Laserfiche WebLink
7 Terminate the Unused End of the Cable <br />a. Remove 60 mm (2.5") of the cable sheath from <br />the conductors. <br />b. Check that all terminator parts are present. <br />hex wire <br />cap <br />nut organizer 1 1 <br />c. Slide the hex nut onto the cable. <br />d. Insert the cable end all the way into the <br />wire organizer (up to the stop). <br />e. Attach the cap. <br />bend wires down <br />- into recesses of wire <br />/ organizer and <br /> trim to length <br />place cap over <br />f the wire organizer <br />„5'' hold the cap <br />with the discon- <br />nect tool ora #2 <br />screwdriver <br />- rotate the hex nutwith your hand or <br />a wrench until the <br />latching mechanism <br />meets the base-do <br />not over torque <br />f. Attach the terminated cable end to the PV <br />racking with a cable clip or tie wrap. <br />0 <br />.Ai <br />t <br />Connect the Cable to the AC Junction Box <br />Connect the cable into the AC branch Gilcuit <br />junction box. See notes in Step Details on back. <br />\\ <br />Complete the Installation Map <br />Build the map manually, or you can use the <br />ArrayGun feature from the Enphase installer Toolkit <br />to build the system. For more information, go to <br />htto.//enphase.com/products/arravaun/. <br />To manually build the map, peel the removable se- <br />rial number label from each microinverter and affix <br />it to the respective location on the map included <br />with this guide. <br />serial <br />*1,1 knurnber <br />labels --- <br />.-- <br />Connect the PV Modules <br />a. Mount the PV modules above the microinverters. <br />b. Connect the DC leads of each PV module to <br />the DC input connectors of their corresponding <br />microinverter. <br />60-cell PV La <br />modde\ <br />verify <br />polarity on <br />at ]east one <br />unit pair <br />Never unscrew the hex nut. This action <br />can twist and damage the cable. <br />--