09 00 00 FINISHES CONTINUED
<br />10 00 00 SPECIALITIES
<br />10 44 16 - FIRE EXTINGUISHERS
<br />1 A PORTABLE FIRE EXTINGUISHER WITH A MINIMUM 2A10BC RATING SHALL BE PROVIDED EVERY 75' OF TRAVEL
<br />DISTANCE FROM ANY POINT WITHIN THE AREA DEFINED AS SCOPE OF WORK PER THESE PLANS. PROVIDE FIRE
<br />EXTINGUISHERS AS REQUIRED BY FIRE DEPARTMENT FIELD INSPECTOR.
<br />12 00 00 FURNISHINGS
<br />12 21 00 - WINDOW BLINDS
<br />1 CONTRACTOR IS TO PROVIDE BUILDING STANDARD BLINDS AT ALL EXTERIOR WINDOWS. CONTRACTOR IS
<br />VERIFY THE CONDITION OF THE EXISTING BLINDS PRIOR TO PRICING. PROVIDE A PRICE TO CLEAN ALL BLINDS.
<br />CONTRACTOR IS TO SEAL ALL BLINDS TO PREVENT DUST FROM COLLECTING. IF BLINDS ARE IN NEED OF
<br />REPLACEMENT OR MISSING PROVIDE A COST FOR NEW IN THESE LOCATIONS. VERIFY CONDITION OF ALL BLINDS AT
<br />WINDOWS PRIOR TO PRICING. ANY NEW BLINDS SHALL MATCH EXISTING, VERIFY MANUFACTURER, STYLE, COLOR
<br />AND MOUNTING PRIOR TO PRICING. ANY NEW INTERIOR GLAZING IS TO BE PROVIDED WITH NEW BUILDING
<br />STANDARD BLINDS TO MATCH EXISTING.
<br />2 REPAIR/REPLACE WINDOW COVERINGS WHERE NECESSARY, SEE SHEET A-5.0 FOR SPECIFICATION
<br />21 00 00 FIRE SUPPRESSION
<br />1 EXISTING FIRE SPRINKLER SYSTEM IS BUILDING STANDARD U.O.N.
<br />2 REWORK FIRE SPRINKLER SYSTEM AS REQUIRED TO ACCOMMODATE NEW CONSTRUCTION AND TO COMPLY WITH
<br />CURRENT CODE.
<br />3 AT ALL GYPSUM BOARD CEILING AREAS USE FULLY CONCEALED SPRINKLER HEADS, COLOR SHALL BE WHITE.
<br />4 EXTEND/MODIFY FIRE/LIFE SAFETY SYSTEM AS REQUIRED.
<br />5 IT IS INTENDED THAT FIRE SPRINKLER SYSTEM SHALL BE DESIGN/BUILD BY GENERAL CONTRACTOR WITH
<br />DEFERRED APPROVAL.
<br />6 FIRE SPRINKLER PLANS MUST BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL BY APPROPRIATELY
<br />LICENSED CONTRACTOR FOR BUILDING PERMIT ISSUANCE, AND PRIOR TO INSTALLATION OR MODIFICATION OF
<br />EXISTING SYSTEM. REFER SHEET A-0.1 'FIRE PREVENTION' NOTES FOR ADDITIONAL INFORMATION.
<br />22 00 00 PLUMBING
<br />1 FURNISH AND INSTALL ALL PLUMBING ROUGH-INS, FIXTURES AND ACCESSORIES SHOWN ON ALL
<br />CONSTRUCTION PLANS AND DETAIL DRAWINGS UNLESS OTHERWISE NOTED.
<br />2 THE PLUMBING CONTRACTOR SHALL SUBMIT CUTS OF ALL NEW FIXTURES, FITTINGS AND ACCESSORIES TO
<br />SHLEMMER ALGAZE ASSOCIATES FOR REVIEW AND APPROVAL.
<br />3 THE PLUMBING CONTRACTOR SHALL COORDINATE AND INSTALL HIS WORK IN ACCORDANCE WITH
<br />MANUFACTURERS PUBLISHED SPECIFICATIONS.
<br />4 ALL EXISTING PLUMBING BEING ABANDONED SHALL BE CAPPED BEHIND EXISTING FINISHED SURFACES.
<br />EXISTING SURFACES SHALL BE PATCHED TO MATCH EXISTING SURROUNDING SURFACES IN MATERIAL AND FINISH.
<br />THE GENERAL CONTRACTOR SHALL ALSO INCLUDE IN HIS BID A COST FOR WORK FOR CEILING REMOVAL AND
<br />REINSTALLATION REQUIRED FOR PLUMBING WORK IN CEILING PLENUM OF FLOOR BELOW TO COMPLETE WORK ON
<br />FLOOR BEING RENOVATED.
<br />5 THE PLUMBING CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL OTHER TRADES.
<br />6 FURNISH ALL VALVES AS INDICATED ON THE DRAWINGS OR AS MAY BE REQUIRED FOR THE PROPER CONTROL OF
<br />THE VARIOUS APPARATUS AND PIPELINES INSTALLED UNDER THIS SECTION SO THAT ANY FIXTURES PIPE OR
<br />APPARATUS MAY BE CUT OFF FOR REPAIR WITHOUT INTERFERENCE OR INTERRUPTION OF THE SERVICE TO THE
<br />REST OF THE BUILDING.
<br />7 BEFORE BEING COVERED UP OR BUILT-IN ALL PIPING SHALL BE TESTED AS REQUIRED BY THE AUTHORITIES HAVING
<br />JURISDICTION.
<br />8 TOILET FLUSH CONTROLS PROVIDED AND INSTALLED AS PART OF THE WORK SHALL BE OPERABLE WITH ONE HAND
<br />AND SHALL NOT REQUIRE TIGHT GRASPING, PINCHING OR TWISTING OF THE WRIST. CONTROLS FOR THE FLUSH
<br />VALVES SHALL BE MOUNTED ON THE WIDE SIDE OF THE TOILET AREAS: NO MORE THAN 44" ABOVE THE FLOOR.
<br />THE FORCE REQUIRED TO ACTIVATE THE CONTROLS SHALL BE NOT GREATER THAN 5 POUNDS.
<br />9 OTHER FLUSH CONTROLS PROVIDED AND INSTALLED AS PART OF THE WORK SHALL BE OPERABLE WITH ONE HAND,
<br />AND SHALL NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST AND SHALL BE MOUNTED NO
<br />MORE THAN 44" ABOVE THE FLOOR. THE FORCE REQUIRED TO ACTIVATE CONTROLS SHALL NOT BE GREATER THAN
<br />5 POUNDS.
<br />10 FAUCET CONTROLS OR OTHER PLUMBING FIXTURE OPERATING MECHANISMS SHALL BE OPERABLE WITH ONE HAND
<br />AND SHALL NOT REQUIRE TIGHT GRASPING, PINCHING, OR TWISTING OF THE WRIST. THE FORCE REQUIRED TO
<br />ACTIVATE THE CONTROLS SHALL BE NO GREATER THAN 5 POUNDS. LEVER OPERATED, PUSH TYPE AND
<br />ELECTRONICALLY CONTROLLED MECHANISMS ARE EXAMPLES OF ACCEPTABLE DESIGNS. SELF CLOSING VALVES
<br />ARE ALLOWED IF THE FAUCET REMAINS OPEN FOR AT LEAST 10 SECONDS.
<br />11. 11. 418.5 Floor Slope. Floors shall be sloped to floor drains.
<br />23 00 00 HVAC
<br />1 THE HVAC ENGINEER WILL PROVIDE NECESSARY ENGINEERING DRAWINGS TO REWORK ALL EXISTING EQUIPMENT.
<br />2 SUBMIT SHOP DRAWINGS INDICATING ALL NEW WORK AND ALL EXISTING EQUIPMENT TO REMAIN INCLUDING
<br />DIFFUSERS, THERMOSTATS AND ANY REQUIRED ACCESS PANELS, TO SHLEMMER ALGAZE ASSOCIATES. FOR REVIEW
<br />PRIOR TO PROCEEDING WITH FABRICATION AND/OR INSTALLATION OR RELOCATION.
<br />3 THE HVAC CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD SUPERVISION OF ALL THEIR WORK DURING
<br />INSTALLATION AND SHALL INSPECT ALL SYSTEMS FOR PROPER OPERATIONS AT COMPLETION OF THE JOB.
<br />4 INTERIOR SPACES SHALL BE MECHANICALLY VENTILATED IN ACCORDANCE WITH THE LOCAL BUILDING CODE. PLANS
<br />SHOWING MECHANICAL VENTILATION SYSTEM WILL BE FILED IN ACCORDANCE WITH THE LOCAL BUILDING
<br />DEPARTMENT.
<br />5 ANY BUILDING SERVICE SHUT DOWNS REQUIRED FOR THIS WORK SHALL BE REQUIRED IN WRITING BY THE HVAC
<br />CONTRACTOR AT LEAST 72 HOURS IN ADVANCE OF THE SHUT DOWN. THE HVAC CONTRACTOR SHALL OBTAIN
<br />APPROVAL FROM ALL AUTHORITIES HAVING JURISDICTION PRIOR TO SHUT DOWN. ANY SHUT DOWN AFFECTING
<br />THE NORMAL HVAC SERVICE OF OTHER BUILDING OCCUPANTS SHALL BE DONE ON OVERTIME AND OFF HOURS.
<br />6 BALANCING OF ENTIRE SYSTEM SHALL BE DONE BY AN INDEPENDENT AIR BALANCE COMPANY. SUBMIT REPORT TO
<br />SHLEMMER ALGAZE ASSOCIATES AND BUILDING OWNER.
<br />7 ALL DUCT WORK SHALL BE INSULATED PER CODE REQUIREMENTS FOR THERMAL AND ACOUSTIC
<br />CONSIDERATIONS.
<br />8 MECHANICAL VENTILATION IN TOILET ROOM SHALL PROVIDE ONE (1) COMPLETE AIR CHANGE EVERY FIFTEEN (15)
<br />MINUTES AND SHALL BE VENTED TO OUTSIDE AIR.
<br />9 ALL NEW MATERIALS REQUIRED SHALL BE EQUAL TO OR BETTER IN QUALITY THAN THE EXISTING.
<br />10 ALL NEW DIFFUSERS SHALL MATCH APPEARANCE OF EXISTING.
<br />23 00 00 HVAC CONTINUED
<br />26 00 00 ELECTRICAL
<br />1 ALL FIXTURES PROVIDED FOR DATA CABLING SHALL COMPLY WITH DATA CONSULTANT'S PERFORMANCE
<br />CRITERIA. (EX: CAT5, ECAT5, CAT6...)
<br />2 ALL FIRE PREVENTION WIRING IS TO BE PLACED IN CONDUIT.
<br />3 FIRE RATED TEFLON PLENUM CABLES SHALL BE USED FOR TELEPHONE AND ANY LOW-VOLTAGE CIRCUITS NOT IN
<br />CONDUIT.
<br />4 PROVIDE TELEPHONE OUTLET BOXES (WHERE SHOWN ON "ELECTRICAL/ TELEPHONE PLAN") AND ALL NECESSARY
<br />CONDUIT RUNS TO TELEPHONE EQUIPMENT AS REQUIRED.
<br />5 ALL TELEPHONE WIRING CONDUIT SHALL BE CONCEALED IN PARTITIONS AND/OR CEILING.
<br />6 PROVIDE CONDUIT FROM SERVER ROOM TO CEILING FOR HORIZONTAL CABLE DISTRIBUTION. DATA VENDOR TO
<br />CONFIRM SIZE AND QUANTITY OF CONDUITS.
<br />7 CONTRACTOR TO COORDINATE TELEPHONE/ DATA CONDUIT SIZE REQUIREMENTS WITH CLIENTS TELEPHONE/ DATA
<br />VENDOR.
<br />8 CONTRACTOR TO PROVIDE CONDUIT AND NECESSARY CONNECTIONS BETWEEN TENANT'S TELEPHONE
<br />EQUIPMENT AND BUILDING MAIN TELEPHONE CLOSET. SIZE AS REQUIRED BY TENANT VENDOR.
<br />27 00 00 COMMUNICATIONS
<br />28 46 00 FIRE DETECTION & ALARM
<br />CONSTRUCTION SPECIFICATIONS
<br />1. SEMI-RECESSED FIRE EXTINGUISHER CABINET, REFER TO SPECIFICATION BELOW:
<br />MANF.: POTTER-ROEMER
<br />NAME: 7000 SERIES
<br />MODEL: 7023-DVL-6 (NON RATED), GALVANIZED STEEL WITH RECOATABLE WHITE POLYESTER
<br />FINISH, 1/8" CLEAR ACRYLIC GLAZING
<br />INSIDE BOX DIM: 9" WIDE X 24" HIGH X 5-3/4" DEEP
<br />R.O.: 10" WIDE X 25" HIGH X 3" DEEP
<br />USE EXTINGR: 3002, 3005, 3005-3, 3010, 3306, 3310, 3302, 3305, 3305-03, 3306, AND 3405.
<br />MODEL: FRC7023-DVL-6 (RATED), COLD ROLLED STEEL WITH RECOATABLE WHITE POLYESTER
<br />FINISH, 1/8" CLEAR ACRYLIC GLAZING, 3" TRIM
<br />INSIDE BOX DIM: 9" WIDE X 24" HIGH X 5/3/4" DEEP
<br />R.O.: 11-1/4" WIDE X 26" HIGH X 3-7/8" DEEP
<br />USE EXTINGR: 3006, 3010, 3306, 3310, AND 3405.
<br />FINISH: PAINT EXTERIOR TO MATCH ADJACENT WALL. INTERIOR OF CABINET IS TO
<br />REMAIN STANDARD WHITE FINISH.
<br />MT. HT.. AT ACCESSIBLE HEIGHT PER MANUFACTURER SPEC.
<br />NOTE 1: USE SEMI-RECESSED STYLE WALL MOUNT.
<br />NOTE 2: AT FIRE RATED CONDITION A MINIMUM OF 3-5/8" STUDS MUST BE USED.
<br />NOTE 3: REFER TO DETAIL 5/A-30.0 AND 6/A-30.0
<br />2. DOUBLE COMPARTMENT SINK, REFER TO SPECIFICATION BELOW:
<br />MANF.: EKLAY
<br />NAME: ADA COMPLIANT DROP IN BOWL
<br />MODEL: LRAD331955 (DRAIN LOCATION AT REAR)
<br />SIZE: 33" LONG X 19-1/2" WIDE X 5-1/2" DEEP
<br />FINISH: 18 GA. TYPE 304 18-8 STAINLESS STEEL. UNDERSIDE IS FULLY
<br />UNDERCOATED.
<br />NOTE #1: THREE (3) FAUCET HOLES FURNISHED, U.O.N.,
<br />NOTE #2: LEVER FAUCET TO BE:
<br />MANF..: MOEN
<br />MODEL: CHATEAU 7425
<br />FINISH: POLISHED CHROME
<br />NOTE: PROVIDE 1 GPM AERATOR FROM GRAINGER ITEM 4XGL3.
<br />3. ALTERNATE DOUBLE COMPARTMENT SINK, REFER TO SPECIFICATION BELOW:
<br />MANF.: JUST
<br />NAME: ADA COMPLIANT DOUBLE BOWL UNDERMOUNTED SINK
<br />MODEL: UDADA1832A55-J (DRAIN LOCATION AT REAR)
<br />SIZE: 30" LONG X 18-1/2" WIDE X 5-3/8" DEEP
<br />FINISH: 18 GA. TYPE 304 18-8 STAINLESS STEEL. UNDERSIDE IS FULLY
<br />UNDERCOATED.
<br />NOTE #1: THREE (3) FAUCET HOLES FURNISHED, U.O.N.,
<br />NOTE #2: LEVER FAUCET TO BE:
<br />MANF..: GROHE
<br />MODEL: CONCETTO 32665003
<br />FINISH: POLISHED CHROME
<br />NOTE: PROVIDE 1 GPM AERATOR FROM GRAINGER ITEM 4XGL3.
<br />EQUIPMENT SPECIFICATIONS
<br />1. GARBAGE DISPOSAL, REFER TO SPECIFICATION BELOW:
<br />MANF.: INSINKERATOR
<br />MODEL: BADGER - CONTINUOUS FEED
<br />HP: 3/4
<br />POWER: 120 VOLTS, 60 HERTZ, 9.5 AMP
<br />NOTE #1: SWITCH AT WALL.
<br />NOTE #2: POWER CONNECTION: LINE CORD.
<br />2. UNDER COUNTER INSTANTANEOUS WATER HEATER, REFER TO SPECIFICATION BELOW:
<br />MANF.: CHRONOMITE
<br />MODEL: M-30L OR EQUAL
<br />POWER: 30amps, 277volts, 4160watts
<br />NOTE #1: 57° F TEMP. RISE, 1.0 GPM FLOW RATE.
<br />NOTE #2: MOUNT SO THAT IT IS NOT VISIBLE.
<br />NOTE #3: CONTRACTOR TO VERIFY AVAILABLE VOLTAGE FOR USE.
<br />3. DISHWASHER, REFER TO SPECIFICATION BELOW:
<br />MANF.: ASKO
<br />MODEL: DBI564TS.U OR EQUAL
<br />SIZE: 32-11/16" - 34-13/16" HIGH, 23 15/16" WIDE, 21 13/16" DEEP
<br />COLOR: STAINLESS
<br />POWER: 115 VOLTS, 60HZ, 15 AMPS
<br />NOTE #1: PROVIDE A UNDERCOUNTER INSTANTANEOUS HOT WATER HEATER.
<br />PROVIDE ALL REQUIRED PLUMBING, REFER TO PLUMBING DRAWINGS.
<br />11 IT IS THE INTENT OF THE DRAWINGS THAT ALL EXPOSED SURFACES RECEIVE FINISHES AS INDICATED ON THE
<br />DRAWINGS OR IN THE SPECIFICATIONS UNLESS SPECIFICALLY NOTED OTHERWISE. ANY SURFACES WHICH DO NOT
<br />HAVE A SPECIFIC FINISH NOTED OR ARE NOTED TO REMAIN UNFINISHED SHALL BE BROUGHT TO THE ATTENTION OF
<br />SHLEMMER ALGAZE ASSOCIATES AND FINISHED PER SHLEMMER ALGAZE ASSOCIATES INSTRUCTION.
<br />12 FINISH FRONT SIDE, BACK SIDE AND DOOR EDGES AT STRIKE SIDE AND HINGE SIDE. LEAVE TOP AND BOTTOM
<br />UNPAINTED TO PREVENT WARPING.
<br />13 PAINT ALL METAL ACCESS DOORS AND ACCESS PANELS TO MATCH ADJACENT WALL OR CEILING FINISH.
<br />GRAPHICS ON DOOR OR PANEL (IF ANY) ARE TO BE REPAINTED/RE-APPLIED TO MATCH EXISTING, IF APPLICABLE.
<br />14 CLOSET WALL SURFACES ARE TO BE PAINTED TO MATCH THE COLOR OF THE ADJACENT OUTSIDE WALL
<br />SURFACES.
<br />15 ALL PAINT SHALL BE APPLIED IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATION FOR THE PARTICULAR
<br />SURFACE.
<br />16 ALL SURFACES SHALL BE PROPERLY PREPARED WITH APPROPRIATE SEALER PRIOR TO INSTALLATION OF
<br />WALLCOVERINGS AND INSTALLED PER MANUFACTURER'S RECOMMENDATION.
<br />17 CONTRACTOR TO REFINISH DOORS & FRAMES (REMOVE ALL SCRATCHES AND DINGS) WHEN THEY ARE BEING
<br />REUSED.
<br />18 FACTORY PRIMED HOLLOW METAL DOORS AND FRAMES SHALL BE FINISHED WITH TWO COATS OF SEMI-GLOSS
<br />PAINT, UNLESS OTHERWISE NOTED.
<br />19 ALL BASE TO BE PAINTED SHALL MATCH ADJACENT WALL U.O.N. SEE FLOOR FINISH PLANS FOR LOCATIONS AND
<br />FINISH SCHEDULE FOR SPECIFICATION.
<br />09 00 00 FINISHES CONTINUED26 00 00 ELECTRICAL CONTINUED
<br />4 THE MEANS OF EGRESS, INCLUDING THE EXIT DISCHARGE SHALL BE ILLUMINATED AT ALL TIMES THE BUILDING
<br />SPACE SERVED BY THE MEANS OF EGRESS IS OCCUPIED. THE MEANS OF EGRESS ILLUMINATION LEVEL SHALL NOT BE
<br />LESS THAN 1 FOOT-CANDLE (11-LUX) AT THE WALKING SURFACE LEVEL. (2022 CBC 1008.1, 1008.2)
<br />5 EXIT ILLUMINATION SHALL COMPLY WITH 2022 CBC SECTION 1008 AND 1013.
<br />6 EXIT SIGNS SHALL BE INSTALLED AT REQUIRED EXIT DOORWAYS AND WHERE OTHERWISE NECESSARY TO CLEARLY
<br />INDICATE THE DIRECTION OF EGRESS WHEN THE EXIT SERVES AN OCCUPANT LOAD OF 50 OR MORE.
<br />EXCEPTION: MAIN EXTERIOR EXIT DOORS WHICH OBVIOUSLY AND CLEARLY ARE IDENTIFIABLE
<br />AS EXITS NEED NOT BE SIGNED WHEN APPROVED BY THE BUILDING OFFICIAL.
<br />7 WHEN NECESSARY, THE FINAL LOCATION AND QUANTITY OF EXIT SIGNS SHALL BE DETERMINED BY THE FIRE
<br />DEPARTMENT PRIOR TO CONSTRUCTION OF ANY WORK.
<br />8 THE COLOR AND DESIGN OF LETTERING, ARROWS AND OTHER SYMBOLS ON EXIT SIGN SHALL BE IN HIGH
<br />CONTRAST WITH THEIR BACKGROUND (3/4" X 6" LETTERS MIN.)
<br />1 SMOKE DETECTORS SHALL BE INSTALLED IN TENANT SPACE BY LICENSED ALARM SYSTEMS CONTRACTOR, WORK
<br />SHALL BE CONNECTED TO EXISTING BUILDING SYSTEM.
<br />2 REWORK FIRE/LIFE SAFETY SYSTEM AS REQUIRED TO COMPLY WITH CURRENT CODE. REFER SHEET A-0.1 'FIRE
<br />PREVENTION' NOTES FOR ADDITIONAL INFORMATION.
<br />3 PROVIDE EMERGENCY NOTIFICATION SYSTEM FOR THE HEARING AND VISUAL IMPAIRED PER A.D.A.
<br />REQUIREMENTS AND 2022 CBC 11B-215.
<br />11 THE HEATING, VENTILATING, AND AIR CONDITIONING SYSTEMS SHALL ACCOMMODATE THE NEW OCCUPANCY. ALL
<br />ROOMS AND AREAS SHALL HAVE SUPPLY AND RETURN AIR. THERMOSTATS SHALL HAVE AUTOMATIC CHANGEOVER
<br />FEATURE, (NO MANUAL SWITCHING FROM HEATING TO COOLING CYCLES), WITH METAL, NON VISUAL TAMPER
<br />PROOF COVERS.
<br />12 PRIOR TO INSTALLATION, HVAC ZONES AND T-STAT LOCATIONS SHALL BE APPROVED BY TENANT & COORDINATED
<br />WITH FURNITURE PLANS AND WALL FINISH LOCATIONS.
<br />13 CONTRACTOR TO VERIFY WITH ARCHITECT IF LINEAR DIFFUSER IS REQUIRED WHERE CEILING SYSTEM IS GYP.
<br />BOARD.
<br />14 REWORK ALL EXISTING HVAC SYSTEM TO ACCOMMODATE NEW CONSTRUCTION.
<br />15 FIRE DAMPERS OR DOORS SHALL BE PROVIDED WHERE AIR DUCTS PENETRATE FIRE RATED WALLS OR CEILING AS
<br />PER 2022 CBC SECTION 716. SMOKE DAMPERS SHALL BE PROVIDED WHERE AIR DUCTS PENETRATE FIRE
<br />RATED WALLS OR CEILING AS PER 2022 CBC SECTION 716.
<br />16 THE GENERAL CONTRACTOR SHALL SUPPLY ALL RETURN AIR OPENINGS IN SLAB TO SLAB PARTITIONS ABOVE HUNG
<br />CEILINGS TO MATCH AREA CALCULATIONS REQUIREMENTS AS SHOWN ON ENGINEERING DRAWINGS. ALL OPENINGS
<br />IN DEMISING AND SOUND ATTENUATED WALLS TO HAVE SOUND BOOTS.
<br />17 DESIGN/BUILD DOCUMENTS SHALL COORDINATE EXISTING DIFFUSER AND SPRINKLER HEAD LOCATIONS.
<br />CONTRACTOR TO RELOCATE DIFFUSERS AND/OR SPRINKLER HEADS AS REQUIRED BY BUILDING CODE. CONTRACTOR
<br />TO PROVIDE LOCATION LAYOUT TO SAA PRIOR TO INSTALLATION.
<br />1 THE CONTRACTOR SHALL COORDINATE ALL ELECTRICAL WORK WITH MANUFACTURERS SPECIFICATIONS.
<br />2 THE WORK SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL
<br />BOARD OF FIRE UNDERWRITERS, PUBLIC UTILITIES COMPANY, TELEPHONE COMPANY AND ALL OTHER
<br />AUTHORITIES HAVING JURISDICTION.
<br />3 ALL NEW MATERIALS SPECIFIED SHALL COMPLY WITH THE STANDARDS OF THE UNDERWRITERS LABORATORIES, INC.
<br />IN EVERY CASE WHERE SUCH A PARTICULAR TYPE OF MATERIAL IS SPECIFIED, UNLESS OTHERWISE NOTED.
<br />4 VERIFY LOCATION OF FLOOR MONUMENT CORES WITH SAA IN THE FIELD PRIOR TO THE START OF ANY
<br />CORING. REFER ALSO TO SECTION 01 73 29 - CUTTING AND PATCHING. (COORDINATE CORE LOCATION WITH
<br />MILLWORK AND FURNITURE LAYOUT). PROVIDE CONDUIT DISTRIBUTION FROM CORES TO WALL STUB-UPS. PROVIDE
<br />FIRE SAFING AND SMOKE SEALANT AT FLOOR PENETRATIONS AS REQUIRED.
<br />5 PROVIDE FIRE CAULKING AND OR ACOUSTICAL CAULKING AT OUTLETS AT ACOUSTICAL AND FIRE RATED
<br />PARTITIONS. TYPICAL DIMENSION RANGE GIVEN AT ALL PRIVATE OFFICES IS A GENERAL GUIDELINE. OUTLETS ON
<br />EITHER SIDE OF THE WALL SHOULD SHIFT, 6" TO 12" IN OPPOSITE DIRECTIONS.
<br />6 NO "BACK-TO-BACK" OUTLETS ARE PERMITTED WITHIN A WALL. OUTLETS MUST BE STAGGERED IN LOCATION AND
<br />INSTALLED IN SEPARATE STUD CAVITIES.
<br />7 REFER TO DETAIL ON SHEET A-0.1 FOR TYPICAL INSTALLATION HEIGHT OF ALL WALL MOUNTED DEVICES, SWITCHES,
<br />OUTLETS, AND THERMOSTATS. LOCATE TOP OF THERMOSTATS, PULL BOXES, CONTROL DEVICES AND
<br />SWITCHES/DIMMERS AT A MAXIMUM OF 48" ABOVE FINISHED FLOOR TO TOP OF OUTLET BOX. WHERE
<br />SWITCHES/DIMMERS ARE GANGED TOGETHER, PROVIDE A SINGLE PIECE COVERPLATE
<br />8 THE ELECTRICAL CONTRACTOR SHALL SUBMIT CUTSHEETS OF ALL FIXTURES AS DIRECTED.
<br />9 THE ELECTRICAL CONTRACTOR SHALL COORDINATE ANY ELECTRICAL OR LIGHTING INSTALLATION INTO THE CABINET
<br />WORK WITH THE CABINET CONTRACTOR AS REQUIRED.
<br />10 THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL TEMPORARY LIGHTING AND ELECTRICAL SERVICE FOR ALL
<br />TRADES AS REQUIRED.
<br />11 ALL ELECTRICAL, TELEPHONE RECEPTACLES AND LIGHT FIXTURES SHALL BE LOCATED AS DIMENSIONED ON SAA
<br />PLANS.
<br />12 ALL NEW OUTLETS ON COLUMNS WILL BE CENTERED ON FACE SHOWN, UNLESS OTHERWISE NOTED.
<br />13 POWER AND TELEPHONE OUTLETS SHOWN ON PLANS ARE NOT INCLUSIVE OF ALL OUTLETS REQUIRED BY OWNER.
<br />CONTRACTOR SHALL VERIFY WITH OWNER ALL REQUIRED OUTLETS PRIOR TO COMPLETING WALL CONSTRUCTION.
<br />14 THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL POWER WIRING. ALL ELECTRICAL WIRING SHALL BE
<br />PLACED IN CONDUIT.
<br />15 UNLESS OTHERWISE NOTED, ALL OUTLETS SIDE BY SIDE SHALL BE 6" FROM CENTER OF PLATE WITH POSITIONING
<br />DIMENSIONS CENTERED BETWEEN.
<br />16 ALL ELECTRICAL AND TELEPHONE WIRING CONDUIT SHALL BE CONCEALED IN PARTITIONS AND/OR CEILING.
<br />17 THE ELECTRICAL AND/OR GENERAL CONTRACTOR SHALL PROVIDE ALL CUTTING AND PATCHING OF ALL
<br />CHASES IN FLOORS, WALLS, AND CEILINGS, AS REQUIRED.
<br />18 PROVIDE NEW BLANK COVER PLATES FOR ABANDONED OUTLET LOCATIONS.
<br />19 CONVENIENCE RECEPTACLES SHALL BE DUPLEX TYPE RATED 15 AMP, 125 V., GROUNDED TYP., UNLESS
<br />OTHERWISE NOTED.
<br />20 THE ELECTRICAL CONTRACTOR WILL COORDINATE HIS WORK WITH THE AIR CONDITIONING ENGINEER AND
<br />CONTRACTOR PRIOR TO EXECUTING HIS WORK.
<br />21 AS IT RELATES TO THIS SET OF DOCUMENTS A DEDICATED CIRCUIT (DC) SHALL BE A SINGLE CIRCUIT WITH MULTIPLE
<br />OUTLETS DEDICATED TO A SPECIFIC EQUIPMENT USAGE.
<br />22 ELECTRICAL CONTRACTOR TO FIELD VERIFY THAT ALL CIRCUITS AT THE MAIN PANEL ARE ADEQUATE FOR NEW
<br />REQUIREMENTS, AND SHALL INSTALL NEW CONDUIT, CIRCUITS, AND PANELS IF REQUIRED.
<br />23 ALL EXPOSED ELECTRICAL DEVICES, I.E. SWITCHES, STROBES, OUTLETS, WALL TELEPHONE MOUNTS, ETC. AND ALL
<br />COVERPLATES TO MATCH "BLDG. STD.".
<br />24 GENERAL CONTRACTOR IS TO VERIFY THE POWER REQUIREMENT AND CIRCUITING OF ANY SPECIALTY
<br />EQUIPMENT DURING ROUGH IN ELECTRICAL TO INSURE THE PROPER VOLTAGE AND CIRCUIT CONFIGURATION.
<br />25 GENERAL CONTRACTOR IS TO HAVE FURNITURE VENDOR APPROVE ALL POWER AND TELEPHONE FEEDS FOR
<br />WORKSTATIONS PRIOR TO INSTALLATION. G.C. IS TO HAVE FURNITURE VENDOR APPROVE ALL ELECTRICAL AND
<br />DATA IN PRIVATE OFFICES PRIOR TO INSTALLATION.
<br />26 FURNITURE VENDOR FOR EITHER WORKSTATIONS OR CASEWORK SHALL FIELD VERIFY LAYOUT TO VERIFY CLEAR
<br />DIMENSIONS REQUIRED FOR FURNITURE PRIOR TO ORDERING FURNITURE. DO NOT SCALE THE DRAWINGS.
<br />27 CONTRACTOR MUST COORDINATE ALL ELECTRICAL OUTLETS FOR FURNITURE WITH FURNITURE CONTRACTOR
<br />BEFORE PLACEMENT IN FIELD.
<br />28 CONTRACTOR SHALL PROVIDE ELECTRICAL DRAWINGS STAMPED AND SIGNED BY LICENSED ENGINEER.
<br />PROVIDE COMPLETE WORKING DRAWINGS, CALCULATIONS AND DESCRIPTIVE DATA AS REQUIRED TO OBTAIN
<br />PERMITS FOR TENANT ELECTRICAL WORK. (DOES NOT ALWAYS APPLY)
<br />29 LABEL ALL JUNCTION BOXES WITH CIRCUITS. LABEL PANEL WITH PREPRINTED TYPEWRITTEN PANEL SCHEDULE.
<br />30 ALL CONDUIT SHALL BE EMT OR FLEX, NO BX OR PREWIRED CABLE ALLOWED.
<br />31 ALL ELECTRICAL OUTLETS TO BE 120V. SINGLE PHASE AND MINIMUM 15 AMPS 3-WIRE GROUNDED WITH 1/2"
<br />CONDUIT. (UNLESS OTHERWISE NOTED)
<br />32 PROVIDE SUPPORT FOR ALL CONDUITS ABOVE THE CEILING AS REQUIRED PER CODE.
<br />33 ENSURE THAT ROOM SEPARATION OF LIGHTING IS MAINTAINED BY PROVIDING SWITCHING REQUIRED TO
<br />ACCOMPLISH THIS.
<br />34 ELECTRICAL ENGINEER WILL BE RESPONSIBLE FOR EMERGENCY LIGHTING CALCULATIONS AND SPECS.
<br />35 IF LIGHT FIXTURES ARE TO BE REUSED/RELOCATED, CONTRACTOR SHALL CLEAN & RE-LAMP TO MATCH. ALL LIGHTS
<br />AND FIXTURES OF THE SAME TYPE (NEW AND EXISTING) SHALL HAVE MATCHING LAMPS.
<br />36 ALL SWITCHING AND LIGHTING LAYOUTS SHALL COMPLY WITH TITLE 24.
<br />37 VERIFY QUANTITY OF LIGHT FIXTURES BETWEEN ARCHITECTURAL DRAWINGS AND ENGINEERING DRAWINGS. IF
<br />QUANTITY IS DIFFERENT NOTIFY ARCHITECT DURING BIDDING.
<br />26 52 00 - SAFETY LIGHTING
<br />1 GENERAL CONTRACTOR SHALL PROVIDE AN EMERGENCY EXIT AND EXIT LIGHTING SYSTEM AS REQUIRED BY
<br />GOVERNING JURISDICTIONS.
<br />2 GENERAL CONTRACTOR TO PROVIDE EXIT SIGNS READILY VISIBLE TO CLEARLY INDICATE THE DIRECTION OF EGRESS
<br />TRAVEL. EXIT SIGNS SHALL BE PROPERLY ILLUMINATED. (2022 CBC 1013.5 AND 1013.6) ALL EXIT SIGN GRAPHICS,
<br />ILLUMINATION, AND POWER SOURCE MUST COMPLY WITH (2022 CBC 1013.5 AND 1013.6)
<br />3 CONTRACTOR MUST COMPLY WITH (2022 CBC 1013.5 AND 1013.6) FOR THE EXIT SIGN GRAPHIC,
<br />ILLUMINATION, AND POWER SOURCE.
<br />4 SPACES BEING SURFACED SHALL BE CLOSED TO TRAFFIC AND OTHER WORK DURING THE LAYING OF FLOORING.
<br />STONE FLOORS SHALL BE COVERED AFTER INSTALLATION FOR PROTECTION.
<br />5 UPON COMPLETION, ALL WORK SHALL BE CLEANED BY THE CONTRACTOR REMOVING ALL SPOTS OF ADHESIVE
<br />AND SURFACE STAINS AND ALL SCRAPS, CARTONS AND CONTAINERS SHALL BE REMOVED FROM THE BUILDING.
<br />6 STONE, WOOD, AND TILE FLOORING CONTRACTORS TO SUBMIT TO SAA ACTUAL DIMENSIONED LAYOUT PLAN FOR
<br />APPROVAL PRIOR TO INSTALLATION.
<br />7 THE GENERAL CONTRACTOR TO COORDINATE ALL FLOORING CONTRACTORS INVOLVED TO ASSURE FLUSH
<br />INSTALLATION OF ALL VARYING FLOOR MATERIALS USED. ALL TRANSITION METHODS TO BE APPROVED BY
<br />SHLEMMER ALGAZE ASSOCIATES.
<br />8 CLOSET FLOORS ARE TO HAVE SAME FLOORING AS THE FLOORING IN ADJACENT AREA, UNLESS OTHERWISE NOTED.
<br />9 ALL FINISHES SHALL HAVE A MAXIMUM FLAME SPREAD OF 200 AND A MAXIMUM SMOKE DENSITY OF 450.
<br />(2022 CBC 803.1& 803.1.1).
<br />10 CONTRACTOR TO VERIFY AVAILABILITY OF ALL PRODUCTS SPECIFIED AND NOTIFY ARCHITECT IMMEDIATELY IF THERE
<br />ARE ANY DISCREPANCIES WITH PROJECT COMPLETION DATE. PRODUCTS MAY REQUIRE A TWO TO SIX WEEK LEAD-
<br />TIME. NOTIFY ARCHITECT OF ALL LONG LEAD ITEMS.
<br />11 NO SUBSTITUTIONS OF ANY MATERIAL ALLOWED WITHOUT WRITTEN APPROVAL OF ARCHITECT.
<br />12 PROVIDE APPROPRIATE SEALER ON STONE FLOORING TO ACHIEVE THE SLIP COEFFICIENT REQUIRED BY CODE.
<br />OBTAIN ALL TEST RESULTS AND PROVIDE THE ORIGINAL TEST RESULTS TO THE SAA. APPLY SEALER PER
<br />MANUFACTURES INSTRUCTIONS.
<br />13 THE GENERAL CONTRACTOR SHALL PROVIDE AS PART OF HIS BID, A SEPARATE UNIT COST FOR EACH FLOORING
<br />MATERIAL SPECIFIED FOR THIS PROJECT. REFER TO SHEET A-5.0 FOR FLOORING MATERIALS SPECIFIED. PROVIDE A
<br />SEPARATE COST FOR THE INSTALLATION OF THE FLOORING MATERIAL. ANY BID THAT DOES NOT PROVIDE A BREAK
<br />DOWN WILL BE CONSIDERED NON-RESPONSIVE AND NOT ACCEPTED.
<br />09 65 00 - RESILIENT FLOORING
<br />1 THE GENERAL CONTRACTOR, AFTER PROPERLY CLEANING THE FLOORING MATERIAL, SHALL GIVE RESILIENT TILE
<br />FLOOR TWO (2) APPLICATIONS OF AN APPROVED NON-SLIP WAX WHICH IS TO BE THOROUGHLY MACHINE BUFFED
<br />AND LEFT IN CONDITION ENTIRELY SATISFACTORY TO SHLEMMER ALGAZE ASSOCIATES.
<br />2 THE GENERAL CONTRACTOR SHALL PROVIDE AND MAINTAIN ADEQUATE PROTECTION FOR ALL RESILIENT FLOORING
<br />WORK FOR THE DURATION OF THE CONTRACT, AND REMOVE ALL PROTECTION PRIOR TO PUNCH LIST.
<br />09 65 13 - RESILIENT BASE AND ACCESSORIES
<br />1 RUBBER AND/OR VINYL BASE SHALL IN ALL CONDITIONS MATCH THE COLOR OF ADJACENT WALL U.O.N. GENERAL
<br />CONTRACTOR TO CONFIRM WITH SAA EXACT COLOR IF NOT SPECIFIED ON DRAWINGS AND SUBMIT SAMPLE OF
<br />COLORED BASE TO SAA FOR APPROVAL PRIOR TO PURCHASE AND INSTALLATION.
<br />2 ALL RESILIENT BASE TO BE AS SPECIFIED ON SHEET A-5.0. ALL MASONRY WALLS AND DRYWALL SHALL HAVE
<br />SPECIFIED STRAIGHT VINYL BASE IN CARPETED AREAS AND COVE VINYL BASE IN RESILIENT TILE AREAS UNLESS
<br />OTHERWISE NOTED.
<br />3 PROVIDE RUBBER REDUCER STRIP WHERE CARPET AND VCT TRANSITION OCCURS, UNLESS OTHERWISE
<br />NOTED. GC TO COORDINATE WITH ARCHITECT FOR CLARIFICATION OF COLOR BEFORE PURCHASE.
<br />09 68 00 - CARPETING
<br />1 ALL ROLL CARPETING SHALL BE INSTALLED DIRECT GLUE, U.O.N.
<br />2 ALL CARPET SEAMS ARE TO BE SEALED AS PER CARPET MANUFACTURER'S PUBLISHED INSTALLATION
<br />INSTRUCTIONS. SEAMING DIAGRAMS TO BE APPROVED BY SHLEMMER ALGAZE ASSOCIATES BEFORE
<br />ORDERING/INSTALLATION OF CARPETING.
<br />3 ALL WORKMANSHIP SHALL BE OF THE HIGHEST QUALITY AND WHEN THE WORK IS COMPLETE, IT SHALL BE FREE
<br />FROM BUCKLES, BUBBLES, OPEN JOINTS OR OTHER IMPERFECTIONS. SEAMS SHALL BE KEPT IN ACCURATE
<br />ALIGNMENT ALONG BOTH COORDINATES. CARPET TILE HAVING CHIPPED OR ROUNDED CORNERS WILL BE REJECTED
<br />AND IF LAID, SHALL BE REMOVED AND REPLACED WITH ACCEPTABLE TILE.
<br />4 CARPET TILE SHALL BE INSTALLED IN A SQUARE PATTERN WITH COURSES PARALLEL TO WALLS, UNLESS
<br />OTHERWISE INDICATED ON DRAWINGS. THE ADHESIVE USED FOR CEMENTING TILE SHALL BE APPLIED FAR ENOUGH
<br />IN ADVANCE OF THE SETTING TO PERMIT THE ADHESIVE TO REACH ITS INITIAL SET BUT NOT ITS FINAL SET.
<br />5 INSTALL CARPET FROM THE SAME DYE LOT.
<br />6 SUBMIT CARPET FROM ACTUAL CARPET RUNS. APPROVAL IS AT THE DISCRETION OF SAA AND OWNER.
<br />7 CREATE CARPET TO CARPET OR CARPET TO OTHER FLOORING TRANSITIONS BENEATH THE CENTERLINE OF DOOR IN
<br />THE CLOSED POSITION.
<br />8 WHERE FLOOR MOUNTED OUTLETS ARE REQUIRED ON CARPETED AREA, CUT THE CARPET IN AN "X" OVER THE HOLE
<br />AND CARPET UNDER, THIS ALLOWS CARPET PATCHING WHERE OUTLETS ARE LATER CAPPED. DO NOT TRIM THE
<br />CARPET.
<br />9 CARPET CONTRACTOR MUST VERIFY EXISTING FLOOR CONDITIONS PRIOR TO BID AND INSTALLATION.
<br />10 CARPET MUST MEET OR EXCEED CARPET AND RUG INSTITUTE'S GREEN LABEL PLUS TESTING AND PRODUCT
<br />REQUIREMENTS.
<br />11 CARPET PAD, IF SPECIFIED, MUST MEET OR EXCEED CARPET AND RUG INSTITUTE'S GREEN LABEL TESTING AND
<br />PRODUCT REQUIREMENTS.
<br />12 CARPET ADHESIVES MUST BE LOW VOC AND MUST NOT EXCEED THE VOC CONTENT LIMITS OF SCAQMD RULE #1168
<br />REQUIREMENTS IN EFFECT ON JANUARY 1, 2011.
<br />13 CONTRACTOR SHALL SUBMIT MSDS SHEETS, SIGNED ATTESTATIONS OR OTHER OFFICIAL LITERATURE FROM
<br />MANUFACTURER FOR ALL FLOOR FINISH, BASE AND ADHESIVES USED ON THE PROJECT.
<br />09 72 00 - WALLCOVERINGS
<br />1 THE GENERAL CONTRACTOR SHALL INSTALL WALLCOVERINGS IN ACCORDANCE WITH MANUFACTURERS
<br />INSTALLATION SPECIFICATIONS, WHERE DESIGNATED. ALL WALLCOVERINGS SHALL BE SMOOTH, WITH NO
<br />WRINKLES, BUBBLES OR LOOSE EDGES, ALL PASTE AND BRUSH MARKS SHALL BE THOROUGHLY REMOVED. WALL
<br />COVERING ADJOINING WOOD OR METAL TRIM SHALL BE CUT STRAIGHT AND SQUARE. ALL WORKMANSHIP WHICH
<br />IS NOT JUDGED TO BE FIRST QUALITY BY SHLEMMER ALGAZE ASSOCIATES WILL BE REJECTED.
<br />2 ALL FINISHES SHALL COMPLY TO A MAXIMUM FLAME SPREAD OF 200 AND A MAXIMUM SMOKE DENSITY OF 450.
<br />(2022 CBC 803.1 & 803.1.1)
<br />3 ALL DRAPES, HANGING CURTAINS AND OTHER DECORATIVE MATERIALS SHALL BE TREATED AND MAINTAINED IN A
<br />FLAME RETARDANT CONDITION.
<br />09 90 00 - PAINTING AND COATING
<br />1 UNLESS OTHERWISE SPECIFIED, ALL AREAS ARE TO BE PAINTED IN ACCORDANCE WITH FINISH PLANS.
<br />2 WALLS SHALL INCLUDE SURFACES FROM FLOOR TO CEILING, INCLUDING PILASTERS, FASCIA, JAMBS, DOOR FRAMES,
<br />REVEALS, RETURNS, AND ALL VERTICAL SURFACES NOT INCLUDED IN CEILING.
<br />3 PAINT COLORS SHALL BE SPECIFIED BY SHLEMMER ALGAZE ASSOCIATES AND THE GENERAL CONTRACTOR SHALL
<br />SUBMIT THREE (3) SAMPLES (12" X 12") OF EACH COLOR SPECIFIED FOR REVIEW BY SHLEMMER ALGAZE
<br />ASSOCIATES.
<br />4 ALL WALLS AND CEILINGS SHALL BE PROPERLY PREPARED, SPACKLE, SANDED, ETC. TO PROVIDE A PERFECTLY
<br />SMOOTH FINISH AND SURFACE READY FOR PRIME AND PAINT.
<br />5 ALL EXISTING LOOSE PAINT SHALL BE REMOVED AND SPACKLE OR PLASTER PATCHED.
<br />6 ALL EXISTING UNEVENNESS IN ALL PARTITIONS SHALL BE SANDED OR CHIPPED AWAY AND SURFACES PLASTER-
<br />PATCHED OR SPACKLED TO INSURE A PERFECTLY EVEN SURFACE.
<br />7 ALL WOOD SHELVING AND PAINTED DOORS SHALL RECEIVE PRIMING, SANDING AND TWO FULL COATS OF
<br />SEMI-GLOSS ENAMEL FREE OF BRUSH MARKS, UNLESS OTHERWISE NOTED.
<br />8 THE CONTRACTOR SHALL REMOVE ALL ELECTRICAL SWITCH PLATES AND OUTLET PLATES, SURFACE HARDWARE,
<br />ETC., PRIOR TO PAINTING, PROTECTING AND REPLACING SAME WHEN PAINTING HAS BEEN COMPLETED. HE SHALL
<br />REMOVE ALL PAINT FROM WHERE IT HAS SPILLED, SPLASHED OR SPLATTERED ON SURFACES, INCLUDING BUT NOT
<br />LIMITED TO LIGHT FIXTURES, DIFFUSERS, REGISTERS AND SLAB FITTINGS, ETC.
<br />9 THE CONTRACTOR SHALL USE A LATEX BASE PAINT IN COLORS AND FINISHES SELECTED BY SHLEMMER ALGAZE
<br />ASSOCIATES. CONTRACTOR SHALL PROPERLY PREPARE ALL SURFACES TO RECEIVE ONE (1) PRIME COAT AND TWO (2)
<br />FINISH COATS OF PAINT IN COLOR SELECTED BY SHLEMMER ALGAZE ASSOCIATES.
<br />11 THE CONTRACTOR SHALL EXAMINE ALL AREAS OF CONSTRUCTION AFTER COMPLETION OF WORK BY ALL TRADES
<br />(INCLUDING TELEPHONE INSTALLATION, FLOORING, ETC.) AND INDICATE ALL NECESSARY "TOUCH-UP" PAINTING
<br />AND/OR PATCHING.
<br />DATE:
<br />DRAWN:
<br />REVIEWED:
<br />PROJECT NO:
<br />SCALE:
<br />OWNERSHIP AND USE OF DOCUMENTS ALL DRAWINGS, SPECIFICATIONS AND COPIES THEREOF
<br />FURNISHED BY SAA INTERIORS ARE AND SHALL REMAIN IT'S PROPERTY. THEY ARE TO BE USED
<br />ONLY WITH RESPECT TO THIS PROJECT. FEDERAL LAW PROHIBITS THE REPRODUCTION,
<br />DISPLAY, SALE, OR OTHER DISPOSITION OF THIS DOCUMENT WITHOUT THE EXPRESS WRITTEN
<br />CONSENT OF SHLEMMER ALGAZE ASSOCIATES.
<br />COPYRIGHT © 2015 SHLEMMER ALGAZE ASSOCIATES ALL RIGHTS RESERVED
<br />SHEET TITLE:
<br />SHEET NO:
<br />SEAL AND STAMP:
<br />CONSULTANTS:
<br />PROJECT:
<br />CULVER CITY - IRVINE - LOS ANGELES - SAN FRANCISCO -
<br />NEW JERSEY - NEW YORK
<br />6083 Bristol Parkway
<br />Culver City, CA 90230
<br />18600 MacArthur Blvd., Suite 100
<br />Irvine, CA 92612
<br />515 South Flower Street, Suite 1200
<br />Los Angeles, CA 90071
<br />T 310.553.3252
<br />T 949.724.8958
<br />T 213.929.1400
<br />DRAWINGS ISSUE
<br />485C US Route 1 South, Suite 105
<br />Iselin, NJ 08830
<br />T 848.200.1200
<br />711 3rd Ave., 6th Floor
<br />New York, NY 10017
<br />T 917.512.6688
<br />www.saaia.com
<br />T 415.390.6793
<br />NOT FOR CONSTRUCTION
<br />IF DRAWINGS AND MATERIALS DEVELOPED AND PROVIDED BY SAA INTERIORS + ARCHITECTURE
<br />AT THE TIME OF AND RELATING TO COVID-19 CONTAIN RECOMMENDATIONS FROM THE
<br />CENTER FOR DISEASE CONTROL AND PREVENTION (CDC) AND THE WORLD HEALTH
<br />ORGANIZATION (WHO), SUCH RECOMMENDATIONS ARE ONLY VALID AS OF THE DATE THE
<br />DRAWINGS AND MATERIALS ARE PRODUCED. THE CDC AND/OR WHO MAY UPDATE OR MODIFY
<br />THEIR RECOMMENDATIONS AT ANY TIME PER THEIR DISCRETION. IN USING
<br />RECOMMENDATIONS FROM THESE DRAWINGS AND MATERIALS, THE RECIPIENT
<br />ACKNOWLEDGES THAT IT WAS BASED ON THEIR OWN DECISION AND TAKE FULL RESPONSIBILITY
<br />AND LIABILITY. THE INTENDED RECIPIENT INDEMNIFIES AND DEFENDS SAA FOR ANY USE OF
<br />THESE DRAWINGS AND MATERIALS BY OTHERS. SAA’S SERVICES ARE INTENDED TO ONLY BE OF
<br />ASSISTANCE AND GUIDANCE FOR OUR CLIENT’S STRATEGIES AND DO NOT CONSTITUTE AS
<br />REQUIREMENTS OR ANY FORM OF HEALTH, ILLNESS OR DISEASE ADVICE. SAA MAKES NO
<br />REPRESENTATIONS OR WARRANTIES REGARDING THE ACCURACY OR COMPLETENESS OF THE
<br />DRAWINGS AND MATERIALS. ANY RECOMMENDATIONS OR USE OF ANY CDC OR WHO
<br />INFORMATION DOES NOT CONSTITUTE ENDORSEMENT BY THE U.S. GOVERNMENT,
<br />DEPARTMENT OF HEALTH AND HUMAN SERVICES OR THE CDC AND WHO NOR ITS AFFILIATES.
<br />575 Market Street, #502
<br />San Francisco, CA 94105
<br />A-0.3
<br />04/10/24
<br />AW
<br />JN/MP
<br />634495
<br />GENERAL NOTES AND
<br />SPECIFICATIONS
<br />X ENGINEERING
<br />6 E HUTTON CENTRE
<br />DRIVE
<br />SANTA ANA, CA 92707
<br />SUITE 650 EXPANSION
<br />DATE DESCRIPTION DELTA
<br />04/16/24 ISSUE FOR ENGINEERING
<br />05/08/24 TENANT REVISION
<br />05/20/24 ISSUE FOR PLAN CHECK
<br />NELSON
<br />ALGAZE
<br />No. C-21090
<br />REN. 03/31/2025L,CEN S E ' ARC+,7
<br />E
<br />C7S7A
<br />7
<br />E O) CA L ,)O RN,A6 E Hutton Center Dr
<br />Unit# 625 & 6509/23/2024
|