Laserfiche WebLink
FCU SPLIT SYSTEM HEAT PUMP SCHEDULE (AIR HANDLER)BASIS OF DESIGN: LENNOX <br />MARK LOCATION AREA SERVED <br />SUPPLY FAN COOLING DATA HEAT PUMP HEATING ELECTRICAL <br />CFM ESP <br />(IN) <br />NOM <br />HP <br />TOTAL <br />(MBH) <br />SENS. <br />(MBH) <br />EAT (°F)LAT (°F) <br />DB WB DB WB <br />MIN <br />OUT <br />(MBH) <br />AMBIENT <br />(DB) <br />ENT. <br />AIR <br />DB <br />(°F) <br />LVG. <br />AIR <br />DB <br />(°F) <br />V/PH MCA MOCP DISC <br />TYPE <br />STARTER <br />TYPE <br />WEIGHT MODEL #REMARKS <br />MODEL NUMBERS SHALL NOT BE CONSIDERED COMPLETE AND MATERIAL SHALL NOT BE ORDERED BY MANUFACTURER AND MODEL NUMBERS ONLY. REVIEW THE COMPLETE DESCRIPTION, NOTES AND SPECIFICATIONS TO DETERMINE THE EXACT <br />MATERIAL AND ACCESSORIES TO BE ORDERED. THE MANUFACTURER LISTED ARE THE BASIS OF DESIGN. <br />NOTES: <br />A. ASSOCIATED CONDENSING UNIT SHALL BE BY THE SAME MANUFACTURER <br />B. FOR COOLING EQUIPMENT SIZED FOR 105°F AMBIENT TEMPERATURE. HEAT PUMP HEATING CAPACITY BASED ON AMBIENT TEMPERATURE LISTED. <br />C. PROVIDE 1" MERV 13, PLEATED THROWAWAY AIR FILTERS. <br />D. PROVIDE WITH BOTTOM INLET CONNECTION. <br />E. PROVIDE WITH TOP OUTLET CONNECTION. <br />F. PROVIDE WITH 7-DAY PROGRAMMABLE THERMOSTAT WITH STAGED HEATING AND COOLING CAPABILITY AS REQUIRED FOR OPERATION OF HEAT PUMP HEATING, AUXILIARY HEATING (EDH-1), COOLING, AND CONTROLS. <br />G. DISCONNECT SWITCH FURNISHED BY DIV 26 CONTRACTOR. <br />H. STARTER FURNISHED BY DIV 26 CONTRACTOR. <br />I. PROVIDE SINGLE POINT POWER CONNECTION. <br />J. SPECIFIED FAN ESP ACCOUNTS FOR DUCT LOSSES EXTERNAL TO UNIT. FILTER LOSS IS AT A MAXIMUM 400 FPM FACE VELOCITY. <br />K. PROVIDE MOTOR HORSEPOWER TO OVERCOME INTERNAL UNIT STATIC PRESSURE DROP PLUS SPECIFIED EXTERNAL STATIC PRESSURE DROP, NOMINAL MOTOR HP SHALL BE NO LARGER THAN THE FIRST AVAILABLE NOMINAL MOTOR <br />SIZE GREATER THAN THE REQUIRED BHP. <br />L. PROVIDE WITH SPRING VIBRATION ISOLATION AND ALL-THREAD HANGING RODS. <br />M. PROVIDE HEATER TO MEET OR EXCEED SCHEDULED MINIMUM MBH OUTPUT. COORDINATE EQUIPMENT POWER SUPPLY WITH ELECTRICAL CONTRACTOR IF DIFFERENT FROM THAT SCHEDULED. <br />N. PROVIDE AUXILIARY DRAIN PAN WITH FLOOD DETECTOR SWITCH TO SHUT OFF UNIT WHEN WATER IS PRESENT IN DRAIN PAN. <br />O. ROUTE CONDENSATE DRAIN PIPING FROM UNIT TO NEAREST MOP SINK OR FLOOR DRAIN AND TERMINATE WITH CODE-APPROVED AIR GAP. <br />FCU-1 OPEN OFFICE 104 BACK OF HOUSE 1550 0.8 1 45.4 39.4 80.0 65.0 56.0 55.1 30.0 20 60.0 77.9 208/1 10 15 NF ECM 186 CBA27UHE-048 SEE BELOW <br />HP SPLIT SYSTEM HEAT PUMP SCHEDULE (CONDENSING UNIT)BASIS OF DESIGN: LENNOX <br />MARK LOCATION AREA SERVED <br />COOLING CAPACITY HEATING CAPACITY ELECTRICAL <br />TH <br />(MBH) <br />AMBIENT <br />(DB) <br />MIN EFF <br />(EER)(SEER) <br />CAP <br />(MBH) <br />AMBIENT <br />(DB) <br />MIN EFF <br />(HSPF) <br />V/PH MCA MOCP WEIGHT MODEL #REMARKS <br />MODEL NUMBERS SHALL NOT BE CONSIDERED COMPLETE AND MATERIAL SHALL NOT BE ORDERED BY MANUFACTURER AND MODEL NUMBERS ONLY. REVIEW THE COMPLETE DESCRIPTION, <br />NOTES AND SPECIFICATIONS TO DETERMINE THE EXACT MATERIAL AND ACCESSORIES TO BE ORDERED. THE MANUFACTURERS LISTED ARE THE BASIS OF DESIGN. <br />NOTES: <br />A. REFER TO HEAT PUMP CONTROL MATRIX, POINTS LIST AND SEQUENCE OF OPERATIONS. <br />B. EQUIPMENT CAPACITY SCHEDULED IS MINIMUM CAPACITY THAT MUST BE PROVIDED AT AMBIENT TEMPERATURE INDICATED. <br />C. CONTRACTOR SHALL VERIFY WITH EQUIPMENT SUPPLIER EXACT QUANTITY AND SIZE OF REFRIGERANT PIPING BASED ON FIELD ROUTING. <br />D. PROVIDE LIQUID LINE FILTER DRYER AND SIGHT GLASS. <br />E. PROVIDE HOUSEKEEPING PAD PER SPECIFICATIONS. <br />F. DISCONNECT SWITCH FURNISHED BY DIV 26 CONTRACTOR. <br />G. STARTERS FOR ALL MOTORS SHALL BE FURNISHED INTEGRAL WITH UNIT. <br />H. COORDINATE SIZE OF CONDUCTOR TERMINATION LUGS WITH CONDUCTOR SIZES SHOWN ON ELECTRICAL DRAWINGS. <br />I. PROVIDE CONDENSER COIL HAIL GUARDS. <br />J. PROVIDE HARD START KIT. <br />K. PROVIDE UNIT WITH EXTENDED REFRIGERANT LINE SETS. <br />HP-1 ROOF BACK OF HOUSE 47.5 105 12 16 30.0 20.0 9.0 208/3 19 30 294 SPB048H4-230 SEE BELOW <br />DISC <br />NF <br />REFR <br />TYPE <br />R-410A <br />NOM <br />TONS <br />4 <br />NOM <br />TONS <br />4 <br />Mechanical and Electrical Engineers <br />Lilker Associates <br />1001 Avenue of the Americas <br />New York, NY 10018 <br />tel 212.695.1000 <br />fax 212.695.1299 <br />www.lilker.com <br />Kenneth A. Gruskin AIA <br />No. Date Description <br />Consultant: <br />Checked By: <br />Drawn By: <br />Job Address: <br />Drawing Title: <br />Revision Issue: <br />Professional Seal: <br />Drawing Number: <br />2022 Gruskin Architecture + Design, P.C.c <br />This document and the ideas and designs incorporated <br />herein, as an instrument of professional service, is the <br />property of GRUSKIN ARCHITECTURE + DESIGN, P.C., <br />and is not to be used in whole or in part for any other <br />project without the written authorization of GRUSKIN <br />ARCHITECTURE + DESIGN, P.C. <br />North <br />Arrow: <br />Job Name and Number: <br />Date Issued For <br />All Rights Reserved <br />Client: <br />Landlord: <br />Permit: <br />Bid: <br />Construction: <br />0006261 <br />AR91629 <br />5421 <br />9613 <br />39209 <br />10635 <br />2537 <br />11016 <br />5734 <br />ARC 2596 <br />4674 <br />2666 <br />AI 09999 <br />2796 <br />0401 011223 <br />2572 <br />17680 <br />RA-015432-B <br />025528-1 NY <br />TX <br />VA <br />VT <br />MA <br />MT <br />RI <br />PA <br />NY <br />NJ <br />NH <br />MD <br />LA <br />ME <br />KS <br />FL <br />DE <br />CT <br />AZ <br />AL <br />C-1967WY <br />RA011075GA <br />AR10400066IN <br />C-29898CA <br />NM 004168 <br />ARC-400347CO <br />HI AR 11489 <br />PR 19965 <br />OR 4899 <br />SC 6834 <br />NC 9961 <br />13761OH <br />05713IA <br />WV 3727 <br />IL 001-019152 <br />UT 5881358-0301 <br />ID AR-984459 <br />1301052379MI <br />ARC100723DC <br />WI 9900-005MN44326 <br />A-3547NE <br />3811AR <br />5967KY 101374TN <br />MS 3860 <br />1666ND <br />A-2005029740MO <br />a4895OK <br />NV 5521 <br />WA 10344 <br />13167AK <br />SD 11532 <br />C: <br />\ <br />R <br />e <br />v <br />i <br />t <br /> <br />L <br />o <br />c <br />a <br />l <br /> <br />F <br />i <br />l <br />e <br />s <br />\ <br />2 <br />4 <br />0 <br />0 <br />1 <br />3 <br />0 <br />8 <br />_ <br />V <br />E <br />R <br />I <br />Z <br />O <br />N <br />_ <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />_ <br />C <br />A <br />_ <br />ME <br />C <br />H <br />A <br />N <br />I <br />C <br />A <br />L <br />_ <br />v <br />2 <br />3 <br />_ <br />r <br />t <br />r <br />o <br />v <br />a <br />t <br />o <br />T <br />7 <br />V <br />P <br />K <br />. <br />r <br />v <br />t <br />2023-0069 <br />Proposed <br />Store Design <br />for: VERIZON <br />Metro Pointe <br />3500 South Bristol Street <br />Suite 100 <br />Santa Ana, CA 92704 <br />3/15/2024 <br />3/15/2024 <br />MECHANICAL <br />SCHEDULES - 2 OF 2 <br />M.0.4 <br />BS <br />RT <br />37 OF 81 <br />3500 S Bristol St Unit# 100 - <br />101119098, 20182666 & <br />401390437/11/2024