My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002 W Alton Ave - Soils Report
PBA
>
Building
>
Soils Reports
>
A
>
Alton Ave
>
2002 W Alton Ave
>
2002 W Alton Ave - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2021 8:57:47 AM
Creation date
6/28/2021 8:57:13 AM
Metadata
Fields
Template:
Soils Report
Full Address
2002 W Alton Ave
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project No. D-36E5-06 <br />Christ Our Savior Catholic Parish <br />Appropriate amount of water should be added to achieve slump of about 2 inches or less <br />at injection point. <br />Procedure <br />Compaction grouting can be conducted in the following manner: <br />Grout pipes (2.5 inch OD, 1.875 inch ID, flush joint) should be drilled to 25 feet <br />below existing ground surface. <br />a <br />o <br />a <br />a <br />A design placement of 5 cubic feet of grout/stage (stage : I foot) for Primary <br />locations for depths between 25- and lO-feet and 4 cubic feet of grouVstage lor <br />secondary locations and maximum of 0.5 cubic feet of grout/stage shall be <br />injected between 5- to 10-feet depth. <br />Ground surface or structural heave should be observed. <br />Grout would be injected at a rate of2 cubic feeVminute or less until either pressure <br />refusal of the hole is achieved (back pressure in excess of 15 x D psi, where, D = <br />depth of injection in feet from ground surface, maximum pressure allowed is 450 <br />psi). <br />Grout pipe should be retrieved in I -foot intervals <br />Depending on pressures and depth, some additional grout may be placed to <br />maximize the densification of soils at the deeper depths. <br />o <br />a <br />o Grout holes may be drilled in Primary and secondary Pattem. <br />o Grout then should be injected frorn bottom elevation of pipe to 5 feet belorv <br />qround surface. <br />o Grout retum to surface constitutes failure of grout stage. <br />I <br />E <br />T <br />I <br />I <br />I <br />E <br />I <br />T <br />T <br />I <br />E <br />I <br />I <br />T <br />T <br />t.l <br />I <br />I30
The URL can be used to link to this page
Your browser does not support the video tag.