Laserfiche WebLink
PVC <br />RMC <br />GRADE <br />SCH. 40 <br />PVC CONDUIT <br />PVC <br />COUPLING <br />24" MIN.CURB LINE <br />PV MODULE (TYP.) <br />DC CONDUCTOR IN FREE AIR <br />CARPORT #2 <br />INVERTER #3 <br />INVERTER #4 <br />CARPORT #3 <br />INVERTER #5 <br />CARPORT #4 <br />INVERTER #6 <br />CARPORT #5 <br />(N) AC DISCONNECT <br />24" MIN. <br />GALVANIZED RIGID METAL CONDUIT <br />WRAPPED AROUND WITH 20 MIL BLACK <br />ELECTRICAL PLASTIC TAPE . <br />(N) AC DISCONNECT(N) AC DISCONNECT(N) AC DISCONNECT <br />6'-7" MAX 6'-7" MAX 6'-7" MAX 6'-7" MAX <br />OFF <br />ON <br />(N) PANELBOARD DP-PV1 <br />(N) UTILITY PV DISCONNECT <br />(E) SERVICE POINT & UTILITY METER <br />#V349N-018849, POINT OF INTERCONNECTION <br />(N) XFMR T-EVC <br />(N) DAS <br />PVC <br />RMC <br />GRADE <br />SCH. 40 <br />PVC CONDUIT <br />PVC <br />COUPLING <br />24" MIN. <br />6'-7" MAX <br />(N) PANELBOARD DP-EV <br />CURB LINECURB LINE6" <br />EMT TYP. <br />PV MODULE (TYP.) <br />DC CONDUCTOR IN FREE AIR CARPORT #1 <br />INVERTER #1 INVERTER #2 <br />(E) ELECTRICAL ROOM <br />GALVANIZED RIGID METAL CONDUIT <br />WRAPPED AROUND WITH 20 MIL BLACK <br />ELECTRICAL PLASTIC TAPE . <br />GALVANIZED RIGID METAL CONDUIT <br />WRAPPED AROUND WITH 20 MIL BLACK <br />ELECTRICAL PLASTIC TAPE. <br />(N) AC DISCONNECT <br />CUSTOMER <br />DATE: <br />SCALE: <br />SHEET # <br />CUSTOMER <br />E-8.1 <br />APN <br />PLAN SET REVISIONS <br />399-031-24 / 399-031-23 <br />6/8/2023 <br />SAMUELI ACADEMY <br />1901/1919 N. FAIRVIEW ST. <br />SANTA ANA, CA. 92705 <br />CONTRACTOR SIGNATURE: <br />DAVID CLEVELAND <br />CO <br />N <br />T <br />R <br />A <br />C <br />T <br />O <br />R <br />' <br />S <br /> <br />L <br />I <br />C <br />E <br />N <br />S <br />E <br /> <br /># <br /> <br />1 <br />0 <br />8 <br />9 <br />1 <br />1 <br />7 <br /> <br />C <br />L <br />A <br />S <br />S <br /> <br />B <br />CON <br />T <br />R <br />A <br />C <br />T <br />O <br />R <br />' <br />S <br /> <br />L <br />I <br />C <br />E <br />N <br />S <br />E <br /> <br /># <br /> <br />1 <br />0 <br />8 <br />9 <br />1 <br />1 <br />7 <br /> <br />C <br />L <br />A <br />S <br />S <br /> <br />B <br />DRAWN BY: <br />CHECKED BY: <br />APPROVED BY: <br />ENGINEER STAMP <br />PROJECT NUMBER <br />1074220072 <br />C: <br />\ <br />U <br />s <br />e <br />r <br />s <br />\ <br />j <br />o <br />d <br />i <br />a <br />z <br />\ <br />A <br />p <br />p <br />D <br />a <br />t <br />a <br />\ <br />L <br />o <br />c <br />a <br />l <br />\ <br />T <br />e <br />m <br />p <br />\ <br />A <br />c <br />P <br />u <br />b <br />l <br />i <br />s <br />h <br />_ <br />2 <br />0 <br />1 <br />2 <br />8 <br />\ <br />S <br />a <br />m <br />u <br />e <br />l <br />i <br /> <br />A <br />c <br />a <br />d <br />e <br />m <br />y <br />_ <br />M <br />A <br />S <br />T <br />E <br />R <br /> <br />P <br />L <br />A <br />N <br /> <br />S <br />E <br />T <br />_ <br />1 <br />0 <br />- <br />2 <br />6 <br />- <br />2 <br />3 <br />. <br />d <br />w <br />g <br /> <br />N <br />o <br />v <br /> <br />0 <br />7 <br />, <br /> <br /> <br />2 <br />0 <br />2 <br />3 <br /> <br />- <br /> <br />3 <br />: <br />5 <br />7 <br />p <br />m <br />EQUIPMENT DETAILS <br />SHEET #1 <br />J.D. 10-27-23 <br />J.M. 10-27-23 <br />B.B. 10-27-23 <br />EQUIPMENT ELEVATION - ELECTRICAL ROOM & CARPORT #1 SCALE: N.T.S. <br />NOTE: RMC WILL BE PAINTED <br />THE SAME COLOR AS CARPORT <br />BEAM AND WILL BE INSTALLED <br />INSIDE THE I BEAM GROVE TYP. <br />GENERAL NOTES <br />1. ALL EQUIPMENT TO BE LISTED. <br />2. ALL EQUIPMENT WIRING AND GROUNDING SHALL CONFORM TO THE MANUFACTURER'S RECOMMENDED PRACTICES. REFER TO THE INSTALLATION AND USER MANUALS FOR GUIDANCE. <br />3. EXPOSED NON-CURRENT CARRYING METAL PARTS OF MODULE FRAMES, EQUIPMENT, AND ENCLOSURES SHALL BE GROUNDED IN ACCORDANCE WITH CEC ART. 250.134 AND 250.136. CONTRACTOR TO REFER TO MANUFACTURER'S INSTALLATION MANUAL FOR APPROVED METHOD OF GROUNDING. <br />4. INSTALLATION SHALL COMPLY WITH THE 2019 CEC. <br />5. ALL EXPOSED RACEWAY OPENINGS SHALL BE SEALED USING A SUITABLE METHOD TO PREVENT ENTRY OF INSECTS. <br />6. BONDING SHALL BE PROVIDED WHERE NECESSARY TO ENSURE ELECTRICAL CONTINUITY AND THE CAPACITY TO CONDUCT SAFELY ANY FAULT CURRENT IN ACCORDANCE WITH CEC ART. 250. <br />7. MODULES AND RACKING SYSTEM MUST BE PROPERLY GROUNDED PER THE GROUNDING METHOD PROVIDED IN THE RACKING MANUFACTURER'S INSTALLATION MANUAL. IF NO METHOD IS STIPULATED, AN ILSCO GBL-4DBT OR EQUIVALENT GROUNDING LUG PER DETAIL GD SHOULD BE USED TO GROUND EACH MODULE AND RAIL OR PURLIN WITH THE <br />APPROPRIATELY SIZED GROUND WIRE AND TORQUE SPECIFICATION PER THE TABLE IN THE DETAIL. <br />8. SEE SECTION 3 OF SPECIFICATIONS ON E-1 FOR CONDUIT TYPES AND USES, AS WELL AS WHEN EXPANSION JOINTS ARE REQUIRED. <br />9. ALL EQUIPMENT REQUIRES ATTACHMENT DETAILS PER MANUFACTURER'S INSTRUCTIONS; EQUIPMENT THAT IS 400 LBS OR MORE REQUIRE STRUCTURAL CALCULATIONS OF THE ATTACHMENTS. <br />10. WORKING CLEARANCES FOR ALL NEW ELECTRICAL EQUIPMENT SHALL BE PER CEC ART. 110.26(A) AND 110.34(A). CONTRACTOR SHALL MAINTAIN WORKING AND MAINTENANCE CLEARANCES FOR EXISTING EQUIPMENT. <br />11. SWITCHES OR CIRCUIT BREAKERS USED AS SWITCHES SHALL BE INSTALLED SUCH THAT THE CENTER OF THE GRIP OF THE OPERATING HANDLE, WHEN IN ITS HIGHEST POSITION, IS NOT MORE THAN 6 FEET 7 INCHES ABOVE THE FLOOR OR WORKING PLATFORM PER CEC ART. 404.8(A). <br />12. CONTRACTOR TO CONSULT INSTALLATION MANUALS OF NEW EQUIPMENT FOR PROPER MOUNTING METHODS AND CLEARANCES. <br />13. EXACT CONDUIT ROUTE TBD BY CONTRACTOR. <br />14. CONDUITS AND FITTINGS VISIBLE TO THE PUBLIC SHALL BE PAINTED TO MATCH THE EXISTING BUILDING IF REQUIRED BY THE JURISDICTION OR OWNER. <br />1 <br />EQUIPMENT ELEVATION - CARPORTS # 2- 5 SCALE: N.T.S.2 <br />NOTE: RMC WILL BE PAINTED <br />THE SAME COLOR AS CARPORT <br />BEAM AND WILL BE INSTALLED <br />INSIDE THE I BEAM GROVE TYP. <br />N.T.S. <br />1901 N Fairview St & Bldg A, B, <br />C, F & 1919 N Fairview St Bldg E <br />4/11/2024