My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11A - 2ND READ CANNABIS CULTIVATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
05/01/2018
>
11A - 2ND READ CANNABIS CULTIVATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2018 7:52:54 PM
Creation date
4/26/2018 7:52:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
11A
Date
5/1/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
applicant on the RSP Eligibility List may then choose to file an application for a RSP in <br />Phase 2. <br />C. The requirements for Phase 1 include but are not limited to: <br />All application documents required in the City's Phase 1 <br />Registration Application package. <br />ii. Application was submitted during the application period. <br />iii. Application forms are filled out completely. <br />iv. Business Owner(s)/Applicant(s) referenced on the application <br />provides. a Live Scan that was conducted within 14 days prior to <br />submitting the application. <br />V. Phase 1 application fee is paid. <br />vi. A signed statement that the proposed location of the commercial <br />cannabis business on the application meets the zoning criteria <br />established in this article including, but not limited to, any and all <br />sensitive use separation criteria required by this article. <br />vii. Proof of site control for commercial cannabis retail businesses <br />submitting Phase 1 applications on or after July 1, 2018. <br />d. The Director of Planning and Building or his or her designee(s) shall <br />determine whether each application demonstrates compliance with the minimum <br />requirements (above) and be placed on the RSP Eligibility List and entered into the <br />Phase 2 application and review process. <br />e. The Director of Planning and Building or his or her designee(s) shall review <br />each application upon submission and ensure that the application is complete. <br />Incomplete applications will be promptly rejected and the applicant shall be notified in <br />writing of the deficiencies. The applicant shall be given an opportunity to cure any <br />incomplete or deficient application prior to the conclusion of the application processing <br />term, if such time period is applicable. <br />3. Phase 2 - Regulatory Safety Permit Application <br />a. Each applicant identified on the RSP Eligibility List may choose to <br />complete and file a RSP application to the Director of Planning and Building. The <br />application shall be filed together with a nonrefundable fee as established by resolution <br />of the City Council, to defray the cost of investigation required by this article. <br />Ordinance No. NS -2944 <br />Page 23 of 35 <br />11 A-25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.