My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11A - 2ND READ CANNABIS CULTIVATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
05/01/2018
>
11A - 2ND READ CANNABIS CULTIVATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2018 7:52:54 PM
Creation date
4/26/2018 7:52:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
11A
Date
5/1/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. The RSP application period shall be open for thirty (30) calendar days and <br />may run concurrently with the Phase 1 review period. Following the RSP application <br />period, the Director of Planning and Building or designee(s) shall stop accepting <br />applications and review all applications received in Phase 2. <br />C. The Director of Planning and Building or designee(s) will review all <br />application documents required in the City's Phase 2 application package plus the <br />additional requirements in subsection (d) below. The Director of Planning and Building <br />or his or her designee(s) will use a merit based point system to review and rank each of <br />applications from the most to the least points and objectively award the top applicants a <br />RSP. A complete description of the merit based point system and all merit based point <br />considerations shall be included with the application forms. <br />d. Phase 2 requirements include but are not limited to: <br />All application documents required in the City's Phase 2 RSP <br />application package. <br />ii. Phase 2 application fee is paid and a comprehensive owner <br />background check is completed. <br />iii. The Building Official or designee has inspected all structures in <br />which the use is located to determine that all applicable standards <br />and requirements are met. If a building permit is required for site <br />improvements, Permit issuance will be deferred until a certificate of <br />occupancy or other building permit approval is issued. Additionally, <br />the Building Official has determined that there are no notices of <br />nuisance or other code compliance issues recorded or on the <br />property. <br />iv. The Planning Manager or designee has issued zoning clearance <br />documenting compliance with the following: . <br />1. The use is permitted; <br />2. All land use permits, if any, have been approved and all <br />conditions of approval have been met or are in good <br />standing; and, <br />3. No zoning violations exist on the property. <br />e. The Director of Planning and Building or his or her designee(s) shall <br />review each application upon submission and ensure that the application is complete. <br />Incomplete applications will be promptly rejected and the applicant shall be notified that <br />business day of the deficiencies. The applicant shall be given an opportunity to cure any <br />incomplete or deficient application prior to the conclusion of the application processing <br />term, if such time period is applicable. <br />Ordinance No. NS -2944 <br />Page 24 of 35 <br />11 A-26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.