My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA WESTMINISTER IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
05/01/2018
>
20A - AA WESTMINISTER IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2018 6:45:36 PM
Creation date
4/26/2018 6:39:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
5/1/2018
Destruction Year
2023
Document Relationships
EBS GENERAL ENGINEERING, INC. (6)
(Amended By)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA EXHIBIT 3 <br />PROPOSAL <br />PROJECT NO. 15-6825 <br />WESTMINSTER AVE. FROM HARBOR BLVD, TO CLINTON ST. <br />PROJECT 18-6902 <br />WESTMINSTER AVE. FROM CLINTON ST TO FAIRVIEW ST. <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: EBS General Eneineerine. Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Unclassified Excavation <br />2,200 <br />CY <br />$ <br />$ <br />3awn <br />2 <br />AC Pavement (Asphalt Concrete) <br />5,300 <br />IN <br />$ <br />$ <br />D <br />3 <br />Asphalt Rubber Hot Mix (ARHM) <br />5,100 <br />TN <br />$ <br />$ <br />i <br />4 <br />Cold Milling (T-3") <br />354,000 <br />SF <br />$ <br />$ <br />aV <br />5 <br />Crushed Miscellaneous Base(CMB)* <br />50 <br />TN <br />$ <br />$ <br />�� � <br />5. <br />6 <br />PCC Sidewalk(T=4")* <br />5,000 <br />SF <br />$ <br />$ <br />S, <br />S <br />7 <br />PCC Driveway Approach (T=8")* <br />600 <br />SF <br />$ <br />$ <br />d i <br />8 <br />PCC Curb Ramp* <br />5,000 <br />SF <br />$ <br />$ <br />C7' <br />(� <br />9 <br />Concrete Bus Pad <br />1,100 <br />SF <br />$ <br />$ <br />10 <br />PCC Curb and Gutter (Type A-2-8)* <br />1,000 <br />LF <br />$ <br />$ <br />.0- <br />0 <br />11 <br />PCC Curb (Type B-1)* <br />300 <br />LF <br />$ <br />$ <br />J <br />12 <br />PCC Cross -Gutter (Arterial Street)* <br />3,000 <br />SF <br />$ <br />$ <br />13 <br />PCC Grinding <br />100 <br />LF <br />$ <br />$ <br />S� <br />P-1 of P-17 <br />20A-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.