Laserfiche WebLink
HVAC SPECIFICATIONS <br />FINAL TESTING AND ADJUSTMENTS <br />REFER TO THE 'GENERAL SPECIFICATIONS FOR AIR BALANCING AND TESTING' THIS SHEET. <br />ADJUST ALL EQUIPMENT, THERMOSTATS AND CONTROL DEVICES TO OPERATE AS INTENDED BY THE SPECIFICATION. <br />ALIGN AND/OR REPLACE BEARINGS THAT HAVE DIRT OR FOREIGN MATERIAL IN THEM WITH NEW BEARINGS WITHOUT <br />ADDITIONAL COST TO THE OWNER. ADJUST BURNERS, FANS, ETC. FOR PROPER AND EFFICIENT OPERATION. CERTIFY <br />TO ARCHITECT THAT ADJUSTMENTS HAVE BEEN MADE AND THAT SYSTEM IS OPERATING SATISFACTORILY. FURTHER <br />ADJUSTMENTS SHALL BE MADE TO OBTAIN UNIFORM TEMPERATURE IN SPACES. CALIBRATE, SET AND ADJUST <br />AUTOMATIC TEMPERATURE CONTROLS. CHECK PROPER SEQUENCING OF INTERLOCK SYSTEMS AND OPERATION OF <br />SAFETY CONTROLS. <br />NEW MERV-13 FILTERS SHALL BE INSTALLED PRIOR TO TEST AND BALANCE. <br />HVAC SYSTEM AND CONTROLS WILL BE COMMISSIONED PER THE REQUIREMENTS OF THE COMMISSIONING <br />SPECIFICATIONS IN THE LEED PROTOTYPE GREEN SPECIFICATIONS. GENERAL CONTRACTOR AND ALL SUB- <br />CONTRACTORS MUST CONFIRM THAT THEY WILL BE AVAILABLE FOR ON-SITE COMMISSIONING. IF ANY PARTY MISSES <br />THIS COMMISSIONING, THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS REQUIRED FOR AN ADDITIONAL <br />SITE VISIT BY VzW REP AND COMMISSIONING TESTER, INCLUDING TRAVEL EXPENSES. <br />COMMISSIONING <br />GENERAL CONTRACTOR TO COORDINATE WITH VERIZON WIRELESS FOR MEP COMMISSIONING AND FORWARD ALL <br />FUNCTIONALITY AND COMMISSIONING FORMS TO REQUIRED SUB-CONTRACTORS.COMMISSIONING WILL BE <br />COMPLETED ON ALL PROJECTS NOT JUST LEED PROJECTS.CONTRACTORS TO REFER TO VZW BID PACKAGE FOR <br />FORMS AND TESTING REQUIREMENTS.ALL CONTRACTORS TO REFER TO THE DOCUMENT TITLED COMMISSIONING <br />TESTING SCHEDULE WITHIN THE BID PACKAGE.THIS FILE WILL OUTLINE THE REQUIRED SCHEDULE AND THE <br />MATERIALS/EQUIPMENT THE SUB-CONTRACTOR WILL BE RESPONSIBLE TO BRING TO COMPLETE THE TESTING.VZW <br />WILL ESTABLISH A DATE FOR THIS TESTING.THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS MUST <br />CONFIRM THAT THEY WILL BE AVAILABLE ON SITE FOR THE COMMISSIONING. TEST AND BALANCE CONTRACTOR <br />SHALL BE ON SITE DURING COMMISSIONING WITH THE SAME EQUIPMENT USED FOR THE TEST AND BALANCE TO <br />VALIDATE AIRFLOWS. <br />15A.2 DUCT INSULATION, DUCTWORK, ACCESSORIES, AND FANS <br />DUCT INSULATION <br />COVER CONCEALED RIGID ROUND AND RECTANGULAR DUCTWORK WITH 2-1/4" THICK, 3/4-POUND DENSITY MINIMUM <br />R-6.0 DUCT WRAP, CERTAINTEED, OR EQUIVALENT OWENS-CORNING OR KNAUF WITH HEAVY DUTY FOIL-SCRIM- <br />KRAFT FACING AND WITH JOINTS TAPED WITH 3" WIDE FOIL TAPE AS FOLLOWS: <br />A. SUPPLY AND RETURN AIR DUCTWORK IN ENTIRETY. <br />B. EXHAUST AND RELIEF AIR DUCTWORK WITHIN 10 FEET OF EXTERIOR DISCHARGE. <br />PROVIDE 1/2-INCH THICK RIGID DUCT ACOUSTICAL LINER FOR SUPPLY AIR AND RETURN AIR DUCTS WHERE <br />INDICATED ON PLANS. (INCREASE DUCT SIZES SHOWN ON PLANS TO MAINTAIN INSIDE CLEAR DIMENSIONS) <br />INSULATING MATERIALS, ADHESIVES, COATINGS, ETC. SHALL NOT EXCEED FLAME SPREAD RATING OF 25 AND <br />SMOKE DEVELOPMENT RATING OF 50 PER ASTM E 84; ADHESIVES, COATINGS, ETC. SHALL COMPLY WITH "V.O.C." <br />LIMITS AS SPECIFIED IN THE LEED GREEN SPECIFICATIONS. CONTAINERS FOR MASTICS AND ADHESIVES SHALL <br />HAVE UL LABEL. <br />CONTRACTOR SHALL INSPECT THE INSULATION OF ALL EXISTING AND NEW SUPPLY AIR DUCTWORK CONNECTIONS <br />AND REPAIR AS REQUIRED. <br />DUCTWORK <br />DUCT CONSTRUCTION, BOTH METAL AND FLEXIBLE, SHALL BE PERFORMED IN ACCORDANCE WITH CURRENT <br />SMACNA HVAC DUCT CONSTRUCTION STANDARDS. <br />PROVIDE RECTANGULAR GALVANIZED STEEL DUCTWORK AND HOUSINGS TO SIZES AS SHOWN ON DRAWINGS. <br />CONSTRUCT DUCTWORK INCLUDING FITTINGS AND TRANSITIONS IN CONFORMANCE WITH CURRENT SMACNA <br />STANDARDS RELATIVE TO GAUGE, BRACING, JOINTS, ETC. MINIMUM THICKNESS OF DUCT SHALL BE 26-GAUGE SHEET <br />METAL. REINFORCE HOUSINGS AND DUCTWORK OVER 30" WITH 1-1/4" ANGLES NOT LESS THAN 5'-6" ON CENTERS, <br />AND CLOSER IF REQUIRED FOR SUFFICIENT RIGIDITY TO PREVENT VIBRATION. <br />PROVIDE ROUND AND FLAT-OVAL DUCT TO SIZES AS SHOWN ON DRAWINGS. APPROVED MANUFACTURERS OF <br />ROUND AND FLAT-OVAL SPIRAL LOCK-SEAM DUCTS ARE LINDAB INC, MCGILL AIRFLOW CORP, SEMCO INC, LAPINE <br />METAL PRODUCTS, OR APPROVED EQUAL. ROUND AND FLAT-OVAL SPIRAL LOCK-SEAM SUPPLY AND RETURN DUCTS <br />SHALL BE FABRICATED OF GALVANIZED STEEL ACCORDING TO SMACNA STANDARDS BASED ON PRESSURE CLASS. <br />MINIMUM THICKNESS OF DUCT SHALL BE 26 GAUGE SHEET METAL. ROUND AND FLAT-OVAL FITTINGS SHALL BE <br />FACTORY FABRICATED WELDED DESIGN. DUCTS UP TO 20 INCHES IN DIAMETER SHALL HAVE CENTER-BEADED SLIP <br />COUPLING, SEALED BEFORE AND AFTER FASTENING, ATTACHED WITH SHEET METAL SCREWS. DUCTS 21 TO 72 <br />INCHES SHALL HAVE A THREE-PIECE GASKETED FLANGED JOINT CONSISTING OF TWO INTERNAL FLANGES WITH <br />SEALANT AND ONE EXTERNAL CLOSURE BAND WITH GASKET. PREFABRICATED CONNECTION SYSTEM CONSISTING <br />OF FLANGES AND GASKET ARE ACCEPTABLE, APPROVED MANUFACTURERS ARE DUCTMATE INDUSTRIES INC AND <br />LINDAB. ELBOWS, TEES, AND BENDS SHALL HAVE A RADIUS NOT LESS THAN 1-1/2 TIMES THE WIDTH OF THE <br />CENTERLINE. TRANSITIONS IN DUCT SIZE SHALL BE GRADUAL NOT EXCEEDING 15 DEGREES WHERE POSSIBLE. <br />ROUND ELBOWS UP TO 14 INCHES SHALL BE PLEATED AND GORED FOR 16 INCH AND ABOVE. ALL FLAT OVAL ELBOWS <br />SHALL BE GORED. 90 DEGREE TEES, LATERALS, AND CONICAL TEES SHALL BE FABRICATED TO SMACNA. <br />SUPPORT HORIZONTAL RUNS OF DUCT FROM STRAP IRON HANGERS ON CENTERS NOT TO EXCEED 8'-0". DO NOT <br />SUPPORT CEILING GRID, CONDUITS, PIPES, EQUIPMENT, ETC. FROM DUCTWORK. COORDINATE ROUTING OF <br />DUCTWORK WITH OTHER CONTRACTORS SUCH THAT PIPING, ELECTRICAL CONDUIT, AND ASSOCIATED SUPPORTS <br />ARE NOT ROUTED THROUGH THE DUCTWORK. <br />CONSTRUCT SUPPLY DUCTS TO MEET SMACNA POSITIVE PRESSURE OF 2" W.G. CONSTRUCT RETURN, OUTDOOR AND <br />EXHAUST DUCTWORK UPSTREAM OF FANS TO MEET SMACNA NEGATIVE PRESSURE OF 1"W.G. CONSTRUCT EXHAUST <br />DUCTWORK DOWNSTREAM OF FANS TO MEET SMACNA POSITIVE PRESSURE OF 1" W.G. <br />SEAL DUCTWORK WITH HEAVY LIQUID SEALANT -SEALANTS SHALL COMPLY WITH THE FOLLOWING REQUIREMENTS: <br />MILL FINISH ALUMINUM SUBSTRATE WITH GRAY ADHESIVES, MINIMUM 30 MIL THICK, MINIMUM 17 LB/IN PEEL <br />STRENGTH, MAX SMOKE DEVELOPED OF 50 WHEN TESTED IN ACCORDANCE WITH ASTM G-53, VOC CONTENT OF 250 <br />g/L OR LESS, PRESSURE CLASS UP TO 10" W.C. -HARDCAST IRONGRIP 601, DESIGN POLYMER DP 1010, UNITED <br />MCGlLL DUCT SEALER OR APPROVED EQUAL APPLIED ACCORDING TO SEALANT MANUFACTURER'S INSTRUCTIONS. <br />OUTDOOR DUCTWORK SHALL BE SEALED TO: SUPPLY -CLASS A; EXHAUST -CLASS C; RETURN -CLASS A. INDOOR <br />DUCTWORK SHALL BE SEALED TO: SUPPLY -CLASS C; EXHAUST -CLASS B; RETURN -CLASS C. <br />PROVIDE RADIUS ELBOWS, TURNS AND OFFSETS WITH A MINIMUM CENTERLINE RADIUS OF 1-1/2 TIMES THE DUCT <br />WIDTH. WHERE SPACE DOES NOT PERMIT FULL RADIUS ELBOWS PROVIDE SHORT RADIUS ELBOWS WITH A MINIMUM <br />OF TWO CONTINUOUS SPLITTER VANES. VANES SHALL BE THE ENTIRE LENGTH OF THE BEND. PROVIDE MITERED <br />ELBOWS WHERE SPACE DOES NOT PERMIT RADIUS ELBOWS WHERE SHOWN ON THE DRAWINGS OR AT THE OPTION <br />OF THE CONTRACTOR WITH THE ENGINEER'S APPROVAL. MITERED ELBOWS LESS THAN 45 DEGREES SHALL NOT <br />REQUIRE TURNING VANES. MITERED ELBOWS 45 DEGREES AND GREATER SHALL HAVE SINGLE THICKNESS TURNING <br />VANES OF SAME GAUGE AS DUCTWORK RIGIDLY FASTENED WITH GUIDE STRIPS IN DUCTWORK. VANES FOR MITERED <br />ELBOWS SHALL BE PROVIDED IN ALL SUPPLY AND EXHAUST DUCTWORK AND IN RETURN AND OUTSIDE AIR <br />DUCTWORK THAT HAS AN AIR VELOCITY EXCEEDING 1000 FPM. <br />DUCTS SHALL BE CONNECTED TO FANS, FAN CASINGS AND FAN PLENUMS BY MEANS OF FLEXIBLE CONNECTORS. <br />FLEXIBLE CONNECTORS SHALL BE NEOPRENE-COATED, GLASS CLOTH CANVAS CONNECTIONS, DURO-DYNE, ELGEN, <br />VENTFABRIC OR EQUAL. FLEX IBLE CONNECTORS SHALL HAVE A FLAME SPREAD OF 25 OR LESS AND SMOKE <br />DEVELOPED RATING NOT HIGHER THAN 50. MAKE AIRTIGHT JOINTS AND INSTALL WITH MINIMUM 1-1/2" SLACK. <br />PROVIDE BALANCING DAMPERS MANUFACTURED BY RUSKIN, GREENHECK, NAILOR INDUSTRIES, CESCO, LOUVERS & <br />DAMPERS, POTTORFF OR APPROVED EQUAL, WHERE SHOWN ON DRAWINGS AND WHEREVER NECESSARY FOR <br />COMPLETE ACCESS & CONTROL OF AIR FLOW. SPLITTER DAMPERS SHALL BE CONTROLLED BY LOCKING QUADRANTS; <br />PROVIDE YOUNG REGULATOR OR VENTLOK END BEARINGS FOR THE DAMPER ROD. RECTANGULAR VOLUME <br />DAMPERS SHALL BE OPPOSED BLADE INTERLOCKING TYPE. ROUND VOLUME DAMPERS SHALL BE BUTTERFLY TYPE <br />CONSISTING OF CIRCULAR BLADE MOUNTED TO A SHAFT. <br />DAMPER LEAKAGE FOR OUTSIDE AIR DAMPERS SHALL NOT EXCEED THE FOLLOWING AT 1" W.G. PRESSURE <br />DIFFERENTIAL ACROSS THE DAMPER: <br />• 4 CFM/SQ FT OF DAMPER AREA (CLIMATE ZONES 1,2,6,7,8 ) <br />• 10 CFM/SQ FT OF DAMPER AREA (MOTORIZED) -(ALL OTHER CLIMATE ZONES) <br />• 20 CFM/SQ FT OF DAMPER AREA (NON-MOTORIZED) -(ALL OTHER CLIMATE ZONES) <br />• 40 CFM/SQ FT IF THE DAMPERS ARE < 24”IN EITHER DIMENSION -(ALL OTHER CLIMATE ZONES <br />REFERENCE MANUFACTURER AND MODEL NUMBER FOR OUTDOOR AIR DAMPERS IS RUSKIN MODEL CD-50. PROVIDE <br />FLEXMASTER MODEL 'STO' OR EQUAL. 45-DEGREE RECTANGULAR/ROUND SIDE TAKEOFF FITTING WITH MODEL 'SLBO' <br />DOUBLE BEARING DAMPER WITH INSULATION BUILD-OUT FOR ROUND DUCTWORK, BRANCH TAKEOFFS, AND <br />INDIVIDUAL AIR DEVICES. <br />WHERE ACCESS TO DAMPERS THROUGH A CEILING IS REQUIRED, PROVIDE A METROPOLITAN AIR TECHNOLOGY <br />MODEL RT-250 OR EQUAL BY YOUNG'S REGULATOR CONCEALED, CABLE-OPERATED VOLUME DAMPER WITH REMOTE <br />OPERATOR. DAMPER SHALL BE ADJUSTABLE THROUGH THE DIFFUSER FACE OR FRAME WITH STANDARD 1NUT- <br />DRIVER OR FLAT SCREWDRIVER. CABLE ASSEMBLY SHALL ATTACH TO DAMPER AS ONE PIECE WITH NO LINKAGE <br />ADJUSTMENT. POSITIVE, DIRECT, TWO-WAY DAMPER CONTROL SHALL BE PROVIDED WITH NO SLEEVES, SPRINGS OR <br />SCREW ADJUSTMENTS TO COME LOOSE AFTER INSTALLATION. SUPPORT CABLE ASSEMBLY TO AVOID BENDS AND <br />KINKS IN CABLE. <br />ROUND OR OVAL DUCTWORK SHALL BE SEMCO, UNITED, WESCO OR EQUAL, SHEETMETAL WITH SMOOTH INTERIOR <br />SURFACE WITH LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2" W.G.) ROUND DUCTWORK GAUGES <br />PER THE FOLLOWING TABLE (REFERENCE SMACNA HVAC DUCT CONSTRUCTION STANDARDS FOR GAUGES WHEN <br />PRESSURES EXCEED 2" W.G.): <br />SIZE DUCT GAUGE FITTING GAUGE <br />14" & UNDER 26 24 <br />15" THRU 26"24 22 <br />28" THRU 36"22 20 <br />LINDAB SPIROSAFE, LEWIS & LAMBERT OR APPROVED EQUAL FACTORY-MANUFACTURED ROUND DUCTWORK AND <br />FITTINGS MAY BE SUBSTITUTED FOR SPECIFIED ROUND BRANCH DUCTWORK AT CONTRACTOR'S OPTION. HEAVY <br />LIQUID JOINT SEALANT MAY BE OMITTED ON FACTORY-MANUFACTURED ROUND DUCTWORK. <br />SUBMIT THREE COPIES OF LITERATURE BOUND IN APPROVED BINDERS WITH INDEX AND TABS SEPARATING <br />EQUIPMENT TYPES TO THE OWNER AT THE TERMINATION OF THE WORK. PAPER CLIPS, STAPLES, RUBBER BANDS <br />AND MAILING ENVELOPES ARE NOT CONSIDERED APPROVED BINDERS. FINAL APPROVAL OF MECHANICAL SYSTEMS <br />INSTALLED UNDER THIS CONTRACT WILL BE WITHHELD UNTIL THIS EQUIPMENT BROCHURE IS RECEIVED AND DEEMED <br />COMPLETE BY THE ARCHITECT AND ENGINEER. INSTRUCT SUB-CONTRACTORS TO SAVE REQUIRED LITERATURE <br />SHIPPED WITH THE EQUIPMENT ITSELF FOR INCLUSION IN THIS BROCHURE. <br />PROVIDE "AS-BUILT" DRAWINGS WITHIN TWO (2) WEEKS OF PROJECT COMPLETION. <br />TRAINING <br />AT A TIME MUTUALLY AGREED UPON BETWEEN THE OWNER AND CONTRACTOR, PROVIDE THE SERVICES OF A <br />FACTORY TRAINED AND AUTHORIZED REPRESENTATIVE TO TRAIN OWNER'S DESIGNATED PERSONNEL ON THE <br />OPERATION AND MAINTENANCE OF THE EQUIPMENT PROVIDED FOR THIS PROJECT. PROVIDE TRAINING TO INCLUDE, <br />BUT NOT BE LIMITED TO, AN OVERVIEW OF THE SYSTEM AND/OR EQUIPMENT AS IT RELATES TO THE FACILITY AS A <br />WHOLE, OPERATION AND MAINTENANCE PROCEDURES AND SCHEDULES RELATED TO STARTUP AND SHUTDOWN, <br />TROUBLESHOOTING, SERVICING, PREVENTIVE MAINTENANCE AND APPROPRIATE OPERATOR INTERVENTION; AND <br />REVIEW OF DATA INCLUDED IN THE OPERATION AND MAINTENANCE MANUALS. <br />SUBMIT A CERTIFICATION LETTER TO THE ARCHITECT STATING THAT THE OWNER'S DESIGNATED REPRESENTATIVE <br />HAS BEEN TRAINED AS SPECIFIED HEREIN. LETTER SHALL INCLUDE DATE, TIME, ATTENDEES AND SUBJECT OF <br />TRAINING. THE CONTRACTOR AND THE OWNER'S REPRESENTATIVE SHALL SIGN THE CERTIFICATION LETTER <br />INDICATING AGREEMENT THAT THE TRAINING HAS BEEN PROVIDED. <br />SCHEDULE OWNER TRAINING WITHIN AT LEAST 7 DAYS ADVANCE NOTICE. <br />SPARE PARTS <br />THIS CONTRACTOR SHALL PROVIDE TO THE OWNER, WITH RECEIPT, THE FOLLOWING SPARE PARTS FOR THE <br />EQUIPMENT INSTALLED FOR THIS PROJECT: <br />A. ONE SET OF SPARE FILTERS OF EACH TYPE REQUIRED FOR EACH UNIT. IN ADDITION TO THE SPARE SET OF <br />FILTERS, INSTALL NEW FILTERS PRIOR TO TESTING, ADJUSTING AND BALANCING WORK AND BEFORE TURNING <br />SYSTEM OVER TO OWNER. <br />B. ONE COMPLETE SET OF BELTS FOR EACH FAN. <br />C. THREE OPERATING KEYS FOR EACH TYPE OF AIR OUTLET AND INLET THAT REQUIRE THEM. <br />WARRANTIES <br />WARRANT EACH SYSTEM AND EACH ELEMENT THEREOF AGAINST ALL DEFECTS DUE TO FAULTY WORKMANSHIP, <br />DESIGN OR MATERIAL FOR A PERIOD OF 12 MONTHS FROM DATE OF SUBSTANTIAL COMPLETION UNLESS SPECIFIC <br />ITEMS ARE NOTED TO CARRY A LONGER WARRANTY IN THE CONSTRUCTION DOCUMENTS OR MANUFACTURER'S <br />STANDARD WARRANTY EXCEEDS 12 MONTHS. REMEDY ALL DEFECTS OCCURRING WITHIN THE WARRANTY PERIOD(S) <br />AS STATED IN THE GENERAL CONDITIONS AND DIVISION 1. <br />WARRANTIES SHALL INCLUDE LABOR AND MATERIAL. MAKE REPAIRS OR REPLACEMENTS WITHOUT ANY ADDITIONAL <br />COSTS TO THE OWNER. <br />AT THE TIME OF SUBSTANTIAL COMPLETION, DELIVER TO THE OWNER ALL WARRANTIES, IN WRITING AND PROPERLY <br />EXECUTED, INCLUDING TERM LIMITS FOR WARRANTIES EXTENDING BEYOND THE ONE YEAR PERIOD, EACH <br />WARRANTY INSTRUMENT BEING ADDRESSED TO THE OWNER AND STATING THE COMMENCEMENT DATE AND TERM. <br />CUTTING AND PATCHING <br />PERFORM CUTTING OF WALLS, FLOORS, CEILINGS, ETC. AS REQUIRED TO INSTALL WORK UNDER THIS SECTION. <br />OBTAIN PERMISSION FROM THE ARCHITECT PRIOR TO CUTTING. DO NOT CUT OR DISTURB STRUCTURAL MEMBERS <br />WITHOUT PRIOR APPROVAL FROM THE ARCHITECT. CUT HOLES AS SMALL AS POSSIBLE. GENERAL CONTRACTOR <br />SHALL PATCH WALLS, FLOORS, ETC. AS REQUIRED BY WORK UNDER THIS SECTION. PATCHING SHALL MATCH THE <br />ORIGINAL MATERIAL AND CONSTRUCTION. REPAIR AND REFINISH AREAS DISTURBED BY WORK TO THE CONDITION OF <br />ADJOINING SURFACES IN A MANNER SATISFACTORY TO THE ARCHITECT. <br />ROUGH-IN <br />COORDINATE WITHOUT DELAY ROUGHING-IN WITH GENERAL CONSTRUCTION. CONCEAL PIPING AND CONDUIT ROUGH- <br />IN EXCEPT IN UNFINISHED AREAS AND WHERE OTHERWISE SHOWN. <br />STRUCTURAL STEEL <br />STRUCTURAL STEEL USED FOR SUPPORT OF EQUIPMENT, DUCTWORK AND PIPING SHALL BE NEW, CLEAN AND <br />CONFORM TO ASTM DESIGNATION A-36. <br />SUPPORT MECHANICAL COMPONENTS FROM THE BUILDING STRUCTURE. DO NOT SUPPORT MECHANICAL <br />COMPONENTS FROM CEILINGS, OTHER MECHANICAL OR ELECTRICAL COMPONENTS, NOR OTHER NON-STRUCTURAL <br />ELEMENTS. <br />ACCESS DOORS <br />PROVIDE ACCESS DOORS IN CEILINGS, WALLS, ETC. WHERE INDICATED OR REQUIRED FOR ACCESS OR MAINTENANCE <br />TO CONCEALED VALVES AND EQUIPMENT INSTALLED UNDER THIS SECTION. PROVIDE CONCEALED HINGES, <br />SCREWDRIVER-TYPE LOCK, ANCHOR STRAPS; MANUFACTURED BY MILCOR, ZURN, TITUS OR EQUAL. OBTAIN <br />ARCHITECT'S APPROVAL OF TYPE, SIZE, LOCATION AND COLOR BEFORE ORDERING. <br />PENETRATIONS <br />SEAL ELEVATED FLOOR, EXTERIOR WALL AND ROOF PENETRATIONS WATERTIGHT AND WEATHERTIGHT WITH NON- <br />SHRINK, NON-HARDENING COMMERCIAL SEALANT. PACK WITH MINERAL WOOL AND SEAL BOTH ENDS WITH MINIMUM <br />OF 1/2" OF SEALANT. SEAL AROUND PENETRATIONS OF FIRE-RATED ASSEMBLIES. COORDINATE FIRE RATINGS AND <br />LOCATIONS WITH THE ARCHITECTURAL DRAWINGS. REFER TO ARCHITECTURAL SPECIFICATIONS FOR FIRE STOPPING. <br />PROVIDE A PRODUCT SCHEDULE FOR UL LISTING, LOCATION, WALL OR FLOOR RATING AND INSTALLATION DRAWING <br />FOR EACH PENETRATION FIRE STOP SYSTEM. <br />PROVIDE PRE-FABRICATED ROOF CURBS MANUFACTURED BY CUSTOM CURB, INC., PATE COMPANY, THYCURB OR <br />APPROVED EQUAL. PROVIDE ROOF CURB WITH FACTORY INSTALLED WOOD NAILER; WELDED 18-GAUGE GALVANIZED <br />STEEL SHELL, BASE PLATE AND FLASHING; 1/2" THICK, 3-POUND RIGID INSULATION; FULLY MITERED 3-INCH RAISED <br />CANT; COVER OF WEATHER RESISTANT, WEATHER-PROOF MATERIAL AND PIPE COLLAR OF WEATHER-RESISTANT <br />MATERIAL WITH STAINLESS STEEL PIPE CLAMPS. <br />AIR FILTERS <br />IF HVAC EQUIPMENT IS USED DURING THE CONSTRUCTION PERIOD, THIS CONTRACTOR SHALL PROVIDE MINIMUM <br />MERV-8 FILTERS OR FILTRATION MEDIA OVER ANY RETURN AIR GRILLES AND OPEN RETURN AIR DUCT WORK FOR <br />THE DURATION OF THE CONSTRUCTION PERIOD. CONTRACTOR SHALL PROVIDE ONE SET OF FILTERS WHEN THE UNIT <br />IS STARTED AND REPLACE FILTERS AS NEEDED, BUT NOT LESS THAN EVERY FOUR WEEKS. <br />ON THE DAY OF SUBSTANTIAL COMPLETION, THE CONTRACTOR SHALL CLEAN THE UNIT AND PROVIDE A NEW SET OF <br />FILTERS IN THE UNIT. <br />PROVIDE MINIMUM MERV-13 FILTERS MANUFACTURED BY FARR, AMERICAN AIR FILTER, FLANDERS, OR APPROVED <br />EQUAL, UNLESS OTHERWISE NOTED. AIR UNITS SHALL HAVE NEW FILTERS INSTALLED WHEN THEY ARE OPERATED <br />BEFORE FINAL ACCEPTANCE. <br />MOTORS AND STARTERS <br />PROVIDE MOTORS AND STARTING EQUIPMENT WHERE NOT FURNISHED WITH THE EQUIPMENT PACKAGE. MOTORS <br />SHALL HAVE COPPER WINDINGS, CLASS B INSULATION, AND STANDARD SQUIRREL CAGE WITH STARTING TORQUE <br />CHARACTERISTICS SUITABLE FOR THE EQUIPMENT SERVED. MOTORS FOR AIR HANDLING EQUIPMENT SHALL BE <br />SELECTED FOR QUIET OPERATION. EACH MOTOR SHALL BE CHECKED FOR PROPER ROTATION AFTER ELECTRICAL <br />CONNECTION HAS BEEN COMPLETED. PROVIDE DRIP-PROOF ENCLOSURE FOR LOCATIONS PROTECTED FROM <br />WEATHER AND NOT IN AIR STREAM OF FAN; AND TOTALLY ENCLOSED FAN-COOLED ENCLOSURE FOR MOTORS <br />EXPOSED TO WEATHER. MOTORS SHALL BE MANUFACTURED BY CENTURY, GENERAL ELECTRIC, WESTINGHOUSE, <br />LOUIS-ALLIS OR APPROVED EQUAL. <br />PROVIDE EVERY MOTOR, EXCEPT FRACTIONAL HORSEPOWER SINGLE PHASE MOTORS WITH AN APPROVED TYPE OF <br />BUILT-IN THERMAL OVERLOAD PROTECTION, WITH A MOTOR STARTER. EACH STARTER SHALL BE PROVIDED WITH <br />OVERLOAD HEATERS SIZED TO THE MOTOR RATING, AND EVERY THREE-PHASE MOTOR STARTER SHALL HAVE <br />OVERLOAD HEATERS IN EACH PHASE. AMBIENT COMPENSATED HEATERS SHALL BE INSTALLED WHEREVER <br />NECESSARY, UNLESS NOTED OTHERWISE. MOTOR STARTERS SHALL BE FURNISHED BY THE DIVISION 15 <br />CONTRACTOR. FOR INSTALLATION AND CONNECTION BY THE DIVISION 16 CONTRACTOR, STARTERS SHALL BE ALLEN- <br />BRADLEY, CLARK, FURNAS, SQUARE D, OR APPROVED EQUAL. <br />ELECTRICAL WIRING <br />LINE VOLTAGE WIRING, CONTROLS AND INTERLOCK WIRING FOR MECHANICAL SYSTEMS SHALL BE PROVIDED BY <br />DIVISION 16 CONTRACTOR. LOW VOLTAGE CONTROL WIRING SHALL BE PROVIDED BY THE DIVISION 15 CONTRACTOR. <br />FURNISH WIRING DIAGRAMS TO THE DIVISION 16 CONTRACTOR AS REQUIRED FOR PROPER EQUIPMENT HOOKUP. <br />COORDINATE WITH THE DIVISION 16 CONTRACTOR THE ACTUAL WIRE SIZING AMPS FOR MECHANICAL EQUIPMENT <br />(FROM THE EQUIPMENT NAMEPLATE) TO ENSURE PROPER INSTALLATION. <br />ALL LOW VOLTAGE CONTROL WIRING (24 -VOLT) SHALL BE IN CONDUIT AND IN ACCORDANCE WITH THE NATIONAL <br />ELECTRICAL CODE AND ALL STATE AND LOCAL CODES AND ORDINANCES AND SHALL BE DONE BY THIS HVAC <br />CONTRACTOR. <br />REFRIGERANT AND OIL <br />PROVIDE FULL REFRIGERANT AND OIL CHARGE IN NEW AIR CONDITIONING REFRIGERATION SYSTEMS, AND MAINTAIN <br />IT FOR FULL TERM OF THE GUARANTEE. <br />ALL NEW MECHANICAL EQUIPMENT SHALL UTILIZE R-410A. <br />EQUIPMENT FURNISHED BY OTHERS <br />PROVIDE NECESSARY EQUIPMENT AND ACCESSORIES THAT ARE NOT PROVIDED BY THE EQUIPMENT SUPPLIER OR <br />OWNER TO COMPLETE INSTALLATION OF EQUIPMENT FURNISHED BY OTHERS IN LOCATIONS AS INDICATED ON THE <br />DRAWINGS AND/OR DESCRIBED IN THE GENERAL NOTES TO THIS CONTRACTOR. EQUIPMENT AND ACCESSORIES NOT <br />PROVIDED BY THE EQUIPMENT SUPPLIER MAY INCLUDE CONDENSATE DRAINS, FLUES, VENTS, INTAKES, ASSOCIATED <br />ROOF JACKS AND CAPS TO EXTERIOR, DAMPERS, INLINE FANS, ROOF FANS, CONTROL INTERLOCKS, ETC. AS <br />REQUIRED FOR PROPER OPERATION OF THE COMPLETE SYSTEM IN ACCORDANCE WITH THE MANUFACTURER'S <br />INSTRUCTIONS. <br />CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE INSPECTION OF ALL EXISTING EQUIPMENT PROVIDED BY THE <br />LANDLORD. UPON COMPLETION OF INSPECTION, CONTRACTOR SHALL NOTIFY VERIZON WIRELESS REPRESENTATIVE <br />OF ANY REQUIRED OR RECOMMENDED REPAIRS TO, AND/OR REPLACEMENT OF, EXISTING SYSTEMS THAT HAVE NOT <br />BEEN SPECIFICALLY NOTED IN THE CONSTRUCTION DOCUMENTS. <br />CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECT ROUGH-IN DIMENSIONS AND SHALL VERIFY SAME WITH <br />ARCHITECT AND/OR EQUIPMENT SUPPLIER PRIOR TO SERVICE INSTALLATIONS. <br />15A.1 GENERAL INSTRUCTIONS <br />GENERAL REQUIREMENTS <br />REQUIREMENTS UNDER DIVISION ONE AND THE GENERAL AND SUPPLEMENTARY CONDITIONS OF THESE <br />SPECIFICATIONS SHALL BE A PART OF THIS SECTION. CONTRACTOR SHALL BECOME THOROUGHLY ACQUAINTED <br />WITH ITS CONTENTS AS TO REQUIREMENTS THAT AFFECT THIS DIVISION OR SECTION. THE WORK REQUIRED UNDER <br />THIS SECTION INCLUDES MATERIAL, EQUIPMENT, APPLIANCES, TRANSPORTATION, SERVICES AND LABOR REQUIRED <br />TO COMPLETE THE ENTIRE SYSTEM AS REQUIRED BY THE DRAWINGS AND SPECIFICATIONS. <br />THE SPECIFICATIONS AND DRAWINGS FOR THE PROJECT ARE COMPLEMENTARY, AND THE PORTIONS OF THE WORK <br />DESCRIBED IN ONE SHALL BE PROVIDED AS IF DESIRED IN BOTH. IN THE EVENT OF DISCREPANCIES, NOTIFY THE <br />ENGINEER AND REQUEST CLARIFICATION PRIOR TO PROCEEDING WITH THE WORK. <br />VISIT TO SITE <br />PRIOR TO SUBMITTING A PROPOSAL, THE CONTRACTOR SHALL VISIT AND EXAMINE THE PREMISES OF THE <br />PROPOSED WORK & FAMILIARIZE HIMSELF WITH PROJECT CONDITIONS (I.E.; ANY STRUCTURAL, ARCHITECTURAL OR <br />ELECTRICAL OBSTRUCTIONS. NO CLAIMS FOR "EXTRA" COMPENSATION DUE TO UNFAMILIARITY WITH EXISTING <br />CONDITIONS AND/OR DESIGN DRAWINGS OR SPECIFICATIONS WILL BE CONSIDERED. <br />MATERIALS AND WORKMANSHIP <br />PROVIDE NEW MATERIAL, EQUIPMENT, AND APPARATUS UNDER THIS CONTRACT, UNLESS NOTED OTHERWISE, OF <br />BEST QUALITY NORMALLY USED IN GOOD COMMERCIAL PRACTICE, AND FREE FROM DEFECTS. MODEL NUMBERS <br />SHOWN IN THE DOCUMENTS ARE NOT NECESSARILY INTENDED TO DESIGNATE ALL REQUIRED ACCESSORIES AND <br />TRIM; WRITTEN DESCRIPTIONS GOVERN MODEL NUMBER VARIATIONS. <br />PIPE, PIPE FITTINGS, PIPE SPECIALTIES, AND VALVES SHALL BE MANUFACTURED IN PLANTS LOCATED IN THE UNITES <br />STATES. <br />WORK PERFORMED UNDER THIS CONTRACT SHALL PROVIDE A NEAT AND "WORKMANLIKE" APPEARANCE WHEN <br />COMPLETED, TO THE SATISFACTIONS OF THE ARCHITECT AND ENGINEER. WORKMANSHIP SHALL BE THE FINEST <br />POSSIBLE BY EXPERIENCED MECHANICS. INSTALLATIONS SHALL COMPLY WITH ALL APPLICABLE CODES AND LAWS. <br />THE COMPLETE INSTALLATION SHALL FUNCTION AS DESIGNED AND INTENDED WITH RESPECT TO EFFICIENCY, <br />CAPACITY, NOISE LEVEL, ETC. ABNORMAL NOISE CAUSED BY RATTLING EQUIPMENT, PIPING, DUCTS, AIR DEVICES, <br />AND SQUEAKS IN ROTATING COMPONENTS WILL NOT BE ACCEPTABLE. IN GENERAL, MATERIALS AND EQUIPMENT <br />SHALL BE OF COMMERCIAL SPECIFICATION GRADE IN QUALITY. LIGHT DUTY AND RESIDENTIAL TYPE EQUIPMENT <br />WILL NOT BE ACCEPTED. <br />REMOVE FROM THE PREMISES ALL WASTE MATERIAL PRESENT AS A RESULT OF WORK, INCLUDING CARTONS, <br />CRATING, PAPER, STICKERS, AND/OR EXCAVATION MATERIAL NOT USED IN BACKFILLING, ETC., FOLLOWING ALL <br />CONSTRUCTION WASTE MANAGEMENT GUIDELINES. CLEAN EQUIPMENT INSTALLED UNDER THIS CONTRACT TO <br />PRESENT A NEAT AND CLEAN INSTALLATION AT THE TERMINATION OF THE WORK. <br />REPAIR OR REPLACE PUBLIC AND PRIVATE PROPERTY DAMAGED AS A RESULT OF WORK PERFORMED UNDER THIS <br />CONTRACT TO THE SATISFACTION OF AUTHORITIES AND REGULATIONS HAVING JURISDICTION. <br />COORDINATION <br />COORDINATE WORK WITH THAT OF OTHER TRADES SO THAT THE VARIOUS COMPONENTS OF THE SYSTEMS WILL BE <br />INSTALLED AT THE PROPER TIME, WILL FIT THE AVAILABLE SPACE, AND WILL ALLOW PROPER SERVICE ACCESS TO <br />THOSE ITEMS REQUIRING MAINTENANCE. COMPONENTS WHICH ARE INSTALLED WITHOUT REGARD TO THE <br />AFOREMENTIONED SHALL BE RELOCATED AT NO ADDITIONAL COST TO THE OWNER. <br />UNLESS OTHERWISE INDICATED, THE GENERAL CONTRACTOR WILL PROVIDE CHASES AND OPENINGS IN BUILDING <br />CONSTRUCTION REQUIRED FOR INSTALLATION OF THE SYSTEMS SPECIFIED HEREIN. CONTRACTOR SHALL FURNISH <br />THE GENERAL CONTRACTOR WITH INFORMATION WHERE CHASES AND OPENING ARE REQUIRED. <br />THE WORK SHALL BE LAID OUT FROM DIMENSIONS SHOWN ON THE DRAWINGS ONLY. DO NOT SCALE DRAWINGS. <br />CONTRACTOR SHALL WORK FROM MOST RECENT DRAWINGS SUPPLIED BY OWNER OR ARCHITECT. WORK SHALL BE <br />PERFORMED ONLY AFTER WRITTEN DIRECTION BY OWNER OR ARCHITECT. <br />MECHANICAL PLANS ARE PARTIALLY DIAGRAMMATIC, NOT SHOWING EVERY ITEM IN EXACT LOCATION OR DETAIL. <br />MEASUREMENTS AND LOCATIONS MUST BE COORDINATED WITH ARCHITECTURAL, STRUCTURAL, ELECTRICAL AND <br />OTHER BUILDING DRAWINGS. <br />CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO BEGINNING WORK AS VARIATIONS MAY OCCUR. <br />CONTRACTOR WILL BE HELD RESPONSIBLE FOR ERRORS THAT COULD HAVE BEEN AVOIDED BY PROPER INSPECTION <br />AND VERIFICATION. <br />CODES AND PERMITS <br />WORK PERFORMED UNDER THIS CONTRACT SHALL, AT A MINIMUM, BE IN FULL ACCORDANCE WITH ALL APPLICABLE <br />CODES, RULES AND REGULATIONS OF NATIONAL, STATE, COUNTY & MUNICIPAL AUTHORITIES HAVING JURISDICTION <br />OVER THE PREMISES. EQUIPMENT FURNISHED AND ASSOCIATED INSTALLATION WORK PERFORMED UNDER THIS <br />CONTRACT SHALL BE IN STRICT COMPLIANCE WITH CURRENT APPLICABLE CODES ADOPTED BY THE LOCAL <br />GOVERNING AUTHORITY INCLUDING ANY AMENDMENTS AND STANDARDS AS SET FORTH BY THE NATIONAL FIRE <br />PROTECTION ASSOCIATION (NFPA), UNDERWRITERS LABORATORIES (UL), OCCUPATIONAL SAFETY AND HEALTH <br />ADMINISTRATION (OSHA), AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME), AMERICAN SOCIETY OF HEATING, <br />REFRIGERATION, AND AIR CONDITIONING ENGINEERS (ASHRAE), AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), <br />AMERICAN SOCIETY OF TESTING MATERIALS (ASTM), AND OTHER NATIONAL STANDARDS AND CODES WHERE <br />APPLICABLE. WHERE THE CONTRACT DOCUMENTS EXCEED THE REQUIREMENTS OF THE REFERENCED CODES, <br />STANDARDS, ETC., THE CONTRACT DOCUMENTS SHALL TAKE PRECEDENT. <br />THIS CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, LICENSES AND CERTIFICATES OF INSPECTION <br />INCIDENTAL TO HIS WORK REQUIRED BY THE FOREGOING AUTHORITIES. ALL SUCH CERTIFICATES SHALL BE <br />DELIVERED TO THE ARCHITECT IN DUPLICATE. <br />PROTECTION OF EQUIPMENT AND MATERIALS <br />CONTRACTOR SHALL DEVELOP AND IMPLEMENT AN INDOOR AIR QUALITY MANAGEMENT PLAN THAT MEETS OR <br />EXCEEDS THE MINIMUM REQUIREMENTS OF 'SMACNA' IAQ GUIDELINES FOR OCCUPIED BUILDINGS UNDER <br />CONSTRUCTION, SECOND EDITION 2007, ANSI/SMACNA 008-2008 CHAPTER 3. CONTRACTOR SHALL MEET <br />REQUIREMENTS FOR CONSTRUCTION INDOOR AIR QUALITY MANAGEMENT PROVIDED IN THE LEED PROTOTYPE <br />GREEN SPECIFICATIONS. <br />STORE AND PROTECT FROM DAMAGE EQUIPMENT AND MATERIALS DELIVERED TO JOB SITE. COVER WITH <br />WATERPROOF, TEAR-RESISTANT HEAVY TARP OR POLYETHYLENE PLASTIC AS REQUIRED TO PROTECT FROM <br />PLASTER, DIRT, PAINT, WATER OR PHYSICAL DAMAGE. EQUIPMENT AND MATERIAL THAT HAS BEEN DAMAGED BY <br />CONSTRUCTION ACTIVITIES WILL BE REJECTED AND CONTRACTOR IS OBLIGATED TO FURNISH NEW EQUIPMENT AND <br />MATERIAL OF A LIKE KIND. <br />KEEP PREMISES BROOM CLEAN FROM FOREIGN MATERIAL CREATED DURING WORK PERFORMED UNDER THIS <br />CONTRACT. PIPING, EQUIPMENT, ETC. SHALL HAVE A NEAT AND CLEAN APPEARANCE AT THE TERMINATION OF THE <br />WORK. <br />PLUG, CAP OR COMPLETELY COVER ALL OPEN ENDS OF DUCTWORK AND PIPING SYSTEMS WHILE STORED AND/OR <br />INSTALLED DURING CONSTRUCTION WHEN NOT IN USE TO PREVENT THE ENTRANCE OF DEBRIS INTO THE SYSTEMS. <br />CONTRACTOR SHALL PROVIDE A MINIMUM OF 40 PHOTOGRAPHS (10 EACH WEEK OF DIFFERENT ITEMS AND/OR <br />VIEWS) OF CONSTRUCTION IAQ MANAGEMENT MEASURES SUCH AS PROTECTION OF DUCTS AND ON-SITE STORED <br />OR INSTALLED ABSORPTIVE MATERIALS. SEE CONSTRUCTION "IAQ" MANAGEMENT SPECIFICATIONS PROVIDED ON <br />THE LEED PROTOTYPE GREEN SPECIFICATIONS FOR MORE INFORMATION. <br />SUBSTITUTIONS <br />ITEMS SPECIFIED BY MANUFACTURER'S NAME AND/OR MODEL NUMBER INDICATES THE MINIMUM QUALITY, SIZE AND <br />CAPACITY REQUIRED. OTHER MANUFACTURER'S PRODUCTS OF EQUAL SPECIFICATIONS WILL BE CONSIDERED BUT <br />ONLY IF NOTED AT THE TIME OF BIDDING AND WITH THE WRITTEN APPROVAL OF THE ARCHITECT PRIOR TO <br />PURCHASING THE EQUIPMENT. <br />THE BASE BID SHALL INCLUDE ONLY THE PRODUCTS FROM MANUFACTURERS SPECIFICALLY NAMED IN THE <br />DRAWINGS AND SPECIFICATIONS. NO SUBSTITUTION WILL BE CONSIDERED PRIOR TO RECEIPT OF BIDS UNLESS <br />WRITTEN REQUEST FOR APPROVAL TO BID HAS BEEN RECEIVED BY THE ARCHITECT OR ENGINEER AT LEAST TEN <br />(10) CALENDAR DAYS PRIOR TO THE DATE FOR RECEIPT OF BIDS. EACH SUCH REQUEST SHALL INCLUDE THE NAME <br />OF THE MATERIAL OR EQUIPMENT FOR WHICH IT IS TO BE SUBSTITUTED AND A COMPLETE DESCRIPTION OF THE <br />PROPOSED SUBSTITUTE INCLUDING DRAWINGS, CUT SHEETS, PERFORMANCE AND TEST DATA, AND OTHER <br />INFORMATION NECESSARY FOR AN EVALUATION. A STATEMENT SETTING FORTH CHANGES IN OTHER MATERIALS, <br />EQUIPMENT OR OTHER WORK THAT INCORPORATION OF THE SUBSTITUTE WOULD REQUIRE SHALL BE INCLUDED. <br />THE BURDEN OF PROOF OF THE MERIT OF THE PROPOSED SUBSTITUTE IS UPON THE PROPOSER. THE ARCHITECT'S <br />OR ENGINEER'S DECISION OF APPROVAL OR DISAPPROVAL TO BID OF A PROPOSED SUBSTITUTE ON SHALL BE FINAL. <br />THE TERMS "APPROVED", "APPROVED EQUAL", AND "EQUAL" REFER TO APPROVAL BY THE ARCHITECT OR ENGINEER <br />AS AN ACCEPTABLE ALTERNATE BID. NO SUBSTITUTIONS WILL BE CONSIDERED THAT ARE NOT BID AS AN <br />ALTERNATE. NO MATERIAL SUBSTITUTIONS SHALL BE CONSIDERED FOR APPROVAL PRIOR TO AWARD OF <br />CONTRACT. <br />COORDINATE AND VERIFY WITH OTHER TRADES WHETHER OR NOT THE SUBSTITUTED EQUIPMENT CAN BE <br />INSTALLED AS SHOWN ON THE CONSTRUCTION DRAWINGS WITHOUT MODIFICATION TO ASSOCIATED SYSTEMS OR <br />ARCHITECTURAL OR ENGINEERING DESIGN. INCLUDE ADDITIONAL COSTS FOR ARCHITECTURAL AND ENGINEERING <br />DESIGN FEES IN BID IF DRAWING MODIFICATIONS ARE REQUIRED BECAUSE OF SUBSTITUTED EQUIPMENT. <br />SUBSTITUTIONS FOR ANY REFRIGERANTS OR EQUIPMENT SHALL BE SUBMITTED AND APPROVED BY ARCHITECT <br />FOR LEED REQUIREMENTS. SEE REQUIREMENTS FOR SUBSTITUTIONS ON THE LEED PROTOTYPE GREEN <br />SPECIFICATIONS. <br />ELECTRONIC DRAWING FILES <br />IN PREPARATION OF SHOP DRAWINGS OR RECORD DRAWINGS, CONTRACTOR MAY, AT HIS OPTION, OBTAIN <br />ELECTRONIC DRAWINGS FILES IN AUTOCAD OR DXF FORMAT AS DESIRED FROM THE ARCHITECT OR ENGINEER. <br />OPERATION AND MAINTENANCE INSTRUCTIONS <br />DURING THE COURSE OF CONSTRUCTION, COLLECT AND COMPILE A COMPLETE BROCHURE OF EQUIPMENT <br />FURNISHED AND INSTALLED ON THIS PROJECT. INCLUDE OPERATIONAL AND MAINTENANCE INSTRUCTIONS, <br />MANUFACTURER'S CATALOG SHEETS, WIRING DIAGRAMS, PARTS LISTS, APPROVED SHOP DRAWINGS AND <br />DESCRIPTIVE LITERATURE AS FURNISHED BY THE EQUIPMENT MANUFACTURER. INCLUDE AN INSIDE COVER SHEET <br />THAT LISTS THE PROJECT NAME, DATE, OWNER, ARCHITECT, CONSULTING ENGINEER, GENERAL CONTRACTOR, SUB- <br />CONTRACTORS AND AN INDEX OF CONTENTS. <br />LOW-PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2" W.G.) FITTINGS 24" IN DIAMETER AND LESS SHALL <br />BE PREFABRICATED, SPOTWELDED AND INTERNALLY SEALED. CONTINUOUSLY WELD FITTINGS LARGER THAN 24" IN <br />DIAMETER. FITTING GAUGE SHALL BE 22-GAUGE FOR 36" FITTINGS AND UNDER 20-GAUGE FOR LARGER SIZES. 90- <br />DEGREE TEE'S SHALL BE CONICAL-TYPE. SEAL LONGITUDINAL AND TRANSVERSE DUCTWORK JOINTS AlR-TIGHT WITH <br />HEAVY LIQUID SEALANT APPLIED ACCORDING TO MANUFACTURER'S INSTRUCTIONS. PROVIDE GAUGE THICKNESS IN <br />MEDIUM PRESSURE (DUCT PRESSURE CLASS 3" TO 6" W.G.) DUCTWORK AS RECOMMENDED BY SMACNA. <br />FLEXIBLE DUCT <br />ANY FLEX DUCT CONNECTIONS MADE FROM BRANCH DUCTS TO DIFFUSERS SHALL BE MADE WITH FLEXIBLE AIR DUCT <br />SIMILAR TO "CERTAFLEX" OR "GENFLEX". LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2" W.G.) AND <br />MEDIUM PRESSURE (DUCT PRESSURE CLASS 2" TO 6" W.G.) FLEXIBLE DUCT SHALL BE FLEXMASTER TYPE 8B, <br />THERMAFLEX TYPE G-KM, M-KE OR EQUAL (FIRE-RETARDANT POLYETHYLE PROTECTIVE VAPOR BARRIER, U.L.181 <br />CLASS 1, ACOUSTICALLY INSULATED DUCT, R-6.0 FIBERGLASS INSULATION). PROVIDE 'CPE' LINER WITH STEEL WIRE <br />HELIX MECHANICALLY LOCKED OR PERMANENTLY BONDED TO THE LINER. <br />FLEXIBLE DUCT RUNS SHALL NOT EXCEED 5-FEET IN LENGTH AND SHALL BE INSTALLED FULLY EXTENDED AND <br />STRAIGHT AS POSSIBLE AVOIDING TIGHT TURNS. INSTALL FLEXIBLE DUCT IN ACCORDANCE WITH MANUFACTURER'S <br />INSTRUCTIONS. NO MORE THAN ONE (1) 90-DEGREE BEND SHALL BE CREATED. SUPPORT FLEXIBLE DUCT AT MAXIMUM <br />5-FEET ON CENTER AND WITHIN 6-INCHES OF BENDS. BENDS SHALL NOT EXCEED A CENTERLINE RADIUS OF ONE DUCT <br />DIAMETER. DUCT SAG SHALL NOT EXCEED 1/2-INCH. SUPPORTING MATERIAL IN DIRECT CONTACT WITH THE DUCT <br />SHALL NOT BE LESS THAN 1-1/2-INCHES IN WIDTH. <br />CONNECT FLEXIBLE DUCT TO RIGID METAL DUCT OR AIR DEVICES AS RECOMMENDED BY THE MANUFACTURER. AT A <br />MINIMUM, INSTALL TWO WRAPS OF DUCT TAPE AROUND THE INNER CORE CONNECTION AND A METALLIC OR NON- <br />METALLIC CLAMP OVER THE TAPE AND TWO WRAPS OF DUCT TAPE OR A CLAMP OVER THE OUTER JACKET. DUCT <br />CLAMPS SHALL BE LABELED IN ACCORDANCE WITH U.L.181B AND MARKED 181B-C. DUCT TAPE SHALL BE LABELED IN <br />ACCORDANCE WITH U.L.181B AND MARKED 181B-FX. <br />AIR TERMINALS <br />PROVIDE AIR DEVICES AS SCHEDULED ON DRAWINGS, MANUFACTURED BY TITUS. SELECT AIR DEVICES TO LIMIT ROOM <br />NOISE LEVEL TO HIGHER THAN NC-30 UNLESS OTHERWISE SHOWN. PROVIDE DEVICES WITH A SOFT PLASTIC GASKET <br />TO MAKE AN AIR-TIGHT SEAL AGAINST THE MOUNTING SURFACE. COORDINATE FINAL LOCATION, FRAME, AND <br />MOUNTING TYPE OF AIR DEVICES WITH ARCHITECTURAL REFLECTED CEILING PLANS. <br />PROVIDE CEILING SUPPLY AIR DIFFUSERS AND RETURN AIR GRILLES OF LAY-IN OR SURFACE-MOUNTED TYPE AS <br />REQUIRED TO BE COMPATIBLE WITH CEILING CONSTRUCTION. PROVIDE CEILING DIFFUSERS AND GRILLES WITH WHITE <br />ENAMEL FINISH UNLESS NOTED 0THERWISE. <br />LOUVERS, PLENUMS AND SCREENS <br />PROVIDE INTAKE AND EXHAUST AIR LOUVERS BY RUSKIN MODEL ELF375X OR EQUAL AMERICAN WARMING & <br />VENTILATING, CESCO, GREENHECK, INDUSTRIAL LOUVERS OR LOUVERS & DAMPERS AS SCHEDULED ON THE <br />DRAWINGS. COORDINATE EXACT SIZE AND LOCATION WITH ARCHITECTURAL DRAWINGS. LOUVERS SHALL BE <br />STATIONARY, WITH MILL FINISH. LOUVERS SHALL HAVE EXTRUDED ALUMINUM BLADES, 0.080 INCH WALL THICKNESS, 45 <br />DEGREE BLADE ANGLE, BLADES ON 5 INCH CENTERS; FRAME SHALL BE EXTRUDED ALUMINUM, 0.080 INCH WALL <br />THICKNESS; WITH EXPANDED FLATTENED ALUMINUM BIRDSCREEN. PROVIDE LOUVERS WITH A MINIMUM FREE AREA OF <br />45 PERCENT, WITH A MAXIMUM AIR PRESSURE DROP OF 0.1 INCH AT SCHEDULED AIRFLOW. <br />CONSTRUCT PLENUMS WITH GALVANIZED STEEL FRAMING MEMBERS AND GALVANIZED SHEETMETAL BRACED WITH <br />GALVANIZED ANGLES. GAUGES AND BRACING SHALL CONFORM TO SMACNA RECOMMENDATIONS FOR DUCTWORK <br />SIZES. WHERE ACCESS DOORS ARE SHOWN, PROVIDE HINGED DOORS WITH #202 VENTLOK LATCH. MAKE WATERTIGHT <br />CONNECTIONS TO LOUVERS, SLOPING BOTTOM OF PLENUM TO DRAIN WATER TO WEEPHOLES IN BOTTOM OF LOUVER. <br />PROVIDE SCREENS ON LOUVERS, DUCTS, HOODS, FANS, AND OPENINGS TO THE OUTDOORS AS SCHEDULED AND/OR <br />NOTED ON THE DRAWINGS. BIRD SCREENS SHALL BE 0.041-INCH, 1/2-INCH MESH GALVANIZED STEEL WIRE. <br />EXHAUST AIR SYSTEMS <br />PROVIDE INLINE EXHAUST FANS AS SCHEDULED ON THE DRAWINGS OR EQUAL TO COOK, GREENHECK, CARNES, TWIN <br />CITY FANS, ACME OR PENNBARRY COMPLETE WITH ALUMINUM HOUSING, ALUMINUM CENTRIFUGAL WHEEL, MOTOR <br />WITH INTEGRAL THERMAL OVERLOAD PROTECTION, DISCONNECT SWITCH, BACKDRAFT DAMPER. THREE-PHASE FANS <br />SHALL BE FURNISHED WITH MAGNETIC STARTERS WITH PUSH BUTTON STATION. <br />DRAIN PANS <br />DRAIN PANS SHALL SLOPE TOWARDS THE DRAIN OUTLET BY AT LEAST 0.125 INCHES PER FOOT. THE OUTLET SHALL <br />BE LOCATED AT THE LOWEST POINT OF THE PAN AND BE SIZED TO PRECLUDE OVERFLOW. FOR UNITS WITH NEGATIVE <br />STATIC DRAW AT THE DRAIN PAN RELATIVE TO THE OUTLET, DRAIN LINE SHALL INCLUDE A P-TRAP OR OTHER SEAL <br />TO PREVENT INGESTION OF AMBIENT AIR WHILE ALLOWING THE PAN TO DRAIN COMPLETELY. DRAIN PANS SHALL BE <br />LOCATED DIRECTLY BELOW COILS OR OTHER WATER-PRODUCING DEVICES. <br />15A.3 HVAC EQUIPMENT <br />HVAC EQUIPMENT <br />ALL HVAC EQUIPMENT SHALL MEET PERFORMANCE REQUIREMENTS OF ASHRAE 90.1-2007 AND SHALL BE ENERGY <br />STAR LABELED. <br />REFER TO ASHRAE 90.1 -2007, TABLE 6.5.1.1.3A FOR ALLOWABLE ECONOMIZER OPTIONS PER CLIMATE ZONE. <br />PROTOTYPICAL DESIGN PROVIDES UNITS WITH COMPARATIVE ENTHALPY ECONOMIZERS IN MOIST (A) AND MARINE (C) <br />CLIMATE ZONES AND DRY-BULB ECONOMIZERS IN DRY (B) REGIONS. <br />PROVIDE ECONOMIZERS WITH BAROMETRIC RELIEF DAMPERS FOR ROOFTOP UNITS WITH LESS THAN OR EQUAL TO 4- <br />TONS COOLING. PROVIDE ECONOMIZERS WITH POWER RELIEF FANS FOR ROOFTOP UNITS WITH CAPACITIES GREATER <br />THAN OR EQUAL TO 5-TONS COOLING. <br />EQUIPMENT SHALL BE INSTALLED WITH SUFFICIENT WORKING SPACE FOR INSPECTION, ROUTINE MAINTENANCE, <br />CLEANING, AND CALIBRATION. <br />PROVIDE MIN. 3" TALL LABELS ON HVAC EQUIPMENT INDICATING UNIT IDENTIFICATION NUMBER. <br />NEW ACCESS DOORS OR PANELS SHALL BE PROVIDED WHERE REQUIRED FOR THE SERVICING OF EQUIPMENT AND <br />SHALL BE OF THE APPROVED DESIGN AND LOCATION. <br />ROOFTOP UNITS (GAS HEAT) <br />PROVIDE ELECTRIC COOLING, GAS HEATING ROOFTOP UNITS AS SCHEDULED ON THE DRAWINGS, MANUFACTURED BY <br />LENNOX, COMPLETE WITH FACTORY-INSTALLED, DIRECT-DRIVE HERMETIC COMPRESSORS WITH INTERNAL SPRING <br />VIBRATION ISOLATION, BUILT-IN MOTOR THERMAL OVERLOAD PROTECTION, CRANKCASE HEATER, AND LOW PRESSURE <br />SWITCHES; DIRECT EXPANSION COOLING AND CONDENSING COILS; MINIMUM SEER OR EER RATING (COOLING) AS <br />REQUIRED BY THE APPLICABLE ENERGY CODE OR GREATER IF SCHEDULED ON THE DRAWINGS; CENTRIFUGAL <br />EVAPORATOR BLOWER; AIR FILTER RACK WITH 2" THICK MERV-13 FILTER, PROPELLER-TYPE CONDENSER FAN, <br />FACTORY PROVIDED ELECTRIC RESISTANCE HEATING COIL, FORCED COMBUSTION AIR BLOWER; COMPLETE FACTORY- <br />INSTALLED MICRO-PROCESSOR CONTROLS INCLUDING ANTI-SHORT CYCLE TIMERS, TIME DELAY RELAYS AND MINIMUM <br />"ON" TIME CONTROLS, BUILT-IN THERMAL OVERLOAD PROTECTION ON MOTORS AND COMPRESSORS, 100-PERCENT <br />OUTDOOR AIR ENTHALPY ECONOMIZER WITH POWER RELIEF FAN; WEATHERTIGHT HOUSING CONSTRUCTED OF ZINC- <br />COATED, HEAVY-GAUGE GALVANIZED STEEL WITH WEATHER-RESISTANT, BAKED ENAMEL FINISH; MINIMUM INSULATED <br />DOWN-FLOW STANDARD ROOF CURB WITH MINIMUM HEIGHT OF 14-INCHES FOR ROOFS WITH NO INSULATION, 14- <br />INCHES FOR ROOFS WITH INSULATION OR AS SCHEDULED ON THE DRAWINGS; SINGLE-POINT ELECTRICAL POWER <br />CONNECTION. PROVIDE SLOPED ROOF CURB AS REQUIRED TO MATCH SLOPE OF ROOF STRUCTURE SO THAT UNIT IS <br />INSTALLED LEVEL. PROVIDE A 125-VAC, 20-AMP DUPLEX CONVENIENCE RECEPTACLE MOUNTED TO UNIT, READY FOR <br />FIELD WIRING WITH A COVER UL LISTED FOR WET AND DAMP LOCATIONS WHEN IN USE. COORDINATE W/ DIVISION 16 <br />CONTRACTOR TO WIRE UL LISTED DUCT-TYPE SMOKE DETECTORS AS REQUIRED BY CODE TO SHUT DOWN ROOFTOP <br />UNIT UPON DETECTION OF SMOKE. PROVIDE UNIT COMPLETE WITH MANUFACTURER'S ONE-YEAR GUARANTEE ON <br />COMPONENTS, PLUS AN ADDITIONAL FOUR-YEAR GUARANTEE ON THE COMPRESSORS AND HEAT EXCHANGERS. <br />SMOKE DETECTION <br />ELECTRICAL CONTRACTOR SHALL PROVIDE SMOKE DETECTORS IN RETURN AIR DUCTS AT THE UNIT (AND IN SUPPLY <br />AIR DUCTS) IF REQUIRED BY CODE. SMOKE DETECTORS SHALL BE WIRED BY ELECTRICAL CONTRACTOR AND SHALL <br />FUNCTION TO SHUT DOWN HVAC UNITS UPON ALARM. HVAC UNITS SHALL NOT RESTART AUTOMATICALLY ON RESET OF <br />SMOKE DETECTOR. PROVIDE CONTACTS AS REQUIRED FOR FIRE ALARM PANEL. IF SMOKE DETECTORS ARE EXISTING, <br />CONTRACTOR MAY RE-USE, UPON ENSURING PROPER INSTALLATION AND OPERATION, CLEANING, AND OTHERWISE <br />REFURBISHING FOR LIKE-NEW CONDITION. <br />PROVIDE REMOTE VISUAL AND AUDIBLE ALARM DEVICE IN AN APPROVED LOCATION IF SMOKE DETECTORS ARE NOT <br />CONNECTED TO A FIRE ALARM PANEL AND LABEL DEVICE AS "AIR DUCT DETECTOR TROUBLE" <br />PROVIDE REMOTE TEST SWITCHES FOR ALL DUCT SMOKE DETECTORS. CONTACT FIRE DEPARTMENT PRIOR TO <br />INSTALLATION FOR PROPER PLACEMENT. <br />MECHANICAL CONTRACTOR SHALL COORDINATE WITH ELECTRICAL CONTRACTOR. <br />CONTROL DAMPERS <br />PROVIDE FACTORY FABRICATED, PARALLEL BLADE CONTROL DAMPERS SIZED AS SHOWN ON THE DRAWINGS AND AS <br />SPECIFIED. INDIVIDUAL DAMPER SECTIONS SHALL NOT BE LARGER THAN 48 INCHES X 60 INCHES WITH MAXIMUM <br />BLADE WIDTH OF 6 INCHES. FRAME CONSTRUCTION SHALL BE MINIMUM 16 GAUGE GALVANIZED STEEL FOR <br />RECTANGULAR DAMPERS, 20 GAUGE FOR ROUND, 1/8 INCH THICK FOR ALUMINUM, WITH FLANGES FOR DUCT <br />MOUNTING. PROVIDE ELASTOMERIC OR NEOPRENE SEALS, MECHANICALLY ATTACHED AND FIELD REPLACEABLE. <br />PROVIDE A MINIMUM OF ONE DAMPER ACTUATOR PER SECTION. TEST DAMPER PERFORMANCE IN ACCORDANCE <br />WITH AMCA 500-D. <br />PROVIDE MODULATING DAMPERS WITH LINEAR FLOW CHARACTERISTICS. SIZE MODULATING DAMPERS BASED ON <br />THE SMALLER OF 1,500 FPM THROUGH THE DAMPER OR FULL OPEN AIR PRESSURE DROP OF 0.1 INCHES W.C. SIZE <br />TWO-POSITION DAMPERS FULL DUCT SIZE AND SELECT TO MINIMIZE PRESSURE DROP. <br />MOTORIZED DAMPERS USED FOR VENTILATION AIR INTAKE, EXHAUST AIR, OR RELIEF AIR SHALL HAVE LEAKAGE <br />RATES NOT TO EXCEED 4.0 CFM/SQUARE FOOT IN FULL CLOSED POSITION AT 1 INCH W.G. PRESSURE DIFFERENTIAL <br />ACROSS THE DAMPER. <br />PROVIDE DAMPERS AS MANUFACTURED BY GREENHECK, CESCO, POTTORFF, NAILOR, OR RUSKIN. REFERENCE <br />MANUFACTURER WITH MODEL NUMBER FOR OUTSIDE AIR DAMPERS IS RUSKIN CD-50 CONSTRUCTED OF ALUMINUM, <br />AND ALL OTHER APPLICATIONS IS RUSKIN CD-35 CONSTRUCTED OF GALVANIZED STEEL. <br />PROVIDE DAMPER OPERATOR FOR EACH AUTOMATIC DAMPER WITH SUFFICIENT CAPACITY TO OPERATE THE <br />DAMPER UNDER ALL CONDITIONS AND TO GUARANTEE TIGHT CLOSE-OFF OF DAMPERS AGAINST SYSTEM PRESSURE <br />ENCOUNTERED. EACH OPERATOR SHALL BE PROVIDED WITH SPRING-RETURN FOR NORMALLY CLOSED OR <br />NORMALLY OPEN POSITION FOR FAIL SAFE OPERATION TO ACCOUNT FOR FIRE, LOW TEMPERATURES, OR POWER <br />INTERRUPTION AS REQUIRED BY THE CONTROL SYSTEMS SPECIFIED ON THE DRAWINGS. DAMPER OPERATORS <br />SHALL BE MANUFACTURED BY BELIMO, JOHNSON CONTROLS OR APPROVED EQUAL. PROVIDE TRANSFORMER FOR <br />DAMPER MOTORS IF DIFFERENT VOLTAGES ARE REQUIRED. <br />CONDENSING UNITS <br />PROVIDE SPLIT SYSTEM, AIR COOLED CONDENSING UNITS AS SCHEDULED ON THE DRAWINGS, MANUFACTURED BY <br />LENNOX, COMPLETE WITH FACTORY INSTALLED HERMETIC OR SEMI-HERMETIC MOTOR/COMPRESSOR ASSEMBLY <br />WITH INTERNAL SPRING VIBRATION ISOLATION, BUILT-IN THERMAL OVERLOAD PROTECTION, AND CRANKCASE <br />HEATER; TOP DISCHARGE CONDENSER FAN AND MOTOR; LOW AMBIENT HEAD PRESSURE CONTROLS FOR <br />OPERATION TO TEMPERATURE AS SCHEDULED; ANTI-SHORT CYCLE TIMERS; TIME DELAY RELAYS; HIGH AND LOW <br />PRESSURE SWITCHES; FULL REFRIGERANT HOLDING CHARGE; AND WEATHERTIGHT HOUSING CONSTRUCTED OF ZINC <br />COATED, HEAVY GAUGE, GALVANIZED STEEL WITH WEATHER-RESISTANT BAKED ENAMEL FINISH AND FACTORY <br />INSTALLED CONDENSER COIL HAIL GUARDS. FOR UNITS GREATER THAN 5 TONS, PROVIDE LIQUID LINE DRIER AND <br />REFRIGERANT SIGHT GLASS. PROVIDE A FIVE YEAR GUARANTEE ON THE COMPRESSOR AND REFRIGERANT CIRCUIT, <br />AND A ONE YEAR GUARANTEE ON THE REMAINING COMPONENTS. PROVIDE REFRIGERANT PIPING SIZED AS <br />RECOMMENDED BY EQUIPMENT MANUFACTURER WITH FOAMED PLASTIC INSULATION ON THE SUCTION LINE AS <br />SPECIFIED IN THIS SECTION. FOR HEAT PUMP UNITS PROVIDE REVERSING VALVE, SUCTION LINE ACCUMULATOR, <br />FLOW CONTROL CHECK VALVE, AND SOLID STATE DEFROST/TIMED-OFF CONTROL. PROVIDE 3-1/2 INCH THICK <br />CONCRETE SLABS FOR CONDENSING UNITS LOCATED ON GRADE. <br />FAN COIL UNITS (DIRECT EXPANSION, 1.5-5 TONS) <br />PROVIDE SPLIT SYSTEM, FAN COIL UNITS AS SCHEDULED ON THE DRAWINGS, MANUFACTURED BY LENNOX, WITH <br />CONFIGURATION AS SCHEDULED, COMPLETE WITH ZINC COATED, HEAVY GAUGE, GALVANIZED STEEL CABINET WITH <br />WEATHER-RESISTANT BAKED ENAMEL FINISH; INTERNALLY INSULATED; ACCESS DOORS; DIRECT EXPANSION <br />COOLING COIL SECTION OF ALUMINUM/COPPER CONSTRUCTION; CONDENSATE DRAIN PAN; STATICALLY AND <br />DYNAMICALLY BALANCED CENTRIFUGAL FAN SECTION WITH BUILT-IN MOTOR THERMAL OVERLOAD PROTECTION; <br />FACTORY INSTALLED AND WIRED CONTROLS AND SINGLE POINT ELECTRICAL POWER CONNECTION; MAGNETIC <br />MOTOR STARTERS AND CONTACTORS AS REQUIRED; AIR FILTER RACK WITH 1 INCH THICK THROWAWAY FILTERS; <br />FACTORY INSTALLED ELECTRIC HEATING COIL WITH CODE REQUIRED INTEGRAL SAFETY FEATURES AND CONTROLS. <br />PROVIDE SPRING VIBRATION ISOLATORS AND ALL-THREAD HANGING RODS FOR HORIZONTAL INSTALLATIONS. <br />PROVIDE AN AUXILIARY DRAIN PAN FOR SUSPENDED UNITS WITH FLOOD DETECTOR SWITCH TO SHUT OFF UNIT <br />WHEN WATER IS DETECTED IN AUXILIARY DRAIN PAN. FLOOD DETECTOR SWITCH SHALL BE DIVERSITECH WET <br />SWITCH OR EQUIVALENT. DETECTOR SHALL SHUT SYSTEM DOWN WHEN WATER COMES IN CONTACT WITH THE <br />HYDROPHILIC PAD OF THE DETECTOR. PLACE DETECTOR IN THE LOWEST LOCATION IN THE AUXILIARY DRAIN PAN. <br />WIRE DETECTOR TO REMOTE ALARM, DIVERSITECH UNIVERSAL ALARM OR EQUIVALENT. <br />REFRIGERANT PIPING AND INSULATION <br />COPPER TUBING: ASTM B 280, ALLOY C12200, TYPE ACR, HARD-DRAWN STRAIGHT LENGTHS, AND SOFT-ANNEALED <br />COILS, SEAMLESS COPPER TUBING. TUBING SHALL BE FACTORY CLEANED, READY FOR INSTALLATION, AND HAVE <br />ENDS CAPPED TO PROTECT CLEANLINESS OF PIPE INTERIORS PRIOR TO SHIPPING. <br />FITTINGS: WROUGHT-COPPER FITTINGS: ANSI B16.22, STREAMLINED PATTERN. <br />BRAZING FILLER METALS: BCUP -5: COPPER (CU), PHOSPHORUS (P) 4.8 -5.2 PERCENT, AND SILVER (AG) 14.5 -15.5 <br />FOR JOINING WROUGHT COPPER FITTINGS AND COPPER TUBING. BRAZE JOINTS WITH A SLOW STREAM OF DRY <br />NITROGEN PASSING THROUGH THE PIPING. <br />INSULATE SUCTION LINES WITH 1-1/2 INCH AND LIQUID LINES WITH 1/2 INCH FOAMED PLASTIC INSULATION, ARMAFLEX <br />OR EQUAL. PIPING INSULATION SHALL HAVE A FLAME SPREAD OF 25 OR LESS, AND A SMOKE DEVELOPED RATING OF <br />50 OR LESS WHEN TESTED IN ACCORDANCE WITH ASTM E84. COAT INSULATION THAT IS EXPOSED TO THE ELEMENTS <br />WITH A PROTECTIVE SEALER. INSTALL AND SUPPORT PIPING TO KEEP NOISE AND VIBRATION TO A MINIMUM. <br />SUPPORT AND SECURE PIPING TO UNISTRUT TYPE SUPPORTS SO THAT NO VIBRATION PASSES TO THE BUILDING <br />STRUCTURE. PIPE ATTACHMENTS SHALL BE COPPER-PLATED OR HAVE NONMETALLIC COATING FOR ELECTROLYTIC <br />PROTECTION WHERE ATTACHMENTS ARE IN DIRECT CONTACT WITH COPPER TUBING. INSTALL A SUPPORT WITHIN <br />ONE FOOT OF EACH CHANGE OF DIRECTION. MOUNT PIPE HANGERS AROUND THE OUTSIDE OF THE INSULATION WITH <br />SADDLES TO PREVENT HANGERS FROM RUPTURING THE INSULATION. REPLACE INSULATION THAT IS CUT OR BROKEN <br />BY THE HANGERS. <br />RUN REFRIGERANT LINES PARALLEL AND PERPENDICULAR TO WALL AND FLOOR LINES AND TO APPEAR STRAIGHT <br />AND IN GOOD ORDER. PITCH SUCTION LINES DOWN SLIGHTLY (1 INCH IN 20 FEET) TOWARDS THE COMPRESSOR. <br />PROVIDE OIL TRAPS AT THE BASE OF VERTICAL SUCTION RISERS OVER 6 FEET HIGH. <br />INSTALL LIQUID LINE SIGHT GLASSES IN LIQUID LINES NEAREST THE EXPANSION VALVE. FACTORY MOUNT <br />EXPANSION VALVES WITH THE SENSING BULBS SHIPPED LOOSE. FIELD MOUNT EXPANSION VALVE BULB AFTER <br />REFRIGERANT PIPING IS COMPLETE (DAMAGE MAY OCCUR IF BULBS COME IN CONTACT WITH HEAT). <br />FOR SYSTEMS OF 5 TON CAPACITY AND SMALLER, THE CONTRACTOR SHALL HAVE THE OPTION TO PROVIDE COPPER <br />REFRIGERANT TUBING LINE SET SIZED AS RECOMMENDED BY EQUIPMENT MANUFACTURER AND OF LENGTH AS <br />REQUIRED FOR THE INSTALLATION. PROVIDE MINIMUM 1 INCH THICK FOAMED PLASTIC INSULATION, ARMAFLEX OR <br />EQUAL, ON THE SUCTION AND LIQUID LINES. PROVIDE QUICK-CONNECT FLARE TUBING COMPRESSION FITTINGS OR <br />SOLDER CONNECTIONS AS REQUIRED TO MATCH THE CONNECTIONS OF THE CONDENSING UNIT AND EVAPORATOR <br />COIL. <br />SYSTEM EVACUATION AND CHARGING <br />BLOW OUT REFRIGERATION LINES WITH DRY NITROGEN AT A SUITABLE PRESSURE BEFORE MAKING FINAL <br />CONNECTION AT THE CONDENSING UNIT OR COIL TO ENSURE AGAINST DIRT, SCALE, OR OTHER FOREIGN MATERIAL <br />BEING IN THE LINES. DRAW A VACUUM TO 29 INCHES OF MERCURY. BREAK THIS VACUUM BY CHARGING DRY <br />REFRIGERANT GAS INTO THE SYSTEM, RAISING THE PRESSURE TO 0 PSIG.REPEAT <br />THE LATTER TWO STEPS FOR A TRIPLE EVACUATION BEFORE THE FINAL EVACUATION IS STARTED. MAKE FINAL <br />EVACUATION BY REDUCING THE SYSTEM ABSOLUTE PRESSURE TO A MAXIMUM OF 0.5 MILLIMETERS (500 MICRONS) <br />AND ALLOWING THE PUMP TO RUN AT THIS PRESSURE FOR A MINIMUM OF TWO HOURS. <br />REPEAT THE PROPER AMOUNT OF REFRIGERANT CHARGE PER THE MANUFACTURER'S RECOMMENDATIONS. RECORD <br />THE AMOUNT OF REFRIGERANT BY WEIGHT CHARGED INTO THE SYSTEM FOR EACH CIRCUIT RECORDED TO THE <br />NEAREST 1/4 POUND ON TAGS AND ATTACH TAGS TO THE LIQUID LINE NEAR THE CONDENSING UNIT. REFRIGERANT <br />SHALL BE SUPPLIED BY THE HVAC CONTRACTOR. <br />Mechanical and Electrical Engineers <br />Lilker Associates <br />1001 Avenue of the Americas <br />New York, NY 10018 <br />tel 212.695.1000 <br />fax 212.695.1299 <br />www.lilker.com <br />Kenneth A. Gruskin AIA <br />No. Date Description <br />Consultant: <br />Checked By: <br />Drawn By: <br />Job Address: <br />Drawing Title: <br />Revision Issue: <br />Professional Seal: <br />Drawing Number: <br />2022 Gruskin Architecture + Design, P.C.c <br />This document and the ideas and designs incorporated <br />herein, as an instrument of professional service, is the <br />property of GRUSKIN ARCHITECTURE + DESIGN, P.C., <br />and is not to be used in whole or in part for any other <br />project without the written authorization of GRUSKIN <br />ARCHITECTURE + DESIGN, P.C. <br />North <br />Arrow: <br />Job Name and Number: <br />Date Issued For <br />All Rights Reserved <br />Client: <br />Landlord: <br />Permit: <br />Bid: <br />Construction: <br />0006261 <br />AR91629 <br />5421 <br />9613 <br />39209 <br />10635 <br />2537 <br />11016 <br />5734 <br />ARC 2596 <br />4674 <br />2666 <br />AI 09999 <br />2796 <br />0401 011223 <br />2572 <br />17680 <br />RA-015432-B <br />025528-1 NY <br />TX <br />VA <br />VT <br />MA <br />MT <br />RI <br />PA <br />NY <br />NJ <br />NH <br />MD <br />LA <br />ME <br />KS <br />FL <br />DE <br />CT <br />AZ <br />AL <br />C-1967WY <br />RA011075GA <br />AR10400066IN <br />C-29898CA <br />NM 004168 <br />ARC-400347CO <br />HI AR 11489 <br />PR 19965 <br />OR 4899 <br />SC 6834 <br />NC 9961 <br />13761OH <br />05713IA <br />WV 3727 <br />IL 001-019152 <br />UT 5881358-0301 <br />ID AR-984459 <br />1301052379MI <br />ARC100723DC <br />WI 9900-005MN44326 <br />A-3547NE <br />3811AR <br />5967KY 101374TN <br />MS 3860 <br />1666ND <br />A-2005029740MO <br />a4895OK <br />NV 5521 <br />WA 10344 <br />13167AK <br />SD 11532 <br />C: <br />\ <br />R <br />e <br />v <br />i <br />t <br /> <br />L <br />o <br />c <br />a <br />l <br /> <br />F <br />i <br />l <br />e <br />s <br />\ <br />2 <br />4 <br />0 <br />0 <br />1 <br />3 <br />0 <br />8 <br />_ <br />V <br />E <br />R <br />I <br />Z <br />O <br />N <br />_ <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />_ <br />C <br />A <br />_ <br />ME <br />C <br />H <br />A <br />N <br />I <br />C <br />A <br />L <br />_ <br />v <br />2 <br />3 <br />_ <br />r <br />t <br />r <br />o <br />v <br />a <br />t <br />o <br />T <br />7 <br />V <br />P <br />K <br />. <br />r <br />v <br />t <br />2023-0069 <br />Proposed <br />Store Design <br />for: VERIZON <br />Metro Pointe <br />3500 South Bristol Street <br />Suite 100 <br />Santa Ana, CA 92704 <br />3/15/2024 <br />3/15/2024 <br />HVAC SPECIFICATIONS <br />M.0.0 <br />BS <br />RT <br />33 OF 81 <br />MECHANICAL DRAWING LIST <br />Sheet Number Sheet Name <br />M.0.0 HVAC SPECIFICATIONS <br />M.0.1 HVAC SPECIFICATIONS <br />M.0.2 MECHANICAL NOTES, SYMBOLS & ABBREVIATIONS <br />M.0.3 MECHANICAL SCHEDULES - 1 OF 2 <br />M.0.4 MECHANICAL SCHEDULES - 2 OF 2 <br />M.1.0 MECHANICAL CONSTRUCTION PLAN <br />M.1.1 MECHANICAL ROOF CONSTRUCTION PLAN <br />M.2.0 MECHANICAL DETAILS <br />M.2.1 MECHANICAL DETAILS <br />M.2.2 MECHANICAL DETAILS <br />M.3.0 TITLE 24 MECHANICAL COMPLIANCE <br />M.3.1 TITLE 24 MECHANICAL COMPLIANCE <br />3500 S Bristol St Unit# 100 - <br />101119098, 20182666 & <br />401390437/11/2024