Laserfiche WebLink
4/17/2026 <br />Client:  <br />RE: <br />Solara Home Energy <br />555 Menlo Dr, Suite A <br />Rocklin, CA 95765 <br />Solar PV Array Install Structural Certification Letter <br />Habitat for Humanity Residence <br />1921 Washington Ave - Unit 2 <br />Santa Ana , CA 92705 <br />To Whom It May Concern: <br />Scope of Work: <br />2. <br />Provided Information:  <br />Building Design Criteria: <br />Framing Description: <br />The below table is a description of the framing based on the information that was provided by Solara Home Energy: <br />Array Name(s) Slope Span <br />Metal plate connected pre‐manufactured trusses  <br />spaced at 24 in. o.c. with 2x4 top and bottom chords,  <br />and 2x4 webs. <br />Tile with Plywood Decking <br />Domus Structural Engineering, LLC. was asked to provide a structural review of the project at the above referenced address for  <br />the proposed installation of roof‐mounted solar panels. The scope of this report is strictly limited to the items listed below and  <br />based on the building design criteria. <br />The findings of this report are based on a jobsite evaluation of the existing framing system with the information gathered by  <br />Solara Home Energy as a request of Domus Structural Engineering, LLC. All attached structural calculations are based on the  <br />provided information. If roof assembly has been altered since this initial observation, contractor shall notify engineer prior to  <br />starting construction. <br />Determine if the existing roof framing is structurally sufficient to support the new PV system in addition to  <br />the code required design loads. <br />1. <br />Framing Description Roof Material <br />Ground Snow Load: <br />Seismic: <br />Pg = 0 psf, Pg(asd) = 0 ps <br />Seismic check required as Ss >= .4 and SDC is D or greate <br />Building Codes and Standards: <br />Risk Category: <br />Dead Loads: <br />Roof Live Loads: <br />Wind Speed & Exposure: <br />Roof/Sloped Snow Loads: <br />Evaluate the connection capacity of the proposed racking and system to the existing roof structure. <br />Roof 1 16 7'‐0" <br />P(roof) = 0 ps <br />2025 CBC, ASCE 7‐22 <br />II <br />13 psf (Roof 1) <br />20 psf (Live load is removed directly under panels) <br />110 mph (Vult), Exp C <br />P.O. Box 560, Broomfield, CO 80038 | projects@domusstruc.com | Page 1 of 8