Laserfiche WebLink
A <br />ACCES ACCESSORY <br />ACOUS ACOUSTIC(AL) <br />AFF ABOVE FINISHED FLOOR <br />AL ALUMINUM <br />ALT ALTERNATE <br />ANNUNC ANNUNCIATOR <br />ANOD ANODIZED <br />APPL APPLIANCE <br />ARCH ARCHITECT(URAL) <br />AUTO AUTOMATIC <br />AVG AVERAGE <br />& AND <br />B <br />BLDG BUILDING <br />BOLLD BOLLARD <br />BD BOARD <br />BLKG BLOCKING <br />BRDLM BROADLOOM <br />BU BUILT UP <br />C <br />CAB CABINET <br />CPT CARPET <br />CEM CEMENT(ITIOUS) <br />CER CERAMIC <br />CLG CEILING <br />COATG COATING <br />COILG COILING <br />CONC CONCRETE <br />CONSTR CONSTRUCTION <br />CONT CONTINUOUS(ATION) <br />CONTR CONTRACT(OR) <br />COV COVER <br />CMU CONCRETE MASONRY UNIT <br />D <br />DBL DOUBLE <br />DEPT DEPARTMENT <br />DES DESIGN(ED) <br />DET DETAIL <br />DF DRINKING FOUNTAIN <br />DIA DIAMETER <br />DIFF DIFFUSER <br />DIM DIMENSION <br />DISP DISPENSER <br />DIV DIVISION <br />DN DOWN <br />$ DOLLAR (US CURRENCY) <br />DR DOOR <br />DSCON DISCONNECT <br />DWR DRAWER <br />E <br />ELAST ELASTOMERIC <br />ELEC ELECTRICAL <br />EMBED EMBEDD(ED)(ING) <br />ENGR ENGINEER(ED) <br />ENTR ENTRANCE <br />EQ EQUAL <br />EQUIP EQUIPMENT <br />EXIST EXISTING <br />EXP JT EXPANSION JOINT <br />EXPS EXPOSE(D) <br />EXT EXTERIOR <br />F <br />FAB FABRICATION <br />FD FLOOR DRAIN <br />FE FIRE EXTINGUISHER <br />FEC FIRE EXTINGUISHER AND <br />CABINET <br />FHC FIRE HOSE CABINET <br />FIN FINISH <br />FLDG FOLDING <br />FPLC FIREPLACE <br />FR FIRE RAT(ING)(ED) <br />FRMG FRAMING <br />FXD FIXED <br />FXTR FIXTURE <br />FLR FLOOR(ING) <br />FURN FURNITURE <br />FWC FABRIC WALL COVERING <br />G <br />GA GAUGE <br />GFRC GLASS FIBER REINFORCED <br />CONCRETE <br />GFRG GLASS FIBER REINFORCED <br />GYPSUM <br />GFRP GLASS FIBER REINFORCED <br />PLASTER <br />GL GLASS <br />GR GRAD(E)(ING) <br />GYP GYPSUM <br />H <br />HD HEAD <br />HDWD HARDWOOD <br />HDWE HARDWARE <br />HM HOLLOW METAL <br />HORIZ HORIZONTAL <br />HVAC HEATING, VENTILATING, AND AIR <br />CONDITIONING <br />I <br />INFO INFORMATION <br />INSTRUM INSTRUMENT(ATION) <br />INSUL INSULATION <br />INTLK INTERLOCK(ING) <br />INT INTERIOR <br />INFILTR INFILTRATION <br />J <br />JAN JANITOR <br />K <br />KIT KITCHEN <br />L <br />LAV LAVATORY <br />LB POUND <br />£ BRITISH POUND (CURRENCY) <br />LT LIGHT <br />LVLG LEVELING <br />LVR LOUVER <br />M <br />MAX MAXIMUM <br />MFD MANUFACTURED <br />MFR MANUFACTURER <br />MECH MECHANICAL <br />MET METAL <br />MEMB MEMBRANE <br />MEZZ MEZZANINE <br />MIN MINIMUM <br />MISC MISCELLANEOUS <br />MLWK MILLWORK <br />MOIST MOISTURE <br />MOT MOTOR(IZED) <br />MTD MOUNTED <br />N <br />NIC NOT IN CONTRACT <br />NO NUMBER <br />NTS NOT TO SCALE <br />O <br />ORNA ORNAMENTAL <br />OVFL OVERFLOW <br />OVHD OVERHEAD <br />OPNG OPENING(S) <br />OPR OPERABLE <br />P <br />PTN PARTITION <br />PEDTR PEDESTRIAN <br />PBD PARTICLE BOARD <br />PNL PANEL <br />POLYST POLYSTYRENE <br />PORT PORTABLE <br />PREFIN PREFINISHED <br />PREFAB PREFABRICATED <br />PLAM PLASTIC LAMINATE <br />PLAS PLASTER <br />PLSTC PLASTIC <br />PLYWD PLYWOOD <br />PRTECN PROTECTION <br />R <br />RDR READER <br />RECES RECESSED <br />RECPT RECEPTACLE <br />REF REFER(ENCE) <br />REFL REFLECTED <br />REFR REFRIGERATOR <br />REQD REQUIRED <br />RESIS RESIST(ANT)(IVE) <br />REINF REINFORCE(D)(ING)(MENT) <br />RESIL RESILIENT <br />RFG ROOFING <br />RM ROOM <br />RO ROUGH OPENING <br />S <br />SCR SCRIBE <br />SECUR SECURITY <br />SF SQUARE FEET <br />SGL SINGLE <br />SHORG SHORING <br />SIM SIMILAR <br />SST STAINLESS STEEL <br />STD STANDARD <br />STL STEEL <br />STRFR STOREFRONT <br />STRUCT STRUCTURAL <br />SURF SURFACE <br />SUSP SUSPENDED <br />SYS SYSTEM(S) <br />T <br />THK THICK <br />TLT TOILET <br />TRAF TRAFFIC <br />TRANS TRANSPARENT <br />TRTD TREATED <br />T&G TONGUE AND GROOVE <br />TYP TYPICAL <br />U <br />UNDRLAY UNDERLAYMENT <br />UTIL UTILITY <br />UNO UNLESS NOTED OTHERWISE <br />V <br />VEH VEHICLE <br />VERT VERTICAL <br />VIF VERIFY IN FIELD <br />W <br />W/ WITH <br />WC WATER CLOSET <br />WD WOOD <br />WDW WINDOW <br />W/O WITHOUT <br />WT WEIGHT <br />WTRPRF WATERPROOFING <br />OWNER: <br />5121 W Roberts Dr. Santa Ana, CA 92704 <br />Contact: LAM TRAN <br />Phone: 949. 337. 5292 <br />Email: proselytus@gmail.com <br />ABBREVIATIONS <br />ABBREVIATIONS (CONT.) <br />PROJECT INFORMATION DRAWING INDEX <br />PROJECT TEAM <br />ARCHITECTURAL LEGENDS <br />REVISION <br />EQUIPMENT SYMBOL <br />KEYNOTE <br />DOOR NUMBER / FINISH TYPE <br />WINDOW SYMBOL <br />PLAN NORTH <br />GRID OR <br />COLUMN LINE <br />DIMENSION <br />FINISH ELEVATION <br />ELEVATION <br />CENTER LINE <br />FACE DIMENSION <br />CENTER LINE <br />SECTION NUMBER <br />PORTION OF PLAN SHOWN <br />MATCH LINE <br />DRAWN <br />SHEET WHERE <br />SHEET WHERE DRAWN <br />ELEVATION NUMBER <br />INTERIOR ELEVATION: <br />SHEET WHERE DRAWN <br />SECTION: <br />DETAIL: <br />DETAIL NUMBER <br />A WALL TYPE <br />FLUSH FINISH MATERIALS <br />ENGINER OF RECORD / STRUCTURAL ENGINEER: <br />PROJECT DESIGNER: <br />VICINITY MAP <br />ALL CONSTRUCTION SHALL CONFORM TO ALL GOVERNING LAWS, <br />CODES AND ORDINANCES INCLUDING BUT NOT LIMITED TO THE <br />FOLLOWING: <br />1. TITLE 24 OF THE CALIFORNIA ADMINISTRATIVE CODE, <br /> THE 2022 CBC <br />2. 2022 CALIFORNIA ELECTRICAL CODE <br />3. 2022 CALIFORNIA MECHANICAL CODE <br />4. 2022 CALIFORNIA PLUMBING CODE <br />5. 2022 CALIFORNIA FIRE CODE <br />6. 2022 CALIFORNIA ENERGY CODE <br />7. 2022 CALIFORNIA GREEN CODE <br />8. 2022 CALIFORNIA RESIDENTIAL CODE <br />9. CITY OF SANTA ANA MUNICIPAL CODE <br />CODE / AGENCIES CONFORMANCES <br />BUILDING STORIES: <br />PROJECT ADDRESS: <br />ASSESSOR'S PARCEL NO.: <br />ZONING : <br />FRONT YARD: 20' <br />REAR SETBACK: 10' <br />5121 W ROBERTS DR. SANTA ANA CA 92704 <br />5121 W ROBERTS DR. #2 SANTA ANA CA 92704 <br />R-1 <br />R-3/U (MAIN HOUSE) & R-3 (ADU)OCCUPANCY TYPE : <br />CONSTRUCTION TYPE : <br />188 062 27 <br />1 <br />LOT NO.: <br />SETBACKS: <br />PROJECT SCOPE OF WORK <br />CONSTRUCTION MEANS CONSTRUCTING, CLEARING, GRADING OR EXCAVATION THAT <br />RESULT IN SOIL DISTURBANCE. <br />CONSTRUCTION INCLUDES STRUCTURE TEARDOWN (DEMOLITION). IT DOES NOT <br />INCLUDE ROUTINE MAINTENANCE TO MAINTAIN ORIGINAL LINE AND GRADE, HYDRAULIC <br />CAPACITY, OR ORIGINAL PURPOSE OF FACILITY; EMERGENCY CONSTRUCTION <br />ACTIVITIES REQUIRED TO IMMEDIATELY PROTECT PUBLIC HEALTH AND SAFETY; <br />INTERIOR REMODELING WITH NO OUTSIDE EXPOSURE OF CONSTRUCTION MATERIAL <br />OR CONSTRUCTION WASTE TO STORM WATER; MECHANICAL PERMIT WORK; OR SIGN <br />PERMIT WORK. <br />1. ERODED SEDIMENTS AND POLLUTANTS SHALL BE RETAINED ON SITE AND SHALL NOT <br />BE TRANSPORTED FROM THE SITE VIA SHEET FLOW, SWALES, AREA DRAINS, NATURAL <br />DRAINAGE OR WIND. <br />2. STOCKPILES OF EARTH AND OTHER CONSTRUCTION-RELATED MATERIALS SHALL BE <br />COVERED AND/OR PROTECTED FROM BEING TRANSPORTED FROM THE SITE BY WIND <br />OR WATER. <br />3. FUELS, OILS, SOLVENTS AND OTHER TOXIC MATERIALS MUST BE STORED IN <br />ACCORDANCE WITH THEIR LISTING AND SHALL NOT CONTAMINATE THE SOIL NOR THE <br />SURFACE WATERS. ALL APPROVED TOXIC STORAGE CONTAINERS ARE TO BE <br />PROTECTED FROM THE WEATHER. SPILLS MUST BE CLEANED UP IMMEDIATELY AND <br />DISPOSED OF PROPERLY AND SHALL NOT BE WASHED INTO THE DRAINAGE SYSTEM. <br />4. NON-STORM WATER RUNOFF FROM EQUIPMENT AND VEHICLE WASHING AND ANY <br />OTHER ACTIVITY SHALL BE CONTAINED ON THE PROJECT SITE. <br />5. EXCESS OR WASTE CONCRETE MAY NOT BE WASHED INTO THE PUBLIC WAY OR ANY <br />DRAINAGE SYSTEM. PROVISIONS SHALL BE MADE TO RETAIN CONCRETE WASTE <br />ON-SITE UNTIL IT CAN BE APPROPRIATELY DISPOSED OF OR RECYCLED. <br />6. TRASH AND CONSTRUCTION -RELATED SOLID WASTES MUST BE DEPOSITED INTO A <br />COVERED RECEPTACLE TO PREVENT CONTAMINATION OF STORM WATER AND <br />DISPERSAL BY WIND. <br />7. SEDIMENTS AND OTHER MATERIALS SHALL NOT BE TRACKED FROM THE SITE BY <br />VEHICLE TRAFFIC. THE CONSTRUCTION ENTRANCE ROADWAYS MUST BE STABILIZED <br />SO AS TO INHIBIT SEDIMENTS FROM BEING DEPOSITED INTO THE STREET/PUBLIC WAYS. <br />ACCIDENTAL DEPOSITIONS MUST BE SWEPT UP IMMEDIATELY AND MAY NOT BE <br />WASHED DOWN BY RAIN OR BY ANY OTHER MEANS. <br />8. RETENTION BASINS OF SUFFICIENT SIZE SHALL BE PROVIDED TO RETAIN STORM <br />WATER RUNOFF ON-SITE AND SHALL BE PROPERLY LOCATED TO COLLECT ALL <br />TRIBUTARY SITE RUNOFF. <br />9. WHERE RETENTION OF STORM WATER RUNOFF ON-SITE IS NOT FEASIBLE DUE TO SITE <br />CONSTRAINTS, RUNOFF MAY BE CONVEYED TO THE STREET AND THE STORM DRAIN <br />SYSTEM PROVIDED THAT AN APPROVED FILTERING SYSTEM IS INSTALLED AND <br />MAINTAINED ON-SITE DURING THE CONSTRUCTION DURATION. <br />STORM WATER POLLUTION CONTROL <br />ARCHITECTURAL <br />A00.00 DRAWING INDEX, VICINITY MAP, LOCATION MAP & PROJECT <br />INFORMATION, GRAPHICS SYMBOLS, ABBREVIATIONS <br />A00.50 EXISTING/DEMOLITION STITE PLAN - SITE PLANS <br />A00.51 SITE DRAINAGE PLAN <br />A01.00 EXISTING / DEMOLITION FLOOR PLAN & ROOF PLAN <br />A02.00 PROPOSED FLOOR PLANS MAIN HOUSE <br />A02.01 PROPOSED FLOOR PLANS ADU <br />A03.00 ELECTRICAL / LIGHTING PLANS MAIN HOUSE <br />A03.01 ELECTRICAL / LIGHTING PLANS ADU <br />A05.00 PROPOSED ROOF PLAN MAIN HOUSE <br />A05.01 PROPOSED ROOF PLAN ADU <br />A08.00 EXTERIOR ELEVATIONS MAIN HOUSE <br />A08.01 EXTERIOR ELEVATIONS ADU <br />A09.00 BUILDING SECTIONS - MAIN HOUSE ADDITION <br />A12.00 WALL, ROOF, DOOR & WINDOW DETAILS <br />d2b group <br />11881 Comstock Rd. Garden Grove, CA 92840 <br />Contact: MAX NGUYEN <br />Phone: 714. 651. 9945 <br />Email: max@d2bgroup.com <br />DONG ENGINEERING INC. <br />12682 Hoover St. Garden Grove, CA 92841 <br />Contact: TRUONG DONG <br />Phone: 714. 204. 2874 <br />Email: troy@dongengineering.com <br />BUS STOP DISTANCE <br />STRUCTURAL <br />S0 STRUCTURAL GENERAL NOTES <br />S.1 MAIN HOUSE - FOUNDATION & ROOF FRAMING PLANS <br />S.2 ADU - FOUNDATION & ROOF FRAMING PLANS <br />SD1 STRUCTURAL DETAILS <br />SD2 STRUCTURAL DETAILS <br />SD3 STRUCTURAL DETAILS <br />ENERGY EFFICIENCY <br />T24.1 TITLE 24 MAIN HOUSE <br />T24.2 TITLE 24 ADU <br />T24.3 TITLE 24 CONT. <br />SIDE SETBACK: 5' <br />4' <br />MAIN HOUSE ADU <br />4' <br />V-B, NON SPRINKLERED <br />MAIN SFD- NON SPRINKLERED <br />- MAIN HOUSE ADDITION 264 S.F. CONSISTS BEDROOM & <br />BATHROOM. <br />- DETACHED ADU 1,000 S.F WITH 2 BEDROOMS, 2 BATHROOMS, <br />LIVING AREA AND SEPARATE ENTRY. <br />- DEMO EXISTING STORAGE SHED ON EAST SIDE OF MAIN HOUSE. <br />- LEGALIZE 3 TON CENTRAL AC FOR MAIN HOUSE. <br />- DEMOLISH 220 METAL COVERED PATIO AND CONSTRUCT NEW <br />COVERED PATIO. <br />- LEGALIZE WINDOW REPLACEMENT WITH NEW OF MAIN HOUSE. <br />PROJECT STATISTIC <br />SITE COVERAGE <br />SITE AREA <br />MAIN HOUSE STRUCTURE AREA 1,758 SQ. FT. <br />100 %8,063 SQ. FT. <br />34.7 % 35 % MAX. <br />ALLOWABLE <br />2,800 SQ. FT.TOTAL COVERED AREA <br />MAIN HOUSE PROPOSED <br />ADU <br />(E) LIVING AREA 1,094 SQ. FT. 1,000 SQ. FT. <br />AREA CALCULATION <br />NEW ADDITION <br />400 SQ. FT. <br />TOTAL 1,758 SQ. FT. <br />GRAND TOTAL <br />BOTH BLDG. <br />2,800 SQ. FT.1,042 SQ. FT. <br />(E) GARAGE <br />264 SQ. FT. <br />(N) ADU 1,000 SQ. FT. <br />DIG ALERT (811) IS TO BE CONTACTED AND THAT COMPLIANCE WITH EXCAVATION SAFETY IN <br />ACCORDANCE WITH GOVERNMENT CODE 4216 WILL BE FOLLOWED PRIOR TO ANY EXCAVATION <br />TAKING PLACE. <br />OWNER'S SIGNATURE: <br />DATE: <br />DIG ALERT NOTE <br />SEPARATE REVIEW & PERMIT <br />A PV SOLAR SYSTEM IS REQUIRED AND SHALL BE SUBMITTED UNDER SEPARATE PERMIT. THE <br />PV SYSTEM SHALL BE APPROVED AND INSTALLED PRIOR TO FINAL INSPECTION OF THE <br />DWELLING. <br />PV IS DEFERRED APPROVAL AND BUILDING CANNOT BE OCCUPIED UNTIL PV IS APPROVED BY <br />CITY. <br />NEW PORCH 42 SQ. FT. <br />(N) PORCH 42 SQ. FT. <br />2 <br />YES (THIS PROPERTY IS PARTIALLY LOCATED <br />IN FLOOD ZONE - 18' OF NORTH PROPERTY) <br />FLOOD ZONE : <br />A09.01 BUILDING SECTIONS - ADU <br />1,000 SQ. FT. ADU / 1,094 SQ.FT. SFD = 0.91% <br />MECHANICAL, ELECTRICAL AND PLUMBING ARE NOT PART OF THIS PLAN REVIEW AND <br />APPROVAL. THE BUILDING AND SAFETY DIVISION PLAN REVIEW DOES NOT INCLUDE POTENTIAL <br />ELECTRICAL, WATER, OR GAS REVISIONS REQUIRED BY ANY NON-CITY UTILITY COMPANY. IT IS <br />SOLELY ON THE CONTRACTOR TO ENSURE PROPOSED ADDITION OR ALTERATION CAN AND <br />WILL MEET UTILITY COMPANY REQUIREMENTS. MEP ARE SUBJECT TO BUILDING FIELD <br />INSPECTION. <br />AD <br />D <br />I <br />T <br />I <br />O <br />N <br /> <br />T <br />O <br /> <br />M <br />A <br />I <br />N <br /> <br />H <br />O <br />U <br />S <br />E <br /> <br />& <br /> N <br />E <br />W <br /> <br />D <br />E <br />T <br />A <br />C <br />H <br />E <br />D <br /> <br />A <br />D <br />U <br />51 <br />2 <br />1 <br /> <br />W <br />. <br /> <br />R <br />o <br />b <br />e <br />r <br />t <br />s <br /> <br />D <br />r <br />. <br /> <br />& <br /> <br /># <br />2 <br /> <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br />11 <br />8 <br />8 <br />1 <br /> <br />c <br />o <br />m <br />s <br />t <br />o <br />c <br />k <br /> <br />r <br />o <br />a <br />d <br /> <br />g <br />a <br />r <br />d <br />e <br />n <br /> <br />g <br />r <br />o <br />v <br />e <br /> <br /> C <br />A <br /> <br /> 9 <br />2 <br />8 <br />4 <br />0 <br /> <br /> <br /> <br /> <br />T: <br /> <br />7 <br />1 <br />4 <br />. <br />6 <br />5 <br />1 <br />. <br />9 <br />9 <br />4 <br />5 <br /> <br /> <br />E: <br /> <br />d <br />e <br />s <br />i <br />g <br />n <br />2 <br />b <br />u <br />i <br />l <br />d <br />@ <br />y <br />a <br />h <br />o <br />o <br />. <br />c <br />o <br />m <br />06/27/2024 <br />2 <br />2 <br />Bldg #101119306-07 <br /> <br />APPROVALS: <br />PLNG - F. Arias <br />BLDG - J. Lo <br />POLICE - B. Martin <br />PUBLIC WORKS - B. Sarlak <br />FLOOD ZONE - 5121 W <br />Roberts Dr & #23/19/2025