Laserfiche WebLink
23XX <br />26575 Ruether Ave 2nd floor <br />CH <br />A <br />R <br />C <br />Santa Clarita, CA 91350 <br />661.383.2352 - 818.919.2248 <br />GENERAL NOTES <br />THE FOLLOWING NOTES (ITEMS) REPRESENT THE MANDATORY REQUIREMENTS FOR ALL <br />BUILDINGS. <br />TITLE 24 REQUIREMENTS <br /> 1. DOORS AND WINDOWS SHALL MEET THE MINIMUM INFILTRATION REQUIREMENTS PER <br />SECTION 110.6 AND 110.7 E.E.S. <br /> 2. ALL ENVELOPE AND MECHANICAL CERTIFICATE OF ACCEPTANCE FORMS AND ALL <br />RELATED ACCEPTANCE DOCUMENTS SHALL BE SUBMITTED TO THE FIELD INSPECTOR <br />DURING CONSTRUCTION. CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL <br />THESE FORMS ARE REVIEWED AND APPROVED. <br /> 3. ALL PIPING AND DUCT WORK SHALL BE INSULATED CONSISTENT WITH THE <br />REQUIREMENTS OF SECTIONS 120.3, 120.4, AND 120.7 TITLE 24 ENERGY STANDARDS <br />AND CHAPTER 6 OF CMC. <br /> 4. ALL HVAC SYSTEMS SHALL MEET THE CONTROL REQUIREMENTS PER SECTION 110.2 <br />AND 120.2 E.E.S. <br /> 5. ALL HVAC EQUIPMENT AND APPLIANCES SHALL MEET THE REQUIREMENTS PER <br />SECTION 110.1 -110.3, 110.5, 120.1-120.4 TITLE-24 ENERGY STANDARDS. <br /> 6. INSULATION MATERIAL SHALL MEET THE CALIFORNIA QUALITY STANDARD PER <br />SECTION 110.8 ENERGY EFFICIENCY STANDARDS (E.E.S.) <br /> 7, THE PERSON WITH OVERALL RESPONSIBILITY FOR CONSTRUCTION OR THE PERSON <br />RESPONSIBLE FOR THE INSTALLATION OF REGULATED FEATURES, MATERIALS, <br />COMPONENTS, OR MANUFACTURED DEVICES SHALL POST, OR MAKE AVAILABLE WITH <br />THE BUILDING PERMIT(S) ISSUED FOR THE BUILDING, THE REQUIRED INSTALLATION <br />CERTIFICATE(S) FOR FEATURES, MATERIALS, COMPONENTS, OR MANUFACTURED <br />DEVICES REGULATED BY THE APPLIANCE EFFICIENCY REGULATIONS OR PART 6. <br />SUCH INSTALLATION CERTIFICATE(S) SHALL BE MADE AVAILABLE TO THE <br />ENFORCEMENT AGENCY FOR ALL APPROPRIATE INSPECTIONS. THESE CERTIFICATES <br />SHALL: <br />I. IDENTIFY FEATURES, MATERIALS, COMPONENTS, OR MANUFACTURED DEVICES <br />REQUIRED TO VERIFY COMPLIANCE WITH THE APPLIANCE EFFICIENCY <br />REGULATIONS AND PART 6. <br />II. INCLUDE A STATEMENT INDICATING THAT THE FEATURES, MATERIALS, <br />COMPONENTS, OR MANUFACTURED DEVISE CONFORM TO THE APPLIANCE <br />EFFICIENCY REGULATIONS AND PART 6 AND THE REQUIREMENTS FOR SUCH <br />FEATURES, MATERIALS, COMPONENTS, OR MANUFACTURED DEVICES GIVEN IN <br />THE PLANS AND SPECIFICATIONS APPROVED BY THE LOCAL ENFORCEMENT <br />AGENCY. <br />III. STATE THE NUMBER OF THE BUILDING PERMIT UNDER WHICH THE <br />CONSTRUCTION OR INSTALLATION WAS PERFORMED. <br /> 8. WITHIN 90 DAYS AFTER ISSUANCE OF CERTIFICATE OF OCCUPANCY RECORD <br />DRAWINGS SHALL BE PROVIDED TO THE OWNER. IF A BUILDING DESIGN FEATURE, <br />MATERIAL, COMPONENT OR MANUFACTURED DEVICE IS CHANGED BEFORE FINAL <br />CONSTRUCTION AND INSTALLATION, SUCH THAT THE BUILDING MAY NO LONGER <br />COMPLY WITH PART 6, THE BUILDING MUST BE BROUGHT INTO COMPLIANCE, AND SO <br />INDICATED ON AMENDED PLANS AND CERTIFICATE OF COMPLIANCE(S) THAT SHALL <br />BE SUBMITTED FOR APPROVAL. <br /> 9, THE BUILDER SHALL PROVIDE THE BUILDING OWNER OR PERSON(S) RESPONSIBLE <br />FOR BUILDING MAINTENANCE AT THE OCCUPANCY THE FOLLOWING: <br />I.OPERATING INFORMATION: THE APPROPRIATE CERTIFICATE(S) OF <br />COMPLIANCE AND A LIST OF THE FEATURES, MATERIALS, COMPONENTS, AND <br />MECHANICAL DEVICES INSTALLED IN THE BUILDING AND INSTRUCTIONS ON <br />HOW TO OPERATE THEM EFFICIENTLY. <br />II. MAINTENANCE INFORMATION: REQUIRED ROUTINE MAINTENANCE ACTIONS <br />SHALL BE CLEARLY STATED AND INCORPORATED ON A READILY ACCESSIBLE <br />LABEL. THE LABEL MAY BE LIMITED TO IDENTIFYING THE OPERATION AND <br />MAINTENANCE MANUAL. <br />III. VENTILATION INFORMATION: A DESCRIPTION OF THE QUANTITIES OF <br />OUTDOOR AND RE-CIRCULATED AIR THAT THE VENTILATION SYSTEMS ARE <br />DESIGNED TO PROVIDE TO EACH AREA. <br /> 10. THE LESSER OF THE MINIMUM RATE OR OUTDOOR AIR REQUIRED BY SEC 120.1(c), OR <br />THREE COMPLETE AIR CHANGES SHALL BE SUPPLIED TO THE ENTIRE BUILDING <br />DURING THE ONE-HOUR PERIOD IMMEDIATELY BEFORE THE BUILDING IS NORMALLY <br />OCCUPIED. <br /> 11. ALL MECHANICAL VENTILATION AND SPACE-CONDITIONING SYSTEMS SHALL BE <br />DESIGNED WITH DUCTWORK, DAMPERS, AND CONTROLS WHICH ALLOWS OUTSIDE <br />AIR RATES TO BE OPERATED AT THE LARGER OF <br />(1)THE MINIMUM LEVELS SPECIFIED IN SECTION 120.1(c)3 OR <br />(2)THE RATE REQUIRED FOR MAKE-UP OF EXHAUST SYSTEMS THAT ARE <br />REQUIRED FOR AN EXEMPT OR COVERED PROCESS, FOR CONTROL OF <br />ODORS, OR FOR THE REMOVAL OF CONTAMINANTS WITHIN THE SPACE. <br />MEASURED OUTSIDE AIR RATES OF CONSTANT AND VARIABLE VOLUME <br />MECHANICAL VENTILATION SYSTEMS SHALL BE WITHIN 10% OF OUTSIDE <br />AIR RATE SHOWN ON TABLE 120.1-A. <br /> 12. THE THERMOSTATIC CONTROLS FOR HVAC SYSTEMS SHALL BE CAPABLE OF BEING <br />SET LOCALLY OR REMOTELY BY TO CONTROL COMFORT HEATING DOWN TO 55°F OR <br />LOWER AND COOLING UP TO 85°F OR HIGHER. THE THERMOSTATIC CONTROLS SHALL <br />BE CAPABLE OF PROVIDING A DEAD BAND RANGE OF AT LEAST 5°F WITHIN WHICH <br />HEATING AND COOLING ENERGY TO THE ZONE IS SHUT-OFF OR REDUCE TO A <br />MINIMUM. <br /> 13. OUTDOOR AIR SUPPLY AND EXHAUST EQUIPMENT SHALL BE INSTALLED WITH <br />DAMPERS THAT AUTOMATICALLY CLOSE UPON FAN SHUTDOWN. <br /> 14, SPACE CONDITIONING SYSTEMS WITH DDC ZONE CONTROLS SHALL HAVE OPTIMUM <br />START/STOP CONTROLS. MINIMUM CONTROLS SHOULD FUNCTION THE <br />DIFFERENCE(S) BETWEEN SPACE TEMPERATURE(S) AND OCCUPIED SET POINT(S), <br />THE OUTDOOR AIR TEMPERATURE(S), AND THE AMOUNT OF TIME PRIOR TO <br />SCHEDULED OCCUPANCY. <br /> 15. EACH SPACE-CONDITIONING SYSTEM SHALL BE INSTALLED WITH CONTROLS <br />(1)CAPABLE OF AUTOMATICALLY SHUTTING OFF THE SYSTEM DURING <br />PERIODS OF NON-USE AND SHALL HAVE <br />(A) 4-HR TIMER OR; <br />(B) OCCUPANCY SENSORS OR; <br />(C) AUTO-TIME SWITCH CONTROLS AND ACCESSIBLE MANUAL OVERRIDE <br />FOR UP TO 4-HRS. <br />(2)AUTOMATICALLY RE-START AND TEMPORARILY OPERATE THE SYSTEM TO <br />MAINTAIN SETBACK THERMOSTAT SETPOINTS FOR MECHANICAL HEATING <br />AND COOLING. <br />(3)MULTIPURPOSE, CLASSROOMS, CONFERENCE, CONVENTION, AUDITORIUM, <br />AND MEETING CENTER ROOMS OF CERTAIN SIZE WHICH DO NOT HAVE <br />PROCESSES OR OPERATIONS THAT GENERATE DUSTS, FUMES, VAPORS OR <br />GASSES SHALL BE EQUIPPED WITH OCCUPANT SENSOR(S) TO ACCOMPLISH <br />THE FOLLOWING DURING UNOCCUPIED PERIODS <br />(A)AUTOMATICALLY SET-UP THE OPERATING COOLING TEMPERATURE <br />SET POINT BY 2°F OR MORE AND SETBACK THE OPERATING HEATING <br />TEMPERATURE SET POINT BY 2°F OR MORE AND: <br />(B)AUTOMATICALLY RESET THE MINIMUM REQUIRED VENTILATION RATE <br />WITH AN OCCUPANT SENSOR VENTILATION CONTROL DEVICE <br />ACCORDING TO SECTION 120.1(c)5. <br /> 14, ALL ENCLOSED SPACES IN A BUILDING THAT ARE NORMALLY USED BY HUMANS SHALL <br />BE VENTILATED IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 121. <br /> 15. ALL FAN SYSTEMS EXHAUSTING AIR FROM THE BUILDING TO THE OUTSIDE SHALL BE <br />PROVIDED WITH BACKDRAFT OR AUTOMATIC DAMPERS TO PREVENT AIR LEAKAGE. <br /> 16. DUCT SYSTEMS SHALL COMPLY WITH UL 181, INCLUDING ALL COLLARS, CONNECTIONS <br />AND SPLICES. ALL PRESSURE-SENSITIVE TAPES, HEAT-ACTIVATED TAPES AND <br />MASTICS SHALL COMPLY WITH UL 181, UL 181A, OR UL181B <br /> 17. ALL THERMOSTATS SHALL HAVE A DEADBAND BETWEEN HEATING AND COOLING, <br />CAPABLE OF ADJUSTMENT UP TO 10°F. <br /> 18. ALL EQUIPMENT DESIGNED TO BE FIXED IN POSITION SHALL BE SECURELY FIXED IN <br />PLACE, AND IN ACCORDANCE WITH SEISMIC REQUIREMENTS. <br /> 19. REQUIRED ROUTINE MAINTENANCE ACTION SHALL BE CLEARLY STATED AND <br />INCORPORATED ON A READILY ACCESSIBLE PERMANENT LABEL. THE LABEL MAY BE <br />LIMITED TO CROSS REFERENCING THE MAINTENANCE MANUAL IF SUCH <br />MAINTENANCE ACTION IS DESCRIBED THEREIN FOR THE LABELED ITEM. <br /> 20. ALL EQUIPMENT SHALL CONFORM TO AND BE CERTIFIED IN ACCORDANCE WITH THE <br />APPLIANCE STANDARDS AND THE REQUIREMENTS FOR SUCH DEVICES GIVEN IN THE <br />PLANS AND SPECIFICATIONS APPROVED BY THE LOCAL ENFORCEMENT AGENCY. <br /> 21. ALL EQUIPMENT SHALL BE LABELED AS TO FUNCTION AND SPACES SERVED. (SEE <br />SCHEDULE) <br />EQUIPMENT AND SYSTEMS EFFICIENCY <br />ANY APPLIANCE FOR WHICH THERE IS A CALIFORNIA STANDARD ESTABLISHED IN THE <br />APPLIANCE EFFICIENCY STANDARDS MAY BE INSTALLED ONLY IF THE MANUFACTURER <br />HAS CERTIFIED TO THE COMMISSION, AS SPECIFIED IN THOSE REGULATIONS, THAT THE <br />APPLIANCE COMPLIES WITH THE APPLICABLE STANDARD FOR THAT APPLIANCE. <br />INCLUDED ARE ROOM AIR CONDITIONERS, CENTRAL AIR CONDITIONING HEAT PUMPS <br />(REGARDLESS OF CAPACITY, EXCEPT THAT REQUIREMENTS FOR CENTRAL AIR <br />CONDITIONING HEAT PUMPS WITH COOLING CAPACITY OF 135,000 BTU/HR OR MORE <br />APPLY TO HEATING PERFORMANCE BUT NOT COOLING PERFORMANCE), OTHER CENTRAL <br />AIR CONDITIONERS WITH A COOLING CAPACITY LESS THAN 135,000 BTU/HR, FAN TYPE <br />CENTRAL FURNACES WITH INPUT RATE LESS THAN 400,000 BTU/HR, BOILERS WALL <br />FURNACES, FLOOR FURNACES, ROOM HEATERS, UNIT HEATERS, AND DUCT FURNACES <br />SHALL HAVE BEEN CERTIFIED TO THE CALIFORNIA ENERGY COMMISSION BY ITS <br />MANUFACTURER TO COMPLY WITH THE APPLIANCE EFFICIENCY STANDARDS. <br />THE FOLLOWING SPACE CONDITIONING EQUIPMENT MAY BE INSTALLED ONLY IF THE <br />MANUFACTURER HAS CERTIFIED THAT THE EQUIPMENT MEETS OR EXCEEDS ALL <br />APPLICABLE EFFICIENCY REQUIREMENTS LISTED IN 112 OF THE ENERGY EFFICIENCY <br />STANDARDS: ALL AIR CONDITIONERS, HEAT PUMPS AND CONDENSING UNITS 135,000 <br />BTU/HR; ALL WATER CHILLERS; ALL GAS-FIRED BOILERS 300,000 BTU/HR; ALL OIL-FIRED <br />BOILERS 225,000 BTU/HR; AND ALL WARM AIR FURNACES AND COMBINATION WARM AIR <br />FURNACES/ AIR-CONDITIONING UNITS 225,000 BTU/HR. FAN TYPE CENTRAL FURNACES <br />SHALL NOT HAVE A PILOT LIGHT. <br />PIPING, EXCEPT THOSE CONVEYING FLUIDS AT TEMPERATURES BETWEEN 60° F AND 105° <br />F, OR WITHIN HVAC EQUIPMENT, SHALL BE INSULATED IN ACCORDANCE WITH STANDARDS <br />123. <br />AIR HANDLING DUCT SYSTEMS SHALL BE CONSTRUCTED, INSTALLED, SEALED, AND <br />INSULATED IN COMPLIANCE WITH WITH SECTIONS 601, 602, 603, 604, AND 605 OF 2019 CMC <br />STANDARDS. (NO DUCT TAPE ALLOWED). <br />CONTROLS <br />EACH SPACE CONDITIONING SYSTEM SHALL BE INSTALLED WITH ONE OF THE FOLLOWING: <br />O EACH SPACE CONDITIONING SYSTEM SERVING BUILDINGS (AND ALL OTHERS <br /> NOT EXPLICITLY EXEMPT FROM THE REQUIREMENTS OF SECTION 112(D)) <br /> SHALL BE INSTALLED WITH AN AUTOMATIC TIME SWITCH WITH AN <br /> ACCESSIBLE MANUAL OVERRIDE THAT ALLOWS OPERATION OF THE SYSTEM <br /> DURING OFF-HOURS FOR UP TO 4 HOURS. THE TIME SWITCH SHALL BE <br /> CAPABLE OF PROGAMMING DIFFERENT SCHEDULES FOR WEEKDAYS AND <br /> WEEKENDS; INCORPORATE AN AUTOMATIC HOLIDAY "SHUT-OFF" FEATURE <br /> THAT TURNS OFF ALL LOADS FOR AT LEAST 24 HOURS, THEN RESUMES THE <br /> NORMALLY SCHEDULED OPERATION; AND HAS PROGRAM BACKUP <br /> CAPABILITIES THAT PREVENT THE LOSS OF THE DEVICE'S PROGRAM AND <br /> TIME SETTING FOR AT LEAST 10 HOURS IF POWER IS INTERRUPTED. <br />O EACH SPACE CONDITIONING SYSTEM SHALL BE INSTALLED WITH AN <br /> OCCUPANCY SENSOR TO CONTROL THE OPERATING PERIOD OF THE SYSTEM. <br />O EACH SPACE CONDITIONING SYSTEM SHALL BE INSTALLED WITH A <br /> 4-HOUR TIMER THAT CAN BE MANUALLY OPERATED TO CONTROL THE <br /> OPERATING PERIOD OF THE SYSTEM. <br />O EACH SPACE CONDITIONING SYSTEM SHALL BE INSTALLED WITH CONTROLS THAT <br /> TEMPORARILY RESTART AND TEMPORARILY OPERATE THE SYSTEM AS REQUIRED TO <br /> MAINTAIN A SETBACK HEATING AND/OR A SETUP COOLING THERMOSTAT SETPOINT. <br />O THERMOSTATS SHALL HAVE NUMERIC SETPOINTS IN ° F AND ADJUSTABLE <br /> SETPOINT STOPS ACCESSIBLE ONLY TO AUTHORIZED PERSONNEL. <br />O EACH SPACE CONDITIONING SYSTEM SERVING MULTIPLE ZONES WITH A COMBINED <br /> CONDITIONING FLOOR AREA MORE THAN 25,000 SQ.FT. SHALL BE PROVIDED WITH <br /> ISOLATION ZONES. EACH ZONE SHALL : NOT EXCEED 25,000 SQ.FT.; SHALL BE <br /> PROVIDED WITH ISOLATION DEVICES, SUCH AS VALVES OR DAMPERS, THAT ALLOW <br /> THE SUPPLY OF HEATING OR COOLING TO BE SETBACK OR SHUT OFF <br /> INDEPENDENTLY OF OTHER ISOLATION AREAS; AND SHALL BE CONTROLLED BY A <br /> TIME CONTROL DEVICE AS DESCRIBED ABOVE. <br />O EACH SPACE CONDITIONING ZONE SHALL BE CONTROLLED BY AN INDIVIDUAL <br /> THERMOSTATIC CONTROL THAT RESPONDS TO TEMPERATURE WITHIN THE ZONE. <br /> WHERE USED TO CONTROL HEATING, THE CONTROL SHALL BE ADJUSTABLE DOWN TO <br /> 55° F OR LOWER. FOR COOLING, THE CONTROL SHALL BE ADJUSTABLE UP TO 85° F <br /> OR HIGHER. WHERE USED TO CONTROL BOTH HEATING AND COOLING, THE CONTROL <br /> SHALL BE CAPABLE OF PROVIDING A DEAD BAND OF AT LEAST 5° F WITHIN <br /> WHICH THE SUPPLY OF HEATING AND COOLING IS SHUT OFF OR REDUCED TO A <br /> MINIMUM. <br />O HEAT PUMPS SHALL BE INSTALLED WITH CONTROLS TO PREVENT ELECTRIC <br /> RESISTANCE SUPPLEMENTARY HEATER OPERATION WHEN THE HEATING LOAD CAN <br /> BE MET BY THE HEAT PUMP ALONE. ELECTRIC HEATING LOAD CAN BE MET BY <br /> THE HEAT PUMP ALONE. ELECTRIC RESISTANCE SUPPLEMENTARY HEATER <br /> OPERATION IS PERMITTED DURING TRANSIENT PERIODS, SUCH AS START-UPS AND <br /> FOLLOWING ROOM THERMOSTAT SETPOINT ADVANCE, WHEN CONTROLS ARE PROVIDED <br /> WHICH USE PREFERENTIAL RATE CONTROL, INTELLIGENT RECOVERY, STAGING, <br /> RAMPING, OR SIMILAR CONTROL MECHANISMS DESIGNED TO PRECLUDE THE <br /> UNNECESSARY OPERATION OF SUPPLEMENTARY HEATING DURING THE RECOVERY <br /> PERIOD. SUPPLEMENTARY HEATER OPERATION IS ALSO PERMITTED DURING <br /> DEFROST. <br />VENTILATION <br />O CONTROL SHALL BE PROVIDED TO ALLOW OUTSIDE AIR DAMPERS OR DEVICES TO BE <br /> OPERATED AT THE VENTILATION RATES AS SPECIFIED ON THESE PLANS. <br />O GRAVITY OR AUTOMATIC DAMPERS INTERLOCKED AND CLOSED ON FAN SHUTDOWN <br /> SHALL BE PROVIDED ON THE OUTSIDE AIR INTAKES AND DISCHARGES OF ALL <br /> SPACE CONDITIONING AND EXHAUST SYSTEMS. <br />O ALL GRAVITY VENTILATING SYSTEMS SHALL BE PROVIDED WITH AUTOMATIC OR <br /> READILY ACCESSIBLE MANUALLY OPERATED DAMPERS IN ALL OPENINGS TO THE <br /> OUTSIDE, EXCEPT FOR COMBUSTION AIR OPENINGS. <br />O AIR BALANCING: ALL SPACE CONDITIONING AND VENTILATION SYSTEMS SHALL BE <br /> BALANCED TO THE QUANTITIES SPECIFIED IN THESE PLANS, IN ACCORDANCE WITH <br /> THE NATIONAL ENVIRONMENTAL BALANCING BUREAU(NEBB) PROCEDURAL <br /> STANDARDS(1983), OR ASSOCIATED AIR BALANCE COUNCIL (AABC) NATIONAL <br /> STANDARDS (1986). <br />O OUTSIDE AIR CERTIFICATION: THE SYSTEM SHALL PROVIDE THE MINIMUM OUTSIDE <br /> AIR AS SHOWN ON THE MECHANICAL DRAWINGS, AND SHALL BE MEASURED AND <br /> CERTIFIED BY THE INSTALLING LICENSED C-20 MECHANICAL CONTRACTOR AND <br /> CERTIFIED BY (1) THE DESIGN MECHANICAL ENGINEER, (2) THE INSTALLING <br /> LICENSED C-20 MECHANICAL CONTRACTOR, OR (3) THE PERSON WITH OVERALL <br /> RESPONSIBILITY FOR THE DESIGN OF THE VENTILATION SYSTEM. <br />O OUTSIDE AIR MEASUREMENT: THE SYSTEM SHALL BE EQUIPPED WITH A <br /> CALIBRATED LOCAL OR REMOTE DEVICE CAPABLE OF MEASURING THE QUANTITY OF <br /> OUTSIDE AIR ON A CONTINUOUS BASIS AND DISPLAYING THAT QUANTITY ON A <br /> READILY ACCESSIBLE DISPLAY DEVICE. <br />O ANOTHER METHOD APPROVED BY THE COMMISION. <br />MECHANICAL MANDATORY MEASURES <br /> 1. ENERGY EFFICIENCY COMPLIANCE PROVIDED IN ACCORDANCE WITH <br />MINIMUM REQUIREMENTS. <br /> 2. A COPY OF THE CONSTRUCTION DOCUMENTS OR A COMPARABLE <br />DOCUMENT INDICATING THE INFORMATION FROM ENERGY CODE <br />SECTION 110.10(B) THROUGH 110.10(C) SHALL BE PROVIDED TO THE <br />OCCUPANT. (ENERGY CODE 110.10(D) <br /> 3. AFTER FUNCTIONAL PERFORMANCE TESTS ARE CONCLUDED, FORM <br />GRN24 SHALL BE COMPLETED AND READILY AVAIALABLE TO THE FIELD <br />INSPECTIOR PRIOR TO FINAL APPROVAL. (5.410.2.4) <br /> 4. ALL OPERATIONAL ASPECTS OF THE BUILDING SHALL BE DOCUMENTED <br />WITHIN A SYSTEMS MANUAL. THIS SYSTEMS MANUAL SHALL BE <br />DELIVERED TO THE OWNER OR REPRESENTATIVE. (5.410.2.5.1) <br /> 5. THE TRAINING OF THE APPROPRIATE MAINTENANCE STAFF FOR EACH <br />EQUIPMENT TYPE AND/OR SYSTEM SHALL BE DOCUMENTED IN THE <br />COMMISSIONING REPORT (5.410.2.5.2). <br /> 6. FORM GRN 25 SHALL BE COMPLETED AND READILY AVAILABLE TO THE <br />FIELD INSPECTOR PRIOR TO FINAL APPROVAL. <br /> 7. A COMPLETE COMMISSIONING REPORT AND FORM GRN 26 (COMPLETED0 <br />SHALL BE PROVIDED TO THE OWNER OR REPRESENTATIVE AND WILL BE <br />READILY AVAILABLE TO THE FIELD INSPECTOR PRIOR TO THE FINAL <br />APPROVAL. (5.410.2.6, 5.410.4.4). <br /> 8. TESTING AND ADJUSTMENT IS REQUIRED FOR ALL NEW INSTALLATION <br />OF ANY OF THE FOLLOWING SYSTEMS: <br />A.RENEWABLE ENERGY SYSTEMS. <br />I. DESCRIBE THE TYPE OF SYSTEM (E.G. SOLAR PHOTOVOLTAIC, <br />WIND TURBINES, ETC...) <br /> II. PROVIDE NARRATIVE OF THE TESTING AND ADJUSTMENT <br />PROCEDURE FOR THE SYSTEM. <br />B.LANDSCAPE IRRIGATION SYSTEMS <br /> I. DESCRIBE THE TYPE OF IRRIGATORS AND CONTROLLER(S) <br /> II. PROVIDE NARRATIVE OF THE TESTING AND ADJUSTMENT <br />PROCEDURE FOR THE IRRIGATION SYSTEM, INCLUDING BUT NOT <br />LIMITED TO, PRESSURE TESTS, WATER COVERAGE, AND PROPER <br />CONTROLLER FUNCTION. <br />C.WATER RE-USE SYSTEMS <br /> I. DESCRIBE THE TYPE OF GREY WATER OR RECLAIMED/RECYCLED <br />WATER SYSTEM. <br /> II. PROVIDE NARRATIVE OF THE TESTING AND ADJUSTMENT <br />PROCEDURE FOR THE SYSTEM (5.410.4.2, 5.410.4.3) <br /> 9. A FINAL REPORT FOR THE TESTING AND ADJUSTING OF ALL NEW <br />SYSTEMS SHALL BE COMPLETED AND PROVIDED TO THE FIELD <br />INSPECTOR PRIOR TO FINAL APPROVAL. THIS REPORT SHALL BE <br />SIGNED BY THE INDIVIDUAL RESPONSIBLE FOR PERFORMING THESE <br />SERVICES. (5.410.4.4) <br />10. AN OPERATION & SYSTEMS MANUAL, SHALL BE PROVIDED TO THE <br />OWNER OR REPRESENTATIVE AND TO THE FIELD INSPECTOR AT THE <br />TIME OF FINAL INSPECTION. (5.410.4.5) <br />11. IF THE HVAC SYSTEM IS USED DURING CONSTRUCTION, USE RETURN <br />AIR FILTERS WITH A MERV OF 13. REPLACE ALL FILTERS IMMEDIATELY <br />PRIOR TO OCCUPANCY. (5.504.1) <br />12. ALL DUCT AND OTHER RELATED AIR DISTRIBUTION COMPONENT <br />OPENINGS SHALL BE COVERED WITH TAPE, PLASTIC, OR SHEET METAL <br />UNTIL THE FINAL START-UP OF THE HEATING, COOLING, AND <br />VENTILATING EQUIPMENT. (5.504.3) <br />13. ARCHITECTURAL PAINTS AND COATINGS, ADHESIVES, CAULKS, AND <br />SEALANTS SHALL COMPLY WITHT THE VOLATILE ORGANIC COMPOUND <br />(V0C) LIMITS LISTED IN TABLES 5.504.4.1 - 5.504.4.3 (5.504.4.1 - 5.504.4.3). <br />14. THE VOC CONTENT VERIFICATION CHECKLIST, FORM GRN 2, SHALL BE <br />COMPLETED AND VERIFIED PRIOR TO FINAL INSPECTION APPROVAL. <br />THE MANUFACTURER'S SPECIFICATIONS SHOWING VOC CONTENT FOR <br />ALL APPLICABLE PRODUCTS SHALL BE READILY AVAILABLE AT THE JOB <br />SITE AND BE PROVIDED TO THE FIELD INSPECTOR FOR VERIFICATION. <br />(5.504.4.3.2) <br />15. MECHANICALLY VENTILATED BUILDINGS SHALL PROVIDE REGULARLY <br />OCCUPIED AREA OF THE BUILDING WITH A MERV 13 FILTER FOR <br />OUTSIDE AND RETURN AIR. FILTERS SHALL BE INSTALLED PRIOR TO <br />OCCUPANCY AND RECOMMENDATIONS FOR MAINTENANCE WITH <br />FILTERS OF THE SAME VALUE SHALL BE INCLUDED IN THE OPERATION <br />AND MAINTENANCE MANUAL. (5.504.5.3) <br />16. DESIGNATED OUTDOOR SMOKING AREA SHALL BE AT LEAST 25 FEET <br />FROM ANY OUTDOOR AIR INTAKE OR OPERABLE WINDOWS. (5.504.7) <br />17. THE BUILDING SHALL MEET OR EXCEED THE PROVISIONS FOR <br />MECHANICAL VENTILATION. <br />18. BUILDINGS THAT USE DEMAND CONTROL VENTILATION SHALL HAVE CO2 <br />SENSORS AND VENTILATION CONTROLS INSTALLED IN ACCORDANCE <br />WITH THE REQUIREMENTS OF THE CURRENT EDITION OF THE <br />CALIFORNIA ENERGY CODE, CCR, TITLE 24, PART 6, SECTION 102.1(C)(4) <br />(5.506.2) <br />19. THE HVAC, REFRIGERATION, AND FIRE SUPPRESSION EQUIPMENT SHALL <br />NOT CONTAIN CFC OR HALONS. (5.508.1) <br />20. FOR RETAIL FOOD STORES OF 8,000 SQ. FT. OR MORE OF CONDITIONED <br />AREA THAT HAVE A COMMERCIAL REFRIGERATION SYSTEM. (LEAK <br />REDUCTION MEASURES IN ACCORDANCE WITH LAGBC 5.508.2 SHALL <br />APPLY TO REFRIGERATION SYSTEMS WITH A GLOBAL-WARMING <br />POTENTIAL (GWP) OF 150 OR GREATER. SEPARATE MECHANICAL PLAN <br />CHECK IS REQUIRED.) (5.508.2) <br />CAL-GREEN BUILDING NOTES <br />1.REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION OF DIFFUSERS <br />AND REGISTERS. CONTRACTOR SHALL VARY LOCATIONS AS REQUIRED TO MATCH FINAL <br />ARCHITECTURAL REFLECTED CEILING PLANS WHEN ISSUED. <br />2.ALL THERMOSTATS SHALL BE 4'-0'' ABOVE FINISHED FLOOR. <br />3.DO NOT HANG DUCTS OR PIPES FROM ROOF DECK BUT SUSPEND FROM BEAMS AND BAR <br />JOISTS. PROVIDE CHANNELS AND ANGLE IRON HORIZONTAL SUPPORTS AS REQUIRED AND <br />APPROVED BY THE STRUCTURAL ENGINEER. <br />4.NO FLEXIBLE DUCT SHALL PENETRATE ANY PARTITION RATED OR OTHERWISE. <br />5.ALL MATERIAL IN PLENUMS SHALL HAVE A MOLD, HUMIDITY AND EROSION RESISTING FACE <br />THAT HAS MET THE REQUIREMENTS OF U.M.C. STANDARD NO. 6-1 AND A FLAME-SPREAD INDEX <br />NOT GREATER THAN 25 AND A SMOKE DEVELOPED INDEX NOT GREATER THAN 50 WHEN <br />TESTED AS A COMPOSITE PRODUCT PER TEST METHODS LISTED IN CHAPTER 6 OF 2022 CMC. <br />6.IN ROOM WITH NO CEILING, SUSPEND CEILING DIFFUSERS FROM STRUCTURE ABOVE PER <br />SMACNA GUIDELINES OR LOCAL CODE, WHICHEVER THE MOST RESTRICTIVE. <br />7.APPLIANCE MUST BE CERTIFIED BY CALIFORNIA ENERGY COMMISSION. <br />8.EQUIPMENT SHALL BE PROVIDED WITH A PERMANENT LABEL AFFIXED TO THE EQUIPMENT <br />WHICH WILL BE EITHER CLEARLY INDICATE THE ROUTINE MAINTENANCE ACTIONS WHICH MUST <br />BE PERFORMED TO MAINTAIN THE EQUIPMENT IN EFFICIENT OPERATING CONDITION OR <br />INDICATE BY WHICH MAINTENANCE OR OPERATING MANUALS EXPLAIN THE MAINTENANCE <br />REQUIREMENTS IN GREATER DETAIL. <br />9.DAMPER MANUFACTURER'S LABEL SHALL INDICATE MAXIMUM LEAKAGE OF 3%. <br />10.THE USE OF THOSE MANUFACTURED DEVICES LISTED IN TABLES 110.2-A THROUGH TABLE <br />110.2-K IS LIMITED TO ONLY THOSE THAT HAVE BEEN CERTIFIED TO THE CALIFORNIA ENERGY <br />COMMISSION. <br />11.DUCT SYSTEMS USED WITH BLOWER TYPE EQUIPMENT THAT ARE PORTIONS OF HEATING, <br />COOLING, ABSORPTION, EVAPORATIVE COOLING OR OUTDOOR VENTILATION SYSTEM SHALL <br />BE SIZED IN ACCORDANCE WITH AN APPROVED STANDARD LISTED IN TABLE 1701.1 2022 CMC, <br />OR BY OTHER APPROVED METHODS. <br />12.ALL AIR DISTRIBUTION SYSTEM DUCTS AND PLENUMS, INCLUDING, BUT NOT LIMITED TO, <br />BUILDING CAVATIES, MECHANICAL CLOSETS, AIR HANDLER BOXES, AND SUPPORT PLATFORMS <br />USED AS DUCTS OR PLENUMS, SHALL BE INSTALLED, SEALED, AND INSULATED TO MEET THE <br />REQUIREMENTS OF CHAPTER 6 OF THE 2022 CMC. LEAKAGE/PRESSURE TESTS SHALL BE <br />COMPLETED BEFORE ANY DUCTWORK INSULATION IS APPLIED. PORTIONS OF SUPPLY-AIR AND <br />RETURN-AIR DUCTS CONVEYING HEATED OR COOLED AIR LOCATED IN ONE OR MORE OF THE <br />FOLLOWING SPACES SHALL BE INSULATED TO A MINIMUM INSTALLED LEVEL OF R-8: <br />a)OUTDOORS; OR <br />b)IN A SPACE BETWEEN THE ROOF AND AN INSULATED CEILING; OR <br />c)IN A SPACE DIRECTLY UNDER A ROOF WITH FIXED VENTS OR OPENINGS TO THE OUTSIDE OR <br />UNCONDITIONED SPACES; OR <br />d)IN AN UNCONDITIONED CRAWLSPACE; OR IN OTHER UNCONDITIONED SPACES. <br />13.OVERFLOW DRAINS FROM A/C UNITS LOCATED IN AN ATTIC OR FURRED SPACE DISCHARGE AT <br />A POINT WHICH CAN BE READILY OBSERVED. <br />14.ALL APPLIANCES DESIGNED TO BE FIXED IN POSITION SHALL BE SECURELY FASTENED IN <br />PLACE DESIGNED AND CONSTRUCTED TO SUSTAIN VERTICAL AND HORIZONTAL LOADS WITHIN <br />STRESS LIMITATIONS SPECIFIED IN THE BUILDING CODE. <br />15.HYDRONIC PIPING INSTALLATION SHALL COMPLY WITH CHAPTER 12 OF THE 2022 CMC. <br />16.PROVIDE ANY ACCESS DOORS REQUIRED, BUT NOT INDICATED OR SHOWN, ON PLANS, FOR <br />ACCESS TO QUADRANT DAMPERS, FIRE DAMPERS, AND CONTROLS VALVES. <br />17.CONDENSATE FROM AIR CONDITIONING UNITS SHALL BE ROUTED TO APPROVED PLUMBING <br />RECEPTACLE WITH 1" AIR GAP OR TAILPIECE CONNECTION. IF THESE PLUMBING FIXTURES ARE <br />NOT AVAILABLE, THEN SUBJECT TO FIELD INSPECTION APPROVAL. <br />18.INSTALL DUCT ACCESSORIES ACCORDING TO APPLICABLE DETAILS IN SMACNA'S HVAC DUCT <br />CONSTRUCTION STANDARDS. INSTALL VOLUME DAMPERS AT POINTS ON SUPPLY, RETURN, <br />AND EXHAUST SYSTEMS WHERE BRANCHES EXTEND FROM LARGER DUCTS. LOCATE VOLUME <br />DAMPERS AT LEAST TWO DIAMETERS FROM A FITTING AND AS FAR AS POSSIBLE FROM <br />OUTLETS. SET DAMPERS TO FULLY OPEN POSITION BEFORE TESTING, ADJUSTING, AND <br />BALANCING. <br />19.ALL NEW PIPE INSULATION AND DUCT INSULATION SHALL COMPLY WITH UNIFORM MECHANICAL <br />CODE FOR FLAME SPREAD (25) AND SMOKE DISTRIBUTION (50). (SEE SPECIFICATIONS FOR <br />EXACT SIZES) AND CONSISTENT WITH THE LATEST REQUIREMENTS OF THE CALIFORNIA <br />TITLE-24. <br />20.ALL DUCT DETECTORS SHALL REQUIRE AND ACCEPTANCE FUNCTION TEST. TESTING SHALL BE <br />IN ACCORDANCE WITH NFPA STANDARD 72 AND MANUFACTURER'S INSTRUCTIONS. <br />21.DUCT DETECTORS SHALL BE CONNECTED TO THE BUILDING FIRE ALARM SYSTEM TO INITIATE <br />SUPERVISION UNLESS OTHERWISE REQUIRED BY THE AUTHORITY HAVING JURISDICTION. <br />22.ALL CONCEALED SMOKE DETECTORS SHALL BE PROVIDED WITH ACCESS PANELS AND REMOTE <br />LED INDICATORS LOCATED BELOW CEILING TO INDICATE THE LOCATION OF THE SMOKE <br />DETECTOR IT IS SERVING. <br />23.RELOCATE ANY EXISTING DUCTWORK OR PIPING WHICH IS TO REMAIN BUT INTERFERES WITH <br />THE INSTALLATION OF NEW DUCTWORK AND/OR NEW EQUIPMENT ABOVE CEILING. THE <br />CONTRACTOR SHALL FIELD VERIFY ALL EXISTING DIMENSIONS, SERVICES, AND POINTS OF <br />CONNECTION PRIOR TO START OF WORK. <br />24.PROVIDE ADEQUATE SUPPORTS AND SWAY BRACES FOR ALL PIPING, DUCTWORK, AND <br />EQUIPMENT AS REQUIRED BY CALIFORNIA MECHANICAL CODE. ALL SUSPENDED ELEMENTS TO <br />BE PROVIDED WITH APPROVED LATERAL OR SWAY BRACING. <br />25.PROVIDE ANY ACCESS DOORS REQUIRED, BUT NOT INDICATED OR SHOWN, ON PLANS, FOR <br />ACCESS TO QUADRANT DAMPERS, FIRE DAMPERS, AND VALVES. <br />26.JOB CONDITIONS: DUCTWORK, PIPING, AND CONDUIT, AS SHOWN ON DRAWINGS, IS <br />DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY <br />AND SHALL BE FABRICATED AND INSTALLED BASED ON ACTUAL FIELD MEASUREMENT. ADHERE <br />TO DRAWINGS AS CLOSELY AS POSSIBLE IN LAYOUT DUCTWORK. VARY RUN OF PIPING, RUN <br />AND SHAPE OF DUCTWORK AND MAKE OFFSETS DURING PROGRESS OF WORK AS REQUIRED <br />TO MEET STRUCTURAL AND OTHER INTERFERENCES AS APPROVED BY ARCHITECT. INSTALL <br />PIPING AND DUCTWORK IN FURRED SPACES WHEREVER POSSIBLE. RUN EXPOSED PIPING AND <br />DUCTWORK PARALLEL TO, OR AT RIGHT ANGLES TO, BUILDING WALLS. KEEP HORIZONTAL <br />LINES AS CLOSE TO BOTTOM OF STRUCTURES AS POSSIBLE. CONFORM TO CEILING HEIGHTS <br />ESTABLISHED ON ARCHITECTURAL DRAWINGS. COORDINATE WITH OTHER TRADES AS <br />REQUIRED. <br />27.ALL EQUIPMENTS, DUCTWORK AND PIPING SHALL BE INSTALLED IN TOTAL COMPLIANCE WITH <br />CALIFORNIA MECHANICAL CODE. <br />28.FILTERS SHALL BE CLASS I OR II FLAMESPREAD, U.L. OR CSFM LISTED. PROVIDE PRE-FILTER <br />WITH A MINIMUM EFFICIENCY OF 90% OR MERV-13. <br />29.ALL EXISTING DUCT SUPPORTS, PIPE SUPPORTS, ETC. WITHIN THE SCOPE OF WORK SHALL BE <br />BROUGHT UP TO CURRENT CODES. <br />30.ALL AIR HANDLER DUCT SYSTEM SHALL BE CONSTRUCTED, INSTALLED, AND INSULATED AS <br />PROVIDED IN CHAPTER 6 OF 2022 CMC. <br />31.MECHANICAL CONTRACTOR SHALL BECOME KNOWLEDGEABLE WITH BUILDING STRUCTURE <br />AND CEILING SPACE. ALLOW FOR INSTALLATION OF EQUIPMENT PRIOR TO BID AND FOR <br />PRICING ADDITIONAL OFFSETS OF DUCTS AND PIPING THAT ARE NOT SHOWN ON DRAWING. <br />32.FIRE STOPPING REQUIREMENTS: PENETRATIONS THRU RATED WALLS AND FLOORS SHALL <br />BE SEALED WITH A MATERIAL CAPABLE OF PENETRATING THE PASSAGE OF FLAMES AND HOT <br />GASES WHEN SUBJECTED TO THE REQUIREMENTS OF SECTION 07270. PROVIDE U.L. LISTED <br />AND APPROVED FIRE STOP ASSEMBLY AT PENETRATION OF PIPE, CONDUIT AND DUCTWORK <br />THROUGH FIRE RATED WALL. <br />33.PRIOR TO SUBMISSION OF ANY BID, EACH BIDDER SHALL PERFORM A THOROUGH FIELD <br />SURVEY OF THE EXISTING SITE CONDITIONS AND FEATURES, WHICH WILL BE REQUIRED IN <br />ORDER TO PERFORM THEIR PORTION OF THE CONTRACT. ANY SITE CONDITIONS WHICH MAY <br />RESULT IN AN INSTALLATION ISSUE, THUS RESULTING IN A DEVIATION FROM THE DESIGN <br />DRAWINGS, SHALL BE BROUGHT TO THE ATTENTION OF OWNER AND ARCHITECT/ENGINEER OF <br />RECORD FOR CLARIFICATION PRIOR TO SUBMISSION OF THE CONTRACTOR'S BID. VERIFY <br />DIMENSIONS OF ALL PRODUCTS INCLUDING SPECIFIED EQUIPMENT TO ENSURE PROPER <br />COORDINATION WITH CONSTRUCTION. CONTRACTOR SHALL BEAR ALL COSTS FOR THE <br />RELOCATION OF EQUIPMENT, PIPE, DUCTS, ETC., FOR ANY ERROR THROUGH NEGLIGENCE IN <br />ADVISING OF ANY CONFLICT IN WRITING PRIOR TO SUBMISSION OF ANY BID, AND/OR FROM <br />FAILURE TO PROPERLY COORDINATE INSTALLATIONS OF SYSTEMS. <br />34.OUTDOOR AIR INTAKES SHALL BE LOCATED 10'-0" FROM EXHAUST OUTLETS OF VENTILATING <br />SYSTEMS, COMBUSTION EQUIPMENT STACKS, MEDICAL SURGICAL VACUUM SYSTEMS, <br />COOLING TOWERS AND AREAS THAT MAY COLLECT VEHICULAR EXHAUST OR OTHER NOXIOUS <br />FUMES. THE BOTTOM OF OUTDOOR AIR INTAKES SHALL BE LOCATED 10'-0" ABOVE THE <br />GROUND LEVEL OR 18" ABOVE THE ROOF LEVEL. <br />35.EXHAUST OUTLETS SHALL BE LOCATED A MINIMUM 10'-0" ABOVE THE ADJOINING GRADE AND <br />AND 10'-0" FROM DOORS, OCCUPIED AREAS, AND OPERABLE WINDOWS. <br />36.COVERING OF DUCT OPENINGS AND PROTECTION OF MECHANICAL EQUIPMENT SHALL BE <br />MAINTAINED DURING CONSTRUCTION. <br />37.ADHESIVES, SEALANTS, AND CAULKS USED ON THE PROJECT SHALL MEET THE REQUIREMENTS <br />OF THE FOLLOWING STANDARDS: <br />1.ADHESIVES, ADHESIVE BONDING PRIMERS, ADHESIVE PRIMERS, SEALANTS, SEALANT <br />PRIMERS,AND CAULKS SHALL COMPLY WITH LOCAL OR REGIONAL AIR POLLUTION CONTROL <br />OR AIR QUALITY MANAGEMENT DISTRICT RULES WHERE APPLICABLE, OR SCAQMD RULE 1168 <br />VOC LIMITS, AS SHOWN IN TABLES 5.504.4.1 AND 5.504.4.2, CALIFORNIA GREEN BUILDING CODE, <br />2022 <br />38.PIPES, DUCTS AND CONDUITS SHALL BE SUPPORTED AND BRACED PER THE SMACNA <br />"GUIDELINES FOR SEISMIC RESTRAINTS OF MECHANICAL SYSTEMS AND PLUMBING PIPING <br />SYSTEM". DUCTS SHALL BE SUPPORTED AT EACH CHANGE OF DIRECTION AND IN <br />ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARD - METAL AND FLEXIBLE. <br />39.PLUMBING PIPE TO BE INSTALLED ABOVE HVAC DUCT IN VARIOUS LOCATIONS AND SHALL BE <br />SUPPORTED AND BRACED PER THE SMACNA "GUIDELINES FOR SEISMIC RESTRAINTS OF <br />MECHANICAL SYSTEMS AND PLUMBING PIPING SYSTEM". NO WATER PIPING IS ALLOWED <br />ABOVE THE ELECTRICAL ROOM, TELEPHONE SWITCH ROOM AND DATA/COMMUNICATION <br />ROOM. <br />40.PROVIDE SMOKE DETECTORS IN MAIN SUPPLY AIR DUCTS OF AIR MOVING SYSTEMS <br />EXCEEDING 2000 CFM PER 2022 CMC SECTION 609.0. <br />41.AT THE TIME OF ROUGH INSTALLATION, OR DURING STORAGE ON THE CONSTRUCTION SITE <br />AND UNTIL FINAL STARTUP OF THE HEATING, COOLING, AND VENTILATING EQUIPMENT, ALL <br />DUCTS AND OTHER RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED <br />WITH TAPE, PLASTIC, SHEET METAL, OR OTHER ACCEPTABLE METHODS TO REDUCE THE <br />AMOUNT OF DUST, WATER, AND DEBRIS WHICH MAY ENTER THE SYSTEM (2022 CGBC SECTION <br />5.504.3). <br />42.IN MECHANICALLY VENTILATED BUILDINGS, REGULARLY OCCUPIED AREAS OF THE BUILDING <br />SHALL BE PROVIDED WITH AIR FILTRATION MEDIA FOR OUTSIDE AND RETURN AIR THAT <br />PROVIDES AT LEAST A MINIMUM EFFICIENCY REPORTING VALUE (MERV) OF 13. MERV 13 <br />FILTERS SHALL BE INSTALLED PRIOR TO OCCUPANCY, AND RECOMMENDATIONS FOR <br />MAINTENANCE WITH FILTERS OF THE SAME VALUE SHALL BE INCLUDED IN THE OPERATION <br />AND MAINTENANCE MANUAL (2022 CGBC SECTION 5.504.5.3) <br />43.INSTALLATION OF HVAC, REFRIGERATION, AND FIRE SUPPRESSION EQUIPMENT SHALL COMPLY <br />WITH 2022 CGBC SECTIONS 5.508.1.1 AND 5.508.1.2. HVAC, REFRIGERATION, AND FIRE <br />SUPPRESSION EQUIPMENT SHALL NOT CONTAIN CHLOROFLUOROCARBONS (CFC'S) AND SHALL <br />NOT CONTAIN HALONS (2022 CGBC SECTION 5.508.1). <br />44.PROVIDE THE BUILDING OWNER OR REPRESENTATIVE WITH DETAILED OPERATING AND <br />MAINTENANCE INSTRUCTIONS AND COPIES OF GUARANTIES/WARRRANTIES FOR EACH <br />SYSTEM. O & M INSTRUCTIONS SHALL BE CONSISTENT WITH OSHA REQUIREMENTS IN CCR, <br />TITLE 8, SECTION 5142, AND OTHER RELATED REGULATIONS. <br />45.SIZING OF CONDENSATE DRAINS FROM COOLING COILS PER CPC TABLE 814.1 AND SHALL <br />COMPLY WITH THE FOLLOWING CODES: 2022 CMC SECTIONS 310.1, 310.2, 310.3, 310.5, <br />310.6, 312.0, 1105.7, AND TABLE 310.3 2022 CPC SECTIONS 803.0 TO 807.2 AND 814.0 AIR <br />CONDITIONING CONDENSATE DRAIN LINES FROM EACH HVAC UNIT SHALL BE PIPED FULL SIZE <br />FROM THE UNIT DRAIN OUTLET, WITH "P" TRAP AND PIPED TO NEAREST DRAIN. INSULATE <br />INTERIOR LINES WHERE CONDENSATE CAN OCCUR. <br />46.DUCT SHALL BE CONSTRUCTED IN ACCORDANCE WITH SMACNA-2006 OR U.L. 181. ALL DUCT <br />DIMENSIONS, AS SHOWN ON MECHANICAL DRAWINGS, ARE CLEAR INSIDE DIMENSIONS. <br />47.FIRE BLOCKING OR FIRE DAMPER ASSEMBLIES, INCLUDING SLEEVES AND INSTALLATION <br />PROCEDURES AS APPLICABLE WHERE SYSTEM COMPONENTS PENETRATE FIRE RATED <br />SEPARATIONS BLOCKING/DAMPERS SHALL BE RATED IN ACCORDANCE WITH SEPARATION <br />SERVED AND SHALL BE APPROVED BY THE BUILDING INSPECTOR PRIOR TO INSTALLATION. <br />REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF FIRE RATED WALLS AND <br />SMOKE SEPARATIONS. <br />48.ALL HVAC EQUIPMENT AND APPLIANCES SHALL MEET THE REQUIREMENTS OF SECTION <br />111-113, 115, 120-129 OF THE CALIFORNIA ENERGY EFFICIENCY STANDARDS. <br />49.ALL HVAC SYSTEMS SHALL MEET THE LATEST CONTROL REQUIREMENTS OF SECTIONS 112 <br />AND 122 OF THE CALIFORNIA ENERGY EFFICIENCY STANDARDS. <br />50.ALL EQUIPMENT SHALL BE LABELED OR LISTED BY A RECOGNIZED APPROVAL AGENCY. <br />51.ALL ROOF EQUIPMENT SHALL BE LABELED TO INDICATE THE SPACE IT SERVES WHEN THERE IS <br />MORE THAN ONE HEATING OR COOLING UNIT. <br />52.WEATHER PROTECTION FOR OPENINGS SHALL BE A MINIMUM OF 26 GAUGE GALVANIZED STEEL <br />(BC 1504) <br />53.JOINTS, TRAVERSE JOINTS, AND SEAMS FOR DUCT SYSTEMS SHALL COMPLY SMACNA HVAC <br />DUCT STANDARD-METAL AND FLEXIBLE. JOINTS OF DUCT SYSTEMS SHALL BE MADE <br />SUBSTANTIALLY AIRTIGHT BY MEANS OF TAPES, MASTICS, GASKETING, OR OTHER MEANS. <br />CRIMP JOINTS FOR ROUND DUCTS SHALL HAVE A CONTACT LAP OF NOT LESS THAN 1-1/2" AND <br />SHALL BE MECHANICALLY FASTENED BY MEANS OF NOT LESS THAN 3 SHEET-METAL SCREWS <br />EQUALLY SPACED AROUND THE JOINT OR AN EQUIVALENT FASTENING METHOD. <br />54.ALL MATERIALS EXPOSED WITHIN DUCTS AND PLENUMS INCLUDING ANY ABOVE CEILING <br />RETURN AIR PLENUMS SHALL BE NONCOMBUSTABLE OR SHALL HAVE A FLAME SPREAD INDEX <br />NOT TO EXCEED TENTY-FIVE (25) AND A SMOKE DEVELOPED INDEX NOT TO EXCEED FIFTY (50) <br />WHEN TESTED AS A COMPOSITE PRODUCT IN ACCORDANCE WITH ASTM E84 OR UL 723 AND <br />SHALL COMPLY WITH ALL REQUIREMENTS OF THE 2022 CMC SECTION 602.2. <br />55.PORTIONS OF SUPPLY-AIR DUCTS THAT ARE NOT IN ONE OF THESE SPACES, INCLUDING DUCTS <br />BURIED IN CONCRETE SLAB, SHALL BE INSULATED TO TO A MINIMUM INSTALLED LEVEL OF 4.2 <br />(OR ANY HIGHER LEVEL REQUESTED BY CMC SECTION 604.1) OR BE ENCLOSED IN DIRECTLY <br />CONDITIONED SPACE. <br />56.NEW ROOF TOP EQUIPMENT SHALL BE INSTALLED AT A MINIMUM 10'-0" FROM ROOF EDGE. <br />57.REFER TO SPECIFICATIONS FOR MATERIALS AND METHODS FOR CONSTRUCTION. WHERE THE <br />WORD "PROVIDE" OR NEW" IS USED SHALL BE UNDERSTOOD TO MEAN "THE CONTRACTOR <br />SHALL FURNISH AND INSTALL". EQUIPMENT AND MATERIALS PROVIDED SHALL BE NEW AND <br />FREE FROM DEFECTS. NO SALVAGED OR REFURBISHED OR USED EQUIPMENT OR MATERIAL <br />WILL BE ACCEPTED. <br />58.ALL SYMBOLS SHOWN ON SYMBOL LIST ARE NOT NECESSARILY USED ON THIS PROJECT. <br />59.ARCHITECTURAL AND STRUCTURAL PLANS ARE CONSIDERED PART OF THE DESIGN DRAWINGS <br />AND ARE TO BE USED TO DEFINE DETAIL CONFIGURATIONS INCLUDING, BUT NOT LIMITED TO <br />RELATIVE LOCATION OF MEMBERS, ELEVATION, LOCATION OF ALL OPENINGS, ETC. <br />57.SHOP DRAWINGS SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW PRIOR TO <br />FABRICATION. MINIMUM ENGINEER REVIEW TIME IS 7 WORKING DAYS BEFORE RETURN TO THE <br />GENERAL CONTRACTOR. SHOP DRAWINGS WILL BE REJECTED FOR INCOMPLETENESS, LACK <br />OF CALCULATIONS (IF REQUIRED) OR CHANGES WITHOUT PRE-APPROVAL. DELAY IN <br />PROCESSING SHOP DRAWINGS WILL BE THE RESPONSIBILITY OF THIS CONTRACTOR. <br />58.GENERAL AND SUBCONTRACTORS SHALL REVIEW AND STAMP ALL SHOP DRAWINGS PRIOR TO <br />REVIEW BY THE ENGINEER. SHOP DRAWINGS SHALL BE REVIEWED FOR COMPLETENESS AND <br />COMPLIANCE TO THE DRAWINGS. CONTRACTOR SHALL CLEARLY FLAG ANY DEVIATION AND <br />MAKE WRITTEN REQUEST TO THE ENGINEER FOR APPROVAL OF ANY MODIFICATION. ALL <br />MODIFICATIONS MUST BE PRE-APPROVED BEFORE SHOP DRAWINGS ARE PROCESSED & <br />RESUBMITTED FOR FINAL APPROVAL. <br />59.TIME SPENT BY ENGINEERING PERSONNEL AND STAFF IN REPLY TO REQUESTS FOR <br />INFORMATION, THE ANSWERS FOR WHICH CAN BE FOUND IN THE CONTRACT DOCUMENTS, <br />WILL BE CHARGED TO THE CONTRACTOR AND SUCH REQUEST FOR INFORMATION SHALL BE <br />ACCOMPANIED BY A PURCHASE ORDER FOR THE SERVICE REQUESTED. <br />60.PROVIDE CODE APPROVED FLEXIBLE CONNECTIONS AT ALL EQUIPMENT. <br />61.PROVIDE FLASHING AND/OR COUNTER FLASHING OF ALL EXTERIOR PENETRATIONS TO <br />PREVENT WATER INGRESS. <br />67.INSTALLED AIR CONDITIONER AND HEAT PUMP OUTDOOR CONDENSING UNITS MUST HAVE A <br />CLEARANCE OF AT LEAST 5 FEET FROM THE OUTLET OF ANY DRYER VENT. <br />70.PROVIDE VIBRATION ISOLATION FOR MECHANICAL EQUIPMENT TO PREVENT TRANSMISSION OF <br />VIBRATION TO BUILDING STRUCTURE AND A VIBRATION FREE INSTALLATION. <br />73.MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND AS SHOWN IN <br />DETAILS FOR DUCTWORK AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL BE FURNISHED <br />AND INSTALLED BY THE MECHANICAL CONTRACTOR. OTHER TRADES SHALL NOT SHARE <br />SUPPORTS. <br />76.LOCATIONS AND SIZES OF WALL AND ROOF OPENINGS SHALL BE COORDINATED WITH OTHER <br />TRADES INVOLVED. <br />77.MANDATORY REQUIREMENTS <br />77.1.DUCTWORK AND PLENUMS TO BE CONSTRUCTED TO SEAL CLASS A. <br />77.2.CLARIFICATIONS TO SPACES FOR WHICH OCCUPANT SENSOR VENTILATION CONTROL <br />DEVICES ARE REQUIRED. <br />77.3.DUCT LEAKAGE TESTING IS NOW MANDATORY. <br />78.A PERFORMANCE TEST SHALL BE CONDUCTED UPON COMPLETION AND BEFORE APPROVAL OF <br />A VENTILATION SYSTEM SERVING COMMERCIAL COOKING APPLIANCES. THE TEST SHALL <br />VERIFY THE EXHAUST AIRFLOW IN ACCORDANCE WITH SECTIONS 508.10.1.2 THRU508.10.1.5 OR <br />THE AIRFLOW RATE STAMPED ON LISTED HOOD. <br />79.THE PERMIT HOLDER SHALL VERIFY A CAPTURE AND CONTAINMENT PERFORMANCE OF THE <br />HOOD. A FIELD TEST SHALL BE PERFORMED WITH COOKING EQUIPMENT AT NORMAL <br />OPERATING TEMPERATURE AND CAPTURE AND CONTAINMENT SHALL BE VERIFIED THROUGH A <br />VISUAL OBSERVATION OF SMOKE OR STEAM PRODUCED BY SMOKE CANDLES OR PUFFERS. <br />SMOKE BOMBS RAE PROHIBITED FROM USE ON THIS TEST. <br />80.PRIOR TO USE OR CONCEALMENT A GREASE DUCT LEAKAGE TEST SHALL BE PERFORMED TO <br />VERIFY THE WELDED SEAMS AND JOINTS ARE LIQUID TIGHT. THE TEST SHALL BE A WATER <br />PRESSURE TEST, A LIGHT TEST, OR AN APPROVED EQUIVALENT TEST. THE PERMIT HOLDER <br />SHALL BE RESPONSIBLE FOR PROVIDING THE EQUIPMENT AND FOR PERFORMING THE TEST. <br />HOLD- 420 W 17th <br />St3/7/2025