My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2215 S Standard Ave - Soils Report
PBA
>
Building
>
Soils Reports
>
S
>
Standard Ave
>
2215 S Standard Ave
>
2215 S Standard Ave - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2021 9:12:16 AM
Creation date
6/28/2021 9:12:10 AM
Metadata
Fields
Template:
Soils Report
Full Address
2215 S Standard Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Report of Soils Investigation <br />2215 South Standard Ave., Proposed Addition <br />Santa Ara. California <br />Page 17 of 27 <br />Job No. 40-0613 <br />Aoril 5. 1999 <br />I <br />_l <br />j <br />I.l <br />l <br />10.2.5 Overexcavation <br />In order to provide uniform bearing conditions for structural support, it is <br />recommended that the entire building pad area be over-excavated to a minimum <br />depth of 1 foot below the bottom of the proposed footing elevation and a <br />minimum of 5 feet laterally beyond the building pad where practical. Based on <br />exploratory data, excavations can be accomplished using standard grading <br />equipment. Prior to fill placement, exposed subgrades should be evaluated by the <br />geotechnical representative to verify that suitable, uniform bearing conditions <br />exist. <br />Caution should be exercised when overexcavating along the south property line so <br />as not to excavate supporting soil for the adjacent structure. <br />10.2.6 Preparation of Areas to Receive Fill <br />The bottom of all excavations should be founded in competent fi materials. The <br />exposed surface should be scarified to a minimum depth of 8 inches. properly <br />moisture conditioned, and compacted to 90 percent mmpaction relative to ASTM <br />D-1557. <br />-.,) <br />10.2.7 Fill Placement and Comnaction <br />All additional fill and backfill should be compacted to a minimurn relative <br />compaction ol90 percent as evaluated by ASTM D-'1557 at a moisture content of <br />optimum or slightly above. The optimum Iift thickness lor fill soils will be
The URL can be used to link to this page
Your browser does not support the video tag.