Laserfiche WebLink
SU <br />B <br />SITE PLAN <br />NTS <br />PR <br />O <br />P <br />E <br />R <br />T <br />Y <br /> <br />L <br />I <br />N <br />E <br />DRIVEWAY <br />NEW 125A SOLAR READY PANEL <br />UPGRADED FROM 100A <br />(SERIAL # MBED2040PV 125ABF <br />OR EQUIVALENT) <br />(N) EV OUTLET LOCATION <br />(INSIDE GARAGE) <br />F1 - Jobsite Safety Inspection <br />Date Inspected: <br />Lead/CP: <br />Signature: <br />PPE worn as needed: <br />Fall protection worn and inspected before use: <br />EWSP followed for electrical hazards / LOTO (Lock Out Tag Out) <br />Ladders used correctly: <br />Tools used correctly: <br />Housekeeping: <br />Legend: <br />Rescue Plan: <br />Electrical Hazards: <br />Water Shut Off: <br />Gas Main Shut Off: <br />Water: <br />Shade: <br />Trailer: <br />Porta-Potty: <br />(N) SOLAR PV MODULES <br />SAP - SAFETY ATTACHMENT POINT LAP -LADDER ACCESS POINT FOZ -FALLING OBJECTS ZONE <br />ALTON AVE <br />FIRE ROOF ACCESS POINTS <br />(PER CRC R324.6) <br />CONDUIT RUN <br />(GRAPHICAL DEPICTION) <br />(N) ENERGY STORAGE <br />EMERGENCY SHUT OFF <br />DISCONNECT ADJACENT TO MSP <br />(CAPABLE OF BEING LOCKED <br />IN "OFF" POSITION) <br />(N) TESLA AC POWERWALL 3 <br />(OUTSIDE WALL) <br />(N) 200A WHOLE <br />HOME TESLA BACKUP SWITCH <br />(N) TESLA ENERGY GATEWAY <br />(OUTSIDE WALL) <br />(N) 200A PROTECTED LOADS <br />SUB PANEL <br />(OUTSIDE WALL) <br />214 W Alton Ave <br />10/8/2024