My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA WESTMINISTER IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
05/01/2018
>
20A - AA WESTMINISTER IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2018 6:45:36 PM
Creation date
4/26/2018 6:39:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
5/1/2018
Destruction Year
2023
Document Relationships
EBS GENERAL ENGINEERING, INC. (6)
(Amended By)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 15-6825 <br />WESTMINSTER AVE. FROM HARBOR BLVD. TO CLINTON ST, <br />PROJECT 18-6902 <br />WESTMINSTER AVE. FROM CLINTON ST TO FAIRVIEW ST. <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />14 <br />PCC Pattern Stamped Concrete <br />300 <br />SF <br />$ <br />$ <br />C7� <br />000 <br />IS <br />RoctShave <br />5 <br />EA <br />$ <br />$ <br />oD ` <br />SGCJ -� <br />16 <br />Adjust Water Valve Frame and Cover to <br />69 <br />EA$ <br />$p <br />Finished Grade <br />5 b — <br />17 <br />Adjust Sewer and Drainage Manhole to <br />42 <br />EA <br />O <br />$ 0 <br />D <br />$ <br />Finished Grade <br />�7 <br />0 — <br />18 <br />Adjust Water Meter Frame and Cover to <br />4 <br />EA <br />$ <br />$ <br />Finished Grade <br />�� <br />19 <br />Adjust Survey Monument to Finished <br />4 <br />EA <br />$ <br />$ <br />Grade <br />-0O — <br />'3'0o- <br />0 <br />20 <br />20 <br />Furnish and install New #6 Pullbox <br />6 <br />EA <br />$ <br />$ <br />0D� <br />21 <br />Furnish and Install Cast -in Place ADA <br />2 <br />EA <br />$ <br />$ <br />Truncated Dome Panel <br />y — <br />J <br />22 <br />Furnish and Install Traffic Loops Type <br />16 <br />EA <br />$ <br />$ <br />B <br />2f) — <br />23 <br />Fumish and Install Traffic Loops Type <br />39 <br />EA <br />$ <br />$ <br />D <br />Yb <br />24 <br />Temporary Construction Signs <br />10 <br />EA <br />$ <br />$ <br />'70o-- <br />a, — <br />25 <br />Signing and Striping <br />I <br />LS <br />$ <br />$ <br />26 <br />Traffic Control and Traffic Control Plan <br />1 <br />LS <br />$�i 9 J� <br />$ <br />�C <br />27 <br />Project Advertising Sign <br />3 <br />EA <br />$ <br />$ <br />347w- <br />28 <br />Push Button <br />3 <br />EA <br />$ <br />$ <br />y, <br />Y s <br />O <br />P-2 ofP-17 <br />20A-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.