My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2102 S Flower St - DEF1 - Plan
PBA
>
Building
>
ProjectDox
>
F
>
Flower St
>
2102 S Flower St
>
2102 S Flower St - DEF1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2026 5:00:12 AM
Creation date
1/22/2026 5:00:07 AM
Metadata
Fields
Template:
Plan
Permit Number
101125788
Full Address
2102 S Flower St
Street Number
2102
Street Direction
S
Street Name
Flower
Street Suffix
St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Guardian Fall Protection <br /> 6305 S. 231st St., Kent, WA 98032 phone: (800) 466- <br />6385 fax: (800) 670 <br />-7892 <br /> www.guardianfall.com <br />6 <br />Metal Install (part #s 00654, 00657, and 00659): <br />MINIMUM substrate requirement: 18 gauge, or 20 gauge <br />if reinforced with CB Spanner Plate (part # 00604, contact <br />Guardian for more information). <br />1. Place CB-18 at selected installation location. <br />2. Install all (60) fasteners until snug, and ensure CB <br />Anchor is fully secured to substrate. <br />3. All fasteners MUST penetrate metal decking by at <br />least ¼”. <br />Concrete Install (part #s 00652, 00656, and 00658): <br />MINIMUM substrate requirement: 6“ thick, 2,500 psi. <br />Installation must be done a MINIMUM 8“ from all <br />fall hazards. <br />1. Place CB-18 at selected installation location. <br />2. Install all (8) fasteners until snug, and ensure CB-18 <br />is fully secured to substrate. <br />3. Always refer to fastener manufacturer’s instructions <br />regarding fastener installation. <br />Backer Plate Install: <br />Compatible beam width: 6” - 8” *. <br />1. Place CB-18 at compatible installation location. <br />2. Secure Backer Plate to CB-18 with (4) ½“ threaded <br />rods. (2) ½” lock washers and (2) ½” hex nuts <br />required per threaded rod. <br />3. Tighten all fasteners until snug, and ensure <br />CB-18 is secured to substrate. <br />4. Deform threads on all fasteners to prevent <br />tampering. <br />Min. 18 gauge <br />All fasteners penetrate <br />substrate by at least ¼” <br />*Sample profile shown only <br />Min. 6” thick <br />All fasteners fully <br />embedded in substrate <br />*Sample profile shown only <br />(2) ½” lock washers <br />and (2) ½” hex nuts <br />per threaded rod <br />*Backer plate installation may also be done <br />on structural member other than I-beam, <br />provided structural member is deemed <br />compatible by jobsite Competent Person
The URL can be used to link to this page
Your browser does not support the video tag.