09 00 00 FINISHES CONTINUED 01 00 00 GENERAL REQUIREMENTS <br />CONTINUED <br />01 00 00 GENERAL REQUIREMENTS <br />CONTINUED <br />01 00 00 GENERAL REQUIREMENTS08 00 00 OPENINGS CONTINUED <br />3 THE GENERAL CONTRACTOR UPON ACCEPTANCE AND AWARD OF THE CONTRACT ASSUMES FULL <br />RESPONSIBILITY FOR THE CONSTRUCTION, MATERIALS, AND WORKMANSHIP OF THE WORK DESCRIBED IN THESE <br />NOTES AND DRAWINGS, AND WILL BE EXPECTED TO COMPLY WITH THE DESIGN INTENT AS WELL AS ALL OF THE <br />PRINTED AND WRITTEN CONSTRUCTION DOCUMENTS. <br />01 41 00 - REGULATORY REQUIREMENTS <br />1 THE GENERAL CONTRACTOR, SUBCONTRACTOR AND ANY TENANTS' CONTRACTORS SHALL SUBMIT <br />CERTIFICATES TO THE BUILDING MANAGER AND OWNER UPON COMPLETION OF WORK, INCLUDING BUT NOT <br />LIMITED TO THE FOLLOWING: <br />A) FIREPROOF WOOD TEST REPORT (IF REQUIRED) <br />B) ELECTRICAL, PLUMBING AND AIR CONDITIONING CERTIFICATES ISSUED BY: <br />1) DEPARTMENT OF WATER SUPPLY, GAS AND ELECTRICITY <br />2) BOARD OF FIRE UNDERWRITERS <br />2 PROVIDE CERTIFICATION OF THAT ALL ELECTRICAL, MECHANICAL, AND PLUMBING FIXTURES MEET THE <br />REQUIREMENTS OF TITLE 24 AND CALGREEN. <br />3 ALL WORK PERFORMED BY THE CONTRACTOR SHALL CONFORM TO THE REQUIREMENTS OF MUNICIPAL, LOCAL OR <br />FEDERAL AND STATE LAWS, AS WELL AS ANY OTHER GOVERNING REQUIREMENTS, WHETHER OR NOT SPECIFIED <br />ON THE DRAWINGS. <br />4 WHERE THE CONTRACT NOTES OR DRAWINGS CALL FOR ANY WORK OF A MORE STRINGENT NATURE THAN THAT <br />REQUIRED BY THE BUILDING CODE OR ANY OTHER DEPARTMENT HAVING JURISDICTION OVER THE WORK, THE <br />WORK OF THE MORE STRINGENT NATURE CALLED FOR BY THE CONTRACT, CONSTRUCTION NOTES OR DRAWINGS <br />SHALL BE FURNISHED AND PROVIDED IN ALL CASES. <br />5 THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LEGALLY REQUIRED APPROVALS AND PERMITS NECESSARY FOR <br />THE EXECUTION AND COMPLETION OF HIS WORK. FORWARD COPIES TO OWNER AND SAA. <br />01 51 00 - TEMPORARY UTILITIES <br />1 THE GENERAL CONTRACTOR SHALL FURNISH A SYSTEM OF TEMPORARY POWER, LIGHTS, WATER, HEAT, AND ANY <br />OTHER TEMPORARY UTILITIES REQUIRED THROUGHOUT THE SPACE UNDER CONSTRUCTION AS REQUIRED TO <br />COMPLETE THE WORK. <br />01 56 00 - TEMPORARY ENCLOSURES <br />1 THE GENERAL CONTRACTOR SHALL EXERCISE STRICT DUST CONTAINMENT CONTROL OVER THE JOB TO PREVENT <br />DIRT OR DUST FROM LEAVING THE JOB SITE. <br />01 57 00 - TEMPORARY CONTROLS <br />1 "CONSTRUCTION DUST CONTROL": DURING CONSTRUCTION, DUST CONTROL MEASURES SHALL BE REQUIRED. <br />GRADING WILL BE DISCONTINUED DURING FIRST-STAGE SMOG ALERTS AND SUSPENDED DURING PERIODS OF <br />HIGH WINDS (I.E.: OVER 15 MPH). ALL HAULING TRUCKS SHALL HAVE LOADS COVERED OR WETTED AND LOADED <br />BELOW THE SIDEBOARDS TO MINIMIZE DUST. EXERCISE MEASURES TO REMOVE DIRT FROM WHEELED <br />VEHICLES BEFORE ENTERING THE PUBLIC WAY. <br />01 70 00 - EXECUTION AND CLOSEOUT REQUIREMENTS <br />1 THE CONTRACTOR SHALL BE FULLY AND SOLELY RESPONSIBLE FOR THE REMOVAL, REPLACEMENT AND <br />RECTIFICATION OF ALL DAMAGED AND DEFECTIVE MATERIAL AND WORKMANSHIP IN CONNECTION WITH THE <br />CONTRACT WORK. HE SHALL REPLACE OR REPAIR AS DIRECTED ALL SUCH DAMAGED OR DEFECTIVE MATERIALS <br />WHICH SHALL APPEAR WITHIN A PERIOD OF ONE YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION. <br />2 CONTRACT CLOSE-OUT SHALL OCCUR ONLY AFTER THE ARCHITECT HAS PREPARED A PUNCHLIST AND THE <br />PUNCHLIST ITEMS HAVE BEEN CORRECTED. THE GENERAL CONTRACTOR SHALL SUBMIT TO THE OWNER <br />MAINTENANCE AND WARRANTY MANUALS, RELEASE OF LIENS AND RECORD DRAWINGS WITH HIS FINAL <br />APPLICATION FOR PAYMENT. <br />01 71 33 - PROTECTION OF ADJACENT CONSTRUCTION <br />1 THE GENERAL CONTRACTOR SHALL PROVIDE A VISQUEEN SEAL FROM FLOOR TO CEILING AT ALL INTERFACES TO <br />PROTECT ADJACENT BUILDING PROPERTY WHILE DEMOLITION AND CONSTRUCTION ARE IN PROGRESS. THIS SEAL <br />IS TO BE KEPT CLOSED AT ALL TIMES. <br />2 THE GENERAL CONTRACTOR SHALL AT ALL TIMES PROTECT THE PROPERTY OF THE BUILDING OWNER INCLUDING <br />BUT NOT LIMITED TO, WINDOWS, FLOOR AND CEILING TILE, PUBLIC TOILETS, ELEVATORS, DOORS, FRAMES, <br />ELECTRICAL AND AIR CONDITIONING EQUIPMENT, CONVECTOR ENCLOSURES, ETC. <br />3 THE CONTRACTOR SHALL AT NO TIME DO ANY WORK OR PLACE ANY CONSTRUCTION THAT MAY AFFECT THE <br />OPERATIONS OF OTHER TENANTS, INCLUDING ANY INTERRUPTIONS IN THE SUPPLY OF POWER OR OTHER <br />UTILITIES, WITHOUT FIRST NOTIFYING THE BUILDING OWNER AND OBTAINING PERMISSION FROM THEM TO <br />PROCEED. <br />01 73 29 - CUTTING AND PATCHING <br />1 THE GENERAL CONTRACTOR SHALL DO ALL CUTTING, FITTING, AND PATCHING WORK THAT MAY BE REQUIRED TO <br />MAKE ALL PARTS COME TOGETHER PROPERLY AND FIT TO RECEIVE OR BE RECEIVED BY WORK OF OTHER TRADES <br />SHOWN UPON OR REASONABLY IMPLIED BY THE DRAWINGS AND NOTES. <br />2 THE GENERAL CONTRACTOR SHALL PROVIDE ALL FLOOR CUTOUTS AND PATCHING REQUIRED FOR THE <br />INSTALLATION OF ALL WORK. <br />3 THE GENERAL CONTRACTOR SHALL METAL LATH OVER ALL NEW CONDUIT CHASES IN MASONRY PARTITIONS. <br />4 ALL DAMAGED EXISTING AREAS TO REMAIN AND EXISTING AREAS AFFECTED BY DEMOLITION OR NEW <br />CONSTRUCTION WORK SHOWN ON DRAWINGS SHALL BE PATCHED TO MATCH IMMEDIATE EXISTING ADJACENT <br />AREAS IN MATERIALS, FIRE RATING, FINISH AND COLOR UNLESS OTHERWISE NOTED. <br />5 ALL FIRE PROOFING REMOVED FROM COLUMNS AND BEAMS DURING THE COURSE OF CONSTRUCTION <br />SHALL BE REPLACED WITH THE SAME MATERIAL AND RATING AS THAT WHICH WAS REMOVED. <br />6 CONTRACTOR TO VERIFY WITH OWNER IF X-RAY IS REQUIRED PRIOR TO CORE DRILLING. X-RAY FLOOR PRIOR TO <br />THE COMMENCEMENT OF ANY FLOOR CORING. AVOID CORING THROUGH ANY EXISTING STEEL REINFORCEMENT. <br />01 74 00 - CLEANING AND WASTE MANAGEMENT <br />1 THE GENERAL CONTRACTOR SHALL REMOVE ALL RUBBISH AND WASTE MATERIALS, BOTH FROM HIS OWN <br />FORCES AND OTHER SUBCONTRACTORS, INCLUDING RUBBISH WHICH IS A BY-PRODUCT OF CARPET AND CABINET <br />INSTALLATION, TELEPHONE COMPANY INSTALLATION, ETC. AND PROVIDE FOR ITS REMOVAL FROM THE SITE. <br />2 AT THE END OF EACH DAY OF CONSTRUCTION OR FINISH WORK, THE CONTRACTOR AND EACH TRADE SHALL BE <br />RESPONSIBLE FOR REMOVING ANY DEBRIS FROM THE SITE. THE JOB SITE SHALL BE CLEANED TO THE SATISFACTION <br />OF THE OWNER, AND SAA UPON COMPLETION OF THE PROJECT BY THE CONTRACTOR. <br />3 THE EXISTING TO REMAIN, EXISTING RELOCATED OR NEW ITEMS INSTALLED BY THE GENERAL <br />CONTRACTOR IN ADDITION TO BEING AMPLY PROTECTED THROUGHOUT THE PERIOD OF CONSTRUCTION SHALL BE <br />THOROUGHLY CLEANED TO THE SATISFACTION OF SHLEMMER ALGAZE ASSOCIATES PRIOR TO BEING TURNED <br />OVER TO THE OWNER. <br />4 THE EXISTING BUILDING TOILET FACILITIES, IF UTILIZED DURING CONSTRUCTION BY CONTRACTOR PERSONNEL, <br />SHALL BE AMPLY PROTECTED THROUGHOUT THE PERIOD OF CONSTRUCTION AND ALL DAMAGED OR <br />MALFUNCTIONING ITEMS SHALL BE REPAIRED, REPLACED AND THOROUGHLY CLEANED TO THE <br />SATISFACTION OF SHLEMMER ALGAZE ASSOCIATES PRIOR TO BEING TURNED OVER TO THE OWNER. <br />5 ITEMS THAT ARE TO BE REMOVED AND LATER REINCORPORATED INTO THE PROJECT ARE TO BE CLEANED, STORED, <br />AND REPAIRED IF NECESSARY. SEE SHEETS A1.0 AND A2.0 FOR REUSE OF EXISTING MATERIALS. <br />02 41 00 DEMOLITION <br />02 41 19.16 - SELECTIVE INTERIOR DEMOLITION <br />1 THE GENERAL CONTRACTOR SHALL FURNISH ALL LABOR AND MATERIAL REQUIRED TO COMPLETE DEMOLITION <br />AND REMOVAL OF ALL ITEMS AS INDICATED IN SAA DRAWINGS OR AS OTHERWISE DIRECTED BY SAA. <br />2 THE GENERAL CONTRACTOR SHALL FURNISH BUILDING MANAGEMENT AND SAA WITH A COMPLETE INVENTORY <br />LIST OF ALL ITEMS THAT CAN BE REUSED AND/OR STORED IN BUILDING STOCK. <br />3 THE GENERAL CONTRACTOR SHALL EXECUTE ALL WORK IN COMPLIANCE WITH THE REGULATIONS OF THE <br />AUTHORITY HAVING JURISDICTION OVER THE BUILDING FOR DEMOLITION AND REMOVAL OF DEBRIS, NOISE <br />ORDINANCE, INCLUDING ACCEPTABLE HOURS FOR OVERTIME WORK REQUIRED. <br />4 ALL WORK DEMOLISHED SHALL BE REMOVED FROM THE PREMISES EXCEPT ITEMS TO BE REUSED OR RETURNED TO <br />OWNER OR AS OTHERWISE NOTED. <br />5 THE GENERAL CONTRACTOR SHALL REMOVE FROM PREMISES CONDUITS LEFT AFTER WALL DEMOLITION, <br />INCLUDING SWITCH BOXES, PLATES, BRIDGES OR ANY OTHER TELEPHONE OR ELECTRICAL, INCLUDING WIRING AND <br />EQUIPMENT. <br />6 IN ALL AREAS WHERE DEMOLITION (REMOVAL OF TILE, CARPETING, PARTITIONS, ETC.) CAUSES ANY UNEVENNESS <br />IN CONCRETE SLAB, THE CONTRACTOR SHALL PATCH TO LEVEL THE SLAB TO RECEIVE NEW FINISHED FLOORING. <br />3 THE CONTRACTOR SHALL CONTACT THE BUILDING MANAGEMENT TO DETERMINE THE REQUIREMENTS OF THE <br />BUILDING OWNER TO DETERMINE WHEN AND HOW DELIVERIES CAN BE MADE (SEE BELOW), WHAT PHASES OF <br />CONSTRUCTION CAN BE DONE ON REGULAR OR OVERTIME, AND IN GENERAL ANY SPECIAL BUILDING <br />REQUIREMENTS WHICH WILL AFFECT THEIR WORK (IF OVERTIME WORK IS REQUIRED BY ANY TRADE, APPROVAL <br />MUST BE OBTAINED PRIOR TO THE EXECUTION OF ANY WORK INCLUDING COST). THE GENERAL INTENT IS THAT <br />ALL CONSTRUCTION WORK SHALL BE DONE ON REGULAR TIME EXCEPT FOR NOISE GENERATING <br />CONSTRUCTION. <br />4 CONTRACTOR SHALL MAKE ALL REQUIRED ARRANGEMENTS FOR DELIVERY OF EQUIPMENT AND/OR MATERIALS. IT <br />SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK THE RULES AND REGULATIONS GOVERNING WORK <br />ON THE PREMISES, INCLUDING THE FOLLOWING: <br />A) DATE AND TIME OR DELIVERY SHALL BE ESTABLISHED IN CONJUNCTION WITH THE PERSON HAVING <br />JURISDICTION OVER PREMISES. OVERTIME CHARGES AND/OR ANY NECESSARY EXPENSE SHALL BE PAID BY <br />CONTRACTOR. <br />B) BUILDING CONDITIONS, INCLUDING SIZE AND LOADING CAPACITY OF ELEVATORS, SIZE OF DOORWAYS, <br />CORRIDORS, WINDOW OPENINGS, ETC., SHALL BE CHECKED BY THE CONTRACTOR BEFORE DELIVERY TO ASSURE <br />ITEMS WILL FIT INTO SPACE. <br />C) ALL CHARGES INVOLVING THE INSTALLATION AND/OR OPERATION OF A HOIST SYSTEM, IF REQUIRED, SHALL BE <br />BORNE BY THE CONTRACTOR. CHARGES INVOLVING THE TEMPORARY REMOVAL AND REINSTALLATION OF <br />WINDOW SASH AND/OR FIXED PANELS REQUIRED FOR DELIVERY SHALL BE BORNE BY THE CONTRACTOR. <br />5 THE GENERAL CONTRACTOR, HIS SUBCONTRACTOR AND ANY OTHER CONTRACTOR INVOLVED IN THIS PROJECT <br />SHALL TAKE NOTE THAT ANY COST CAUSED BY DEFECTIVE OR ILL-TIMED WORK AS A RESULT OF, BUT NOT LIMITED <br />TO INFERIOR WORKMANSHIP OR MATERIALS, IMPROPER SCHEDULING OR DELINQUENT ORDERING SHALL BE <br />BORNE BY THE PARTY RESPONSIBLE THEREFORE. <br />6 WHERE SPECIAL ITEMS REQUIRE EXTENDED LEAD TIME PREVENTING INSTALLATION BY PROJECTED MOVE IN DATE, <br />CONTRACTOR IS TO PROPOSE AN AVAILABLE ALTERNATE FOR APPROVAL BY SAA AND OWNER AS WELL AS TO <br />PREPARE PRICING FOR POSSIBLE TEMPORARY ASSEMBLIES. <br />01 33 00 - SUBMITTAL PROCEDURES <br />1 THE GENERAL CONTRACTOR SHALL PROVIDE SUBMITTALS FOR REVIEW AND APPROVAL BY SAA. <br />CONTRACTOR SHALL SUBMIT THREE (3) SAMPLES OF THE SPECIFIED MATERIALS. SUBMITTALS SHALL INCLUDE <br />BUT NOT BE LIMITED TO THE FOLLOWING: 9” X 12” BRUSH-OUT SAMPLES OF ALL PAINT COLORS SPECIFIED, <br />SAMPLES OF ALL CARPETS, ALL SPECIFIED FLOOR AND BASE MATERIALS, SAMPLES OF ALL WALL FINISHES, SAMPLES <br />OF SPECIFIED CABINET FINISHES, SAMPLES OF CEILING GRID AND CEILING TILE, CUTSHEETS OF LIGHTING FIXTURES, <br />DOOR/FRAME AND BUILDERS HARDWARE, CASEWORK SHOP DRAWINGS, CASEWORK HARDWARE SUBMITTALS, <br />AND ANY OTHER MATERIALS SPECIFIED. <br />2 THE GENERAL CONTRACTOR SHALL SUBMIT ALL FABRICATION SHOP DRAWINGS AND EQUIPMENT/FIXTURE <br />CUTSHEETS TO SAA FOR REVIEW. CONTRACTOR SHALL PROVIDE THREE (3) COPIES. SAA SHALL HAVE TEN (10) <br />WORK DAYS FOR SHOP DRAWING REVIEW TURNAROUND TIME FROM DATE OF RECEIPT. ALL SHOP DRAWINGS <br />AND CUTSHEETS MARKED "REVIEWED" SHALL SUPERSEDE ORIGINAL DRAWINGS IN DESIGN APPEARANCE ONLY. <br />CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ERRORS IN THEIR DRAWINGS. <br />3 THE USE OF THE WORDS "PROVIDE" OR "PROVIDED" IN CONNECTION WITH ANY ITEM SPECIFIED IS INTENDED TO <br />MEAN, UNLESS OTHERWISE NOTED, THAT WHICH SHALL BE FURNISHED AND INSTALLED, AND CONNECTED WHERE <br />SO REQUIRED. <br />4 WHERE THE TERMS “NO EXCEPTION”, "APPROVED EQUAL", "OTHER APPROVED", "EQUAL TO", <br />"ACCEPTABLE" OR ANY OTHER GENERAL QUALIFYING TERMS ARE USED IN THESE NOTES, IT SHALL BE <br />UNDERSTOOD THAT REFERENCE IS MADE TO THE SOLE INTERPRETATION AND JUDGMENT OF SAA. <br />01 35 00 - SPECIAL PROCEDURES - HEALTH, SAFETY <br />1 SHLEMMER ALGAZE ASSOCIATES IS UNAWARE OF ANY EXISTING ASBESTOS WITHIN THE AREA OF NEW WORK. IT <br />IS THE OWNER'S RESPONSIBILITY TO ADVISE THE GENERAL CONTRACTOR & HIS SUBS OF ANY ASBESTOS <br />CONTAINING MATERIAL OR OTHER HAZARDOUS MATERIALS WITHIN THE FACILITY AND TO PROPERLY REMEDIATE. <br />THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS REQUIRED BY LAW TO PROTECT ALL <br />WORKERS & OCCUPANTS. NOTIFY THE OWNER IMMEDIATELY IF ANY ASBESTOS CONTAINING MATERIAL IS <br />IDENTIFIED, OR IF ANY HAZARDOUS MATERIAL IS SUSPECTED. <br />01 35 16 - ALTERATION PROJECT PROCEDURES <br />1 THE WORK OF THIS PROJECT INCLUDES ALTERATIONS OF THE EXISTING BUILDING TO ACHIEVE THE ARRANGEMENT <br />INDICATED ON THE DRAWINGS. THE CONTRACTOR SHALL VISIT THE JOB SITE TO DETERMINE THE EXTENT OF <br />DEMOLITION WORK REQUIRED BY THE CONSTRUCTION ACTIVITIES. THE ARCHITECTURAL DRAWINGS FOR THESE <br />AREAS SHOW THE CHANGES TO BE MADE. THE CONTRACTOR SHALL REVISE, REARRANGE, REROUTE OR REMOVE <br />EXISTING WIRING AND HVAC DISTRIBUTION AS NECESSARY TO ACCOMMODATE THE CHANGES AND ADDITIONS <br />SHOWN AND TO PROVIDE CONTINUING ELECTRICAL AND HVAC SERVICES FOR THOSE EXISTING PORTIONS OF THE <br />PROJECT WHICH ARE TO REMAIN IN OPERATION. <br />2 THE GENERAL CONTRACTOR SHALL PROPERLY PROTECT THE BUILDING AND ANY ADJOINING PROPERTY OR WORK <br />AND ANY DAMAGE TO SAME, CAUSED BY HIS WORK OR WORKMEN MUST BE MADE GOOD WITHOUT DELAY. ANY <br />COSTS FOR PATCHING AND REPLACING OF DAMAGED WORK SHALL BE BORNE BY THE GENERAL CONTRACTOR. <br />3 IN AREAS WHERE THERE ARE NO ALTERATIONS INDICATED THE EXISTING FACILITIES SHALL BE RETAINED IN <br />SERVICE. IN CASE OF DOUBT ASSUME THAT THE EXISTING ELECTRICAL WIRING IS TO REMAIN IN OPERATION <br />THROUGHOUT THE CONSTRUCTION PERIOD AND THEREAFTER. <br />4 THE ALTERATION OF THE EXISTING BUILDING IS WORK OF A COMPLEX NATURE WHICH WILL REQUIRE ACCURATE <br />PLANNING, CAREFUL PREPARATION AND EXECUTION, ATTENTION TO DETAIL AND CLOSE SUPERVISION BY THE <br />CONTRACTOR. THE CONTRACTOR WILL BE REQUIRED TO PERFORM THIS WORK IN FULL COOPERATION WITH THE <br />OTHER CONSTRUCTION TRADES AND SUBJECT TO AN ACCEPTABLE SCHEDULE. <br />5 ALL WOODWORK, BLOCKING, GROUNDS, ETC. TO BE FIRE RETARDANT TREATED. <br />6 THE GENERAL CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTION FOR HIS WORK UNTIL TURNED OVER TO <br />THE CLIENT. <br />7 THE GENERAL CONTRACTOR SHALL INCLUDE IN HIS ESTIMATE ALL COSTS, (INCLUDING OVERTIME WORK) FOR <br />REMOVAL, NEW INSTALLATION AND REINSTALLATION WORK FOR ANY PLUMBING, CEILING (TAKE-DOWN AND <br />REINSTALLATION), ELECTRICAL, TELEPHONE COMMUNICATIONS EQUIPMENT OR HVAC WORK WITHIN CEILING <br />PLENUM. <br />8 ALL EXISTING APPURTENANCES NOT BEING REMOVED SHALL BE REFURBISHED WHERE REQUIRED. ANY LOOSE <br />ITEMS TIGHTENED (CEILING EXIT SIGNS, ETC.) AND ANY MISSING PARTS REPLACED BY THE GENERAL CONTRACTOR <br />TO ACHIEVE A FINISHED FIRST CLASS INSTALLATION AND APPEARANCE. <br />9 ALL REQUIRED EXITS, WAYS OF APPROACH THERETO, AND WAYS OF TRAVEL FROM THE EXIT INTO THE STREET <br />SHALL CONTINUOUSLY BE MAINTAINED FREE FROM ALL OBSTRUCTIONS AND IMPEDIMENTS FOR UNOBSTRUCTED <br />EGRESS IN THE CASE OF FIRE OR OTHER EMERGENCY. <br />10 THE GENERAL CONTRACTOR SHALL PROVIDE AND INSTALL FIRE EXTINGUISHERS AS REQUIRED BY FEDERAL <br />OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA), BY FIRE DEPARTMENT REGULATIONS, AND AS SHOWN ON SAA <br />DRAWINGS. <br />11 THE GENERAL CONTRACTOR SHALL REPLACE ALL BROKEN OR CRACKED WINDOW GLAZING. ALL WINDOW SASHES <br />SHALL BE INSPECTED BY THE CONTRACTOR AND ALL INOPERABLE CONDITIONS SHALL BE REPAIRED. <br />12 EACH TRADE SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING SEALANTS WHERE SHOWN ON DRAWINGS <br />OR WHERE REQUIRED. <br />13 PROVIDE STRUCTURAL SUPPORTS AT ALL WALL MOUNTED EQUIPMENT, CABINETS, PLUMBING AND LIGHT <br />FIXTURES. <br />14 WHERE OPENINGS OCCUR IN EXISTING FIRE RATED AREAS OR PARTITIONS DUE TO EXISTING OR NEW CONDUIT <br />RUNS, DUCTWORK, CABLES, PIPING, ETC., AND/OR WHERE EXISTING FIREPROOFING HAS BEEN REMOVED AS A <br />RESULT OF EXISTING OR NEW CONSTRUCTION WORK, THE GENERAL CONTRACTOR SHALL CLOSE AND/OR PATCH <br />AS REQUIRED ALL OPENINGS TO MATCH IMMEDIATE ADJACENT AREA IN MATERIAL, FINISH AND FIRE RATING. <br />15 WHERE CONSTRUCTION TO BE REMOVED INTERSECTS CONSTRUCTION TO REMAIN, WORK SHALL INCLUDE ALL <br />ATTACHMENT DEVICES (SHOT PINS, ANCHORS, LAG BOLTS, NAILS, NAILERS, SHIMS, ETC.) REQUIRED FOR A <br />SMOOTH AND EVEN TRANSITION. <br />16 THE GENERAL CONTRACTOR SHALL SURVEY ALL EXISTING FINISHED SURFACES TO INCLUDE CORNER BEADS, <br />STOPS, ETC. FOR CHIPS, CRACKS, HOLES, DAMAGED SURFACES, MARBLE WAINSCOT AND PLASTER CEILING <br />WHENEVER DOOR FRAMES HAVE BEEN REMOVED, AND ANY OTHER DEFECTS CAUSING AN APPEARANCE <br />DIFFERENT FROM A NEW FIRST CLASS FINISHED REPAIRING. GENERAL CONTRACTOR SHALL REMOVE ALL <br />EXISTING DAMAGED FINISHES AND INSTALL NEW SURFACES TO THE SATISFACTION OF SAA. ALL OTHER <br />DAMAGED SURFACES (FINISHED FLOOR SLAB, CONVECTOR ENCLOSURES, ETC.) SHALL BE REPAIRED TO THE <br />SATISFACTION OF SAA. <br />17 THE GENERAL CONTRACTOR SHALL INSPECT ALL EXISTING PLASTER SURFACES. WHERE, AS A RESULT OF <br />DEMOLITION, EXISTING PLASTER HAS BEEN REMOVED AND NEW FINISHED SURFACES WILL NOT ALIGN WITH <br />EXISTING, CONTRACTOR SHALL INSTALL NEW CORNER BEADS AND STOPS AND ENTIRE SURFACE SHALL BE RE- <br />PLASTERED TO A SMOOTH, FLUSH, ALIGNED SURFACE. <br />01 40 00 - QUALITY REQUIREMENTS <br />1 THE CONSTRUCTION NOTES AND/OR DRAWINGS ARE SUPPLIED TO ILLUSTRATE THE DESIGN AND THE GENERAL <br />TYPE OF CONSTRUCTION QUALITY DESIRED. THEY ARE INTENDED TO APPLY TO THE FINEST QUALITY OF <br />CONSTRUCTION, MATERIAL AND WORKMANSHIP THROUGHOUT. <br />2 THE GENERAL CONTRACTOR SHALL MAINTAIN A CURRENT AND COMPLETE SET OF CONSTRUCTION DRAWINGS ON <br />SITE DURING ALL PHASES OF CONSTRUCTION FOR USE BY ALL TRADES. <br />01 11 00 - SUMMARY OF WORK <br />1 TENANT IMPROVEMENT WORK ON ±8,070 SQ. FT. OF THE TOTAL 6TH FLOOR AREA. EXPANSION OF EXISTING <br />SUITE 650 CHANGE FROM ±4,556 SQ. FT. TO ±8,070 SQ. FT. WITH NEW DEMISING WALL. EXISTING SUITE 625 <br />CHANGED FROM ±6,865 SQ. FT. TO ±3,597 SQ. FT. NEW WALL, POWER, LIGHTING AND FINISHES. <br />2 THE AMERICAN INSTITUTE OF ARCHITECTS GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION, AIA <br />FORM A-201 CURRENT EDITION, SHALL APPLY TO ALL WORK IN THIS CONTRACT, EXCEPT AS SPECIFICALLY <br />MODIFIED BELOW AND/OR BY THE OWNER/CONTRACTOR AGREEMENT. <br />3 THE GENERAL CONTRACTOR SHALL NOTIFY SHLEMMER ALGAZE ASSOCIATES (SAA) IMMEDIATELY IF HE CANNOT <br />COMPLY WITH ALL WORK CALLED FOR ON THESE DRAWINGS. <br />4 THE GENERAL CONTRACTOR SHALL NOTIFY SAA IMMEDIATELY OF ANY DISCREPANCIES OR OMISSIONS <br />BETWEEN THE DRAWINGS, THESE NOTES, AND FIELD CONDITIONS BEFORE COMMENCING ANY WORK AND <br />REQUEST CLARIFICATION. <br />5 ALL SAA DRAWINGS AND ALL CONSTRUCTION NOTES ARE COMPLEMENTARY, AND WHAT IS CALLED FOR BY <br />EITHER WILL BE BINDING AS IF CALLED FOR BY ALL. ANY WORK SHOWN OR REFERRED TO ON ANY ONE SET OF <br />DRAWINGS SHALL BE PROVIDED AS THOUGH SHOWN ON ALL RELATED DRAWINGS. <br />6 INSURANCE AND BONDING FOR THE PROJECT SHALL BE AS DIRECTED BY AND TO THE SATISFACTION OF THE <br />OWNER, AND AS REQUIRED IN THE OWNER-CONTRACTOR AGREEMENT. <br />01 23 00 - ALTERNATES <br />1 ALL ASSEMBLIES OR DETAILS MARKED AS ALTERNATES TO BASE REQUIREMENTS SHALL BE PRICED INDIVIDUALLY. <br />NOTE THAT ALTERNATES MAY BE EITHER ADDITIVE OR DEDUCTIVE. BID FORM SHALL ITEMIZE ALL ALTERNATES. <br />01 25 00 - SUBSTITUTION PROCEDURES <br />1 THE GENERAL CONTRACTOR SHALL HAVE TEN WORKING DAYS FROM AWARD OF THE CONTRACT TO SUBMIT <br />SUBSTITUTIONS, ON FORM APPROVED BY SAA, OF SPECIFIED PRODUCTS OR WORK FOR REVIEW BY SAA. <br />CONTRACTOR SHALL INCLUDE CUT SHEETS WITH SPECIFICATIONS AND REASONS FOR SUBSTITUTION. SAA SHALL <br />RESPOND IN TEN WORKING DAYS FROM RECEIPT OF SUBMITTAL AS TO ACCEPTANCE OR REJECTION OF <br />PROPOSED SUBSTITUTION. NO REQUEST FOR SUBSTITUTIONS SHALL BE REVIEWED OR ACCEPTED AFTER THE <br />INITIAL TIME LIMIT HAS PASSED. <br />01 26 00 - CONTRACT MODIFICATION PROCEDURES <br />1 THE OWNER WITHOUT INVALIDATING THE CONTRACT MAY ORDER EXTRA WORK OR MAKE CHANGES BY <br />ALTERING, ADDING TO OR DEDUCTING FROM THE WORK. THE CONTRACT SUM SHALL BE ADJUSTED <br />ACCORDINGLY. ALL SUCH WORK SHALL BE EXECUTED UNDER THE CONDITIONS OF THE ORIGINAL CONTRACT <br />EXCEPT THAT ANY CLAIM FOR EXTENSIONS OF TIME CAUSED THEREBY SHALL BE ADJUSTED AT THE TIME OF <br />ORDERING SUCH CHANGE. <br />2 IF THE GENERAL CONTRACTOR DETERMINES THAT ANY REVISION TO DRAWINGS INVOLVE EXTRA COST UNDER THIS <br />CONTRACT, HE SHALL GIVE SHLEMMER ALGAZE ASSOCIATES WRITTEN NOTICE THEREOF WITHIN REASONABLE <br />AMOUNT OF TIME AFTER RECEIPT OF SUCH INSTRUCTIONS. THE REQUEST SHALL INCLUDE A COMPLETE <br />DESCRIPTION OF THE WORK BEING PERFORMED, LOCATION OF THE WORK, MATERIALS BEING USED, AND ANY <br />OTHER COSTS. BEFORE PROCEEDING TO EXECUTE THE WORK, THE PROCEDURE SHALL BE AS PROVIDED FOR IN THE <br />OWNER-CONTRACTOR AGREEMENT. NO EXTRA COSTS SHALL BE VALID UNLESS APPROVED IN WRITING BY THE <br />OWNER AND ARCHITECT. UNLESS OTHERWISE AGREED, NO PAYMENT WILL BE MADE WITHOUT WRITTEN <br />APPROVAL. <br />01 29 00 - PAYMENT PROCEDURES <br />1 THE GENERAL CONTRACTOR SHALL SUBMIT ALL APPLICATIONS FOR PAYMENT TO THE OWNER OR OWNER <br />DESIGNATED AGENT FOR REVIEW AND APPROVAL. THE FORM OF THE APPLICATION FOR PAYMENT SHALL BE AIA <br />DOCUMENT G702, SUPPORTED BY AIA DOCUMENT G702A CONTINUATION SHEET. A 10% RETAINAGE OF EACH <br />APPLICATION FOR PAYMENT SHALL BE WITHHELD BY THE OWNER UNTIL RELEASE OF FINAL PAYMENT UNLESS <br />NOTED OTHERWISE IN THE AGREEMENT BETWEEN THE OWNER AND CONTRACTOR. <br />01 31 00 - PROJECT MANAGEMENT AND COORDINATION <br />1 INTENT OF THE DRAWINGS IS TO SHOW EXISTING BUILDING CONDITIONS WITH INFORMATION DEVELOPED FROM <br />AVAILABLE DOCUMENTS. CONTRACTOR SHALL MAKE A DETAILED SURVEY OF EXISTING CONDITIONS PERTAINING <br />TO THE WORK BEFORE COMMENCING ANY DEMOLITION OR NEW CONSTRUCTION. THE CONTRACTOR SHALL <br />REPORT DISCREPANCIES BETWEEN DRAWINGS AND ACTUAL FIELD CONDITIONS TO THE ARCHITECT. <br />2 LARGE SCALE DRAWINGS TAKE PRECEDENCE OVER SMALL SCALE DRAWINGS. DETAILS TAKE PRECEDENCE OVER <br />ALL. NOTIFY ARCHITECT OF CONFLICTS OR DISCREPANCIES IN WRITING. <br />3 DIMENSION CONVENTIONS: <br />A) HORIZONTAL DIMENSIONS ARE SHOWN FROM FACE OF FINISH, UNLESS OTHERWISE NOTED. <br />B) DIMENSIONS NOTED "CLEAR" OR "CLR." MUST BE PRECISELY MAINTAINED: ALLOWING FOR THICKNESS OF <br />MATERIALS. <br />C) DIMENSIONS ARE NOT ADJUSTABLE WITHOUT ARCHITECT'S APPROVAL, UNLESS NOTED. <br />D) DIMENSIONS TO EXTERIOR WINDOW WALL ARE TO INSIDE FINISHED FACE OF THE WALL, UNLESS OTHERWISE <br />NOTED. <br />E) DIMENSIONS TO EXTERIOR GLAZING ARE TO THE INSIDE FACE OF THE EXTERIOR GLAZING. <br />F) VERTICAL DIMENSIONS ARE FROM THE TOP OF THE FINISHED FLOOR, UNLESS OTHERWISE NOTED. <br />G) DO NOT SCALE DRAWINGS. IF ANY ITEM OF WORK CANNOT BE LOCATED, DO NOT PROCEED WITH THE WORK <br />BEFORE CLARIFYING WITH ARCHITECT. <br />H) VERIFY DIMENSIONS MARKED "V.I.F." PRIOR TO START OF CONSTRUCTION. REPORT INCONSISTENCIES TO <br />ARCHITECT. <br />4 DEFINITION OF TERMINOLOGY: <br />I) "TYPICAL" MEANS IDENTICAL FOR ALL CONDITIONS, UNLESS OTHERWISE NOTED. <br />J) "SIMILAR" MEANS COMPARABLE CHARACTERISTICS FOR THE CONDITIONS NOTED. <br />K) "PROVIDE" MEANS FURNISH AND INSTALL, COMPLETE AND IN PLACE. <br />L) "FURNISH" MEANS FURNISH ONLY, INSTALLATION BY GENERAL CONTRACTOR UNLESS OTHERWISE NOTED. <br />M) "INSTALL" MEANS PUT INTO PLACE, SUPPLIED BY GENERAL CONTRACTOR UNLESS OTHERWISE NOTED. <br />N) "ALIGN" MEANS ACCURATELY LOCATE FINISH FACES IN THE SAME PLANE. <br />5 BEFORE SUBMITTING A PROPOSAL, ALL CONTRACTORS SHALL VISIT THE PREMISES, FAMILIARIZE THEMSELVES <br />WITH EXISTING CONDITIONS AND SATISFY THEMSELVES AS TO THE NATURE AND SCOPE OF THE WORK AND THE <br />DIFFICULTIES THAT ATTEND TO ITS EXECUTION. CONTRACTOR SHALL REVIEW THE CONSTRUCTION DOCUMENT <br />AND MAKE THE OWNER AWARE OF REQUIRED ITEMS THAT ARE MISSING FROM THE CONSTRUCTION DOCUMENTS. <br />IF REQUIRED ITEMS ARE MISSING, THE CONTRACTOR SHALL BRING THESE ITEMS TO THE ATTENTION OF THE <br />OWNER DURING THE BIDDING PERIOD. <br />6 THE SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN <br />MADE AND LATER CLAIMS FOR LABOR, EQUIPMENT, OR MATERIAL REQUIRED FOR DIFFICULTIES ENCOUNTERED, <br />WHICH COULD HAVE BEEN FORESEEN HAD SUCH AN EXAMINATION BEEN MADE, WILL NOT BE RECOGNIZED. <br />7 CONTRACTOR SHALL CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS AT THE JOB SITE AS IT RELATES TO <br />THEIR WORK AND THE WORK OF THEIR SUBCONTRACTORS. VERIFY DIMENSIONS AND ORIENTATION ON PLANS <br />AND ELEVATIONS. WRITTEN DIMENSIONS GOVERN, DO NOT SCALE DRAWINGS. <br />8 THE GENERAL CONTRACTOR SHALL PROVIDE TO ALL SUBCONTRACTORS COMPLETE SETS OF WORKING <br />DRAWINGS OR ASSUME FULL RESPONSIBILITY FOR COORDINATION OF WORK WHEN COMPLETE SETS ARE NOT <br />AVAILABLE TO SUBCONTRACTOR. <br />9 MANUFACTURERS NAME, TRADEMARK, LOGOS, ETC., SHALL NOT BE VISIBLE TO THE PUBLIC. <br />10 ALL FINISH CONTRACTORS TO FIELD VERIFY SIZE OF ROOMS AND WALLS PRIOR TO PLACING ORDERS OR <br />SUBMITTING BIDS. <br />11 THESE DRAWINGS ARE FOR DESIGN INTENT. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY SITE <br />CONDITIONS, AND INFORM SAA OF ANY CONFLICTS OR ANY ADDITIONAL WORK NECESSARY TO PROVIDE A <br />COMPLETE FINISHED PROJECT, PRIOR TO SUBMITTING BIDS. <br />12 ARCHITECTURAL DOCUMENTS SUPERSEDE ENGINEERING DRAWINGS. IN THE EVENT A DISCREPANCY OCCURS THAT <br />HAS AESTHETIC RAMIFICATIONS, CONTACT THE ARCHITECT FOR CLARIFICATION. <br />13 THE GENERAL CONTRACTOR SHALL VERIFY SIZE, ELECTRICAL REQUIREMENTS, LOCATION AND <br />CHARACTERISTICS OF ALL WORK AND/OR EQUIPMENT SUPPLIED BY THE OWNER OR OTHERS, WITH THE <br />MANUFACTURER OR SUPPLIER PRIOR TO THE START OF RELATED WORK. <br />14 THE GENERAL CONTRACTOR AGREES TO PAY ALL TRANSPORTATION CHARGES ON ALL MATERIAL OR EQUIPMENT <br />TO THE POINT OF USE, AND SHALL BE RESPONSIBLE FOR ALL UNLOADING, CHECKING AND STORING OF SAME IN <br />CONNECTION WITH THIS CONTRACT. OWNER WILL ONLY PAY FOR INSTALLED PRODUCTS AND EQUIPMENT. <br />01 32 00 - CONSTRUCTION PROGRESS DOCUMENTATION <br />1 PRIOR TO BEGINNING ANY WORK THE GENERAL CONTRACTOR SHALL FURNISH A CONSTRUCTION SCHEDULE <br />SHOWING THE CHRONOLOGICAL PHASE OF HIS WORK AND ALL RELATED WORK FOR THE COMPLETION OF THE <br />PROJECT. THIS SCHEDULE SHALL INDICATE ALL ORDERING LEAD TIMES, LENGTH OF TIME FOR EACH PHASE, ITS <br />START AND COMPLETION, WITH A PROJECTED COMPLETION DATE. CONTRACTOR TO VERIFY AVAILABILITY OF ALL <br />PRODUCTS SPECIFIED AND NOTIFY ARCHITECT IMMEDIATELY IF THERE ARE ANY DISCREPANCIES WITH PROJECT <br />COMPLETION DATE. PRODUCTS MAY REQUIRE A LONG LEAD TIME. CONTRACTOR SHALL TAKE INTO ACCOUNT IN <br />HIS SCHEDULE ALL LONG LEAD ITEMS, AND PLAN ACCORDINGLY SO AS TO NOT DELAY COMPLETION OF THE <br />PROJECT. <br />2 THE GENERAL CONTRACTOR IS WHOLLY RESPONSIBLE FOR THE COORDINATION AND SCHEDULING OF THE <br />WORK EFFORT FOR ALL SUBCONTRACTORS, CRAFTSMAN AND TRADESMAN REQUIRED TO COMPLETE THE JOB. <br />08 00 00 OPENINGS <br />08 10 00 - DOORS AND FRAMES <br />1 THE GENERAL CONTRACTOR SHALL PROVIDE AND INSTALL REQUIRED FRAMES AND ASSEMBLIES AS SHOWN ON <br />SHLEMMER ALGAZE ASSOCIATES DRAWINGS UNLESS OTHERWISE NOTED. COORDINATE OVERALL DOOR FRAME <br />DEPTHS WITH WALL TYPES. DOOR AND FRAME ASSEMBLY DIMENSIONS SHALL BE FIELD VERIFIED PRIOR TO <br />FABRICATION AND INSTALLATION. <br />09 00 00 FINISHES <br />09 22 16.13 - NON-STRUCTURAL METAL STUD FRAMING <br />1 THE GENERAL CONTRACTOR SHALL PROVIDE AND INSTALL ALL PARTITIONS DESIGNATED ON SAA DRAWINGS. <br />2 THE GENERAL CONTRACTOR SHALL PROVIDE ALL WALL TYPE AND WALL RATING MARKINGS ON THE FINISH <br />FLOOR OF ALL PARTITIONS FOR SAA REVIEW. <br />3 UNLESS OTHERWISE NOTED, ALL DIMENSIONS FOR PARTITIONS ARE FROM FINISH FACE OF NEW WALLS, AND/OR <br />FINISH FACE OF EXISTING WALLS. ALL HEIGHTS ARE FROM THE TOP OF THE FINISHED FLOOR UNLESS OTHERWISE <br />NOTED. <br />4 WALL SHOWN ALIGNED WITH BASE BUILDING STRUCTURE SHALL HAVE A FLUSH AND SMOOTH TRANSITION <br />WITH BASE BUILDING STRUCTURE UNLESS OTHERWISE NOTED. <br />5 ALL PARTITIONS SHALL BE SECURELY ANCHORED AS PER MANUFACTURERS SPECIFICATIONS AND AS REQUIRED BY <br />THE STATE AND LOCAL CODES. <br />6 THE GENERAL CONTRACTOR SHALL PROVIDE SUFFICIENT FRAMING FOR ALL WALL PARTITIONS, AND FOR ALL <br />DUCT WORK, RETURN AIR OPENINGS AND GRILL OPENINGS ABOVE AND BELOW HUNG CEILING. THESE OPENINGS <br />ARE TO BE COORDINATED WITH HVAC ENGINEERING DRAWINGS AND THE MECHANICAL CONTRACTORS SHOP <br />DRAWINGS. ALL OPENINGS SHALL BE PROPERLY SEALED FOR SOUNDPROOFING AND VIBRATION. <br />7 THE GENERAL CONTRACTOR SHALL PROVIDE AND INSTALL ALL ACCESS PANELS AS REQUIRED FOR <br />MECHANICAL, ELECTRICAL AND PLUMBING INSTALLATIONS PER LOCAL BUILDING CODES. LOCATIONS SHALL BE <br />COORDINATED WITH SAA PRIOR TO FINAL INSTALLATION. <br />8 THE GENERAL CONTRACTOR WILL NOT BE ENTITLED TO A CHANGE ORDER FOR OPENING ANY PARTITIONS <br />BECAUSE OF TELEPHONE INSTALLATION, SECURITY SYSTEMS OR COMPUTER DATA SYSTEMS. <br />9 SAA SHALL HAVE THE RIGHT TO REVIEW AND APPROVE ALL CHALK LINES PRIOR TO INSTALLATION OF WALL TRACK. <br />SAA IS TO BE NOTIFIED OF ANY REQUIRED DEVIATION FROM CONSTRUCTION DIMENSIONS OR CLEARANCES AS <br />DESIGNATED ON PLAN OR ANY APPARENT CONSTRUCTION CONFLICTS. <br />10 THE GENERAL CONTRACTOR IS TO VERIFY, PRIOR TO BID, THE RATING OF THE EXISTING PARTITIONS, COLUMNS, <br />ETC. THE GENERAL CONTRACTOR SHALL PROVIDE WALL FURRING AT EXISTING PARTITIONS WITH A RATING OF <br />GREATER THEN 1 HOUR WHERE REQUIRED TO ACCOMMODATE ELECTRICAL OR PLUMBING CONDITIONS AS <br />INDICATED ON THE DRAWINGS. <br />11 STANDARD DRYWALL STUDS SHALL BE ELECTRO-GALVANIZED STEEL WITH PUNCHED UTILITY OPENINGS AND <br />KNURLED FLANGE WITH AT LEAST 1-1/4" WIDE FLANGE RETURNS. FURNISH 25 GA. STUDS EXCEPT WHERE 20 <br />GAUGE OR HEAVIER IS SHOWN OR REQUIRED ON THE DRAWINGS. <br />12 GAUGE SPECIFIED ABOVE ARE A MINIMUM, WHERE REQUIRED STUD HEIGHT EXCEEDS CODE COMPLIANCE, <br />PROVIDE HEAVIER GAUGE STUDS OR DECREASE STUD SPACING AS NECESSARY TO CONFORM TO CODE. <br />13 ALL INTERIOR PARTITIONS HAVE BEEN DESIGNED COMPLIANT TO 2022 CBC 1607.5 AND CAN WITHSTAND A <br />HORIZONTAL LOAD OF 5 LBS. SEE SHEET A-9.0. <br />14 ALL FIRE RATED PARTITIONS SHALL MEET CONSTRUCTION REQUIREMENTS PER 2022 CBC TABLE 721.1(2) <br />ITEM # 13-1.1 <br />15 ALL PIPE AND CONDUIT PENETRATIONS THROUGH FIRE RATED PARTITIONS SHALL BE FULLY SEALED WITH <br />APPROVED FIRE RATED CAULKING MATERIAL, AND ALL DUCTWORK FITTED WITH APPROPRIATELY SIZED FIRE <br />DAMPERS. <br />09 29 00 - GYPSUM BOARD <br />1 ALL GYPSUM BOARD CONSTRUCTION IS TO MEET THE GYPSUM ASSOCIATION STANDARDS. <br />2 THE GENERAL CONTRACTOR SHALL USE CORNER BEADS AT ALL EXPOSED CORNERS AND J-MOULD TRIM AT ALL <br />EXPOSED ENDS IN PLASTER AND DRYWALL PARTITIONS. <br />3 ALL DRYWALL SHALL BE INSTALLED WITH VERTICAL JOINTS ONLY. ALL JOINTS SHALL OCCUR AT STUDS <br />ONLY. USE APPROPRIATE SIZE AND LENGTH FASTENERS TO SUIT APPLICATION. <br />4 GYPSUM BOARD FINISH SHALL BE AS REQUIRED BY SAA AND APPROPRIATE TO THE TYPE OF WALL AND LOCATION <br />SERVED. <br />09 30 00 - TILING <br />1 CERAMIC TILE INSTALLATION METHOD - (DRY METHOD). CONTRACTOR TO INSTALL CERAMIC TILE IN <br />ACCORDANCE WITH ANSI/TCA A108.5 SPECIFICATIONS. HORIZONTAL MORTAR BED SHALL BE A THIN SET BOND <br />COAT, DRY OR LATEX PORTLAND CEMENT MORTAR MEETING ANSI/TCA F113-89. VERTICAL APPLICATION SHALL <br />MEET ANSI/TCA METHOD W242-89, GROUT SHALL BE CEMENTING DRY CURE TYPE WITH LATEX ADDITIVE FOR <br />STRENGTH AND ACID RESISTANCE; COLOR TO BE AS SPECIFIED BY SHLEMMER ALGAZE ASSOCIATES. PROVIDE ALL <br />NECESSARY CAPS, STOPS, RETURNS, TRIMMERS AND OTHER SHAPES TO COMPLETE INSTALLATION. PROVIDE COVE <br />TYPE BASE TO MATCH WALL WHERE WALL TILE IS USED, OTHERWISE MATCH COLOR OF FLOOR TILE. PROVIDE <br />THRESHOLD AT WALL OR FRAME OPENINGS TO OTHER BUILDING AREAS NOT RECEIVING CERAMIC TILE FLOOR <br />FINISH. <br />2 CERAMIC TILE INSTALLATION METHOD - (WET METHOD). CONTRACTOR IS TO INSTALL CERAMIC TILE IN <br />ACCORDANCE WITH ANSI/TCA A108.5 SPECIFICATIONS. HORIZONTAL MORTAR BED SHALL BE A THIN SET BOND <br />COAT, DRY OR LATEX PORTLAND CEMENT MORTAR MEETING ANSI/TCA F122-89. VERTICAL APPLICATION SHALL <br />MEET ANSI/TCA METHOD W223-89. SHOWER STALL SHALL MEET ANSI/TCA B416-89. GROUT SHALL BE <br />CEMENTING DRY CURE TYPE WITH LATEX ADDITIVE FOR STRENGTH AND ACID RESISTANCE; COLOR TO BE AS <br />SPECIFIED BY SHLEMMER ALGAZE ASSOCIATES. PROVIDE ALL NECESSARY CAPS, STOPS, RETURNS, TRIMMERS AND <br />OTHER SHAPES TO COMPLETE INSTALLATION. PROVIDE COVE TYPE BASE TO MATCH WALL WHERE WALL TILE IS <br />USED, OTHERWISE MATCH COLOR OF FLOOR TILE. PROVIDE THRESHOLD AT WALL OR FRAME OPENINGS TO OTHER <br />BUILDING AREAS NOT RECEIVING CERAMIC TILE FLOOR FINISH. <br />3 CONTRACTOR IS TO INSTALL CERAMIC TILE IN ACCORDANCE WITH ANSI/TCA A108.5 INSTALLATION <br />SPECIFICATIONS. MORTAR BED SHALL BE A THIN-SET BOND COAT, DRY CEMENT MORTAR MEETING ANSI/TCA <br />A118.4. GROUT SHALL BE CEMENT DRY CURE TYPE, WITH LATEX ADDITIVE FOR STRENGTH AND ACID RESISTANCE, <br />COLOR TO BE SPECIFIED BY DESIGNER. PROVIDE NECESSARY CAPS, STOPS, RETURNS, TRIMMERS AND OTHER <br />SHAPES TO COMPLETE INSTALLATION. PROVIDE COVE TYPE BASE TO MATCH WALL WHERE WALL TILE IS USED, <br />OTHERWISE MATCH COLOR OF FLOOR TILE. PROVIDE THRESHOLD AT WALL OR FRAME OPENINGS TO OTHER <br />BUILDING AREAS NOT RECEIVING CERAMIC TILE FLOOR FINISH. <br />4 CERAMIC TILE INSTALLATION TO BE IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDED <br />INSTRUCTIONS AND ANSI A108, A118 AND A136. <br />5 CERAMIC TILE LAYOUT DIAGRAM TO BE APPROVED BY SHLEMMER ALGAZE ASSOCIATES BEFORE <br />ORDERING/INSTALLATION OF TILE. <br />09 33 00 - STONE TILING <br />1 STONE TILE INSTALLATION SHALL BE A THIN-SET APPLICATION CONFORMING TO ANSI A108.4 TCNA HANDBOOK <br />AND SECTION 12 SHEET A0.2, REQUIREMENTS FOR HORIZONTAL AND VERTICAL APPLICATIONS. GROUTED JOINTS <br />SHALL BE 1/16” AND CONFORM TO ANSI A108.10 AND TCNA HANDBOOK SPECIFICATIONS. GROUT COLOR TO BE <br />SPECIFIED BY SHLEMMER ALGAZE ASSOCIATES. GROUT COLOR AT STONE TILE FLOORING SHALL BE COLORED TO <br />MATCH THE ADJACENT FLOORING MATERIAL OR AS SELECTED BY SAA UNLESS OTHERWISE NOTED. WHERE MORE <br />THAN ONE COLOR IS TO BE INSTALLED, GROUT COLOR SHALL BE CONFIRMED WITH SAA BEFORE INSTALLATION. <br />EXPANSION JOINTS SHALL MEET TCNA METHOD EJ171. ALL HORIZONTAL SURFACES SHALL RECEIVE A CLEAR SEALER <br />COAT AS MANUFACTURED BY MIRA-SEAL #511 OR EQUAL, AND SHALL BE APPLIED IN ACCORDANCE WITH <br />MANUFACTURERS RECOMMENDATIONS. <br />2 PROVIDE FLUSH STONE THRESHOLD TO MATCH ADJACENT STONE FLOORING AT TRANSITIONS BETWEEN STONE <br />AND CARPET FLOORING. <br />3 STONE TILE LAYOUT DIAGRAM TO BE APPROVED BY SHLEMMER ALGAZE ASSOCIATES BEFORE <br />ORDERING/INSTALLATION OF TILE. <br />4 MARBLE TILE INSTALLATION SHALL BE A THIN-SET APPLICATION CONFORMING TO ANSI A108.4 AND TCNA <br />HANDBOOK AND SECTION 12 SHEET GN-1, REQUIREMENTS FOR HORIZONTAL AND VERTICAL APPLICATIONS. <br />GROUTED JOINTS SHALL BE 1/16" AND CONFORM TO ANSI A108.10 AND TCNA HANDBOOK SPECIFICATIONS. <br />GROUT COLOR IS TO BE SELECTED BY SAA. EXPANSION JOINTS SHALL MEET TCNA METHOD EJ171. ALL <br />HORIZONTAL SURFACES SHALL RECEIVE A CLEAR SEALER COAT AS MANUFACTURED BY MIRA-SEAL #511 OR EQUAL <br />AND SHALL BE APPLIED IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS. <br />09 50 00 - CEILINGS <br />1 CONTRACTOR SHALL REFER TO ALL PERTINENT SECTIONS OF THE GENERAL NOTES, SPECIFICATIONS, AND <br />SCHEDULE OF FINISHES FOR COMPLETE AND PROPER INSTALLATION OF WORK. <br />2 GENERAL CONTRACTOR SHALL ENSURE CLEARANCE HEIGHT FOR LIGHT FIXTURES, DUCTS, FIRE SPRINKLERS, ETC. <br />SHOULD ANY OBSTRUCTIONS OCCUR THAT PREVENT INSTALLATION OF ANY REQUIRED COMPONENT, NOTIFY SAA <br />PRIOR TO INSTALLATION OF GRID. INSTALLATION WITHOUT APPROVAL SHALL BE REMOVED REINSTALLED PER <br />DIRECTION OF SAA AT GENERAL CONTRACTORS SOLE EXPENSE. <br />3 FIRE/LIFE SAFETY FIXTURES SHOWN ON PLAN ARE SUGGESTED LOCATIONS ONLY. CONTRACTOR TO PREPARE AND <br />COORDINATE DESIGN/BUILD DRAWINGS SHOWING APPROPRIATE LOCATION OF STROBES AND EXIT SIGNS. SUBMIT <br />COORDINATED SHOP DRAWINGS TO SAA FOR REVIEW AND TO LOCAL FIRE DEPARTMENT FOR PERMIT PRIOR TO <br />THE COMMENCEMENT OF ANY INSTALLATION. <br />4 BOTH NEW AND EXISTING SPRINKLER HEADS FOR THE AREA OF WORK SHALL BE LOCATED PER SPRINKLER <br />CONTRACTOR DESIGN/BUILD DRAWINGS. ONCE SUBMITTED TO AND REVIEWED BY SAA, DRAWINGS SHALL THEN <br />BE SUBMITTED TO LOCAL FIRE DEPARTMENT FOR APPROVAL. <br />5 ALL FIXTURES, DEVICES, AND SPRINKLER HEADS ARE TO BE LOCATED AT THE CENTER OF CEILING TILE UNLESS <br />NOTED OTHERWISE, PROVIDE PROPOSED LOCATIONS IN DRYWALL CEILING TO SAA FOR APPROVAL. <br />6 REFER TO DRAWING DETAILS FOR TYPICAL SUSPENDED CEILING GRID SUPPORT. <br />7 ALL LAY IN PANELS SHALL BE SECURED TO THE SUSPENSION SYSTEM WITH TWO HOLD-DOWN CLIPS MINIMUM FOR <br />EACH TILE WITHIN A 4-FOOT RADIUS OF THE EXIT LIGHTS AND EXIT SIGNS. <br />8 CEILING GRID SHALL BE INSTALLED WITHIN A LEVEL HORIZONTAL TOLERANCE OF 1/8" PER 12'-0". SUPPORT AND <br />BRACE AS INDICATED ON REFLECTED CEILING PLAN DETAILS. <br />9 PROVIDE ACCESS PANELS WHERE REQUIRED WHEN CEILING SYSTEM IS SUSPENDED GYP. BOARD. (EXACT LOCATION <br />OF ACCESS PANELS TO BE APPROVED BY OWNER/ ARCHITECT). ALL ACCESS PANELS IN GYPSUM BOARD CEILING <br />TO BE GFRG ACCESS PANELS SIZED AS REQUIRED. "MOONLIGHT MOLDS" OR APPROVED EQUAL. PROVIDE BOTH <br />24" X 24" & 18" X 18" SIZED OPENING ACCESS PANELS. CONFIRM SIZE AND LOCATION WITH SAA. ACCESS PANELS <br />SHALL BE PROVIDED FOR ELECTRICAL, PLUMBING AND AIR CONDITIONING CONTROLS OR AS REQUIRED BY THE <br />UNIFORM BUILDING CODE, UNIFORM MECHANICAL CODE, NFPA, UPC AND LOCAL CITY CODES. IF LOCATION AND <br />TYPE IS NOT SHOWN ON DRAWINGS, CONFIRM LOCATION AND TYPE WITH SAA PRIOR TO INSTALLATION. <br />10 RELOCATE/RAISE EXISTING BACK BOXES, CONDUIT, HVAC EQUIPMENT, DEVICES AND ANY OTHER ITEMS THAT WILL <br />NEED UPWARD RELOCATION BASED ON NEW ROOM CEILING HEIGHT. <br />11 CEILING GRID SYSTEMS WITHIN AREA OF WORK ARE TO BE INSTALLED IN A CONTINUOUS GRID PATTERN SO THAT <br />WHEN A PENETRATING PARTITION IS REMOVED, NECESSARY CEILING REPAIRS WILL RESULT IN A CONSISTENT <br />CEILING GRID. <br />12 LATERAL BRACING SHALL BE PROVIDED BY WIRES OF MINIMUM 12 GA., SPLAYED IN FOUR DIRECTIONS AND 90 <br />DEGREES APART. CONNECT TO THE MAIN RUNNER WITHIN 12 INCHES OF THE CROSS RUNNER AND TO THE <br />STRUCTURE ABOVE OR TO PARTITION. ATTACH TO WALLS OR BRACE AT AN ANGLE NOT TO EXCEED 45 DEGREES <br />FROM THE PLANE OF THE CEILING. SUPPORT POINTS SHALL BE PLACED 12" O.C. IN EACH DIRECTION WITH THE <br />FIRST POINT WITHIN 4'-0" FROM EACH WALL <br />13 3403.6 - SUSPENDED CEILING UPGRADE. WHEN AN ADDITION, ALTERATION OR REPAIR IS PERFORMED ON AN <br />OCCUPANCY IN WHICH THERE IS AN EXISTING SUSPENDED CEILING, SUCH SUSPENDED CEILING SHALL BE MODIFIED <br />THROUGHOUT TO COMPLY WITH THE PROVISIONS OF ASTM C 635 AND ASTM C 636. (2022 CBC 808.1.1.1). <br />14 AT ALL EXISTING CEILINGS TO REMAIN, THE GENERAL CONTRACTOR SHALL PROVIDE ADDITIONAL <br />AND/OR NEW COMPRESSION POST AND LATERAL BRACING OF THE CEILING GRID AT ALL AREAS WHICH ARE NOT IN <br />COMPLIANCE WITH CURRENT CODES. <br />15 SUSPENSION SYSTEM SHALL BE AS INDICATED IN REFLECTED CEILING PLAN. LIGHT FIXTURES SHALL BE <br />INDEPENDENTLY SUPPORTED AT OPPOSITE CORNERS WITH NO. 12 WIRES. <br />16 PROVIDE NEW SUSPENDED CEILING TO CONCEAL PIPING, DUCTS, ETC. IN FINISHED ROOMS. IF EXISTING <br />CONDITIONS REQUIRE DEVIATIONS FROM INDICATED CEILING HEIGHTS DUE TO STRUCTURAL OR MECHANICAL <br />REQUIREMENTS, OBTAIN SAA APPROVAL BEFORE INSTALLING CEILING. <br />17 ALL CEILING FINISHES SHALL BE NON-COMBUSTIBLE OR HAVE A FLAME SPREAD INDEX OF 0 TO 25; SMOKE- <br />DEVELOPED INDEX 0-450. <br />09 60 00 - FLOORING <br />1 CONTRACTOR SHALL FURNISH AND INSTALL ALL FLOOR FINISHES AS SPECIFIED ON THE DRAWINGS AND <br />SPECIFICATIONS. <br />2 CONTRACTOR TO PREP FLOORS FOR NEW FLOOR COVERING, FLOAT FLOORS TO LEVEL SURFACE AS REQUIRED TO <br />ACCEPT NEW FLOOR FINISH MATERIAL. THE GENERAL CONTRACTOR SHALL PATCH ALL CRACKS, HOLES OR OTHER <br />IMPERFECTIONS (PROJECTIONS SHALL BE REMOVED AND PATCHED TO PROVIDE A CONTINUOUS SMOOTH FLOOR <br />SURFACE). FLOOR LEVEL SHALL NOT EXCEED 1/8" IN 10-0" NON-CUMULATIVE. <br />3 THE GENERAL CONTRACTOR SHALL NOTIFY SAA AFTER FLOOR PATCHING IS COMPLETE AND RECEIVE THEIR <br />REVIEW AND ACCEPTANCE PRIOR TO INSTALLATION OF FINISHED FLOORING. <br />06 00 00 WOOD, PLASTICS AND <br />COMPOSITES <br />06 41 00 - ARCHITECTURAL WOOD CASEWORK <br />1 REFER TO THE “GENERAL NOTES AND INFORMATION SHEETS” FOR ADDITIONAL NOTES. <br />2 CONTRACTOR TO SUBMIT COMPLETE SHOP DRAWINGS FOR APPROVAL AND VERIFY ALL DIMENSIONS IN THE FIELD <br />BEFORE FABRICATION. CONFIRM ALL MATERIALS AND FINISHES ON SHOP DRAWINGS. SUBMIT (4) 9”X9” SAMPLES <br />OF EACH FINISH FOR APPROVAL. CONTRACTOR SHALL SUBMIT MSDS SHEETS, SIGNED ATTESTATIONS OR OTHER <br />OFFICIAL LITERATURE FROM MANUFACTURER FOR ALL ADHESIVES AND SEALANTS USED ON THE PROJECT. ALL <br />JOINTS, CORNERS AND EDGES ARE TO BE DETAILED IN INDIVIDUAL DETAILS. ALL DIMENSIONS, CRITICAL OR <br />OTHERWISE, ARE TO BE CALLED OUT ON THE SHOP DRAWINGS. SHLEMMER ALGAZE ASSOCIATES WILL NOT <br />REVIEW DRAWINGS WHICH ARE INCOMPLETE AND SHOW MINIMAL DETAILING. ALL CASEWORK, SPECIAL <br />PRODUCTS, AND SPECIAL ASSEMBLIES ARE SUBJECT TO SUBMITTAL AND SHOP DRAWING REVIEW. SHOP <br />DRAWINGS AND SUBMITTAL'S SHALL NOT BE WAIVED UNLESS WRITTEN PERMISSION TO DO SO IS GIVEN BY <br />SHLEMMER ALGAZE ASSOCIATES. <br />3 ALL WOOD VENEERED OR CONVERSION VARNISH FINISHED CASEWORK SHALL BE FABRICATED TO WI PREMIUM <br />GRADE STANDARDS. ALL EXPOSED SURFACES INCLUDING DOORS, TOPS AND BASE SHALL BE VENEERED. CASEWORK <br />SHALL BE BIRCH PLYWOOD STAINED TO MATCH FINISH VENEER. <br />4 ALL PLASTIC LAMINATE MILLWORK TO BE FABRICATED TO WI CUSTOM GRADE STANDARDS. ALL EXPOSED <br />SURFACES TO BE LAMINATE. CASEWORK AT WHITE LAMINATE TO BE 5/8” WHITE KORTRON. CASEWORK AT <br />COLORED LAMINATE SHALL BE 5/8” BLACK KORTRON. <br />5 COORDINATE LOCATIONS AND PROVIDE METAL BACKING AT WALL FRAMING FOR ALL WALL- MOUNTED <br />CASEWORK. ALL "INSTALLED" CABINETS SHALL BE SCRIBED TO WALL OR CEILING. CABINET CONTRACTOR TO CHECK <br />JOB PROGRESS AND COORDINATE WITH OTHER TRADES INVOLVED. REFER TO DRAWING DETAILS FOR BACKING <br />SUPPORT OF WALL HANGING ITEMS. <br />6 CONTRACTOR SHALL SUPPLY AND INSTALL ALL NECESSARY HARDWARE REQUIRED BY THE SPECIFICATIONS OR <br />INTENT OF THE DESIGN. SUBMIT TO SAA FOR APPROVAL CUT SHEETS OF ALL CABINET HARDWARE AND SAMPLES <br />OF ALL PULLS AND KNOBS PRIOR TO FABRICATION. <br />7 CONTRACTOR TO PROTECT CASEWORK DURING DELIVERY AND TAKE NECESSARY PRECAUTIONS TO ENSURE THAT <br />INSTALLATION OF CASEWORK AND FINISH CARPENTRY WILL NOT BE DAMAGED BY OTHER CONSTRUCTION WORK. <br />8 COMPOSITE WOOD AND AGRIFIBER PRODUCTS, INCLUDING CORE MATERIALS, SHALL NOT CONTAIN ANY <br />UREAFORMALDEHYDE RESINS. <br />9 LAMINATE ADHESIVES USED TO FABRICATE CASEWORK ON-SITE AND SHOP APPLIED ASSEMBLIES CONTAINING <br />THESE LAMINATE ADHESIVES SHALL NOT CONTAIN ANY UREAFORMALDEHYDE. <br />10 ALL ADHESIVES AND SEALANTS USED FOR MILLWORK, PANELING, OR VENEERING SHALL BE LOW VOC AND MUST <br />NOT EXCEED THE VOC CONTENT LIMITS OF SCAQMD RULE #1168 REQUIREMENTS IN EFFECT ON JANUARY 1, 2011. <br />11 AEROSOL ADHESIVES SHALL MEET REQUIREMENTS EQUAL TO GREEN SEAL STANDARD GC-36 IN EFFECT JANUARY 1, <br />2011. <br />12 THE GENERAL CONTRACTOR SHALL CLOSELY COORDINATE HIS WORK WITH THAT OF THE CABINET <br />CONTRACTOR. <br />13 ALL CABINET FINISHES SHALL BE AS NOTED ON THE DETAILED DRAWINGS. <br />14 THE CABINET CONTRACTOR SHALL PROVIDE RUBBER BUMPERS ON ALL WOOD DOORS. <br />15 WHERE MEMBERS ARE MITERED OR BUTTED, THEY SHALL BE JOINED AND SECURED IN A MANNER TO INSURE <br />AGAINST THE JOINT OPENING. <br />16 ALL FINISHED WORK SHALL, AS FAR AS PRACTICAL, BE ASSEMBLED AND FINISHED IN THE SHOP AND DELIVERED TO <br />THE BUILDING READY TO ERECT IN PLACE. <br />17 WHERE FILES ARE SHOWN AS BEING SET INTO CABINET WORK, THE CABINET CONTRACTOR SHALL SET AND BOLT <br />ALL FILES TOGETHER. <br />18 THE GENERAL CONTRACTOR SHALL COORDINATE HIS WORK WITH THAT OF THE CASEWORK, STONE, OR OTHER <br />SPECIALTIES CONTRACTORS. <br />19 ALL CASEWORK SHOWN SHALL HAVE PLASTIC LAMINATE TOPS, UNLESS OTHERWISE NOTED. <br />20 SHELVES AND SEMI-EXPOSED SURFACES, INCLUDING DRAWER INTERIORS, SHALL BE FINISHED WITH A MELAMINE <br />CABINET LINER OF A UNIFORM COLOR THROUGHOUT. <br />21 ADJUSTABLE METAL SHELF STANDARDS SHALL BE DAPPED OR DRILLED INTO THE SIDES OF CABINETS, UNLESS <br />OTHERWISE NOTED. <br />06 20 00 - FINISH CARPENTRY <br />1 WOOD BASE SHALL, IN ALL CONDITIONS, BE INSTALLED RECESSED AND MATCH THE COLOR OF THE ADJACENT <br />WALL, U.O.N. GENERAL CONTRACTOR TO CONFIRM WITH ARCHITECT COLOR IF NOT SPECIFIED ON DRAWINGS <br />AND SUBMIT SAMPLE OF COLORED BASE FOR SAA APPROVAL PRIOR TO PURCHASE AND INSTALLATION. <br />7 DURING THE ENTIRE PERIOD OF DEMOLITION AND CONSTRUCTION, ALL EXISTING EXITS, EXIT LIGHTING, FIRE <br />PROTECTIVE DEVICES AND ALARMS SHALL BE CONTINUOUSLY MAINTAINED. <br />8 THE GENERAL CONTRACTOR SHALL CUT AND CAP OFF BEHIND FINISH SURFACES ALL PROJECTING PLUMBING, <br />FLOOR ELECTRICAL/TELEPHONE OUTLETS, AND ALL OTHER PROJECTING ITEMS WHICH ARE BEING ABANDONED. <br />9 UPON COMPLETION OF THE DEMOLITION WORK, THE GENERAL CONTRACTOR SHALL LEAVE ALL AREAS IN A <br />BROOM CLEAN CONDITION. <br />10 DEMOLITION NOT DESCRIBED HERE BUT NECESSARY FOR THE COMPLETION OF THE WORK SHALL BE THE <br />RESPONSIBILITY OF THE CONTRACTOR. THE DEMOLITION DRAWINGS ARE ISSUED FOR INFORMATION ONLY AND <br />SHOW THE GENERAL EXTENT OF THE DEMOLITION REQUIRED. THESE DRAWINGS DO NOT NECESSARILY SHOW <br />EVERYTHING TO BE REMOVED IN ORDER TO PREPARE THE EXISTING BUILDING ELEMENTS FOR REMODELING OR <br />NEW CONSTRUCTION. THE ARCHITECTURAL DRAWINGS SHOW THE EXISTING PARTITIONS WITH DOORS AND <br />OTHER ITEMS TO REMAIN. <br />11 ALL REMOVED MATERIAL OTHER THAN ITEMS TO BE SALVAGED OR REUSED SHALL BECOME CONTRACTORS <br />PROPERTY U.O.N., AND SHALL BE REMOVED FROM OWNER'S PROPERTY. CLEAN UP AND DISPOSE OF DEBRIS <br />PROMPTLY AND CONTINUOUSLY AS THE WORK PROGRESSES. SECURE AND PAY FOR REQUIRED HAULING PERMITS, <br />DUMPING FEES AND CHARGES. <br />12 ELECTRICAL, MECHANICAL AND PLUMBING ITEMS SHALL BE REMOVED TO THE FURTHEST TERMINATION POINT ON <br />THE FLOOR. REMOVE ALL UNUSED AND DISCONNECTED HVAC, ELECTRICAL, PLUMBING AND PHONE/DATA <br />CABLING ABOVE CEILING AND REMOVE TO THE FURTHEST TERMINATION POINT ON THE FLOOR. COORDINATE <br />EXTENT OF REMOVAL WITH MECHANICAL/ELECTRICAL/PLUMBING DRAWINGS. <br />13 EXISTING LIGHT FIXTURES, ELECTRICAL OUTLETS, RACEWAY AND WIRING ETC. WILL BE REMOVED AS NOTED PER <br />ARCHITECTURAL AND ELECTRICAL DEMOLITION DRAWINGS. <br />14 REMOVE ALL FIRE DAMPERS IN EXISTING DUCTWORK WHERE FIRE RATED WALLS ARE DEMOLISHED. REMOVE ALL <br />FIRE DAMPERS THAT ARE NOT CODE COMPLIANT. REPLACE ANY FIRE DAMPERS WHERE DAMPERS WILL NEED TO <br />BE UPGRADED TO MEET CURRENT CODE REQUIREMENTS AND RATED WALL IS SCHEDULED TO REMAIN. <br />15 THERMOSTATS AND PNEUMATIC LINES SHALL BE REMOVED GENTLY AND COILED BACK TO THE DEVICE THEY <br />CONTROL AND LEFT IN PLACE. ALL OTHER THERMOSTATS SHALL BE REMOVED AND RETURNED TO BUILDING <br />OWNER. <br />16 UPON REMOVAL OF THE EXISTING CEILING, THAT PORTION OF THE EXISTING MECHANICAL SYSTEM DESIGNATED <br />TO BE RE-USED WILL BE EVALUATED BY THE ENGINEER. IF THE EXISTING MECHANICAL SYSTEMS ARE FOUND TO BE <br />ACCEPTABLE FOR RE-USE, THEN THE EXISTING MAIN DUCT, VAV BOXES, PNEUMATIC CONTROL TUBING ETC. SHALL <br />REMAIN AND SHALL BE PROTECTED TO AVOID DAMAGE TO EXISTING HVAC EQUIPMENT DURING DEMOLITION. <br />17 CONTRACTOR TO VERIFY THAT ALL EXISTING LIGHT FIXTURES NOT BEING REUSED SHALL BE RETURNED TO <br />BUILDING OWNER. <br />18 THE EXISTING FIRE SPRINKLER SYSTEM SHALL REMAIN IN PLACE (ONLY DURING DEMOLITION). ALL OTHER <br />FIRE/LIFE SAFETY EQUIPMENT SHALL BE LEFT IN PLACE. IF A STRUCTURE HOLDING A DEVICE IS REMOVED, THE <br />CONTRACTOR SHALL SUPPORT THE FIRE/LIFE SAFETY DEVICE IN A MANNER THAT DOES NOT IMPAIR ITS FUNCTION <br />IN ANYWAY. <br />19 REMOVE ALL DATA/TELE CABLING IN CEILING BACK TO POINT OF ORIGINATION. (UNLESS OTHERWISE <br />INSTRUCTED) CONTRACTOR TO VERIFY WITH OWNER'S CABLING VENDOR. <br />20 ABANDONED PLUMBING LINES AND DRAINS TO BE REMOVED BACK TO POINT OF ORIGINATION AS REQUIRED FOR <br />NEW WORK. <br />21 MAINTAIN FULLY CHARGED FIRE EXTINGUISHERS READILY AVAILABLE DURING ALL DEMOLITION OPERATIONS <br />02 41 00 DEMOLITION CONTINUED <br />2 THE GENERAL CONTRACTOR SHALL PROVIDE AND INSTALL DOORS AS SPECIFIED ON SHLEMMER ALGAZE <br />ASSOCIATES DRAWINGS UNLESS OTHERWISE NOTED. <br />3 DETAILED DOOR SCHEDULES SHALL BE SUBMITTED TO SHLEMMER ALGAZE ASSOCIATES FOR REVIEW, AND <br />FABRICATION OF DOORS AND FRAMES SHALL NOT BE COMMENCED UNTIL SUCH REVIEW HAS BEEN RETURNED. <br />4 THE BOTTOM 10" OF ALL DOORS (EXCEPT SLIDING AND AUTOMATIC) SHALL HAVE A SMOOTH <br />UNINTERRUPTED SURFACE TO ALLOW THE DOOR TO BE OPENED BY A WHEELCHAIR FOOTREST WITHOUT <br />CREATING A TRAP OR HAZARDOUS CONDITION. WHERE NARROW FRAME DOORS ARE USED, A 10” HIGH SMOOTH <br />PANEL SHALL BE INSTALLED ON THE PUSH SIDE OF THE DOOR, WHICH WILL ALLOW THE DOOR TO BE OPENED BY A <br />WHEELCHAIR FOOTREST WITHOUT CREATING A TRAP OR HAZARDOUS CONDITION. <br />5 ALL REQUIRED EXIT DOORWAYS SHALL HAVE A MINIMUM 32" CLEAR OPENING WITH THE DOOR AT 90 DEGREES TO <br />THE CLOSED POSITION. DOORWAYS SHALL BE NOT LESS THAN 36" IN WIDTH AND NOT LESS THAN 6'-8" IN HEIGHT. <br />(CBC 2022 1010.1.1) <br />6 ONE OF A PAIR OF DOORS SHALL MEET THE MINIMUM OPENING WIDTH REQUIREMENTS. <br />7 LANDINGS OR FLOOR LEVEL AT DOORS SHALL NOT BE MORE THAN 1/2-INCH BELOW THE THRESHOLD. RAISED <br />THRESHOLDS AND FLOOR LEVEL CHANGES GREATER THAN 1/4-INCH AT DOORWAYS SHALL BE BEVELED WITH A <br />SLOPE NOT GREATER THAN ONE UNIT VERTICAL IN TWO UNITS HORIZONTAL. (CBC 2022 11B-404.2.5) <br />8 SEE SHEET A-2.0 FOR REQUIREMENTS OF DOORS, WINDOWS, AND HARDWARE, I.E. DOOR SCHEDULE, <br />HARDWARE SCHEDULE AND DOOR AND WINDOW DETAILS. <br />9 TYPICAL DOOR/FRAME CONVENTIONS ARE AS FOLLOWS: <br />a) DIMENSIONS TO EDGE OF DOOR LOCATING DOOR OPENINGS ARE TO INSIDE FACE OF JAMB, <br />UNLESS OTHERWISE NOTED. <br />b) DOOR OPENINGS ARE TO BE LOCATED SO THAT INSIDE FACE OF BUTT SIDE JAMB IS 4" FROM FACE OF <br />PERPENDICULAR WALL AT CORNER, ALLOWING FOR A 90 DEGREE SWING TYPICAL, UNLESS OTHERWISE <br />NOTED. <br />c) SEE SHEET A-10.0 FOR SPECIFIC DOOR REQUIREMENTS. <br />10 UNDERCUT BUILDING STANDARD INTERIOR DOORS AS REQUIRED TO CLEAR FINISHED FLOOR BY 1/4". ALL RATED <br />DOORS SHALL BE ORDERED SO AS TO CLEAR THE FINISHED FLOOR BY 1/4", UNLESS OTHERWISE NOTED. THE <br />CONTRACTOR SHALL UNDERCUT ALL NEW AND EXISTING DOORS AS REQUIRED TO ACCOMMODATE ALL FLOOR <br />COVERINGS. VERIFY EXACT THICKNESS OF ALL NEW FLOOR COVERING WITH SHLEMMER ALGAZE ASSOCIATES <br />PRIOR TO UNDERCUTTING OF DOORS. <br />11 ANY GLAZING ON OR WITHIN 24" OF A DOOR SHALL BE TEMPERED. <br />12 ALL HOLLOW METAL DOORS SHALL BE PROVIDED WITH STEEL FRAMES. <br />13 EXIT DOORS SHALL SWING IN THE DIRECTION OF EXIT TRAVEL WHEN SERVING ANY HAZARDOUS AREA, ELECTRICAL <br />ROOMS WITH 800A EQUIPMENT, OR WHEN SERVING AN OCCUPANT LOAD OF 50 OR MORE. <br />14 EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR <br />EFFORT. (2022 CBC 1010.2). <br />A. EXCEPTION: THIS REQUIREMENT SHALL NOT APPLY TO EXTERIOR EXIT DOORS IN A GROUP "B" OCCUPANCY <br />IF THERE IS A VISIBLE, DURABLE SIGN ON OR ADJACENT TO THE DOOR STATING "THIS DOOR TO REMAIN <br />UNLOCKED DURING BUSINESS HOURS". THE LETTERS SHALL BE NOT LESS THAN 1 INCH HIGH ON A <br />CONTRASTING BACKGROUND. THE LOCKING DEVICE MUST BE A TYPE THAT WILL BE READILY <br />DISTINGUISHABLE AS LOCKED. <br />08 71 00 - DOOR HARDWARE <br />1 DETAILED HARDWARE SCHEDULES SHALL BE SUBMITTED TO SHLEMMER ALGAZE ASSOCIATES FOR REVIEW. <br />HARDWARE ORDER SHALL NOT COMMENCE UNTIL SUCH REVIEW HAS BEEN RETURNED AND ACCEPTED OR <br />ACCEPTED WITH MARKINGS. <br />2 ALL LOCK SETS SHALL BE CODED AND/OR KEYED IN ACCORDANCE WITH THE BUILDING STANDARD <br />REQUIREMENTS. CODES AND/OR KEYS ARE TO BE DELIVERED TO OWNER PROPERLY TESTED AND/OR TAGGED. <br />THE NUMBER OF MASTER AND PASS KEYS SHALL BE COORDINATED WITH OWNER. BUILDING MASTER KEYS SHALL <br />BE MARKED “DO NOT DUPLICATE”. <br />3 MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED 5 POUNDS FOR EXTERIOR DOORS AND 5 POUNDS FOR <br />INTERIOR DOORS, SUCH PULL/PUSH EFFORT BEING APPLIED AT RIGHT ANGLES TO HINGED DOORS AND AT THE <br />CENTER PLANE OF THE SLIDING OR FOLDING DOORS. COMPENSATING DEVICES OR AUTOMATIC DOOR OPERATORS <br />MAY BE UTILIZED TO MEET THE ABOVE STANDARD. WHEN FIRE DOORS ARE REQUIRED, THE MAXIMUM EFFORT TO <br />OPERATE THE DOOR MAY BE INCREASED TO THE MINIMUM ALLOWABLE BY THE APPROPRIATE AUTHORITY HAVING <br />JURISDICTION, BUT IN ALL CASES SHALL NOT EXCEED 15 POUNDS. <br />4 LATCHING AND LOCKING DOORS THAT ARE HAND ACTIVATED AND WHICH ARE IN THE PATH OF TRAVEL <br />SHALL BE OPERABLE WITH A SINGLE EFFORT BY LEVER TYPE HARDWARE, PANIC BARS, PUSH- PULL ACTIVATING <br />BARS, OR BARS OR OTHER HARDWARE DESIGNED TO PROVIDE PASSAGE WITHOUT REQUIRING THE ABILITY TO <br />GRASP OR PINCH THE OPENING HARDWARE. <br />5 ALL MANUALLY OPERATED EDGE OR SURFACE-MOUNTED FLUSH BOLTS ARE PROHIBITED ON EXIT DOORS. WHEN <br />EXIT DOORS ARE USED IN PAIRS AND APPROVED AUTOMATIC FLUSH BOLTS ARE USED, THE DOOR LEAF HAVING <br />THE AUTOMATIC FLUSH BOLTS SHALL HAVE NO DOOR KNOB OR SURFACE-MOUNTED HARDWARE. THE <br />UNLATCHING OF ANY LEAF SHALL NOT REQUIRE MORE THAN ONE OPERATION. <br />6 ALL EXIT DOOR HARDWARE SHALL BE OF AN APPROVED TYPE AND TESTED IN ACCORDANCE WITH ADA. <br />7 ALL THRESHOLDS SHALL NOT EXCEED 1/2" CHANGE IN ELEVATION WITH A 1:2 BEVEL. (CBC 2022 11B-303) <br />8 PANIC HARDWARE, WHEN INSTALLED, SHALL COMPLY WITH ALL APPLICABLE BUILDING CODE REQUIREMENTS. <br />THE ACTIVATING MEMBER SHALL BE MOUNTED AT A HEIGHT OF NOT LESS THAN 34 INCHES NOR MORE THAN 44 <br />INCHES ABOVE THE FLOOR. THE UNLATCHING FORCE SHALL NOT EXCEED 15 POUNDS WHEN APPLIED IN THE <br />DIRECTION OF EXIT TRAVEL. <br />9 ALL RATED CORRIDOR DOORS SHALL HAVE A THRESHOLD WITH A SMOKE AND DRAFT SEAL AT HEAD AND JAMBS. <br />DATE: <br />DRAWN: <br />REVIEWED: <br />PROJECT NO: <br />SCALE: <br />OWNERSHIP AND USE OF DOCUMENTS ALL DRAWINGS, SPECIFICATIONS AND COPIES THEREOF <br />FURNISHED BY SAA INTERIORS ARE AND SHALL REMAIN IT'S PROPERTY. THEY ARE TO BE USED <br />ONLY WITH RESPECT TO THIS PROJECT. FEDERAL LAW PROHIBITS THE REPRODUCTION, <br />DISPLAY, SALE, OR OTHER DISPOSITION OF THIS DOCUMENT WITHOUT THE EXPRESS WRITTEN <br />CONSENT OF SHLEMMER ALGAZE ASSOCIATES. <br />COPYRIGHT © 2015 SHLEMMER ALGAZE ASSOCIATES ALL RIGHTS RESERVED <br />SHEET TITLE: <br />SHEET NO: <br />SEAL AND STAMP: <br />CONSULTANTS: <br />PROJECT: <br />CULVER CITY - IRVINE - LOS ANGELES - SAN FRANCISCO - <br />NEW JERSEY - NEW YORK <br />6083 Bristol Parkway <br />Culver City, CA 90230 <br />18600 MacArthur Blvd., Suite 100 <br />Irvine, CA 92612 <br />515 South Flower Street, Suite 1200 <br />Los Angeles, CA 90071 <br />T 310.553.3252 <br />T 949.724.8958 <br />T 213.929.1400 <br />DRAWINGS ISSUE <br />485C US Route 1 South, Suite 105 <br />Iselin, NJ 08830 <br />T 848.200.1200 <br />711 3rd Ave., 6th Floor <br />New York, NY 10017 <br />T 917.512.6688 <br />www.saaia.com <br />T 415.390.6793 <br />NOT FOR CONSTRUCTION <br />IF DRAWINGS AND MATERIALS DEVELOPED AND PROVIDED BY SAA INTERIORS + ARCHITECTURE <br />AT THE TIME OF AND RELATING TO COVID-19 CONTAIN RECOMMENDATIONS FROM THE <br />CENTER FOR DISEASE CONTROL AND PREVENTION (CDC) AND THE WORLD HEALTH <br />ORGANIZATION (WHO), SUCH RECOMMENDATIONS ARE ONLY VALID AS OF THE DATE THE <br />DRAWINGS AND MATERIALS ARE PRODUCED. THE CDC AND/OR WHO MAY UPDATE OR MODIFY <br />THEIR RECOMMENDATIONS AT ANY TIME PER THEIR DISCRETION. IN USING <br />RECOMMENDATIONS FROM THESE DRAWINGS AND MATERIALS, THE RECIPIENT <br />ACKNOWLEDGES THAT IT WAS BASED ON THEIR OWN DECISION AND TAKE FULL RESPONSIBILITY <br />AND LIABILITY. THE INTENDED RECIPIENT INDEMNIFIES AND DEFENDS SAA FOR ANY USE OF <br />THESE DRAWINGS AND MATERIALS BY OTHERS. SAA’S SERVICES ARE INTENDED TO ONLY BE OF <br />ASSISTANCE AND GUIDANCE FOR OUR CLIENT’S STRATEGIES AND DO NOT CONSTITUTE AS <br />REQUIREMENTS OR ANY FORM OF HEALTH, ILLNESS OR DISEASE ADVICE. SAA MAKES NO <br />REPRESENTATIONS OR WARRANTIES REGARDING THE ACCURACY OR COMPLETENESS OF THE <br />DRAWINGS AND MATERIALS. ANY RECOMMENDATIONS OR USE OF ANY CDC OR WHO <br />INFORMATION DOES NOT CONSTITUTE ENDORSEMENT BY THE U.S. GOVERNMENT, <br />DEPARTMENT OF HEALTH AND HUMAN SERVICES OR THE CDC AND WHO NOR ITS AFFILIATES. <br />575 Market Street, #502 <br />San Francisco, CA 94105 <br />A-0.2 <br />04/10/24 <br />AW <br />JN/MP <br />634495 <br />GENERAL NOTES <br />X ENGINEERING <br />6 E HUTTON CENTRE <br />DRIVE <br />SANTA ANA, CA 92707 <br />SUITE 650 EXPANSION <br />DATE DESCRIPTION DELTA <br />04/16/24 ISSUE FOR ENGINEERING <br />05/08/24 TENANT REVISION <br />05/20/24 ISSUE FOR PLAN CHECK <br />NELSON <br />ALGAZE <br />No. C-21090 <br />REN. 03/31/2025L,CEN S E ' ARC+,7 <br />E <br />C7S7A <br />7 <br />E O) CA L ,)O RN,A6 E Hutton Center Dr <br />Unit# 625 & 6509/23/2024