Laserfiche WebLink
5 MountingSMA Solar Technology AG <br />Installation Manual SBxx-1SP-US-41-IA-xx-12 27 <br />Procedure: <br />1.CAUTION <br />Risk of injury due to damaged cables <br />There may be power cables or other supply lines (e.g. gas or water) routed in the wall. <br />• Ensure that no lines are laid in the wall which could be damaged when drilling holes. <br />2. Ensure that the DC load-break switch of the inverter <br />is in the O position. <br />3. Opening the Connection Unit Unscrew all six screws (TX25) and carefully remove the <br />enclosure lid toward the front. <br />4. Unscrew the 2 screws on the right and left side of <br />the Power Unit (TX25). As a result, the Power Unit <br />and the Connection Unit are not connected to one <br />another. <br />5. Disconnect the Connection Unit from the Power Unit. <br />6. Align the Connection Unit horizontally on the wall <br />and mark the position of the drill holes using the <br />brackets. <br />7. Drill the holes in the marked positions. <br />8. Insert screw anchors into the drill holes if the support surface requires them. <br />EN <br />G <br />L <br />I <br />S <br />H <br />534 S Sycamore St <br />- 10110979707/01/22