ <br />741,335.60 <br />S <br />S <br />S <br />12,674.00 <br />SUB=TOTAL <br />$ 663,657.90 <br />43,320.00 <br />$ <br />171,097.50 <br />Project No. 18-6902: Westminster Ave from Clinton St to Fairview St <br />Construction Contract <br />Construction Contract City of Sana Ana <br />City of Garden Grove <br />Construction Contact <br />S 1,399,000.00 S 964,130.30 <br />City <br />of Santa Ana <br />City ofGatden Grove <br />It.. Description <br />Quantity Unit <br />Unit Price <br />AmouN <br />Quantity <br />$ <br />Amount <br />Quantity <br />S 1,205,163.30 <br />Amount <br />1 Unclassified Excavation <br />1,029 <br />CY <br />$ 60.00 $ <br />61,740.00 <br />790 <br />S <br />47,400.00 <br />239 <br />S <br />14,340.00 <br />2 AC Pavement (Asphalt Concrete) <br />2,555 <br />TN <br />5 70.00 $ <br />178,850.00 <br />1,615 <br />S <br />113,050.00 <br />940 <br />S <br />65,800A0 <br />3 Asphalt Rubber Hot Mix (ARHM) <br />2,540 <br />TN <br />S 79.00 $ <br />200,660.00 <br />1,260 <br />S <br />99,540.00 <br />1,280 <br />S <br />101.120.00 <br />4 Cold Mill (T-3") <br />187,215 <br />SF <br />S 0.24 $ <br />44,931.60 <br />86,085 <br />$ <br />20,660.40 <br />101,130 <br />S <br />24,271.20 <br />5 Cmshed Miscellaneous Base (CMB) <br />10 <br />TN <br />$ 100.00 $ <br />1,000.00 <br />5 <br />$ <br />500.00 <br />5 <br />S <br />500.00 <br />6 PCC Sidewalk (T=4") <br />3,000 <br />SF <br />S 5.50 S <br />16,500.00 <br />1,600 <br />$ <br />8,800.00 <br />1,400 <br />$ <br />7,700.00 <br />7 PCC DrivewayApproach (T=8') <br />482 <br />SF <br />$ 12.00 $ <br />5,784.00 <br />482 <br />$ <br />5,784.00 <br />$ <br />8 PCC Curb Ramp <br />2,575 <br />SF <br />S 10.00 $ <br />25,750.00 <br />2,000 <br />$ <br />20,000.00 <br />575 <br />S <br />5,750.00 <br />9 Concrete Bus Pad <br />1,100 <br />SF <br />$ 12.00 $ <br />13,200.00 <br />1,100 <br />$ <br />13,200.00 <br />$ <br />10 PCC Cub and Gutter (Type A-2-8) <br />585 <br />LF <br />$ 30.00 $ <br />17,550.00 <br />285 <br />$ <br />8,550.00 <br />300 <br />S <br />9.000.00 <br />11 PCC Curb (Type B-1) <br />300 <br />LF <br />$ 16.00 S <br />4,800.00 <br />195 <br />$ <br />3,120.00 <br />105 <br />S <br />1,680.00 <br />12 PCC Cross-Guner(Arterial Street) <br />2,800 <br />SF <br />$ 12.00 S <br />33600.00 <br />1,845 <br />S <br />22,140.00 <br />955 <br />$ <br />11,460.00 <br />13 PCC Grinding <br />60 <br />LF <br />$ 25.00 S <br />1,500.00 <br />60 <br />$ <br />1,500.00 <br />$ <br />14 PCC Pattern Smmed Concrete <br />300 <br />SF <br />$ 20.00 $ <br />6,000.00 <br />195 <br />$ <br />3,900.00 <br />105 <br />S <br />2,100.00 <br />15 Root Shave <br />4 <br />EA <br />S 500.00 $ <br />2,000.00 <br />4 <br />$ <br />2,000.00 <br />S <br />16 Adjust Water Valve Frame and Cover to Finished Gmde <br />39 <br />EA <br />S 850.00 S <br />33,150.00 <br />15 <br />$ <br />12,750.00 <br />24 <br />$ <br />20400.00 <br />17 Adjust Sewer and Dmins a Manhole to Finished Grade <br />31 <br />EA <br />$ 800.00 $ <br />24,800.00 <br />20 <br />S <br />16,000.00 <br />11 <br />S <br />8,800.00 <br />18 Adjust Water Meter Fame and Cover to Finished Grade <br />4 <br />EA <br />$ 800.00 S <br />3,200.00 <br />$ <br />4 <br />S <br />3,200.00 <br />19 Adjust Survey Movurrent to Finished Gadc <br />4 <br />EA <br />$ 800.00 S <br />3,200.00 <br />3 <br />4 <br />S <br />3,200.00 <br />20Fumishandlnstall NewOPullbox <br />6 <br />EA <br />$ 800.00 S <br />4,800.00 <br />3 <br />S <br />2,400.00 <br />3 <br />S <br />2,400.00 <br />21 Furnish and Insall Cast -in Pace ADA Truncated Dome Panel <br />2 <br />EA <br />$ 700.00 S <br />11400.00 <br />S <br />2 <br />$ <br />1,400.00 <br />22 Punish and Install Tattic Loops Type E <br />7 <br />EA <br />S 250.00 S <br />1,750.00 <br />7 <br />$ <br />1,750.00 <br />S <br />23 Furnish and Insall Traffic Loops Type D <br />17 <br />EA <br />$ 250.00 $ <br />4,250.00 <br />17 <br />$ <br />4,250.00 <br />S <br />24 Temporary Construction Si <br />5 <br />EA <br />S 900.00 $ <br />4,500.00 <br />3 <br />$ <br />2,700.00 <br />2 <br />S <br />1 800.00 <br />25 Signing and Striping0.5 <br />LS <br />$ 78,500.00 $ <br />19,250.00 <br />0.25 <br />$ <br />9,625.00 <br />015 <br />S <br />9,625.00 <br />26 Traffic Control and Traffic Control Plan <br />0.5 <br />LS <br />$ 51,940.00 S <br />25,970.00 <br />0.25 <br />S <br />12,985.00 <br />0.25 <br />S <br />12 985.00 <br />27 Pro, AdvertisingSign <br />1 <br />EA <br />$ 1200.00 S <br />1,200.00 <br />1 <br />S <br />600.00 <br />1 <br />$ <br />600.00 <br />28 Push Button <br />EA <br />S 600.00 $ <br />S <br />$ <br />Construction Contact <br />$ <br />741,335.60 <br />S <br />433204.40 <br />S <br />706,!31.20 <br />Contingency (10%) <br />$ <br />43,320.00 <br />S <br />30,813.00 <br />CDoe nstmcto <br />64,981.00 <br />46,219.00 <br />sign EngvE%) <br />$ <br />S <br />30,813.00 <br />SUB -TOTAL <br />S <br />541,505.40 <br />S <br />415,976.20 <br />TOTAL <br />20A-16 <br />Construction Contract City of Sana Ana <br />City of Garden Grove <br />Construction Contact <br />S 1,399,000.00 S 964,130.30 <br />S 434,869.70 <br />Contingency (10%) <br />$ 96,413.00 <br />S 43,487.00 <br />Construction Engineering (15%) <br />S 144,620.00 <br />S 65,230.00 <br />Design Engmeering(10%) <br />$ <br />S 43,487.00 <br />TOTAL <br />S 1,205,163.30 <br />5 587,073.70 <br />20A-16 <br />