Laserfiche WebLink
WH <br />FD <br />FD <br />UP UP <br />UP <br />UP <br />UP <br />EXISTING PLANNING & BUILDING TABULATIONS <br />SCOPE OF WORK <br />CONVERSION OF EXISTING STORAGE ROOM TO YOUTH ASSEMBLY ROOM (1,445 SF TOTAL AREA) - AS APPROVED UNDER CONDITIONAL USE PERMIT NO. 2022-13: <br />• CONSTRUCTION OF (1) INTERIOR PARTITION & (1) DOOR <br />• MODIFICATION OF EXISTING MECHANICAL & LIGHTING SYSTEMS <br />PROJECT DIRECTORY <br />TENANT/CLIENT: <br />COMPASS BIBLE CHURCH <br />CONTACT: BOB DUMONT <br />2909 DAIMLER STREET <br />SANTA ANA, CA 92705 <br />TEL: (714) 290 - 2593 <br />EMAIL: BOB@COMPASSCHURCH.ORG <br />OWNER: <br />DAIMLER COMMERCE PARTNERS, LP <br />2 TASMAN SEA <br />NEWPORT COAST, CA 92657 <br />EMAIL: FHUANG39@GMAIL.COM <br />ARCHITECT/ APPLICANT: <br />ELEMENTS ARCHITECTURE, INC. <br />6B LIBERTY, SUITE 100 <br />ALISO VIEJO, CA 92656 <br />CONTACT: SHELLEY MACDONALD <br />TEL: (714) 917-7244 <br />EMAIL: STHOMPSON@ELEMENTSARCH.COM <br />PROJECT:COMPASS BIBLE CHURCH - YOUTH ROOM <br />PROJECT ADDRESS:2909 DAIMLER STREET <br />SANTA ANA, CA 92705 <br />LEGAL DESCRIPTION:THE LAND REFERRED TO HEREIN BELOW IS <br />SITUATED IN THE COUNTY OF ORANGE, STATE OF <br />CALIFORNIA, & IS DESCRIBED AS FOLLOWS: <br />PARCEL 2, IN THE CITY OF SANTA ANA, COUNTY OF <br />ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP FILED <br />IN BOOK 30 PAGE 19 OF PARCEL MAPS, IN THE OFFICE OF <br />THE COUNTY RECORDER OF ORANGE COUNTY, CALIFORNIA. <br />EXCEPTIN THEREFROM, ONE-HALF OF ALL OIL, GAS, <br />MINERALS, HYDROCARBONS & ASSOCIATED SUBSTANCES <br />LYING BELOW A DEPTH OF 500 FT. FROM THE SURFACE <br />OF SAID LAND, W/O THE RIGHT OF SURFACE OR <br />SUBSURFACE ENTRY ABOVE A DEPTH OF 500 FT. FROM <br />THE SURFACE OF SAID LAND, AS RESERVED IN DEED <br />RECORDED AUGUST 9, 1968 IN BOOK 8685 PAGE 900 <br />OF OFFICIAL RECORDS OF ORANGE COUNTY. <br />ACCESSORS PARCEL NO.:430-191 -08 <br />FLOOR AREA RATIO:0.39 <br />ZONING DESIGNATION:PROFESSIONAL (P) <br />LAND USE DESIGNATION:PROFESSIONAL & ADMINISTRATIVE OFFICE (PAO) <br />LOT NUMBER(S):LOT 116 <br />LOT AREA:122,099 SF = 2.803 AC. (NO PROPOSED CHANGE) <br />NUMBER OF STORIES:TWO <br />CONSTRUCTION TYPE:TYPE III-B <br />OCCUPANCY CLASSIFICATION:ASSEMBLY (A-3), BUSINESS (B), STORAGE (S-2) <br />*C.B.C. SEC. 508.3 NON-SEPARATED OCCUPANCIES <br />ALLOWABLE ACTUAL <br />BUILDING AREA:28,500 SF 23,538 SF <br />BUILDING HEIGHT:75 FT.+/-22 FT. <br />NO. OF STORIES:THREE TWO <br />ZONING: <br />REQUIRED PROVIDED <br />MAX. STRUCTURE HEIGHT:+35 FT.+/-22 FT. <br />SETBACKS: <br />FRONT: 15 FT.54.28 FT. <br />SIDE (STREET ABUTMENT): 15 FT.N/A <br />SIDE (INT. SIDE PROP. LINES): 5 FT.35.00 FT. <br />REAR (*): 50 FT.N/A <br />REAR: 10 FT.44.61 FT. <br />(*) MAINTAIN SETBACK IF LOT ABUTTING ON REAR PROPERTY LINE IS A PARCEL USED OR ZONED FOR <br />RESIDENTIAL PURPOSES. <br />CONSTRUCTION TYPE:III-B, FULLY SPRINKLERED (NFPA 13) <br />OCCUPANCY CLASSIFICATION:A3, B, S2 (NON-SEPARATED PER CBC 508.3) <br />EXISTING BUILDING AREAS: <br /> OVERALL BUILDING <br />GROUND FLOOR <br />ADJACENT TENANTS (B OCCUPANCY) = 23,888 SF <br />COMPASS BIBLE CHURCH (A-3 OCCUPANCY) = 19,850 SF <br />TOTAL 43,738 SF <br />SECOND FLOOR <br />COMPASS BIBLE CHURCH (A-3 OCCUPANCY) = 3,688 SF <br />TOTAL 3,688 SF <br />TOTAL 47,426 SF <br /> TENANT AREA <br />GROUND FLOOR <br />COMPASS BIBLE CHURCH (A-3 OCCUPANCY) = 19,850 SF <br />SECOND FLOOR <br />COMPASS BIBLE CHURCH (A-3 OCCUPANCY) = 3,688 SF <br />TOTAL 23,538 SF <br />HEIGHT (PER CBC TABLE 504.3): ALLOWABLE ACTUAL <br />60' *22'-0 (EXISTING) <br />*USE A OCCUPANCY; MOST RESTRICTIVE <br />STORIES (PER CBC TABLE 504.4): ALLOWABLE ACTUAL <br />2*2 (EXISTING) <br />*USE A-3 OCCUPANCY; MOST RESTRICTIVE <br />ALLOWABLE AREA (PER CBC TABLE 506.2): ALLOWABLE ACTUAL <br />24,000 SF**19,850 SF (GROUND) <br />3,688 SF (SECOND) <br />48,000 SF **23,538 SF (TOTAL) <br />**Aa = (At + (NS X If) X Sa <br />= (18,000 + (6, 000 X 1 ) X 2 <br />= 48,000 (24,000 PER FLOOR) <br />VICINITY MAPKEY SITE PLAN <br />PLANNING <br />BUILDING <br />ELECTRICAL & MECHANICAL ENGINEER: <br />MEP ENERGY SOLUTIONS GROUP, INC. <br />79705 STAR FLOWER TRAIL <br />LA QUINTA, CA 92253 <br />CONTACT: BENNETT HEALY <br />TEL: (562) 439 - 2935 <br />EMAIL: BHEALY@MEPESG.COM <br />ABBREVIATIONS: <br />GENERAL NOTES <br />1. THE ARCHITECT WILL BE THE INTERPRETER OF THE REQUIREMENTS OF THE CONSTRUCTION <br />DOCUMENTS & THE JUDGE OF THE PERFORMANCE THERE UNDER BY BOTH THE OWNER & THE <br />CONTRACTOR. <br />2. ALL CONSTRUCTION & MATERIALS SHALL BE AS SPECIFIED & AS REQUIRED BY THE CURRENT <br />EDITION OF THE C.B.C., & LOCAL CODES & AUTHORITIES. <br />3. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS & SITE CONDITIONS BEFORE STARTING WORK. <br />SHOULD A DISCREPANCY APPEAR IN THE SPECIFICATIONS OR DRAWINGS OR IN THE WORK DONE BY <br />OTHERS FROM THE CONSTRUCTION DOCUMENTS THAT AFFECT ANY WORK, NOTIFY THE ARCHITECT <br />AT ONCE FOR INSTRUCTION ON HOW TO PROCEED. IF THE CONTRACTOR PROCEEDS WITH THE <br />WORK KNOWING OF AN ERROR, INCONSISTENCY, OR OMISSION IN THE CONTRACT DOCUMENTS <br />WITHOUT WRITTEN INSTRUCTIONS FROM THE ARCHITECT, THE CONTRACTOR SHALL MAKE GOOD <br />ANY RESULTING DAMAGE OR DEFECT TO THE SATISFACTION OF THE ARCHITECT. <br />4. SHOULD A CONFLICT OCCUR IN OR BETWEEN DRAWINGS & SPECIFICATIONS, THE SPECIFICATIONS <br />SHOULD TAKE PRECEDENCE, UNLESS A WRITTEN DECISION FROM THE ARCHITECT HAS BEEN <br />OBTAINED WHICH DESCRIBES A CLARIFICATION OR ALTERNATE METHOD &/OR MATERIALS. <br />5. THE CONTRACTOR SHALL CONFINE THEIR OPERATIONS ON THE SITE TO AREAS PERMITTED BY THE <br />OWNER. THE WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE LAWS, LOCAL ORDINANCES, <br />PERMITS & THE CONTRACT DOCUMENTS. <br />6. THE JOB SITE SHALL BE MAINTAINED IN A CLEAN, ORDERLY CONDITION FREE OF DEBRIS & LITTER, & <br />SHALL NOT BE UNREASONABLY ENCUMBERED WITH ANY MATERIALS OR EQUIPMENT. EACH SUB- <br />CONTRACTOR IMMEDIATELY UPON COMPLETION OF EACH PHASE OF HIS WORK SHALL REMOVE ALL <br />TRASH & DEBRIS AS A RESULT OF HIS OPERATIONS. <br />7. ALL MATERIALS STORED ON THE SITE SHALL BE PROPERLY STACKED & PROTECTED TO PREVENT <br />DAMAGE & DETERIORATION UNTIL USE. FAILURE TO PROTECT MATERIALS MAY BE CAUSE <br />REJECTION OF WORK. <br />8. THE CONTRACTOR SHALL DO ALL CUTTING, FITTING, OR PATCHING OF THEIR WORK THAT MAY BE <br />REQUIRED TO MAKE ITS SEVERAL PARTS FIT TOGETHER PROPERLY & SHALL NOT ENDANGER ANY <br />WORK BY CUTTING, EXCAVATING, OR OTHERWISE ALTERING THE WORK OR ANY PART OF IT. ALL <br />PATCHING, REPAIRING & REPLACING OF MATERIALS & SURFACES, CUT OR DAMAGED IN EXECUTION <br />OF WORK SHALL BE DONE WITH APPLICABLE MATERIALS SO THAT SURFACES REPLACED WILL, UPON <br />COMPLETION MATCH SURROUNDING SIMILAR SURFACES. <br />9. NO PORTION OF THE WORK REQUIRING A SHOP DRAWING OR SAMPLE SUBMISSION SHALL BE <br />COMMENCED UNTIL THE SUBMISSION HAS BEEN APPROVED BY THE ARCHITECT. ALL SUCH <br />PORTIONS OF THE WORK SHALL BE IN ACCORDANCE WITH APPROVED SHOP DRAWINGS & SAMPLES. <br />10. DIMENSIONS: <br />A. ALL DIMENSIONS SHALL HAVE PRECEDENCE OVER SCALE. <br />B. ALL DIMENSIONS TO WOOD STUDS ARE TO FACE OF FRAMING, U.O.N. <br />C. ALL DIMENSIONS TO METAL STUDS ARE TO CENTER OF FRAMING, U.O.N. <br />D. CEILING HEIGHT DIMENSIONS ARE FROM THE FINISH FLOOR SLAB TO THE FACE OF CEILING <br />FINISH MATERIAL UNLESS OTHERWISE NOTED. <br />11. SAMPLES OF ALL COLORS & MATERIALS SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW & <br />APPROVAL PRIOR TO ORDERING OF PRODUCTS OR COMMENCING RELATED WORK. <br />12. SUBSTITUTIONS OF MATERIALS HAVING LIKE QUALITY TO THOSE SPECIFIED OR NOTED WILL BE <br />CONSIDERED BY THE ARCHITECT. WHERE DESIGN OR DETAIL MODIFICATIONS ARE REQUIRED TO <br />INCORPORATE THESE SUBSTITUTIONS, THE CONTRACTOR SHALL PROVIDE ALL DRAWINGS & DATA <br />TO THE ARCHITECT FOR APPROVAL AS REQUESTED TO VERIFY THE QUALITY & CHARACTER OF THE <br />PRODUCTS & SHOWING THEIR CORRECT INCORPORATION INTO THE PROJECT. THE CONTRACTOR <br />SHALL NOT MAKE CHANGES WITHOUT THE PRIOR WRITTEN APPROVAL OF THE ARCHITECT. <br />13. IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY TO ENSURE ALL SUB-CONTRACTORS HAVE <br />ACCESS TO ALL OF THE VARIOUS DISCIPLINE DRAWINGS TO ACCOMPLISH THE WORK SPECIFIED IN <br />THE CONTRACT DOCUMENTS. <br />14. AT LEAST 50% OF CONSTRUCTION WASTE MATERIALS ARE TO BE RECYCLED. <br />15. PROVIDE ALL NECESSARY BLOCKING, BACKING & FRAMING FOR LIGHT FIXTURES, ELECTRIC UNITS, <br />A/C EQUIPMENT & ALL OTHER ITEMS AS REQUIRED. <br />16. PROVIDE ALL ACCESS PANELS AS REQUIRED BY GOVERNING CODE TO ALL CONCEALED SPACES, <br />VOIDS, ATTICS, ETC. VERIFY TYPE REQUIRED WITH ARCHITECT PRIOR TO INSTALLATION. <br />17. WHERE LARGER STUDS OR FURRING IS REQUIRED TO COVER PIPING & CONDUITS, THE LARGER <br />STUD SIZE OR FURRING SHALL EXTEND THE FULL LENGTH OF THE WALL WIDTH & LENGTH WHERE <br />THE FURRING OCCURS. <br />18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FEES & FOR OBTAINING THE PERMITS FOR THE <br />MECHANICAL, ELECTRICAL & PLUMBING SYSTEMS. THESE SYSTEMS SHALL MEET THE <br />REQUIREMENTS OF ALL LOCAL CODES & ORDINANCES, & THE REQUIREMENTS OF ALL CURRENT <br />STATE & FEDERAL CODES. <br />19. THE CONTRACTOR SHALL PAY FOR THE MAIN ARCHITECTURAL BUILDING PERMIT. THE CONTRACTOR <br />WILL BE REIMBURSED BY THE OWNER FOR THE COST OF THIS PERMIT. ALL OTHER PERMIT FEES <br />SHALL BE PAID BY THE GENERAL CONTRACTOR. <br />20. THE PROJECT CONTRACTOR SHALL PROVIDE ALL MEASURES NECESSARY TO MAINTAIN BUILDING <br />SAFEGUARDS, EXITS & FIRE PROTECTION DEVICES. PROTECT ADJACENT PROPERTIES, WORKERS, <br />PEDESTRIANS & OTHER PERSONS DURING EXCAVATION & CONSTRUCTION OPERATIONS. <br />21. THE DISCHARGE OF POLLUTANTS TO ANY STORM DRAINAGE SYSTEM IS PROHIBITED. NO SOLID <br />WASTE, PETROLEUM BYPRODUCTS, SOIL PARTICULATE, CONSTRUCTION WASTE MATERIALS OR <br />WASTEWATER GENERATED ON CONSTRUCTION SITES OR BY CONSTRUCTION ACTIVITIES SHALL BE <br />PLACED, CONVEYED OR DISCHARGED INTO THE STREET, GUTTER OR STORM DRAIN SYSTEM. <br />SYMBOLS LEGEND <br />DETAIL IDENTIFICATION <br />BUILDING DETAIL: <br />SHEET WHERE DETAIL LOCATED <br />BUILDING SECTION: <br />SECTION IDENTIFICATION <br />SHEET WHERE SECTION LOCATED <br />GRID LINE HEAD <br />DOOR REFERENCE <br />KEYNOTE REFERENCE <br />REVISION <br />? <br />0 <br />1 <br />A101 <br />SIM <br />1ROOM NUMBER Room name <br />101 <br />AA-0 FINISH REFERENCE <br />WALL TYPE REFERENCE <br />DETAIL REFERENCE: <br />DETAIL IDENTIFICATION <br />SHEET WHERE DETAIL LOCATED <br />1 <br />A101 <br />? <br />? <br />1 A101 <br /># POUND OR NUMBER <br />@ AT <br />℄ CENTERLINE <br />∠ ANGLE <br />⌀ DIAMETER <br /> --------------------------------------------- <br />A.B. ANCHOR BOLTS <br />A.D. AREA DRAIN <br />A/C AIR-CONDITIONING <br />A.C. ASPHALTIC CONCRETE <br />A.C.T. ACOUSTIC CEILING TILE <br />ACCESS. ACCESSIBLE <br />ACOUS. ACOUSTICAL <br />ADJ. ADJUSTABLE <br />AGGR. AGGREGATE <br />ALUM. ALUMINUM <br />ALT. ALTERNATE <br />ANOD. ANODIZED <br />APPROX. APPROXIMATE <br />ARCH. ARCHITECTURAL <br />ASPH. ASPHALT <br />ASS. ASBESTOS <br />ASSY. ASSEMBLY <br /> --------------------------------------------- <br />B.BASE <br />B.N.BOUNDARY NAILING <br />B.O.BOTTOM OF <br />B.U.BUILT-UP <br />BD.BOARD <br />BETW.BETWEEN <br />BEV.BEVEL <br />BITUM.BITUMINOUS <br />BLDG.BUILDING <br />BLK.BLOCK <br />BLKG.BLOCKING <br />BM.BEAM <br />BOT.BOTTOM <br />BRG.BEARING <br />BSMT.BASEMENT <br /> --------------------------------------------- <br />C.B. CATCH BASIN <br />C.F. CUBIC FOOT <br />C.G. CORNER GUARD <br />C.I.P. CAST-IN-PLACE <br />C.J. CONSTRUCTION JOINT <br />C.I. CAST IRON <br />C.M.U. CONCRETE MASONRY UNIT <br />C.O. CASED OPENING <br />C.Y. CUBIC YARD <br />CAB. CABINET <br />CEM. CEMENT <br />CER. CERAMIC <br />CHAM. CHAMFER(ED) <br />CLG. CEILING <br />CLKG. CAULKING <br />CLO. CLOSET <br />CLR. CLEAR <br />CNTR. COUNTER <br />CO. CLEANOUT <br />COL. COLUMN <br />CONC. CONCRETE <br />CONN. CONNECTION <br />CONSTR. CONSTRUCTION <br />CONT. CONTINUOUS <br />CORR. CORRIDOR <br />CPT. CARPET <br />CSMT. CASEMENT <br />CT. CERAMIC TILE <br />CTR. CENTER <br />CTSK. COUNTERSUNK <br /> --------------------------------------------- <br />D.F.DRINKING FOUNTAIN <br />D.H.DOUBLE HUNG <br />D.L.DEAD LOAD <br />D.S.P.DRY STANDPIPE <br />DBL.DOUBLE <br />DEMO.DEMOLITION <br />DEP.DEPRESS(ED) <br />DEPT.DEPARTMENT <br />DIA.DIAMETER <br />DIM.DIMENSION <br />DISP.DISPENSER <br />DIAG.DIAGONAL <br />DN.DOWN <br />DR.DOOR <br />DS.DOWNSPOUT <br />DTL.DETAIL <br />DWG.DRAWING <br />DWR.DRAWER <br /> --------------------------------------------- <br />E.EAST <br />E.B.EXPANSION BOLT <br />E.F.EACH FACE <br />E.J.EXPANSION JOINT <br />E.P.ELECTRICAL PANELBOARD <br />E.W.C.ELECTRICAL WATER COOLER <br />EA.EACH <br />ELAST.ELASTOMERIC <br />ELECT.ELECTRICAL <br />ELEV.ELEVATION <br />EMER.EMERGENCY <br />ENCL.ENCLOSURE <br />EQ.EQUAL <br />EQUIP.EQUIPMENT <br />EQUIV.EQUIVALENT <br />ESMT.EASEMENT <br />(E)EXISTING <br />EXIST.EXISTING <br />EXP.EXPANSION <br />EXPO.EXPOSED <br />EXT.EXTERIOR <br /> --------------------------------------------- <br />F.A.FIRE ALARM <br />F.D.FLOOR DRAIN <br />F.E.FIRE EXTINGUISHER <br />F.E.C.FIRE EXTINGUISHER CABINET <br />F.F.FINISH FLOOR <br />F.H.FIRE HYDRANT <br />F.H.C.FIRE HOSE CABINET <br />F.N.FIELD NAILING <br />F.O.FACE OF <br />F.O.C.FACE OF CONCRETE <br />F.O.F.FACE OF FINISH <br />F.O.M.FACE OF MASONRY <br />F.O.S.FACE OF STUD <br />FAB.FABRICATE(D)(ION) <br />FDN.FOUNDATION <br />(FF)FACTORY FINISH <br /> -------------------------------------------- <br />FGL.FIBERGLASS <br />FIN. OR F.FINISH <br />FLASH.FLASHING <br />FLR.FLOOR <br />FLUOR.FLUORESCENT <br />FPRF.FIREPROOF <br />FT.FOOT OR FEET <br />FTG.FOOTING <br />FURN.FURNITURE <br />FURR.FURRING <br />FUT.FUTURE <br />FXTR.FIXTURE <br /> -------------------------------------------- <br />G.B. GRAB BAR <br />G.C. GENERAL CONTRACTOR <br />G.I. GALVANIZED IRON <br />GA. GAUGE <br />GALV. GALVANIZED <br />GENL. GENERAL <br />GL. GLASS <br />GLB. GLUED LAMINATED BEAM <br />GND. GROUND <br />GR. GRADE <br />GRVL. GRVL. <br />GT. GROUT <br />GUT. GUTTER <br />GYP. GYPSUM <br />GYP.BD. GYPSUM BOARD <br />GYP.PLAS. GYPSUM PLASTER <br /> --------------------------------------------- <br />H.B.HOSE BIBB <br />H.M.HOLLOW METAL <br />H.V.A.C.HEATING/VENTILATING/AIR-CONDITIONING <br />H.C.HOLLOW CORE <br />HDR.HEADER <br />HDWD.HARDWOOD <br />HDWR.HARDWARE <br />HGR.HANGER <br />HGT.HEIGHT <br />HORIZ.HORIZONTAL <br />HP.LAM.HIGH-PRESSURE LAMINATE <br />HR.HOUR <br />HTR.HEATER <br />HYD.HYDRANT <br />HYDR.HYDRAULIC <br /> --------------------------------------------- <br />I.D.INSIDE DIAMETER (DIM.) <br />IN.INCHES <br />INCAN.INCANDESCENT <br />INCL.INCLUDE(D)(ING) <br />INFO.INFORMATION <br />INSP.INSPECT(ING)(ION) <br />INSTL.INSTALL(ATION) <br />INSUL.INSULATION <br />INT.INTERIOR <br /> --------------------------------------------- <br />JAN.JANITOR <br />JST.JOIST <br />JT.JOINT <br />--------------------------------------------- <br />K.D.KILN DRIED <br />KIT.KITCHEN <br /> --------------------------------------------- <br />L.F.LINEAR FOOT <br />L.H.LEFT-HAND <br />L.L.LIVE LOAD <br />L.V.T.LUXURY VINYL TILE <br />LAB.LABORATORY <br />LAM.LAMINATE <br />LAV.LAVATORY <br />LB.POUND <br />LBS.POUNDS <br />LDGR.LEDGER <br />LIN.LINEAR <br />LKR.LOCKER <br />LOC.LOCATION <br />LT.LIGHT <br />LT.WT.LIGHT-WEIGHT <br />LTG.LIGHTING <br /> -------------------------------------------- <br />M.B.MACHINE BOLT <br />M.C.MEDICINE CABINET <br />MAS.MASONRY <br />MATL.MATERIAL <br />MAX.MAXIMUM <br />MECH.MECHANICAL <br />MED.MEDIUM <br />MEMB.MEMBRANE <br />MEZZ.MEZZANINE <br />MFR.MANUFACTURER <br />MH.MANHOLE <br />MIN.MINIMUM <br />MIR.MIRROR <br />MISC.MISCELLANEOUS <br />MLWK.MILLWORK <br />MTD.MOUNTED <br />MTG.MOUNTING <br />MTL.METAL <br />MTR.MORTAR <br />MUL.MULLION <br /> -------------------------------------------- <br />(N)NEW <br />N.NORTH <br />N.A.NOT APPLICABLE <br />N.I.C.NOT IN CONTRACT <br />N.T.S.NOT TO SCALE <br />NO.NUMBER <br />NOM.NOMINAL <br /> -------------------------------------------- <br />O.A.OVERALL <br />O.C.ON CENTER <br />O.D.OUTSIDE DIAMETER <br />O/OVER <br />OBS.OBSCURE <br />OCC.OCCUPANTS <br />OFC.OFFICE <br />OPNG.OPENING <br />OPP.OPPOSITE <br />OVHD.OVERHEAD <br /> --------------------------------------------- <br />P.LAM. PLASTIC LAMINATE <br />P.G. PAINT GRADE <br />P.T. PRESSURE TREATED <br />PAR. PARALLEL <br />PARTN. PARTITION <br />PCF. POUNDS PER CUBIC FOOT <br />PEMB. PRE-ENGINEERED METAL BUILDING <br />PERF. PERFORATE <br />PERP. PERPENDICULAR <br />PLAS. PLASTIC <br />PLUMB. PLUMBING <br />PLF. POUNDS PER LINEAL FOOT <br />PLYWD. PLYWOOD <br />PNL. PANEL <br />PNT. PAINT <br />PR. PAIR <br />PRCST. PRECAST <br />PREFAB. PREFABRICATE(D) <br />PREFIN. PREFINISH(ED) <br />PROP. PROPERTY <br />PSI. POUNDS PER SQUARE INCH <br />PT. POINT <br />PTN. PARTITION <br />PVC. POLYVINYLCHLORIDE <br />PVMT. PAVEMENT <br /> ------------------------------------------- <br />Q.T.QUARRY TILE <br />QTY.QUANTITY <br />QUAL.QUALITY <br /> --------------------------------------------- <br />R.RISER <br />R.D.ROOF DRAIN <br />R.H.RIGHT-HAND <br />R.O.ROUGH OPENING <br />R.W.L.RAIN WATER LEADER <br />RAD.RADIUS <br />RBR.RUBBER <br />REC.RECESSED <br />REF.REFERENCE <br />REFR.REFRIGERATOR <br />REINF.REINFORCE(D) <br />REQ.REQUIRED <br />RESIL.RESILIENT <br />REV.REVISE OR REVISION <br />RFG.ROOFING <br />RGTR.REGISTER <br />RLG.RAILING <br />RM.ROOM <br />RND.ROUND <br /> --------------------------------------------- <br />S. SOUTH <br />S.C. SOLID CORE <br />S.C.W. SOLID CORE WOOD <br />S.S. STAINLESS STEEL <br />S.SK. SERVICE SINK <br />SCHED. SCHEDULE <br />SECT. SECTION <br />SH. SHELF <br />SHR. SHOWER <br />SHT. SHEET <br />SIM. SIMILAR <br />SPEC. SPECIFICATION <br />SQ. SQUARE <br />ST. STAIN <br />STA. STATION <br />STAG. STAGGER(ED) <br />STD. STANDARD <br />STL. STEEL <br />STOR. STORAGE <br />STRUCT. STRUCTURAL <br />SUSP. SUSPENDED <br />SYM. SYMMETRICAL <br />SYS. SYSTEM <br /> --------------------------------------------- <br />T&B TOP & BOTTOM <br />T&G TONGUE & GROOVE <br />T.TEMPERED <br />T.O.TOP OF <br />T.O.C.TOP OF CURB <br />T.O.P.TOP OF PARAPET <br />T.O.PL.TOP OF PLATE <br />T.O.R.TOP OF ROOF <br />T.O.S.TOP OF SLAB <br />T.P.TOP OF PAVEMENT <br />T.S.TUBE STEEL <br />T.V.TELEVISION <br />T.W.TOP OF WALL <br />TEL.TELEPHONE <br />TEMP.TEMPORARY <br />TER.TERRAZZO <br />THK.THICK <br />THRD.THREAD(ED) <br />THRES.THRESHOLD <br />TI.TILE <br />TR.TREAD <br />TYP.TYPICAL <br /> --------------------------------------------- <br />U.O.N.UNLESS OTHERWISE NOTED <br />UNF.UNFINISHED <br />UR.URINAL <br />UTIL.UTILITY <br /> --------------------------------------------- <br />V.VINYL <br />V.C.T.VINYL COMPOSITION TILE <br />V.I.F.VERIFY IN FIELD <br />V.P.VINYL PLANK <br />V.S.VINYL SHEET <br />VERT.VERTICAL <br />VEST.VESTIBULE <br />VNR.VENEER <br /> ------------------------------------------- <br />W/WITH <br />W/O WITHOUT <br />W.WEST <br />W.C.WATER CLOSET <br />W.GL.WIRE GLASS <br />W.I.WROUGHT IRON <br />W.V.WOOD VENEER <br />W.W.F.WELDED WIRE FABRIC <br />WD.WOOD <br />WDW.WINDOW <br />WF.WIDE FLANGE <br />W.P.WATERPROOF(ING) <br />WSCT.WAINSCOT <br />WT.WEIGHT <br />A <br />B <br />C <br />D <br />E <br />F <br />G <br />H <br />I <br />J <br />K <br />L <br />M <br />N <br />O <br />P <br />Q <br />R <br />S <br />T <br />U <br />V <br />W <br />F <br />APPLICABLE CODES & STANDARDS <br />2022 CALIFORNIA BUILDING CODE (CBC), PART 2, CBSC <br />2022 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, CBSC <br />2022 CALIFORNIA MECHANICAL CODE (CMC), PART 4, CBSC <br />2022 CALIFORNIA PLUMBING CODE (CPC), PART 5, CBSC <br />2022 CALIFORNIA ENERGY CODE, PART 6, CBSC <br />2022 CALIFORNIA FIRE CODE (CFC) <br />2022 CALIFORNIA GREEN BUILDING STANDARDS CODE <br />2022 BUILDING ENERGY EFFICIENCY STANDARDS CODE <br />SANTA ANA MUNICIPAL CODE (SAMC) <br />LIST OF FEDERAL CODES & STANDARDS <br />AMERICANS WITH DISABILITIES ACT (ADA), TITLE II OR TITLE III <br />FOR TITLE II: UNIFORM FEDERAL ACCESSIBILITY STANDARDS (UFAS) <br />OR ADA STANDARDS FOR ACCESSIBLE DESIGN (APPENDIX A OF 28 CFR PART 36) <br />FOR TITLE III: ADA STANDARDS FOR ACCESSIBLE DESIGN (APPENDIX A OF 28 CFR PAR 36) <br />DEFERRED SUBMITTALS <br />THIS PROJECT HAS BEEN PERMITTED WITHOUT REVIEW &/OR APPROVAL OF THE FOLLOWING <br />DEFERRED SUBMITTALS. PLANS APPROVED BY THE CITY SHALL BE OBTAINED FOR EACH DEFERRED <br />ITEM LISTED BELOW PRIOR TO COMMENCING ANY WORK W/IN THE SCOPE OF SUCH DEFERRAL. <br />DEFERRALS MUST BE REVIEWED & ACCEPTED BY THE ARCHITECT OR ENGINEER OF RECORD PRIOR TO <br />SUBMITTING FOR REVIEW W/ THE CITY: <br />1. MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM (IF / AS REQUIRED) <br />2. MODIFICATIONS TO EXISTING FIRE SPRINKLER SYSTEM (IF / AS REQUIRED) <br />FULLY "BUILT-OUT" APPROVED PLAN PER CONDITIONAL USE PERMIT NO. 2022-13 <br />EXISTING/CURRENT PLAN, AS PERMITTED & CONSTRUCTED UNDER #101109480 <br />PROPOSED SCOPE OF WORK UNDER THIS PERMIT <br />YOUTH <br />ASSEMBLY <br />ADJACENT TENANT (NOT IN SCOPE) <br />ADJACENT TENANT (NOT IN SCOPE) <br />STORAGE <br />STORAGE <br />E DYER RD. <br />W MACARTHUR BLVD. <br />E D <br />Y <br />E <br />R RD. <br />E WARNER AVE. <br />E DE <br />E <br />R <br /> <br />A <br />V <br />E <br />. <br />DA <br />I <br />M <br />L <br />E <br />R <br /> <br />S <br />T <br />. <br />PROJECT LOCATION <br />2915 <br />2909 <br />23,538 SF <br />2-STORY <br />A-3 OCCUPANCY <br />COMPASS CHURCH <br />11,944 SF <br />1 -STORY <br />B OCCUPANCY <br />WATER TECHNIQUES <br />2917 <br />11,944 SF <br />1 -STORY <br />B OCCUPANCY <br />PRIMEGEN BIOTECH <br />EXISTING 3-HOUR FIRE WALL <br />DAIMLER STREET <br />AL <br />T <br />O <br />N <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />3009 3001 2921 <br />2915-2917 <br />29012909 <br />PCM IRVINE <br />CHEERLEADING <br />WATER TECHNIQUES, <br />PRIMEGEN BIOTECHREGAL <br />TECHNOLOGY <br />PARTNERS <br />NKMAX <br />BIOTECH <br />HGST "A WESTERN <br />DIGITAL CO." <br />NORTH <br />A1.1 <br />1 <br />AREA OF WORK <br />COMPASS <br />BIBLE <br />CHURCH <br />PROJECT <br />NORTH <br />TRUE <br />NORTH <br />(E) STAIR <br />ADJACENT TENANT (NOT IN SCOPE) <br />EXISTING AREA TO REMAIN <br />NEW INTERIOR PARTITION & DOOR <br />EXISTING STORAGE ROOM TO BE <br />CONVERTED TO YOUTH ASSEMBLY <br />YOUTH ASSEMBLYNEW CURTAIN <br />STORAGE <br />M. STEVEN <br />CAMP <br />C-18,407 <br />JUN. 30, 2025 <br />RENEWAL DATESTATEOFCALIFORNIA <br />LICENSED A RCHITECTM. STEVEN <br />CAMP <br />C-18,407 <br />JUN. 30, 2025 <br />RENEWAL DATESTATEOFCALIFORNIA <br />LICENSED A RCHITECT <br />PROJECT ARCHITECT: <br />PROJECT MANAGER: <br />DRAWN BY: <br />PROJECT NUMBER: <br />All ideas, designs and plans indicated or represented <br />by these drawings are owned by and are the property <br />of Elements Architecture, Inc. and were created and <br />developed for use in connection with the specified <br />project. None of such ideas, designs, or plans shall <br />be used for any purpose whatsoever without the <br />written permission of Elements Architecture. <br />Elements Architecture, Inc. <br />PROJECT NAME: <br />NO. DESCRIPTION DATE <br />M. Steven Camp, AIA <br />Scott Holland, AIA <br />PROJECT ADDRESS: <br />SHELLEY MACDONALD <br />EA <br />SHELLEY MACDONALD <br />1 <br />/ <br />9 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />8 <br />: <br />2 <br />2 <br />: <br />0 <br />6 <br /> <br />A <br />M <br />21.105 <br />TENANT <br />IMPROVEMENT <br />(YOUTH ROOM) <br />2909 DAIMLER STREET <br />SANTA ANA, CA 92705 <br />G0.0 <br />COVERSHEET <br />COMPASS BIBLE CHURCH, <br />TUSTIN SANTA ANA <br />SHEET INDEX <br />SHEET NO. DESCRIPTION <br />ARCHITECTURAL <br />A0.1 CODE ANALYSIS & EGRESS PLAN <br />A1.1 EXISTING SITE PLAN (FOR REFERENCE ONLY) <br />A2.1 PROPOSED GROUND FLOOR PLAN <br />A2.2 EXISTING SECOND FLOOR PLAN (FOR REFERENCE ONLY) <br />A4.1 PROPOSED GROUND FLOOR REFLECTED CEILING PLAN <br />A5.1 SECTIONS & DETAILS <br />ELECTRICAL <br />E0.1 LEGEND, SCHED., GENERAL NOTES & ABBREVIATIONS <br />E0.2 DETAILS & SCHEDULES <br />E0.3 LIGHTING CONTROL DETAILS <br />E2.1 ELECTRICAL FIRST FLOOR LIGHTING PLAN <br />E4.1 SINGLE LINE DIAGRAM & PANEL SCHEDULES <br />E5.1 ELECTRICAL SPECIFICATIONS <br />E6.1 TITLE 24 CALCULATIONS <br />MECHANICAL <br />M0.1 LEGEND, SCHED., GENERAL NOTES & ABBREVIATIONS <br />M0.2 MECHANICAL DETAILS <br />M2.1 MECHANICAL FIRST FLOOR PLAN <br />M3.1 MECHANICAL ROOF PLAN <br />M4.1 MECHANICAL SPECIFICATIONS <br />(UNDER SEPARATE PERMIT) <br />(UNDER SEPARATE PERMIT) <br />G0.0 COVERSHEET <br />01 - <br />00- <br />06- <br />05- <br />Bldg #101122238 <br /> <br />APPROVALS: <br />PLNG - F. Arias <br />BLDG - W. Lee <br />POLICE - B. Martin <br />PUBLIC WORKS - Y. Soto <br />2909 S Daimler St <br />4/16/2025