My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HISTORIC-825 N Lacy St - Plan
PBA
>
Building
>
ProjectDox
>
L
>
Lacy St
>
825 N Lacy St
>
HISTORIC-825 N Lacy St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2025 12:44:26 PM
Creation date
6/15/2025 12:43:53 PM
Metadata
Fields
Template:
Plan
Permit Number
20185119
101122453
Full Address
825 N Lacy St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VICINITY MAP <br />SCALE: NTS <br />AERIAL VIEW <br />SCALE: NTS <br /> STORY HOUSE <br />SINGLE FAMILY RESIDENCE <br />CONSTRUCTION TYPE: V-B <br />OCCUPANCY: <br />ROOF TYPE: <br />SCOPE OF WORK <br />INSTALLATION OF 8.40 KW GRID TIED PHOTOVOLTAIC SYSTEM <br />& 13.5 KWH BATTERY <br />DAVID SMITH <br />825 N LACY ST, SANTA ANA, CA 92701 <br />BUILDING INFORMATION <br />SHEET INDEX <br />AHJ:CITY OF SANTA ANA <br />PHOTOVOLTAIC SYSTEM SUMMARY ELECTRICAL INFORMATION <br />1 PHASE/ 3W / 120/240V <br />UTILITY: <br />EXISTING <br />1 LAYER OF COMPOSITION SHINGLE <br />1 <br />R3/U <br />GENERAL NOTES <br />1. THE CONTRACTOR/INSTALLER OF THE SOLAR PV SYSTEM OVER EXISTING ROOF SHALL CONFIRM TO OSHA REQUIREMENTS DURING THE CONSTRUCTION PHASE. JOB SAFETY AND <br />CONSTRUCTION PROCEDURES ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR/INSTALLER. <br />2. IN CASE OF CONFLICT BETWEEN STRUCTURAL DRAWINGS AND ELECTRICAL DRAWINGS, THE MOST RIGID REQUIREMENTS SHALL GOVERN. <br />3. THE CONTRACTOR/INSTALLER SHALL VERIFY ALL EXISTING BUILDING INFORMATION SHOWN (DIMENSIONS, ROOF TOP PROJECTIONS, ETC.) AND NOTIFY THE ENGINEER OF ANY <br />DISCREPANCIES PRIOR TO INSTALLATIONS OF PV SYSTEM. <br />4. THE CONTRACTOR/INSTALLER SHALL VERIFY AND COORDINATE EXISTING OPENINGS, ROOF TOP UNITS, VENT PIPES, ETC. SHOWN ON DRAWINGS. IF THERE IS A DISCREPANCY BETWEEN <br />DRAWINGS, IT IS THE CONTRACTORS/INSTALLER'S RESPONSIBILITY TO NOTIFY ENGINEER PRIOR TO PERFORMING THE WORK. <br />5. ALL CONSTRUCTION IS TO BE PERFORMED IN STRICT CONFORMANCE WITH ALL APPLICABLE TOWN,COUNTY & STATE REGULATIONS AND/OR ANY OTHER GOVERNING BODIES. <br />6. DO NOT SCALE THESE DRAWINGS, USE DIMENSIONS. CONTRACTOR MUST CONDUCT ROOF SURVEY TO VERIFY DIMENSIONS SHOWN ON PLAN PRIOR TO INSTALLATION. IF THERE IS A <br />DISCREPANCY IT IS CONTRACTOR/INSTALLER'S RESPONSIBILITY TO NOTIFY THE ENGINEER IMMEDIATELY. <br />7. EACH MODULE TO BE GROUNDED USING THE SUPPLIED CONNECTION POINT PER MANUFACTURER'S REQUIREMENTS. ALL SOLAR MODULES, EQUIPMENT, AND METALLIC COMPONENTS ARE <br />TO BE BONDED. IF THE EXISTING GROUNDING ELECTRODE SYSTEM CAN NOT BE VERIFIED OR IS ONLY METALLIC WATER PIPING, IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSTALL A <br />SUPPLEMENTAL GROUNDING ELECTRODE. <br />8. ALL PLAQUES AND SIGNAGE REQUIRED BY THE LATEST EDITION OF NATIONAL ELECTRICAL CODE. LABEL SHALL BE METALLIC OR PLASTIC, ENGRAVED OR MACHINE PRINTED IN A <br />CONTRASTING COLOR TO THE PLAQUE. PLAQUE SHALL BE UV RESISTANT IF EXPOSED TO SUNLIGHT. <br />9. DC CONDUCTORS SHALL BE RUN IN RMC AND SHALL BE LABELED, "CAUTION DC CIRCUIT" OR EQUIV. EVERY 5 FT. <br />10. EXPOSED NON-CURRENT CARRYING METAL PARTS OF ELECTRICAL EQUIPMENT SHALL BE GROUNDED IN ACCORDANCE WITH 250.134 OR 250.136(A). <br />11. CONFIRM LINE SIDE VOLTAGE AT ELECTRIC UTILITY SERVICE PRIOR TO CONNECTING INVERTER. VERIFY SERVICE VOLTAGE IS WITHIN INVERTER VOLTAGE OPERATIONAL RANGE. <br />12. OUTDOOR EQUIPMENT SHALL BE NEMA-3R RATED OR BETTER. <br />13. ELECTRICAL CONTRACTOR TO PROVIDE CONDUIT EXPANSION JOINTS AND ANCHOR CONDUIT RUNS AS REQUIRED PER NEC. <br />14. ALL WIRING MUST BE PROPERLY SUPPORTED BY DEVICES OR MECHANICAL MEANS DESIGNED AND LISTED FOR SUCH USE, AND FOR ROOF-MOUNTED SYSTEMS, WIRING MUST BE <br />PERMANENTLY AND COMPLETELY HELP OFF OF THE ROOF SURFACE. CEC 110.2 - 110.4 / 300.4 <br />15. ALL ROOF PENETRATIONS MUST BE FLASHED. SIMPLY CAULKING DOES NOT SUFFICE. <br />16. PV INSTALLATION SHALL COMPLY WITH ARTICLE 690 OF 2022 CEC, CRC REQUIRES THAT SMOKE ALARMS AND CARBON MONOXIDE ALARMS ARE RETROFITTED INTO EXISTING DWELLING, <br />THE REQUIRED SMOKE ALARMS AND CARBON MONOXIDE DETECTORS SHALL BE LOCATED AS REQUIRED PER SECTION R314 & R315 WITHIN THE CALIFORNIA RESIDENTIAL CODE. <br />17. NEW ELECTRICAL EQUIPMENT SHALL BE LOCATED AT LEAST THREE (3) FEET FROM GAS METER OR GAS SHUT-OFF VALVES. CPC1208.7.1; CEC 110.26 <br />Installation of <br />8.40 KW Grid Tied <br />Photovoltaic System <br />& 13.5 kWh Battery <br />Solar Individual <br />Permit Package <br />DATE DRAWN <br />DRAWN BY <br />SCALE <br />NAREK Y. <br />AS INDICATED <br />SHEET <br />Rev Description Date <br />01.07.25 <br />CONTRACTOR <br />California Solar & <br />Electric, Inc. <br />Address: <br />26074 Avenue Hall Ste 13 <br />Santa Clarita, CA 91355 <br />Phone Number: <br />Tel:(628)998-4928 <br />CSLB License #1073677 <br />Class C-10 <br />Contractor Signature <br />SYSTEM SIZE (DC): <br />STC: 20 X 420 = 8.40kW DC <br />PTC: 20 X 402.5 = 8.05kW DC <br />SYSTEM SIZE (AC): <br />11.5kW AC <br />DAVID SMITH <br />825 N Lacy St, Santa <br />Ana, CA 92701 <br />A0 <br />CODE INFORMATION <br />APN: 39804216 <br />2022 CALIFORNIA BUILDING CODE (CBC) <br />2022 CALIFORNIA RESIDENTIAL CODE (CRC) <br />2022 CALIFORNIA FIRE CODE (CFC) <br />2022 CALIFORNIA ELECTRICAL CODE (CEC) <br />2022 CALIFORNIA MECHANICAL CODE (CMC) <br />2022 CALIFORNIA PLUMBING CODE (CPC) <br />2022 CALIFORNIA ENERGY CODE (CENC) <br />2022 CALIFORNIA GREEN BUILDING CODE (CALGREEN) <br />2022 CALIFORNIA ADMINISTRATIVE CODE (CAC) <br />2020 NATIONAL ELECTRICAL CODE (NEC) <br />AS ADOPTED BY CITY OF SANTA ANA <br />ALL WORK SHALL BE IN COMPLIANCE WITH THE MOST <br />CURRENT LOS ANGELES COUNTY FIRE CODE. (LACFC) <br />SCE <br />(N) 20 REC SOLAR - REC420AA PURE-R (420W) PV MODULES <br />(N) 1 TESLA POWERWALL 3 - 1707000-XX-Y INVERTER <br />(N) 8 MCI-1 RSD <br />(N) 1 TESLA BACKUP SWITCH - 1624171-95-K <br />RACKING: UNIRAC SOLAR MOUNT <br />MAIN SERVICE PANEL BUS SIZE: 200A <br />MAIN SERVICE BREAKER SIZE: 200A <br />ESS SYSTEM: <br />Number and Type ESS unit(s): New - 1 X TESLA POWERWALL 3, 240V AC; Existing - 0 <br />ESS unit(s) capacity (kWh/unit): New - 13.5 kWh/TESLA POWERWALL 3, 240V AC. Existing - 0 <br />Inside attached garages: 0 Unit at 0 kWh <br />Inside detached garages and/or detached accessory structures: 0 Unit at 0 kWh <br />Outdoors on Exterior Walls: 1 Unit at 13.5 kWh <br />Outdoors on Ground: 0 Unit at 0 kWh <br />Other, and/or for another building on the same site, etc: 0 Unit at 0 kWh <br />DISCONNECTS <br />Minimum number of disconnects required to turn off all power sources feeding <br />the home [Utility]: 1 <br />SCOPE OF WORK <br />ESS system size listed in the Title Block is the total usable energy <br />Total Energy Capacity capable of being stored in aggregate. <br />SOLAR A0 <br />SOLAR A1 <br />SOLAR A2 <br />SOLAR A3 <br />SOLAR A4 <br />SOLAR S1 <br />SOLAR E1 <br />SOLAR E2 <br />SOLAR Dn <br />COVER SHEET <br />SITE PLAN <br />PROPERTY PLAN <br />EQUIPMENT ELEVATION <br />ESS MOUNTING DETAIL <br />STRUCTURAL INFORMATION <br />SINGLE LINE DIAGRAM <br />CODE REQUIRED SIGNAGE <br />EQUIPMENT SPEC SHEETS <br />12/31/25 <br />STAMPED FOR <br />EXISTING ROOF AND <br />ATTACHMENT ONLY <br />The scope of the plans is for the installation <br />of the solar photovoltaic system only and <br />the approval is subject to compliance with <br />all applicable city and state codes and <br />regulations regarding construction. The <br />approval of the plans does not constitute <br />any certification of the accuracy, <br />completeness, or building permit status of <br />the existing buildings and structures as <br />shown. <br />Bldg#: 101122453 <br />Elec#: 20185119 <br /> <br />Approvals: <br />Elec: M Smith <br />HISTORIC-825 N <br />Lacy St2/18/2025
The URL can be used to link to this page
Your browser does not support the video tag.