My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10181086_934 S. GUNTHER - Plan (2)
PBA
>
Building
>
Plans
>
G
>
Gunther St
>
934 S Gunther St
>
10181086_934 S. GUNTHER - Plan (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 11:48:29 PM
Creation date
10/25/2020 9:52:02 PM
Metadata
Fields
Template:
Plan
Permit Number
10181086
Full Address
934 S Gunther St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Terminate the Unused End of the Cable <br />a. Remove 60 mm (2.51 otthe cable sheath from <br />the conductors. <br />//% <br />b. Check that all terminator parts are present. <br />hex wire <br />nut organizer1 1 <br />46 <br />c. Slide the hex nut onto the cable. <br />d. Insert the cable end all the way into the <br />wire organizer (up to the stop). <br />e. Attach the cap. <br />bend wires down <br />----- into recesses of wire <br />4r--organizer and <br />A trim to length <br />411 <br />\ place cap over <br />i the wire organizer <br />, hold the cap <br />with the discon- <br />' nest tool ora #2 <br />screw.driver <br />_- rotate the hex nut <br />with your hand or <br />a wrench until the <br />latching mechanism <br />meets the base-do <br />not over torque <br />f.,Attach the terminated cable end to the PV <br />racking with a cable clip or tie wrap. <br />0 <br />cap <br />i l l..A <br />·55-I <br />/94 <br />% 443?,4 <br />CnD -4 <br />10_U€t <br />10 <br />Never unscrew the hex Out,/bis aption <br />pan·twist andidamage.thetal#le.. <br />.·4 -2·1--·..:.J,.: -:4' ; ti'.·.-fr210£y,ILIk-96..'14 2-,- .,= <br />Connect the Cable to. the AC Junction Box <br />Connect the cable into the AC branch circuit <br />junction box. See notes in SteD Details on back. <br />Complete the Installation Map <br />Build the map manually, or you can use the <br />ArrayGun feature from the Enphase Installer Toolkit <br />to build the system. For more information, go to <br />httpl/enphase.com/products/arraw,un/. <br />To manually build trie map, peel the removable se- <br />rial number label from each microinverter and affix <br />it to the respective location on the map included <br />with this guide. <br />' rit---4-[-REIsdrial <br />number ' <br />labels <br />Connect the PV Modules <br />a. Mount the PV modules above the microinverters. <br />b. Cennect the DC leads of each PV module to <br />the DC input corriectors of their corresponding <br />microinverter. <br />60-ce// Pv <br />module \$ <br />verie <br />polarity on <br />at least one <br />unit pair
The URL can be used to link to this page
Your browser does not support the video tag.