HVAC SPECIFICATIONS
<br />FINAL TESTING AND ADJUSTMENTS
<br />REFER TO THE 'GENERAL SPECIFICATIONS FOR AIR BALANCING AND TESTING' THIS SHEET.
<br />ADJUST ALL EQUIPMENT, THERMOSTATS AND CONTROL DEVICES TO OPERATE AS INTENDED BY THE SPECIFICATION.
<br />ALIGN AND/OR REPLACE BEARINGS THAT HAVE DIRT OR FOREIGN MATERIAL IN THEM WITH NEW BEARINGS WITHOUT
<br />ADDITIONAL COST TO THE OWNER. ADJUST BURNERS, FANS, ETC. FOR PROPER AND EFFICIENT OPERATION. CERTIFY
<br />TO ARCHITECT THAT ADJUSTMENTS HAVE BEEN MADE AND THAT SYSTEM IS OPERATING SATISFACTORILY. FURTHER
<br />ADJUSTMENTS SHALL BE MADE TO OBTAIN UNIFORM TEMPERATURE IN SPACES. CALIBRATE, SET AND ADJUST
<br />AUTOMATIC TEMPERATURE CONTROLS. CHECK PROPER SEQUENCING OF INTERLOCK SYSTEMS AND OPERATION OF
<br />SAFETY CONTROLS.
<br />NEW MERV-13 FILTERS SHALL BE INSTALLED PRIOR TO TEST AND BALANCE.
<br />HVAC SYSTEM AND CONTROLS WILL BE COMMISSIONED PER THE REQUIREMENTS OF THE COMMISSIONING
<br />SPECIFICATIONS IN THE LEED PROTOTYPE GREEN SPECIFICATIONS. GENERAL CONTRACTOR AND ALL SUB-
<br />CONTRACTORS MUST CONFIRM THAT THEY WILL BE AVAILABLE FOR ON-SITE COMMISSIONING. IF ANY PARTY MISSES
<br />THIS COMMISSIONING, THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS REQUIRED FOR AN ADDITIONAL
<br />SITE VISIT BY VzW REP AND COMMISSIONING TESTER, INCLUDING TRAVEL EXPENSES.
<br />COMMISSIONING
<br />GENERAL CONTRACTOR TO COORDINATE WITH VERIZON WIRELESS FOR MEP COMMISSIONING AND FORWARD ALL
<br />FUNCTIONALITY AND COMMISSIONING FORMS TO REQUIRED SUB-CONTRACTORS.COMMISSIONING WILL BE
<br />COMPLETED ON ALL PROJECTS NOT JUST LEED PROJECTS.CONTRACTORS TO REFER TO VZW BID PACKAGE FOR
<br />FORMS AND TESTING REQUIREMENTS.ALL CONTRACTORS TO REFER TO THE DOCUMENT TITLED COMMISSIONING
<br />TESTING SCHEDULE WITHIN THE BID PACKAGE.THIS FILE WILL OUTLINE THE REQUIRED SCHEDULE AND THE
<br />MATERIALS/EQUIPMENT THE SUB-CONTRACTOR WILL BE RESPONSIBLE TO BRING TO COMPLETE THE TESTING.VZW
<br />WILL ESTABLISH A DATE FOR THIS TESTING.THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS MUST
<br />CONFIRM THAT THEY WILL BE AVAILABLE ON SITE FOR THE COMMISSIONING. TEST AND BALANCE CONTRACTOR
<br />SHALL BE ON SITE DURING COMMISSIONING WITH THE SAME EQUIPMENT USED FOR THE TEST AND BALANCE TO
<br />VALIDATE AIRFLOWS.
<br />15A.2 DUCT INSULATION, DUCTWORK, ACCESSORIES, AND FANS
<br />DUCT INSULATION
<br />COVER CONCEALED RIGID ROUND AND RECTANGULAR DUCTWORK WITH 2-1/4" THICK, 3/4-POUND DENSITY MINIMUM
<br />R-6.0 DUCT WRAP, CERTAINTEED, OR EQUIVALENT OWENS-CORNING OR KNAUF WITH HEAVY DUTY FOIL-SCRIM-
<br />KRAFT FACING AND WITH JOINTS TAPED WITH 3" WIDE FOIL TAPE AS FOLLOWS:
<br />A. SUPPLY AND RETURN AIR DUCTWORK IN ENTIRETY.
<br />B. EXHAUST AND RELIEF AIR DUCTWORK WITHIN 10 FEET OF EXTERIOR DISCHARGE.
<br />PROVIDE 1/2-INCH THICK RIGID DUCT ACOUSTICAL LINER FOR SUPPLY AIR AND RETURN AIR DUCTS WHERE
<br />INDICATED ON PLANS. (INCREASE DUCT SIZES SHOWN ON PLANS TO MAINTAIN INSIDE CLEAR DIMENSIONS)
<br />INSULATING MATERIALS, ADHESIVES, COATINGS, ETC. SHALL NOT EXCEED FLAME SPREAD RATING OF 25 AND
<br />SMOKE DEVELOPMENT RATING OF 50 PER ASTM E 84; ADHESIVES, COATINGS, ETC. SHALL COMPLY WITH "V.O.C."
<br />LIMITS AS SPECIFIED IN THE LEED GREEN SPECIFICATIONS. CONTAINERS FOR MASTICS AND ADHESIVES SHALL
<br />HAVE UL LABEL.
<br />CONTRACTOR SHALL INSPECT THE INSULATION OF ALL EXISTING AND NEW SUPPLY AIR DUCTWORK CONNECTIONS
<br />AND REPAIR AS REQUIRED.
<br />DUCTWORK
<br />DUCT CONSTRUCTION, BOTH METAL AND FLEXIBLE, SHALL BE PERFORMED IN ACCORDANCE WITH CURRENT
<br />SMACNA HVAC DUCT CONSTRUCTION STANDARDS.
<br />PROVIDE RECTANGULAR GALVANIZED STEEL DUCTWORK AND HOUSINGS TO SIZES AS SHOWN ON DRAWINGS.
<br />CONSTRUCT DUCTWORK INCLUDING FITTINGS AND TRANSITIONS IN CONFORMANCE WITH CURRENT SMACNA
<br />STANDARDS RELATIVE TO GAUGE, BRACING, JOINTS, ETC. MINIMUM THICKNESS OF DUCT SHALL BE 26-GAUGE SHEET
<br />METAL. REINFORCE HOUSINGS AND DUCTWORK OVER 30" WITH 1-1/4" ANGLES NOT LESS THAN 5'-6" ON CENTERS,
<br />AND CLOSER IF REQUIRED FOR SUFFICIENT RIGIDITY TO PREVENT VIBRATION.
<br />PROVIDE ROUND AND FLAT-OVAL DUCT TO SIZES AS SHOWN ON DRAWINGS. APPROVED MANUFACTURERS OF
<br />ROUND AND FLAT-OVAL SPIRAL LOCK-SEAM DUCTS ARE LINDAB INC, MCGILL AIRFLOW CORP, SEMCO INC, LAPINE
<br />METAL PRODUCTS, OR APPROVED EQUAL. ROUND AND FLAT-OVAL SPIRAL LOCK-SEAM SUPPLY AND RETURN DUCTS
<br />SHALL BE FABRICATED OF GALVANIZED STEEL ACCORDING TO SMACNA STANDARDS BASED ON PRESSURE CLASS.
<br />MINIMUM THICKNESS OF DUCT SHALL BE 26 GAUGE SHEET METAL. ROUND AND FLAT-OVAL FITTINGS SHALL BE
<br />FACTORY FABRICATED WELDED DESIGN. DUCTS UP TO 20 INCHES IN DIAMETER SHALL HAVE CENTER-BEADED SLIP
<br />COUPLING, SEALED BEFORE AND AFTER FASTENING, ATTACHED WITH SHEET METAL SCREWS. DUCTS 21 TO 72
<br />INCHES SHALL HAVE A THREE-PIECE GASKETED FLANGED JOINT CONSISTING OF TWO INTERNAL FLANGES WITH
<br />SEALANT AND ONE EXTERNAL CLOSURE BAND WITH GASKET. PREFABRICATED CONNECTION SYSTEM CONSISTING
<br />OF FLANGES AND GASKET ARE ACCEPTABLE, APPROVED MANUFACTURERS ARE DUCTMATE INDUSTRIES INC AND
<br />LINDAB. ELBOWS, TEES, AND BENDS SHALL HAVE A RADIUS NOT LESS THAN 1-1/2 TIMES THE WIDTH OF THE
<br />CENTERLINE. TRANSITIONS IN DUCT SIZE SHALL BE GRADUAL NOT EXCEEDING 15 DEGREES WHERE POSSIBLE.
<br />ROUND ELBOWS UP TO 14 INCHES SHALL BE PLEATED AND GORED FOR 16 INCH AND ABOVE. ALL FLAT OVAL ELBOWS
<br />SHALL BE GORED. 90 DEGREE TEES, LATERALS, AND CONICAL TEES SHALL BE FABRICATED TO SMACNA.
<br />SUPPORT HORIZONTAL RUNS OF DUCT FROM STRAP IRON HANGERS ON CENTERS NOT TO EXCEED 8'-0". DO NOT
<br />SUPPORT CEILING GRID, CONDUITS, PIPES, EQUIPMENT, ETC. FROM DUCTWORK. COORDINATE ROUTING OF
<br />DUCTWORK WITH OTHER CONTRACTORS SUCH THAT PIPING, ELECTRICAL CONDUIT, AND ASSOCIATED SUPPORTS
<br />ARE NOT ROUTED THROUGH THE DUCTWORK.
<br />CONSTRUCT SUPPLY DUCTS TO MEET SMACNA POSITIVE PRESSURE OF 2" W.G. CONSTRUCT RETURN, OUTDOOR AND
<br />EXHAUST DUCTWORK UPSTREAM OF FANS TO MEET SMACNA NEGATIVE PRESSURE OF 1"W.G. CONSTRUCT EXHAUST
<br />DUCTWORK DOWNSTREAM OF FANS TO MEET SMACNA POSITIVE PRESSURE OF 1" W.G.
<br />SEAL DUCTWORK WITH HEAVY LIQUID SEALANT -SEALANTS SHALL COMPLY WITH THE FOLLOWING REQUIREMENTS:
<br />MILL FINISH ALUMINUM SUBSTRATE WITH GRAY ADHESIVES, MINIMUM 30 MIL THICK, MINIMUM 17 LB/IN PEEL
<br />STRENGTH, MAX SMOKE DEVELOPED OF 50 WHEN TESTED IN ACCORDANCE WITH ASTM G-53, VOC CONTENT OF 250
<br />g/L OR LESS, PRESSURE CLASS UP TO 10" W.C. -HARDCAST IRONGRIP 601, DESIGN POLYMER DP 1010, UNITED
<br />MCGlLL DUCT SEALER OR APPROVED EQUAL APPLIED ACCORDING TO SEALANT MANUFACTURER'S INSTRUCTIONS.
<br />OUTDOOR DUCTWORK SHALL BE SEALED TO: SUPPLY -CLASS A; EXHAUST -CLASS C; RETURN -CLASS A. INDOOR
<br />DUCTWORK SHALL BE SEALED TO: SUPPLY -CLASS C; EXHAUST -CLASS B; RETURN -CLASS C.
<br />PROVIDE RADIUS ELBOWS, TURNS AND OFFSETS WITH A MINIMUM CENTERLINE RADIUS OF 1-1/2 TIMES THE DUCT
<br />WIDTH. WHERE SPACE DOES NOT PERMIT FULL RADIUS ELBOWS PROVIDE SHORT RADIUS ELBOWS WITH A MINIMUM
<br />OF TWO CONTINUOUS SPLITTER VANES. VANES SHALL BE THE ENTIRE LENGTH OF THE BEND. PROVIDE MITERED
<br />ELBOWS WHERE SPACE DOES NOT PERMIT RADIUS ELBOWS WHERE SHOWN ON THE DRAWINGS OR AT THE OPTION
<br />OF THE CONTRACTOR WITH THE ENGINEER'S APPROVAL. MITERED ELBOWS LESS THAN 45 DEGREES SHALL NOT
<br />REQUIRE TURNING VANES. MITERED ELBOWS 45 DEGREES AND GREATER SHALL HAVE SINGLE THICKNESS TURNING
<br />VANES OF SAME GAUGE AS DUCTWORK RIGIDLY FASTENED WITH GUIDE STRIPS IN DUCTWORK. VANES FOR MITERED
<br />ELBOWS SHALL BE PROVIDED IN ALL SUPPLY AND EXHAUST DUCTWORK AND IN RETURN AND OUTSIDE AIR
<br />DUCTWORK THAT HAS AN AIR VELOCITY EXCEEDING 1000 FPM.
<br />DUCTS SHALL BE CONNECTED TO FANS, FAN CASINGS AND FAN PLENUMS BY MEANS OF FLEXIBLE CONNECTORS.
<br />FLEXIBLE CONNECTORS SHALL BE NEOPRENE-COATED, GLASS CLOTH CANVAS CONNECTIONS, DURO-DYNE, ELGEN,
<br />VENTFABRIC OR EQUAL. FLEX IBLE CONNECTORS SHALL HAVE A FLAME SPREAD OF 25 OR LESS AND SMOKE
<br />DEVELOPED RATING NOT HIGHER THAN 50. MAKE AIRTIGHT JOINTS AND INSTALL WITH MINIMUM 1-1/2" SLACK.
<br />PROVIDE BALANCING DAMPERS MANUFACTURED BY RUSKIN, GREENHECK, NAILOR INDUSTRIES, CESCO, LOUVERS &
<br />DAMPERS, POTTORFF OR APPROVED EQUAL, WHERE SHOWN ON DRAWINGS AND WHEREVER NECESSARY FOR
<br />COMPLETE ACCESS & CONTROL OF AIR FLOW. SPLITTER DAMPERS SHALL BE CONTROLLED BY LOCKING QUADRANTS;
<br />PROVIDE YOUNG REGULATOR OR VENTLOK END BEARINGS FOR THE DAMPER ROD. RECTANGULAR VOLUME
<br />DAMPERS SHALL BE OPPOSED BLADE INTERLOCKING TYPE. ROUND VOLUME DAMPERS SHALL BE BUTTERFLY TYPE
<br />CONSISTING OF CIRCULAR BLADE MOUNTED TO A SHAFT.
<br />DAMPER LEAKAGE FOR OUTSIDE AIR DAMPERS SHALL NOT EXCEED THE FOLLOWING AT 1" W.G. PRESSURE
<br />DIFFERENTIAL ACROSS THE DAMPER:
<br />• 4 CFM/SQ FT OF DAMPER AREA (CLIMATE ZONES 1,2,6,7,8 )
<br />• 10 CFM/SQ FT OF DAMPER AREA (MOTORIZED) -(ALL OTHER CLIMATE ZONES)
<br />• 20 CFM/SQ FT OF DAMPER AREA (NON-MOTORIZED) -(ALL OTHER CLIMATE ZONES)
<br />• 40 CFM/SQ FT IF THE DAMPERS ARE < 24”IN EITHER DIMENSION -(ALL OTHER CLIMATE ZONES
<br />REFERENCE MANUFACTURER AND MODEL NUMBER FOR OUTDOOR AIR DAMPERS IS RUSKIN MODEL CD-50. PROVIDE
<br />FLEXMASTER MODEL 'STO' OR EQUAL. 45-DEGREE RECTANGULAR/ROUND SIDE TAKEOFF FITTING WITH MODEL 'SLBO'
<br />DOUBLE BEARING DAMPER WITH INSULATION BUILD-OUT FOR ROUND DUCTWORK, BRANCH TAKEOFFS, AND
<br />INDIVIDUAL AIR DEVICES.
<br />WHERE ACCESS TO DAMPERS THROUGH A CEILING IS REQUIRED, PROVIDE A METROPOLITAN AIR TECHNOLOGY
<br />MODEL RT-250 OR EQUAL BY YOUNG'S REGULATOR CONCEALED, CABLE-OPERATED VOLUME DAMPER WITH REMOTE
<br />OPERATOR. DAMPER SHALL BE ADJUSTABLE THROUGH THE DIFFUSER FACE OR FRAME WITH STANDARD 1NUT-
<br />DRIVER OR FLAT SCREWDRIVER. CABLE ASSEMBLY SHALL ATTACH TO DAMPER AS ONE PIECE WITH NO LINKAGE
<br />ADJUSTMENT. POSITIVE, DIRECT, TWO-WAY DAMPER CONTROL SHALL BE PROVIDED WITH NO SLEEVES, SPRINGS OR
<br />SCREW ADJUSTMENTS TO COME LOOSE AFTER INSTALLATION. SUPPORT CABLE ASSEMBLY TO AVOID BENDS AND
<br />KINKS IN CABLE.
<br />ROUND OR OVAL DUCTWORK SHALL BE SEMCO, UNITED, WESCO OR EQUAL, SHEETMETAL WITH SMOOTH INTERIOR
<br />SURFACE WITH LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2" W.G.) ROUND DUCTWORK GAUGES
<br />PER THE FOLLOWING TABLE (REFERENCE SMACNA HVAC DUCT CONSTRUCTION STANDARDS FOR GAUGES WHEN
<br />PRESSURES EXCEED 2" W.G.):
<br />SIZE DUCT GAUGE FITTING GAUGE
<br />14" & UNDER 26 24
<br />15" THRU 26"24 22
<br />28" THRU 36"22 20
<br />LINDAB SPIROSAFE, LEWIS & LAMBERT OR APPROVED EQUAL FACTORY-MANUFACTURED ROUND DUCTWORK AND
<br />FITTINGS MAY BE SUBSTITUTED FOR SPECIFIED ROUND BRANCH DUCTWORK AT CONTRACTOR'S OPTION. HEAVY
<br />LIQUID JOINT SEALANT MAY BE OMITTED ON FACTORY-MANUFACTURED ROUND DUCTWORK.
<br />SUBMIT THREE COPIES OF LITERATURE BOUND IN APPROVED BINDERS WITH INDEX AND TABS SEPARATING
<br />EQUIPMENT TYPES TO THE OWNER AT THE TERMINATION OF THE WORK. PAPER CLIPS, STAPLES, RUBBER BANDS
<br />AND MAILING ENVELOPES ARE NOT CONSIDERED APPROVED BINDERS. FINAL APPROVAL OF MECHANICAL SYSTEMS
<br />INSTALLED UNDER THIS CONTRACT WILL BE WITHHELD UNTIL THIS EQUIPMENT BROCHURE IS RECEIVED AND DEEMED
<br />COMPLETE BY THE ARCHITECT AND ENGINEER. INSTRUCT SUB-CONTRACTORS TO SAVE REQUIRED LITERATURE
<br />SHIPPED WITH THE EQUIPMENT ITSELF FOR INCLUSION IN THIS BROCHURE.
<br />PROVIDE "AS-BUILT" DRAWINGS WITHIN TWO (2) WEEKS OF PROJECT COMPLETION.
<br />TRAINING
<br />AT A TIME MUTUALLY AGREED UPON BETWEEN THE OWNER AND CONTRACTOR, PROVIDE THE SERVICES OF A
<br />FACTORY TRAINED AND AUTHORIZED REPRESENTATIVE TO TRAIN OWNER'S DESIGNATED PERSONNEL ON THE
<br />OPERATION AND MAINTENANCE OF THE EQUIPMENT PROVIDED FOR THIS PROJECT. PROVIDE TRAINING TO INCLUDE,
<br />BUT NOT BE LIMITED TO, AN OVERVIEW OF THE SYSTEM AND/OR EQUIPMENT AS IT RELATES TO THE FACILITY AS A
<br />WHOLE, OPERATION AND MAINTENANCE PROCEDURES AND SCHEDULES RELATED TO STARTUP AND SHUTDOWN,
<br />TROUBLESHOOTING, SERVICING, PREVENTIVE MAINTENANCE AND APPROPRIATE OPERATOR INTERVENTION; AND
<br />REVIEW OF DATA INCLUDED IN THE OPERATION AND MAINTENANCE MANUALS.
<br />SUBMIT A CERTIFICATION LETTER TO THE ARCHITECT STATING THAT THE OWNER'S DESIGNATED REPRESENTATIVE
<br />HAS BEEN TRAINED AS SPECIFIED HEREIN. LETTER SHALL INCLUDE DATE, TIME, ATTENDEES AND SUBJECT OF
<br />TRAINING. THE CONTRACTOR AND THE OWNER'S REPRESENTATIVE SHALL SIGN THE CERTIFICATION LETTER
<br />INDICATING AGREEMENT THAT THE TRAINING HAS BEEN PROVIDED.
<br />SCHEDULE OWNER TRAINING WITHIN AT LEAST 7 DAYS ADVANCE NOTICE.
<br />SPARE PARTS
<br />THIS CONTRACTOR SHALL PROVIDE TO THE OWNER, WITH RECEIPT, THE FOLLOWING SPARE PARTS FOR THE
<br />EQUIPMENT INSTALLED FOR THIS PROJECT:
<br />A. ONE SET OF SPARE FILTERS OF EACH TYPE REQUIRED FOR EACH UNIT. IN ADDITION TO THE SPARE SET OF
<br />FILTERS, INSTALL NEW FILTERS PRIOR TO TESTING, ADJUSTING AND BALANCING WORK AND BEFORE TURNING
<br />SYSTEM OVER TO OWNER.
<br />B. ONE COMPLETE SET OF BELTS FOR EACH FAN.
<br />C. THREE OPERATING KEYS FOR EACH TYPE OF AIR OUTLET AND INLET THAT REQUIRE THEM.
<br />WARRANTIES
<br />WARRANT EACH SYSTEM AND EACH ELEMENT THEREOF AGAINST ALL DEFECTS DUE TO FAULTY WORKMANSHIP,
<br />DESIGN OR MATERIAL FOR A PERIOD OF 12 MONTHS FROM DATE OF SUBSTANTIAL COMPLETION UNLESS SPECIFIC
<br />ITEMS ARE NOTED TO CARRY A LONGER WARRANTY IN THE CONSTRUCTION DOCUMENTS OR MANUFACTURER'S
<br />STANDARD WARRANTY EXCEEDS 12 MONTHS. REMEDY ALL DEFECTS OCCURRING WITHIN THE WARRANTY PERIOD(S)
<br />AS STATED IN THE GENERAL CONDITIONS AND DIVISION 1.
<br />WARRANTIES SHALL INCLUDE LABOR AND MATERIAL. MAKE REPAIRS OR REPLACEMENTS WITHOUT ANY ADDITIONAL
<br />COSTS TO THE OWNER.
<br />AT THE TIME OF SUBSTANTIAL COMPLETION, DELIVER TO THE OWNER ALL WARRANTIES, IN WRITING AND PROPERLY
<br />EXECUTED, INCLUDING TERM LIMITS FOR WARRANTIES EXTENDING BEYOND THE ONE YEAR PERIOD, EACH
<br />WARRANTY INSTRUMENT BEING ADDRESSED TO THE OWNER AND STATING THE COMMENCEMENT DATE AND TERM.
<br />CUTTING AND PATCHING
<br />PERFORM CUTTING OF WALLS, FLOORS, CEILINGS, ETC. AS REQUIRED TO INSTALL WORK UNDER THIS SECTION.
<br />OBTAIN PERMISSION FROM THE ARCHITECT PRIOR TO CUTTING. DO NOT CUT OR DISTURB STRUCTURAL MEMBERS
<br />WITHOUT PRIOR APPROVAL FROM THE ARCHITECT. CUT HOLES AS SMALL AS POSSIBLE. GENERAL CONTRACTOR
<br />SHALL PATCH WALLS, FLOORS, ETC. AS REQUIRED BY WORK UNDER THIS SECTION. PATCHING SHALL MATCH THE
<br />ORIGINAL MATERIAL AND CONSTRUCTION. REPAIR AND REFINISH AREAS DISTURBED BY WORK TO THE CONDITION OF
<br />ADJOINING SURFACES IN A MANNER SATISFACTORY TO THE ARCHITECT.
<br />ROUGH-IN
<br />COORDINATE WITHOUT DELAY ROUGHING-IN WITH GENERAL CONSTRUCTION. CONCEAL PIPING AND CONDUIT ROUGH-
<br />IN EXCEPT IN UNFINISHED AREAS AND WHERE OTHERWISE SHOWN.
<br />STRUCTURAL STEEL
<br />STRUCTURAL STEEL USED FOR SUPPORT OF EQUIPMENT, DUCTWORK AND PIPING SHALL BE NEW, CLEAN AND
<br />CONFORM TO ASTM DESIGNATION A-36.
<br />SUPPORT MECHANICAL COMPONENTS FROM THE BUILDING STRUCTURE. DO NOT SUPPORT MECHANICAL
<br />COMPONENTS FROM CEILINGS, OTHER MECHANICAL OR ELECTRICAL COMPONENTS, NOR OTHER NON-STRUCTURAL
<br />ELEMENTS.
<br />ACCESS DOORS
<br />PROVIDE ACCESS DOORS IN CEILINGS, WALLS, ETC. WHERE INDICATED OR REQUIRED FOR ACCESS OR MAINTENANCE
<br />TO CONCEALED VALVES AND EQUIPMENT INSTALLED UNDER THIS SECTION. PROVIDE CONCEALED HINGES,
<br />SCREWDRIVER-TYPE LOCK, ANCHOR STRAPS; MANUFACTURED BY MILCOR, ZURN, TITUS OR EQUAL. OBTAIN
<br />ARCHITECT'S APPROVAL OF TYPE, SIZE, LOCATION AND COLOR BEFORE ORDERING.
<br />PENETRATIONS
<br />SEAL ELEVATED FLOOR, EXTERIOR WALL AND ROOF PENETRATIONS WATERTIGHT AND WEATHERTIGHT WITH NON-
<br />SHRINK, NON-HARDENING COMMERCIAL SEALANT. PACK WITH MINERAL WOOL AND SEAL BOTH ENDS WITH MINIMUM
<br />OF 1/2" OF SEALANT. SEAL AROUND PENETRATIONS OF FIRE-RATED ASSEMBLIES. COORDINATE FIRE RATINGS AND
<br />LOCATIONS WITH THE ARCHITECTURAL DRAWINGS. REFER TO ARCHITECTURAL SPECIFICATIONS FOR FIRE STOPPING.
<br />PROVIDE A PRODUCT SCHEDULE FOR UL LISTING, LOCATION, WALL OR FLOOR RATING AND INSTALLATION DRAWING
<br />FOR EACH PENETRATION FIRE STOP SYSTEM.
<br />PROVIDE PRE-FABRICATED ROOF CURBS MANUFACTURED BY CUSTOM CURB, INC., PATE COMPANY, THYCURB OR
<br />APPROVED EQUAL. PROVIDE ROOF CURB WITH FACTORY INSTALLED WOOD NAILER; WELDED 18-GAUGE GALVANIZED
<br />STEEL SHELL, BASE PLATE AND FLASHING; 1/2" THICK, 3-POUND RIGID INSULATION; FULLY MITERED 3-INCH RAISED
<br />CANT; COVER OF WEATHER RESISTANT, WEATHER-PROOF MATERIAL AND PIPE COLLAR OF WEATHER-RESISTANT
<br />MATERIAL WITH STAINLESS STEEL PIPE CLAMPS.
<br />AIR FILTERS
<br />IF HVAC EQUIPMENT IS USED DURING THE CONSTRUCTION PERIOD, THIS CONTRACTOR SHALL PROVIDE MINIMUM
<br />MERV-8 FILTERS OR FILTRATION MEDIA OVER ANY RETURN AIR GRILLES AND OPEN RETURN AIR DUCT WORK FOR
<br />THE DURATION OF THE CONSTRUCTION PERIOD. CONTRACTOR SHALL PROVIDE ONE SET OF FILTERS WHEN THE UNIT
<br />IS STARTED AND REPLACE FILTERS AS NEEDED, BUT NOT LESS THAN EVERY FOUR WEEKS.
<br />ON THE DAY OF SUBSTANTIAL COMPLETION, THE CONTRACTOR SHALL CLEAN THE UNIT AND PROVIDE A NEW SET OF
<br />FILTERS IN THE UNIT.
<br />PROVIDE MINIMUM MERV-13 FILTERS MANUFACTURED BY FARR, AMERICAN AIR FILTER, FLANDERS, OR APPROVED
<br />EQUAL, UNLESS OTHERWISE NOTED. AIR UNITS SHALL HAVE NEW FILTERS INSTALLED WHEN THEY ARE OPERATED
<br />BEFORE FINAL ACCEPTANCE.
<br />MOTORS AND STARTERS
<br />PROVIDE MOTORS AND STARTING EQUIPMENT WHERE NOT FURNISHED WITH THE EQUIPMENT PACKAGE. MOTORS
<br />SHALL HAVE COPPER WINDINGS, CLASS B INSULATION, AND STANDARD SQUIRREL CAGE WITH STARTING TORQUE
<br />CHARACTERISTICS SUITABLE FOR THE EQUIPMENT SERVED. MOTORS FOR AIR HANDLING EQUIPMENT SHALL BE
<br />SELECTED FOR QUIET OPERATION. EACH MOTOR SHALL BE CHECKED FOR PROPER ROTATION AFTER ELECTRICAL
<br />CONNECTION HAS BEEN COMPLETED. PROVIDE DRIP-PROOF ENCLOSURE FOR LOCATIONS PROTECTED FROM
<br />WEATHER AND NOT IN AIR STREAM OF FAN; AND TOTALLY ENCLOSED FAN-COOLED ENCLOSURE FOR MOTORS
<br />EXPOSED TO WEATHER. MOTORS SHALL BE MANUFACTURED BY CENTURY, GENERAL ELECTRIC, WESTINGHOUSE,
<br />LOUIS-ALLIS OR APPROVED EQUAL.
<br />PROVIDE EVERY MOTOR, EXCEPT FRACTIONAL HORSEPOWER SINGLE PHASE MOTORS WITH AN APPROVED TYPE OF
<br />BUILT-IN THERMAL OVERLOAD PROTECTION, WITH A MOTOR STARTER. EACH STARTER SHALL BE PROVIDED WITH
<br />OVERLOAD HEATERS SIZED TO THE MOTOR RATING, AND EVERY THREE-PHASE MOTOR STARTER SHALL HAVE
<br />OVERLOAD HEATERS IN EACH PHASE. AMBIENT COMPENSATED HEATERS SHALL BE INSTALLED WHEREVER
<br />NECESSARY, UNLESS NOTED OTHERWISE. MOTOR STARTERS SHALL BE FURNISHED BY THE DIVISION 15
<br />CONTRACTOR. FOR INSTALLATION AND CONNECTION BY THE DIVISION 16 CONTRACTOR, STARTERS SHALL BE ALLEN-
<br />BRADLEY, CLARK, FURNAS, SQUARE D, OR APPROVED EQUAL.
<br />ELECTRICAL WIRING
<br />LINE VOLTAGE WIRING, CONTROLS AND INTERLOCK WIRING FOR MECHANICAL SYSTEMS SHALL BE PROVIDED BY
<br />DIVISION 16 CONTRACTOR. LOW VOLTAGE CONTROL WIRING SHALL BE PROVIDED BY THE DIVISION 15 CONTRACTOR.
<br />FURNISH WIRING DIAGRAMS TO THE DIVISION 16 CONTRACTOR AS REQUIRED FOR PROPER EQUIPMENT HOOKUP.
<br />COORDINATE WITH THE DIVISION 16 CONTRACTOR THE ACTUAL WIRE SIZING AMPS FOR MECHANICAL EQUIPMENT
<br />(FROM THE EQUIPMENT NAMEPLATE) TO ENSURE PROPER INSTALLATION.
<br />ALL LOW VOLTAGE CONTROL WIRING (24 -VOLT) SHALL BE IN CONDUIT AND IN ACCORDANCE WITH THE NATIONAL
<br />ELECTRICAL CODE AND ALL STATE AND LOCAL CODES AND ORDINANCES AND SHALL BE DONE BY THIS HVAC
<br />CONTRACTOR.
<br />REFRIGERANT AND OIL
<br />PROVIDE FULL REFRIGERANT AND OIL CHARGE IN NEW AIR CONDITIONING REFRIGERATION SYSTEMS, AND MAINTAIN
<br />IT FOR FULL TERM OF THE GUARANTEE.
<br />ALL NEW MECHANICAL EQUIPMENT SHALL UTILIZE R-410A.
<br />EQUIPMENT FURNISHED BY OTHERS
<br />PROVIDE NECESSARY EQUIPMENT AND ACCESSORIES THAT ARE NOT PROVIDED BY THE EQUIPMENT SUPPLIER OR
<br />OWNER TO COMPLETE INSTALLATION OF EQUIPMENT FURNISHED BY OTHERS IN LOCATIONS AS INDICATED ON THE
<br />DRAWINGS AND/OR DESCRIBED IN THE GENERAL NOTES TO THIS CONTRACTOR. EQUIPMENT AND ACCESSORIES NOT
<br />PROVIDED BY THE EQUIPMENT SUPPLIER MAY INCLUDE CONDENSATE DRAINS, FLUES, VENTS, INTAKES, ASSOCIATED
<br />ROOF JACKS AND CAPS TO EXTERIOR, DAMPERS, INLINE FANS, ROOF FANS, CONTROL INTERLOCKS, ETC. AS
<br />REQUIRED FOR PROPER OPERATION OF THE COMPLETE SYSTEM IN ACCORDANCE WITH THE MANUFACTURER'S
<br />INSTRUCTIONS.
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE INSPECTION OF ALL EXISTING EQUIPMENT PROVIDED BY THE
<br />LANDLORD. UPON COMPLETION OF INSPECTION, CONTRACTOR SHALL NOTIFY VERIZON WIRELESS REPRESENTATIVE
<br />OF ANY REQUIRED OR RECOMMENDED REPAIRS TO, AND/OR REPLACEMENT OF, EXISTING SYSTEMS THAT HAVE NOT
<br />BEEN SPECIFICALLY NOTED IN THE CONSTRUCTION DOCUMENTS.
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECT ROUGH-IN DIMENSIONS AND SHALL VERIFY SAME WITH
<br />ARCHITECT AND/OR EQUIPMENT SUPPLIER PRIOR TO SERVICE INSTALLATIONS.
<br />15A.1 GENERAL INSTRUCTIONS
<br />GENERAL REQUIREMENTS
<br />REQUIREMENTS UNDER DIVISION ONE AND THE GENERAL AND SUPPLEMENTARY CONDITIONS OF THESE
<br />SPECIFICATIONS SHALL BE A PART OF THIS SECTION. CONTRACTOR SHALL BECOME THOROUGHLY ACQUAINTED
<br />WITH ITS CONTENTS AS TO REQUIREMENTS THAT AFFECT THIS DIVISION OR SECTION. THE WORK REQUIRED UNDER
<br />THIS SECTION INCLUDES MATERIAL, EQUIPMENT, APPLIANCES, TRANSPORTATION, SERVICES AND LABOR REQUIRED
<br />TO COMPLETE THE ENTIRE SYSTEM AS REQUIRED BY THE DRAWINGS AND SPECIFICATIONS.
<br />THE SPECIFICATIONS AND DRAWINGS FOR THE PROJECT ARE COMPLEMENTARY, AND THE PORTIONS OF THE WORK
<br />DESCRIBED IN ONE SHALL BE PROVIDED AS IF DESIRED IN BOTH. IN THE EVENT OF DISCREPANCIES, NOTIFY THE
<br />ENGINEER AND REQUEST CLARIFICATION PRIOR TO PROCEEDING WITH THE WORK.
<br />VISIT TO SITE
<br />PRIOR TO SUBMITTING A PROPOSAL, THE CONTRACTOR SHALL VISIT AND EXAMINE THE PREMISES OF THE
<br />PROPOSED WORK & FAMILIARIZE HIMSELF WITH PROJECT CONDITIONS (I.E.; ANY STRUCTURAL, ARCHITECTURAL OR
<br />ELECTRICAL OBSTRUCTIONS. NO CLAIMS FOR "EXTRA" COMPENSATION DUE TO UNFAMILIARITY WITH EXISTING
<br />CONDITIONS AND/OR DESIGN DRAWINGS OR SPECIFICATIONS WILL BE CONSIDERED.
<br />MATERIALS AND WORKMANSHIP
<br />PROVIDE NEW MATERIAL, EQUIPMENT, AND APPARATUS UNDER THIS CONTRACT, UNLESS NOTED OTHERWISE, OF
<br />BEST QUALITY NORMALLY USED IN GOOD COMMERCIAL PRACTICE, AND FREE FROM DEFECTS. MODEL NUMBERS
<br />SHOWN IN THE DOCUMENTS ARE NOT NECESSARILY INTENDED TO DESIGNATE ALL REQUIRED ACCESSORIES AND
<br />TRIM; WRITTEN DESCRIPTIONS GOVERN MODEL NUMBER VARIATIONS.
<br />PIPE, PIPE FITTINGS, PIPE SPECIALTIES, AND VALVES SHALL BE MANUFACTURED IN PLANTS LOCATED IN THE UNITES
<br />STATES.
<br />WORK PERFORMED UNDER THIS CONTRACT SHALL PROVIDE A NEAT AND "WORKMANLIKE" APPEARANCE WHEN
<br />COMPLETED, TO THE SATISFACTIONS OF THE ARCHITECT AND ENGINEER. WORKMANSHIP SHALL BE THE FINEST
<br />POSSIBLE BY EXPERIENCED MECHANICS. INSTALLATIONS SHALL COMPLY WITH ALL APPLICABLE CODES AND LAWS.
<br />THE COMPLETE INSTALLATION SHALL FUNCTION AS DESIGNED AND INTENDED WITH RESPECT TO EFFICIENCY,
<br />CAPACITY, NOISE LEVEL, ETC. ABNORMAL NOISE CAUSED BY RATTLING EQUIPMENT, PIPING, DUCTS, AIR DEVICES,
<br />AND SQUEAKS IN ROTATING COMPONENTS WILL NOT BE ACCEPTABLE. IN GENERAL, MATERIALS AND EQUIPMENT
<br />SHALL BE OF COMMERCIAL SPECIFICATION GRADE IN QUALITY. LIGHT DUTY AND RESIDENTIAL TYPE EQUIPMENT
<br />WILL NOT BE ACCEPTED.
<br />REMOVE FROM THE PREMISES ALL WASTE MATERIAL PRESENT AS A RESULT OF WORK, INCLUDING CARTONS,
<br />CRATING, PAPER, STICKERS, AND/OR EXCAVATION MATERIAL NOT USED IN BACKFILLING, ETC., FOLLOWING ALL
<br />CONSTRUCTION WASTE MANAGEMENT GUIDELINES. CLEAN EQUIPMENT INSTALLED UNDER THIS CONTRACT TO
<br />PRESENT A NEAT AND CLEAN INSTALLATION AT THE TERMINATION OF THE WORK.
<br />REPAIR OR REPLACE PUBLIC AND PRIVATE PROPERTY DAMAGED AS A RESULT OF WORK PERFORMED UNDER THIS
<br />CONTRACT TO THE SATISFACTION OF AUTHORITIES AND REGULATIONS HAVING JURISDICTION.
<br />COORDINATION
<br />COORDINATE WORK WITH THAT OF OTHER TRADES SO THAT THE VARIOUS COMPONENTS OF THE SYSTEMS WILL BE
<br />INSTALLED AT THE PROPER TIME, WILL FIT THE AVAILABLE SPACE, AND WILL ALLOW PROPER SERVICE ACCESS TO
<br />THOSE ITEMS REQUIRING MAINTENANCE. COMPONENTS WHICH ARE INSTALLED WITHOUT REGARD TO THE
<br />AFOREMENTIONED SHALL BE RELOCATED AT NO ADDITIONAL COST TO THE OWNER.
<br />UNLESS OTHERWISE INDICATED, THE GENERAL CONTRACTOR WILL PROVIDE CHASES AND OPENINGS IN BUILDING
<br />CONSTRUCTION REQUIRED FOR INSTALLATION OF THE SYSTEMS SPECIFIED HEREIN. CONTRACTOR SHALL FURNISH
<br />THE GENERAL CONTRACTOR WITH INFORMATION WHERE CHASES AND OPENING ARE REQUIRED.
<br />THE WORK SHALL BE LAID OUT FROM DIMENSIONS SHOWN ON THE DRAWINGS ONLY. DO NOT SCALE DRAWINGS.
<br />CONTRACTOR SHALL WORK FROM MOST RECENT DRAWINGS SUPPLIED BY OWNER OR ARCHITECT. WORK SHALL BE
<br />PERFORMED ONLY AFTER WRITTEN DIRECTION BY OWNER OR ARCHITECT.
<br />MECHANICAL PLANS ARE PARTIALLY DIAGRAMMATIC, NOT SHOWING EVERY ITEM IN EXACT LOCATION OR DETAIL.
<br />MEASUREMENTS AND LOCATIONS MUST BE COORDINATED WITH ARCHITECTURAL, STRUCTURAL, ELECTRICAL AND
<br />OTHER BUILDING DRAWINGS.
<br />CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO BEGINNING WORK AS VARIATIONS MAY OCCUR.
<br />CONTRACTOR WILL BE HELD RESPONSIBLE FOR ERRORS THAT COULD HAVE BEEN AVOIDED BY PROPER INSPECTION
<br />AND VERIFICATION.
<br />CODES AND PERMITS
<br />WORK PERFORMED UNDER THIS CONTRACT SHALL, AT A MINIMUM, BE IN FULL ACCORDANCE WITH ALL APPLICABLE
<br />CODES, RULES AND REGULATIONS OF NATIONAL, STATE, COUNTY & MUNICIPAL AUTHORITIES HAVING JURISDICTION
<br />OVER THE PREMISES. EQUIPMENT FURNISHED AND ASSOCIATED INSTALLATION WORK PERFORMED UNDER THIS
<br />CONTRACT SHALL BE IN STRICT COMPLIANCE WITH CURRENT APPLICABLE CODES ADOPTED BY THE LOCAL
<br />GOVERNING AUTHORITY INCLUDING ANY AMENDMENTS AND STANDARDS AS SET FORTH BY THE NATIONAL FIRE
<br />PROTECTION ASSOCIATION (NFPA), UNDERWRITERS LABORATORIES (UL), OCCUPATIONAL SAFETY AND HEALTH
<br />ADMINISTRATION (OSHA), AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME), AMERICAN SOCIETY OF HEATING,
<br />REFRIGERATION, AND AIR CONDITIONING ENGINEERS (ASHRAE), AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI),
<br />AMERICAN SOCIETY OF TESTING MATERIALS (ASTM), AND OTHER NATIONAL STANDARDS AND CODES WHERE
<br />APPLICABLE. WHERE THE CONTRACT DOCUMENTS EXCEED THE REQUIREMENTS OF THE REFERENCED CODES,
<br />STANDARDS, ETC., THE CONTRACT DOCUMENTS SHALL TAKE PRECEDENT.
<br />THIS CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS, LICENSES AND CERTIFICATES OF INSPECTION
<br />INCIDENTAL TO HIS WORK REQUIRED BY THE FOREGOING AUTHORITIES. ALL SUCH CERTIFICATES SHALL BE
<br />DELIVERED TO THE ARCHITECT IN DUPLICATE.
<br />PROTECTION OF EQUIPMENT AND MATERIALS
<br />CONTRACTOR SHALL DEVELOP AND IMPLEMENT AN INDOOR AIR QUALITY MANAGEMENT PLAN THAT MEETS OR
<br />EXCEEDS THE MINIMUM REQUIREMENTS OF 'SMACNA' IAQ GUIDELINES FOR OCCUPIED BUILDINGS UNDER
<br />CONSTRUCTION, SECOND EDITION 2007, ANSI/SMACNA 008-2008 CHAPTER 3. CONTRACTOR SHALL MEET
<br />REQUIREMENTS FOR CONSTRUCTION INDOOR AIR QUALITY MANAGEMENT PROVIDED IN THE LEED PROTOTYPE
<br />GREEN SPECIFICATIONS.
<br />STORE AND PROTECT FROM DAMAGE EQUIPMENT AND MATERIALS DELIVERED TO JOB SITE. COVER WITH
<br />WATERPROOF, TEAR-RESISTANT HEAVY TARP OR POLYETHYLENE PLASTIC AS REQUIRED TO PROTECT FROM
<br />PLASTER, DIRT, PAINT, WATER OR PHYSICAL DAMAGE. EQUIPMENT AND MATERIAL THAT HAS BEEN DAMAGED BY
<br />CONSTRUCTION ACTIVITIES WILL BE REJECTED AND CONTRACTOR IS OBLIGATED TO FURNISH NEW EQUIPMENT AND
<br />MATERIAL OF A LIKE KIND.
<br />KEEP PREMISES BROOM CLEAN FROM FOREIGN MATERIAL CREATED DURING WORK PERFORMED UNDER THIS
<br />CONTRACT. PIPING, EQUIPMENT, ETC. SHALL HAVE A NEAT AND CLEAN APPEARANCE AT THE TERMINATION OF THE
<br />WORK.
<br />PLUG, CAP OR COMPLETELY COVER ALL OPEN ENDS OF DUCTWORK AND PIPING SYSTEMS WHILE STORED AND/OR
<br />INSTALLED DURING CONSTRUCTION WHEN NOT IN USE TO PREVENT THE ENTRANCE OF DEBRIS INTO THE SYSTEMS.
<br />CONTRACTOR SHALL PROVIDE A MINIMUM OF 40 PHOTOGRAPHS (10 EACH WEEK OF DIFFERENT ITEMS AND/OR
<br />VIEWS) OF CONSTRUCTION IAQ MANAGEMENT MEASURES SUCH AS PROTECTION OF DUCTS AND ON-SITE STORED
<br />OR INSTALLED ABSORPTIVE MATERIALS. SEE CONSTRUCTION "IAQ" MANAGEMENT SPECIFICATIONS PROVIDED ON
<br />THE LEED PROTOTYPE GREEN SPECIFICATIONS FOR MORE INFORMATION.
<br />SUBSTITUTIONS
<br />ITEMS SPECIFIED BY MANUFACTURER'S NAME AND/OR MODEL NUMBER INDICATES THE MINIMUM QUALITY, SIZE AND
<br />CAPACITY REQUIRED. OTHER MANUFACTURER'S PRODUCTS OF EQUAL SPECIFICATIONS WILL BE CONSIDERED BUT
<br />ONLY IF NOTED AT THE TIME OF BIDDING AND WITH THE WRITTEN APPROVAL OF THE ARCHITECT PRIOR TO
<br />PURCHASING THE EQUIPMENT.
<br />THE BASE BID SHALL INCLUDE ONLY THE PRODUCTS FROM MANUFACTURERS SPECIFICALLY NAMED IN THE
<br />DRAWINGS AND SPECIFICATIONS. NO SUBSTITUTION WILL BE CONSIDERED PRIOR TO RECEIPT OF BIDS UNLESS
<br />WRITTEN REQUEST FOR APPROVAL TO BID HAS BEEN RECEIVED BY THE ARCHITECT OR ENGINEER AT LEAST TEN
<br />(10) CALENDAR DAYS PRIOR TO THE DATE FOR RECEIPT OF BIDS. EACH SUCH REQUEST SHALL INCLUDE THE NAME
<br />OF THE MATERIAL OR EQUIPMENT FOR WHICH IT IS TO BE SUBSTITUTED AND A COMPLETE DESCRIPTION OF THE
<br />PROPOSED SUBSTITUTE INCLUDING DRAWINGS, CUT SHEETS, PERFORMANCE AND TEST DATA, AND OTHER
<br />INFORMATION NECESSARY FOR AN EVALUATION. A STATEMENT SETTING FORTH CHANGES IN OTHER MATERIALS,
<br />EQUIPMENT OR OTHER WORK THAT INCORPORATION OF THE SUBSTITUTE WOULD REQUIRE SHALL BE INCLUDED.
<br />THE BURDEN OF PROOF OF THE MERIT OF THE PROPOSED SUBSTITUTE IS UPON THE PROPOSER. THE ARCHITECT'S
<br />OR ENGINEER'S DECISION OF APPROVAL OR DISAPPROVAL TO BID OF A PROPOSED SUBSTITUTE ON SHALL BE FINAL.
<br />THE TERMS "APPROVED", "APPROVED EQUAL", AND "EQUAL" REFER TO APPROVAL BY THE ARCHITECT OR ENGINEER
<br />AS AN ACCEPTABLE ALTERNATE BID. NO SUBSTITUTIONS WILL BE CONSIDERED THAT ARE NOT BID AS AN
<br />ALTERNATE. NO MATERIAL SUBSTITUTIONS SHALL BE CONSIDERED FOR APPROVAL PRIOR TO AWARD OF
<br />CONTRACT.
<br />COORDINATE AND VERIFY WITH OTHER TRADES WHETHER OR NOT THE SUBSTITUTED EQUIPMENT CAN BE
<br />INSTALLED AS SHOWN ON THE CONSTRUCTION DRAWINGS WITHOUT MODIFICATION TO ASSOCIATED SYSTEMS OR
<br />ARCHITECTURAL OR ENGINEERING DESIGN. INCLUDE ADDITIONAL COSTS FOR ARCHITECTURAL AND ENGINEERING
<br />DESIGN FEES IN BID IF DRAWING MODIFICATIONS ARE REQUIRED BECAUSE OF SUBSTITUTED EQUIPMENT.
<br />SUBSTITUTIONS FOR ANY REFRIGERANTS OR EQUIPMENT SHALL BE SUBMITTED AND APPROVED BY ARCHITECT
<br />FOR LEED REQUIREMENTS. SEE REQUIREMENTS FOR SUBSTITUTIONS ON THE LEED PROTOTYPE GREEN
<br />SPECIFICATIONS.
<br />ELECTRONIC DRAWING FILES
<br />IN PREPARATION OF SHOP DRAWINGS OR RECORD DRAWINGS, CONTRACTOR MAY, AT HIS OPTION, OBTAIN
<br />ELECTRONIC DRAWINGS FILES IN AUTOCAD OR DXF FORMAT AS DESIRED FROM THE ARCHITECT OR ENGINEER.
<br />OPERATION AND MAINTENANCE INSTRUCTIONS
<br />DURING THE COURSE OF CONSTRUCTION, COLLECT AND COMPILE A COMPLETE BROCHURE OF EQUIPMENT
<br />FURNISHED AND INSTALLED ON THIS PROJECT. INCLUDE OPERATIONAL AND MAINTENANCE INSTRUCTIONS,
<br />MANUFACTURER'S CATALOG SHEETS, WIRING DIAGRAMS, PARTS LISTS, APPROVED SHOP DRAWINGS AND
<br />DESCRIPTIVE LITERATURE AS FURNISHED BY THE EQUIPMENT MANUFACTURER. INCLUDE AN INSIDE COVER SHEET
<br />THAT LISTS THE PROJECT NAME, DATE, OWNER, ARCHITECT, CONSULTING ENGINEER, GENERAL CONTRACTOR, SUB-
<br />CONTRACTORS AND AN INDEX OF CONTENTS.
<br />LOW-PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2" W.G.) FITTINGS 24" IN DIAMETER AND LESS SHALL
<br />BE PREFABRICATED, SPOTWELDED AND INTERNALLY SEALED. CONTINUOUSLY WELD FITTINGS LARGER THAN 24" IN
<br />DIAMETER. FITTING GAUGE SHALL BE 22-GAUGE FOR 36" FITTINGS AND UNDER 20-GAUGE FOR LARGER SIZES. 90-
<br />DEGREE TEE'S SHALL BE CONICAL-TYPE. SEAL LONGITUDINAL AND TRANSVERSE DUCTWORK JOINTS AlR-TIGHT WITH
<br />HEAVY LIQUID SEALANT APPLIED ACCORDING TO MANUFACTURER'S INSTRUCTIONS. PROVIDE GAUGE THICKNESS IN
<br />MEDIUM PRESSURE (DUCT PRESSURE CLASS 3" TO 6" W.G.) DUCTWORK AS RECOMMENDED BY SMACNA.
<br />FLEXIBLE DUCT
<br />ANY FLEX DUCT CONNECTIONS MADE FROM BRANCH DUCTS TO DIFFUSERS SHALL BE MADE WITH FLEXIBLE AIR DUCT
<br />SIMILAR TO "CERTAFLEX" OR "GENFLEX". LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2" W.G.) AND
<br />MEDIUM PRESSURE (DUCT PRESSURE CLASS 2" TO 6" W.G.) FLEXIBLE DUCT SHALL BE FLEXMASTER TYPE 8B,
<br />THERMAFLEX TYPE G-KM, M-KE OR EQUAL (FIRE-RETARDANT POLYETHYLE PROTECTIVE VAPOR BARRIER, U.L.181
<br />CLASS 1, ACOUSTICALLY INSULATED DUCT, R-6.0 FIBERGLASS INSULATION). PROVIDE 'CPE' LINER WITH STEEL WIRE
<br />HELIX MECHANICALLY LOCKED OR PERMANENTLY BONDED TO THE LINER.
<br />FLEXIBLE DUCT RUNS SHALL NOT EXCEED 5-FEET IN LENGTH AND SHALL BE INSTALLED FULLY EXTENDED AND
<br />STRAIGHT AS POSSIBLE AVOIDING TIGHT TURNS. INSTALL FLEXIBLE DUCT IN ACCORDANCE WITH MANUFACTURER'S
<br />INSTRUCTIONS. NO MORE THAN ONE (1) 90-DEGREE BEND SHALL BE CREATED. SUPPORT FLEXIBLE DUCT AT MAXIMUM
<br />5-FEET ON CENTER AND WITHIN 6-INCHES OF BENDS. BENDS SHALL NOT EXCEED A CENTERLINE RADIUS OF ONE DUCT
<br />DIAMETER. DUCT SAG SHALL NOT EXCEED 1/2-INCH. SUPPORTING MATERIAL IN DIRECT CONTACT WITH THE DUCT
<br />SHALL NOT BE LESS THAN 1-1/2-INCHES IN WIDTH.
<br />CONNECT FLEXIBLE DUCT TO RIGID METAL DUCT OR AIR DEVICES AS RECOMMENDED BY THE MANUFACTURER. AT A
<br />MINIMUM, INSTALL TWO WRAPS OF DUCT TAPE AROUND THE INNER CORE CONNECTION AND A METALLIC OR NON-
<br />METALLIC CLAMP OVER THE TAPE AND TWO WRAPS OF DUCT TAPE OR A CLAMP OVER THE OUTER JACKET. DUCT
<br />CLAMPS SHALL BE LABELED IN ACCORDANCE WITH U.L.181B AND MARKED 181B-C. DUCT TAPE SHALL BE LABELED IN
<br />ACCORDANCE WITH U.L.181B AND MARKED 181B-FX.
<br />AIR TERMINALS
<br />PROVIDE AIR DEVICES AS SCHEDULED ON DRAWINGS, MANUFACTURED BY TITUS. SELECT AIR DEVICES TO LIMIT ROOM
<br />NOISE LEVEL TO HIGHER THAN NC-30 UNLESS OTHERWISE SHOWN. PROVIDE DEVICES WITH A SOFT PLASTIC GASKET
<br />TO MAKE AN AIR-TIGHT SEAL AGAINST THE MOUNTING SURFACE. COORDINATE FINAL LOCATION, FRAME, AND
<br />MOUNTING TYPE OF AIR DEVICES WITH ARCHITECTURAL REFLECTED CEILING PLANS.
<br />PROVIDE CEILING SUPPLY AIR DIFFUSERS AND RETURN AIR GRILLES OF LAY-IN OR SURFACE-MOUNTED TYPE AS
<br />REQUIRED TO BE COMPATIBLE WITH CEILING CONSTRUCTION. PROVIDE CEILING DIFFUSERS AND GRILLES WITH WHITE
<br />ENAMEL FINISH UNLESS NOTED 0THERWISE.
<br />LOUVERS, PLENUMS AND SCREENS
<br />PROVIDE INTAKE AND EXHAUST AIR LOUVERS BY RUSKIN MODEL ELF375X OR EQUAL AMERICAN WARMING &
<br />VENTILATING, CESCO, GREENHECK, INDUSTRIAL LOUVERS OR LOUVERS & DAMPERS AS SCHEDULED ON THE
<br />DRAWINGS. COORDINATE EXACT SIZE AND LOCATION WITH ARCHITECTURAL DRAWINGS. LOUVERS SHALL BE
<br />STATIONARY, WITH MILL FINISH. LOUVERS SHALL HAVE EXTRUDED ALUMINUM BLADES, 0.080 INCH WALL THICKNESS, 45
<br />DEGREE BLADE ANGLE, BLADES ON 5 INCH CENTERS; FRAME SHALL BE EXTRUDED ALUMINUM, 0.080 INCH WALL
<br />THICKNESS; WITH EXPANDED FLATTENED ALUMINUM BIRDSCREEN. PROVIDE LOUVERS WITH A MINIMUM FREE AREA OF
<br />45 PERCENT, WITH A MAXIMUM AIR PRESSURE DROP OF 0.1 INCH AT SCHEDULED AIRFLOW.
<br />CONSTRUCT PLENUMS WITH GALVANIZED STEEL FRAMING MEMBERS AND GALVANIZED SHEETMETAL BRACED WITH
<br />GALVANIZED ANGLES. GAUGES AND BRACING SHALL CONFORM TO SMACNA RECOMMENDATIONS FOR DUCTWORK
<br />SIZES. WHERE ACCESS DOORS ARE SHOWN, PROVIDE HINGED DOORS WITH #202 VENTLOK LATCH. MAKE WATERTIGHT
<br />CONNECTIONS TO LOUVERS, SLOPING BOTTOM OF PLENUM TO DRAIN WATER TO WEEPHOLES IN BOTTOM OF LOUVER.
<br />PROVIDE SCREENS ON LOUVERS, DUCTS, HOODS, FANS, AND OPENINGS TO THE OUTDOORS AS SCHEDULED AND/OR
<br />NOTED ON THE DRAWINGS. BIRD SCREENS SHALL BE 0.041-INCH, 1/2-INCH MESH GALVANIZED STEEL WIRE.
<br />EXHAUST AIR SYSTEMS
<br />PROVIDE INLINE EXHAUST FANS AS SCHEDULED ON THE DRAWINGS OR EQUAL TO COOK, GREENHECK, CARNES, TWIN
<br />CITY FANS, ACME OR PENNBARRY COMPLETE WITH ALUMINUM HOUSING, ALUMINUM CENTRIFUGAL WHEEL, MOTOR
<br />WITH INTEGRAL THERMAL OVERLOAD PROTECTION, DISCONNECT SWITCH, BACKDRAFT DAMPER. THREE-PHASE FANS
<br />SHALL BE FURNISHED WITH MAGNETIC STARTERS WITH PUSH BUTTON STATION.
<br />DRAIN PANS
<br />DRAIN PANS SHALL SLOPE TOWARDS THE DRAIN OUTLET BY AT LEAST 0.125 INCHES PER FOOT. THE OUTLET SHALL
<br />BE LOCATED AT THE LOWEST POINT OF THE PAN AND BE SIZED TO PRECLUDE OVERFLOW. FOR UNITS WITH NEGATIVE
<br />STATIC DRAW AT THE DRAIN PAN RELATIVE TO THE OUTLET, DRAIN LINE SHALL INCLUDE A P-TRAP OR OTHER SEAL
<br />TO PREVENT INGESTION OF AMBIENT AIR WHILE ALLOWING THE PAN TO DRAIN COMPLETELY. DRAIN PANS SHALL BE
<br />LOCATED DIRECTLY BELOW COILS OR OTHER WATER-PRODUCING DEVICES.
<br />15A.3 HVAC EQUIPMENT
<br />HVAC EQUIPMENT
<br />ALL HVAC EQUIPMENT SHALL MEET PERFORMANCE REQUIREMENTS OF ASHRAE 90.1-2007 AND SHALL BE ENERGY
<br />STAR LABELED.
<br />REFER TO ASHRAE 90.1 -2007, TABLE 6.5.1.1.3A FOR ALLOWABLE ECONOMIZER OPTIONS PER CLIMATE ZONE.
<br />PROTOTYPICAL DESIGN PROVIDES UNITS WITH COMPARATIVE ENTHALPY ECONOMIZERS IN MOIST (A) AND MARINE (C)
<br />CLIMATE ZONES AND DRY-BULB ECONOMIZERS IN DRY (B) REGIONS.
<br />PROVIDE ECONOMIZERS WITH BAROMETRIC RELIEF DAMPERS FOR ROOFTOP UNITS WITH LESS THAN OR EQUAL TO 4-
<br />TONS COOLING. PROVIDE ECONOMIZERS WITH POWER RELIEF FANS FOR ROOFTOP UNITS WITH CAPACITIES GREATER
<br />THAN OR EQUAL TO 5-TONS COOLING.
<br />EQUIPMENT SHALL BE INSTALLED WITH SUFFICIENT WORKING SPACE FOR INSPECTION, ROUTINE MAINTENANCE,
<br />CLEANING, AND CALIBRATION.
<br />PROVIDE MIN. 3" TALL LABELS ON HVAC EQUIPMENT INDICATING UNIT IDENTIFICATION NUMBER.
<br />NEW ACCESS DOORS OR PANELS SHALL BE PROVIDED WHERE REQUIRED FOR THE SERVICING OF EQUIPMENT AND
<br />SHALL BE OF THE APPROVED DESIGN AND LOCATION.
<br />ROOFTOP UNITS (GAS HEAT)
<br />PROVIDE ELECTRIC COOLING, GAS HEATING ROOFTOP UNITS AS SCHEDULED ON THE DRAWINGS, MANUFACTURED BY
<br />LENNOX, COMPLETE WITH FACTORY-INSTALLED, DIRECT-DRIVE HERMETIC COMPRESSORS WITH INTERNAL SPRING
<br />VIBRATION ISOLATION, BUILT-IN MOTOR THERMAL OVERLOAD PROTECTION, CRANKCASE HEATER, AND LOW PRESSURE
<br />SWITCHES; DIRECT EXPANSION COOLING AND CONDENSING COILS; MINIMUM SEER OR EER RATING (COOLING) AS
<br />REQUIRED BY THE APPLICABLE ENERGY CODE OR GREATER IF SCHEDULED ON THE DRAWINGS; CENTRIFUGAL
<br />EVAPORATOR BLOWER; AIR FILTER RACK WITH 2" THICK MERV-13 FILTER, PROPELLER-TYPE CONDENSER FAN,
<br />FACTORY PROVIDED ELECTRIC RESISTANCE HEATING COIL, FORCED COMBUSTION AIR BLOWER; COMPLETE FACTORY-
<br />INSTALLED MICRO-PROCESSOR CONTROLS INCLUDING ANTI-SHORT CYCLE TIMERS, TIME DELAY RELAYS AND MINIMUM
<br />"ON" TIME CONTROLS, BUILT-IN THERMAL OVERLOAD PROTECTION ON MOTORS AND COMPRESSORS, 100-PERCENT
<br />OUTDOOR AIR ENTHALPY ECONOMIZER WITH POWER RELIEF FAN; WEATHERTIGHT HOUSING CONSTRUCTED OF ZINC-
<br />COATED, HEAVY-GAUGE GALVANIZED STEEL WITH WEATHER-RESISTANT, BAKED ENAMEL FINISH; MINIMUM INSULATED
<br />DOWN-FLOW STANDARD ROOF CURB WITH MINIMUM HEIGHT OF 14-INCHES FOR ROOFS WITH NO INSULATION, 14-
<br />INCHES FOR ROOFS WITH INSULATION OR AS SCHEDULED ON THE DRAWINGS; SINGLE-POINT ELECTRICAL POWER
<br />CONNECTION. PROVIDE SLOPED ROOF CURB AS REQUIRED TO MATCH SLOPE OF ROOF STRUCTURE SO THAT UNIT IS
<br />INSTALLED LEVEL. PROVIDE A 125-VAC, 20-AMP DUPLEX CONVENIENCE RECEPTACLE MOUNTED TO UNIT, READY FOR
<br />FIELD WIRING WITH A COVER UL LISTED FOR WET AND DAMP LOCATIONS WHEN IN USE. COORDINATE W/ DIVISION 16
<br />CONTRACTOR TO WIRE UL LISTED DUCT-TYPE SMOKE DETECTORS AS REQUIRED BY CODE TO SHUT DOWN ROOFTOP
<br />UNIT UPON DETECTION OF SMOKE. PROVIDE UNIT COMPLETE WITH MANUFACTURER'S ONE-YEAR GUARANTEE ON
<br />COMPONENTS, PLUS AN ADDITIONAL FOUR-YEAR GUARANTEE ON THE COMPRESSORS AND HEAT EXCHANGERS.
<br />SMOKE DETECTION
<br />ELECTRICAL CONTRACTOR SHALL PROVIDE SMOKE DETECTORS IN RETURN AIR DUCTS AT THE UNIT (AND IN SUPPLY
<br />AIR DUCTS) IF REQUIRED BY CODE. SMOKE DETECTORS SHALL BE WIRED BY ELECTRICAL CONTRACTOR AND SHALL
<br />FUNCTION TO SHUT DOWN HVAC UNITS UPON ALARM. HVAC UNITS SHALL NOT RESTART AUTOMATICALLY ON RESET OF
<br />SMOKE DETECTOR. PROVIDE CONTACTS AS REQUIRED FOR FIRE ALARM PANEL. IF SMOKE DETECTORS ARE EXISTING,
<br />CONTRACTOR MAY RE-USE, UPON ENSURING PROPER INSTALLATION AND OPERATION, CLEANING, AND OTHERWISE
<br />REFURBISHING FOR LIKE-NEW CONDITION.
<br />PROVIDE REMOTE VISUAL AND AUDIBLE ALARM DEVICE IN AN APPROVED LOCATION IF SMOKE DETECTORS ARE NOT
<br />CONNECTED TO A FIRE ALARM PANEL AND LABEL DEVICE AS "AIR DUCT DETECTOR TROUBLE"
<br />PROVIDE REMOTE TEST SWITCHES FOR ALL DUCT SMOKE DETECTORS. CONTACT FIRE DEPARTMENT PRIOR TO
<br />INSTALLATION FOR PROPER PLACEMENT.
<br />MECHANICAL CONTRACTOR SHALL COORDINATE WITH ELECTRICAL CONTRACTOR.
<br />CONTROL DAMPERS
<br />PROVIDE FACTORY FABRICATED, PARALLEL BLADE CONTROL DAMPERS SIZED AS SHOWN ON THE DRAWINGS AND AS
<br />SPECIFIED. INDIVIDUAL DAMPER SECTIONS SHALL NOT BE LARGER THAN 48 INCHES X 60 INCHES WITH MAXIMUM
<br />BLADE WIDTH OF 6 INCHES. FRAME CONSTRUCTION SHALL BE MINIMUM 16 GAUGE GALVANIZED STEEL FOR
<br />RECTANGULAR DAMPERS, 20 GAUGE FOR ROUND, 1/8 INCH THICK FOR ALUMINUM, WITH FLANGES FOR DUCT
<br />MOUNTING. PROVIDE ELASTOMERIC OR NEOPRENE SEALS, MECHANICALLY ATTACHED AND FIELD REPLACEABLE.
<br />PROVIDE A MINIMUM OF ONE DAMPER ACTUATOR PER SECTION. TEST DAMPER PERFORMANCE IN ACCORDANCE
<br />WITH AMCA 500-D.
<br />PROVIDE MODULATING DAMPERS WITH LINEAR FLOW CHARACTERISTICS. SIZE MODULATING DAMPERS BASED ON
<br />THE SMALLER OF 1,500 FPM THROUGH THE DAMPER OR FULL OPEN AIR PRESSURE DROP OF 0.1 INCHES W.C. SIZE
<br />TWO-POSITION DAMPERS FULL DUCT SIZE AND SELECT TO MINIMIZE PRESSURE DROP.
<br />MOTORIZED DAMPERS USED FOR VENTILATION AIR INTAKE, EXHAUST AIR, OR RELIEF AIR SHALL HAVE LEAKAGE
<br />RATES NOT TO EXCEED 4.0 CFM/SQUARE FOOT IN FULL CLOSED POSITION AT 1 INCH W.G. PRESSURE DIFFERENTIAL
<br />ACROSS THE DAMPER.
<br />PROVIDE DAMPERS AS MANUFACTURED BY GREENHECK, CESCO, POTTORFF, NAILOR, OR RUSKIN. REFERENCE
<br />MANUFACTURER WITH MODEL NUMBER FOR OUTSIDE AIR DAMPERS IS RUSKIN CD-50 CONSTRUCTED OF ALUMINUM,
<br />AND ALL OTHER APPLICATIONS IS RUSKIN CD-35 CONSTRUCTED OF GALVANIZED STEEL.
<br />PROVIDE DAMPER OPERATOR FOR EACH AUTOMATIC DAMPER WITH SUFFICIENT CAPACITY TO OPERATE THE
<br />DAMPER UNDER ALL CONDITIONS AND TO GUARANTEE TIGHT CLOSE-OFF OF DAMPERS AGAINST SYSTEM PRESSURE
<br />ENCOUNTERED. EACH OPERATOR SHALL BE PROVIDED WITH SPRING-RETURN FOR NORMALLY CLOSED OR
<br />NORMALLY OPEN POSITION FOR FAIL SAFE OPERATION TO ACCOUNT FOR FIRE, LOW TEMPERATURES, OR POWER
<br />INTERRUPTION AS REQUIRED BY THE CONTROL SYSTEMS SPECIFIED ON THE DRAWINGS. DAMPER OPERATORS
<br />SHALL BE MANUFACTURED BY BELIMO, JOHNSON CONTROLS OR APPROVED EQUAL. PROVIDE TRANSFORMER FOR
<br />DAMPER MOTORS IF DIFFERENT VOLTAGES ARE REQUIRED.
<br />CONDENSING UNITS
<br />PROVIDE SPLIT SYSTEM, AIR COOLED CONDENSING UNITS AS SCHEDULED ON THE DRAWINGS, MANUFACTURED BY
<br />LENNOX, COMPLETE WITH FACTORY INSTALLED HERMETIC OR SEMI-HERMETIC MOTOR/COMPRESSOR ASSEMBLY
<br />WITH INTERNAL SPRING VIBRATION ISOLATION, BUILT-IN THERMAL OVERLOAD PROTECTION, AND CRANKCASE
<br />HEATER; TOP DISCHARGE CONDENSER FAN AND MOTOR; LOW AMBIENT HEAD PRESSURE CONTROLS FOR
<br />OPERATION TO TEMPERATURE AS SCHEDULED; ANTI-SHORT CYCLE TIMERS; TIME DELAY RELAYS; HIGH AND LOW
<br />PRESSURE SWITCHES; FULL REFRIGERANT HOLDING CHARGE; AND WEATHERTIGHT HOUSING CONSTRUCTED OF ZINC
<br />COATED, HEAVY GAUGE, GALVANIZED STEEL WITH WEATHER-RESISTANT BAKED ENAMEL FINISH AND FACTORY
<br />INSTALLED CONDENSER COIL HAIL GUARDS. FOR UNITS GREATER THAN 5 TONS, PROVIDE LIQUID LINE DRIER AND
<br />REFRIGERANT SIGHT GLASS. PROVIDE A FIVE YEAR GUARANTEE ON THE COMPRESSOR AND REFRIGERANT CIRCUIT,
<br />AND A ONE YEAR GUARANTEE ON THE REMAINING COMPONENTS. PROVIDE REFRIGERANT PIPING SIZED AS
<br />RECOMMENDED BY EQUIPMENT MANUFACTURER WITH FOAMED PLASTIC INSULATION ON THE SUCTION LINE AS
<br />SPECIFIED IN THIS SECTION. FOR HEAT PUMP UNITS PROVIDE REVERSING VALVE, SUCTION LINE ACCUMULATOR,
<br />FLOW CONTROL CHECK VALVE, AND SOLID STATE DEFROST/TIMED-OFF CONTROL. PROVIDE 3-1/2 INCH THICK
<br />CONCRETE SLABS FOR CONDENSING UNITS LOCATED ON GRADE.
<br />FAN COIL UNITS (DIRECT EXPANSION, 1.5-5 TONS)
<br />PROVIDE SPLIT SYSTEM, FAN COIL UNITS AS SCHEDULED ON THE DRAWINGS, MANUFACTURED BY LENNOX, WITH
<br />CONFIGURATION AS SCHEDULED, COMPLETE WITH ZINC COATED, HEAVY GAUGE, GALVANIZED STEEL CABINET WITH
<br />WEATHER-RESISTANT BAKED ENAMEL FINISH; INTERNALLY INSULATED; ACCESS DOORS; DIRECT EXPANSION
<br />COOLING COIL SECTION OF ALUMINUM/COPPER CONSTRUCTION; CONDENSATE DRAIN PAN; STATICALLY AND
<br />DYNAMICALLY BALANCED CENTRIFUGAL FAN SECTION WITH BUILT-IN MOTOR THERMAL OVERLOAD PROTECTION;
<br />FACTORY INSTALLED AND WIRED CONTROLS AND SINGLE POINT ELECTRICAL POWER CONNECTION; MAGNETIC
<br />MOTOR STARTERS AND CONTACTORS AS REQUIRED; AIR FILTER RACK WITH 1 INCH THICK THROWAWAY FILTERS;
<br />FACTORY INSTALLED ELECTRIC HEATING COIL WITH CODE REQUIRED INTEGRAL SAFETY FEATURES AND CONTROLS.
<br />PROVIDE SPRING VIBRATION ISOLATORS AND ALL-THREAD HANGING RODS FOR HORIZONTAL INSTALLATIONS.
<br />PROVIDE AN AUXILIARY DRAIN PAN FOR SUSPENDED UNITS WITH FLOOD DETECTOR SWITCH TO SHUT OFF UNIT
<br />WHEN WATER IS DETECTED IN AUXILIARY DRAIN PAN. FLOOD DETECTOR SWITCH SHALL BE DIVERSITECH WET
<br />SWITCH OR EQUIVALENT. DETECTOR SHALL SHUT SYSTEM DOWN WHEN WATER COMES IN CONTACT WITH THE
<br />HYDROPHILIC PAD OF THE DETECTOR. PLACE DETECTOR IN THE LOWEST LOCATION IN THE AUXILIARY DRAIN PAN.
<br />WIRE DETECTOR TO REMOTE ALARM, DIVERSITECH UNIVERSAL ALARM OR EQUIVALENT.
<br />REFRIGERANT PIPING AND INSULATION
<br />COPPER TUBING: ASTM B 280, ALLOY C12200, TYPE ACR, HARD-DRAWN STRAIGHT LENGTHS, AND SOFT-ANNEALED
<br />COILS, SEAMLESS COPPER TUBING. TUBING SHALL BE FACTORY CLEANED, READY FOR INSTALLATION, AND HAVE
<br />ENDS CAPPED TO PROTECT CLEANLINESS OF PIPE INTERIORS PRIOR TO SHIPPING.
<br />FITTINGS: WROUGHT-COPPER FITTINGS: ANSI B16.22, STREAMLINED PATTERN.
<br />BRAZING FILLER METALS: BCUP -5: COPPER (CU), PHOSPHORUS (P) 4.8 -5.2 PERCENT, AND SILVER (AG) 14.5 -15.5
<br />FOR JOINING WROUGHT COPPER FITTINGS AND COPPER TUBING. BRAZE JOINTS WITH A SLOW STREAM OF DRY
<br />NITROGEN PASSING THROUGH THE PIPING.
<br />INSULATE SUCTION LINES WITH 1-1/2 INCH AND LIQUID LINES WITH 1/2 INCH FOAMED PLASTIC INSULATION, ARMAFLEX
<br />OR EQUAL. PIPING INSULATION SHALL HAVE A FLAME SPREAD OF 25 OR LESS, AND A SMOKE DEVELOPED RATING OF
<br />50 OR LESS WHEN TESTED IN ACCORDANCE WITH ASTM E84. COAT INSULATION THAT IS EXPOSED TO THE ELEMENTS
<br />WITH A PROTECTIVE SEALER. INSTALL AND SUPPORT PIPING TO KEEP NOISE AND VIBRATION TO A MINIMUM.
<br />SUPPORT AND SECURE PIPING TO UNISTRUT TYPE SUPPORTS SO THAT NO VIBRATION PASSES TO THE BUILDING
<br />STRUCTURE. PIPE ATTACHMENTS SHALL BE COPPER-PLATED OR HAVE NONMETALLIC COATING FOR ELECTROLYTIC
<br />PROTECTION WHERE ATTACHMENTS ARE IN DIRECT CONTACT WITH COPPER TUBING. INSTALL A SUPPORT WITHIN
<br />ONE FOOT OF EACH CHANGE OF DIRECTION. MOUNT PIPE HANGERS AROUND THE OUTSIDE OF THE INSULATION WITH
<br />SADDLES TO PREVENT HANGERS FROM RUPTURING THE INSULATION. REPLACE INSULATION THAT IS CUT OR BROKEN
<br />BY THE HANGERS.
<br />RUN REFRIGERANT LINES PARALLEL AND PERPENDICULAR TO WALL AND FLOOR LINES AND TO APPEAR STRAIGHT
<br />AND IN GOOD ORDER. PITCH SUCTION LINES DOWN SLIGHTLY (1 INCH IN 20 FEET) TOWARDS THE COMPRESSOR.
<br />PROVIDE OIL TRAPS AT THE BASE OF VERTICAL SUCTION RISERS OVER 6 FEET HIGH.
<br />INSTALL LIQUID LINE SIGHT GLASSES IN LIQUID LINES NEAREST THE EXPANSION VALVE. FACTORY MOUNT
<br />EXPANSION VALVES WITH THE SENSING BULBS SHIPPED LOOSE. FIELD MOUNT EXPANSION VALVE BULB AFTER
<br />REFRIGERANT PIPING IS COMPLETE (DAMAGE MAY OCCUR IF BULBS COME IN CONTACT WITH HEAT).
<br />FOR SYSTEMS OF 5 TON CAPACITY AND SMALLER, THE CONTRACTOR SHALL HAVE THE OPTION TO PROVIDE COPPER
<br />REFRIGERANT TUBING LINE SET SIZED AS RECOMMENDED BY EQUIPMENT MANUFACTURER AND OF LENGTH AS
<br />REQUIRED FOR THE INSTALLATION. PROVIDE MINIMUM 1 INCH THICK FOAMED PLASTIC INSULATION, ARMAFLEX OR
<br />EQUAL, ON THE SUCTION AND LIQUID LINES. PROVIDE QUICK-CONNECT FLARE TUBING COMPRESSION FITTINGS OR
<br />SOLDER CONNECTIONS AS REQUIRED TO MATCH THE CONNECTIONS OF THE CONDENSING UNIT AND EVAPORATOR
<br />COIL.
<br />SYSTEM EVACUATION AND CHARGING
<br />BLOW OUT REFRIGERATION LINES WITH DRY NITROGEN AT A SUITABLE PRESSURE BEFORE MAKING FINAL
<br />CONNECTION AT THE CONDENSING UNIT OR COIL TO ENSURE AGAINST DIRT, SCALE, OR OTHER FOREIGN MATERIAL
<br />BEING IN THE LINES. DRAW A VACUUM TO 29 INCHES OF MERCURY. BREAK THIS VACUUM BY CHARGING DRY
<br />REFRIGERANT GAS INTO THE SYSTEM, RAISING THE PRESSURE TO 0 PSIG.REPEAT
<br />THE LATTER TWO STEPS FOR A TRIPLE EVACUATION BEFORE THE FINAL EVACUATION IS STARTED. MAKE FINAL
<br />EVACUATION BY REDUCING THE SYSTEM ABSOLUTE PRESSURE TO A MAXIMUM OF 0.5 MILLIMETERS (500 MICRONS)
<br />AND ALLOWING THE PUMP TO RUN AT THIS PRESSURE FOR A MINIMUM OF TWO HOURS.
<br />REPEAT THE PROPER AMOUNT OF REFRIGERANT CHARGE PER THE MANUFACTURER'S RECOMMENDATIONS. RECORD
<br />THE AMOUNT OF REFRIGERANT BY WEIGHT CHARGED INTO THE SYSTEM FOR EACH CIRCUIT RECORDED TO THE
<br />NEAREST 1/4 POUND ON TAGS AND ATTACH TAGS TO THE LIQUID LINE NEAR THE CONDENSING UNIT. REFRIGERANT
<br />SHALL BE SUPPLIED BY THE HVAC CONTRACTOR.
<br />Mechanical and Electrical Engineers
<br />Lilker Associates
<br />1001 Avenue of the Americas
<br />New York, NY 10018
<br />tel 212.695.1000
<br />fax 212.695.1299
<br />www.lilker.com
<br />Kenneth A. Gruskin AIA
<br />No. Date Description
<br />Consultant:
<br />Checked By:
<br />Drawn By:
<br />Job Address:
<br />Drawing Title:
<br />Revision Issue:
<br />Professional Seal:
<br />Drawing Number:
<br />2022 Gruskin Architecture + Design, P.C.c
<br />This document and the ideas and designs incorporated
<br />herein, as an instrument of professional service, is the
<br />property of GRUSKIN ARCHITECTURE + DESIGN, P.C.,
<br />and is not to be used in whole or in part for any other
<br />project without the written authorization of GRUSKIN
<br />ARCHITECTURE + DESIGN, P.C.
<br />North
<br />Arrow:
<br />Job Name and Number:
<br />Date Issued For
<br />All Rights Reserved
<br />Client:
<br />Landlord:
<br />Permit:
<br />Bid:
<br />Construction:
<br />0006261
<br />AR91629
<br />5421
<br />9613
<br />39209
<br />10635
<br />2537
<br />11016
<br />5734
<br />ARC 2596
<br />4674
<br />2666
<br />AI 09999
<br />2796
<br />0401 011223
<br />2572
<br />17680
<br />RA-015432-B
<br />025528-1 NY
<br />TX
<br />VA
<br />VT
<br />MA
<br />MT
<br />RI
<br />PA
<br />NY
<br />NJ
<br />NH
<br />MD
<br />LA
<br />ME
<br />KS
<br />FL
<br />DE
<br />CT
<br />AZ
<br />AL
<br />C-1967WY
<br />RA011075GA
<br />AR10400066IN
<br />C-29898CA
<br />NM 004168
<br />ARC-400347CO
<br />HI AR 11489
<br />PR 19965
<br />OR 4899
<br />SC 6834
<br />NC 9961
<br />13761OH
<br />05713IA
<br />WV 3727
<br />IL 001-019152
<br />UT 5881358-0301
<br />ID AR-984459
<br />1301052379MI
<br />ARC100723DC
<br />WI 9900-005MN44326
<br />A-3547NE
<br />3811AR
<br />5967KY 101374TN
<br />MS 3860
<br />1666ND
<br />A-2005029740MO
<br />a4895OK
<br />NV 5521
<br />WA 10344
<br />13167AK
<br />SD 11532
<br />C:
<br />\
<br />R
<br />e
<br />v
<br />i
<br />t
<br />
<br />L
<br />o
<br />c
<br />a
<br />l
<br />
<br />F
<br />i
<br />l
<br />e
<br />s
<br />\
<br />2
<br />4
<br />0
<br />0
<br />1
<br />3
<br />0
<br />8
<br />_
<br />V
<br />E
<br />R
<br />I
<br />Z
<br />O
<br />N
<br />_
<br />S
<br />a
<br />n
<br />t
<br />a
<br />
<br />A
<br />n
<br />a
<br />_
<br />C
<br />A
<br />_
<br />ME
<br />C
<br />H
<br />A
<br />N
<br />I
<br />C
<br />A
<br />L
<br />_
<br />v
<br />2
<br />3
<br />_
<br />r
<br />t
<br />r
<br />o
<br />v
<br />a
<br />t
<br />o
<br />T
<br />7
<br />V
<br />P
<br />K
<br />.
<br />r
<br />v
<br />t
<br />2023-0069
<br />Proposed
<br />Store Design
<br />for: VERIZON
<br />Metro Pointe
<br />3500 South Bristol Street
<br />Suite 100
<br />Santa Ana, CA 92704
<br />3/15/2024
<br />3/15/2024
<br />HVAC SPECIFICATIONS
<br />M.0.0
<br />BS
<br />RT
<br />33 OF 81
<br />MECHANICAL DRAWING LIST
<br />Sheet Number Sheet Name
<br />M.0.0 HVAC SPECIFICATIONS
<br />M.0.1 HVAC SPECIFICATIONS
<br />M.0.2 MECHANICAL NOTES, SYMBOLS & ABBREVIATIONS
<br />M.0.3 MECHANICAL SCHEDULES - 1 OF 2
<br />M.0.4 MECHANICAL SCHEDULES - 2 OF 2
<br />M.1.0 MECHANICAL CONSTRUCTION PLAN
<br />M.1.1 MECHANICAL ROOF CONSTRUCTION PLAN
<br />M.2.0 MECHANICAL DETAILS
<br />M.2.1 MECHANICAL DETAILS
<br />M.2.2 MECHANICAL DETAILS
<br />M.3.0 TITLE 24 MECHANICAL COMPLIANCE
<br />M.3.1 TITLE 24 MECHANICAL COMPLIANCE
<br />3500 S Bristol St Unit# 100 -
<br />101119098, 20182666 &
<br />401390437/11/2024
|