ProJect No. D-3E85-06 <br />Christ Our Savior Catholic Parish <br />Construction Veritication Procedures <br />Installation of driven piles and monitoring of sound and vibrations should be done under <br />the observation and documentation of a representative of the project Geotechnical <br />Engineer. This would help veri$ pile capacities and help avoid vibration and noise levels <br />harmful to close by structures. <br />Geotechnical Engineer means a representative of the consultant company of record, <br />including but not limited to the licensed geotechnical engineer, certified engineering <br />geologist, and field technician supervised by and reporting to licensed professionals, as <br />applicable to items to be verified. <br />Option II. Cast in-situ 18" or 24" Concrete Caissons <br />A new Sanctuary building may be supported by casrin situ concrete caissons with either <br />l8 inches or 24-inches in diameter but because of existence of the shallow groundwater <br />and the system may be costly and thus this recommendation of Option II is not <br />considered. <br />Option III. Soil Improvement by Pre-Loading Method <br />Pre-loading is a method to provide loads by piles of earth and monitor settlement. Based <br />on our preliminary assessment, static settlement is more than 5 inches and worst case <br />seismic settlement of more than 3 inches it may require 4.5 years to complete 90olo <br />settlement and continues further with the secondary settlement. <br />This method may not be a viable solution since it will require time <br />B. Parish Center & Meeting Rooms <br />Parish Center and Meeting Rooms Buildings are comparatively light loaded and the <br />following two options rnay be considered. <br />27 <br />I <br />n <br />u <br />E <br />I <br />f <br />I <br />I <br />t <br />T <br />I <br />I <br />I <br />E <br />I <br />I <br />r <br />I <br />I