Laserfiche WebLink
ELEVATION KEY NOTES <br />1 CEMENT PLASTER (STUCCO), SEE SPECIFICATIONS <br />2 FIBER CEMENT PANELS <br />3 STONE, SEE SPECIFICATION <br />4 SIDING, SEE SPECIFICATIONS <br />5 ROOFING, SEE ROOF PLAN <br />6 WOOD <br />7 ENTRY DOOR <br />8 LINE OF WEEP SCREED <br />9 ATTIC VENT, SEE DETAILS <br />10 SCREENED UNDERFLOOR VENT 6X14 <br />11 HOSE BIB, RECESSED SUPPLY BOX, SEE SPECIFICATIONS <br />12 HOSE BIB, STANDARD <br />13 GUARDRAIL - MIN. 42" A.F.F. <br />14 SKYLIGHT <br />15 WATERPROOF ELECTRICAL OUTLET <br />16 PROVIDE NATURAL GAS SUPPLY <br />17 EXTERIOR LIGHT FIXTURE <br />18 GUTTER WITH DOWNSPOUT <br />EXTERIOR ELEVATION NOTES <br />CONTRACTOR TO FIELD VERIFY BUILDING HEIGHTS AND THE ALLOWABLE <br />BUILDING ENVELOPE. INFORM ARCHITECT OF ANY DISCREPANCIES <br />A <br />CONTRACTOR TO COORDINATE FINISH SURFACE ELEVATIONS OF ALL <br />HARDSCAPE WITH LANDSCAPE AND CIVIL DRAWINGS. INFORM ARCHITECT <br />OF ANY DISCREPANCIES <br />B <br />AT STUCCO (CEMENT PLASTER), PROVIDE CONTINUOUS METAL WEEP <br />SCREED AS REQUIRED BY CODE, SEC R703.6.2.1, SEE DETAILS <br />C <br />AT MECHANICALLY ATTACHED STONE AND BRICK, PROVIDE FLASHING AND <br />MINIMUM 3/8" DIA. WEEP HOLES AT 30" MIN. O.C. AS REQUIRED PER SEC <br />R703.7.2 <br />D <br />STONE INSTALLATION SYSTEM SHALL BE REVIEWED AND APPROVED BY <br />THE STRUCTURAL ENGINEER PRIOR TO INSTALLATION <br />E <br />ALL DIMENSIONS ARE TO FINISH UNLESS OTHERWISE NOTEDF <br />CONTRACTOR SHALL PROVIDE MOCK-UPS OF ALL EXTERIOR FINISHES AND <br />ASSEMBLIES FOR OWNER'S AND ARCHITECT'S REVIEW AND APPROVAL <br />G <br />STRUCTURE SHALL COMPLY TO LOCAL GOVERNING HIGH FIRE HAZARD <br />SEVERITY ZONE AS REQUIRED <br />H <br />STUCCO <br />2-COAT CEMENT PLASTER (STUCCO) SMOOTH "SANTA BARBARA FINISH" <br />2-COAT CEMENT PLASTER (STUCCO) SMOOTH PLASTER FINISH <br />PANELING <br />A.FIBER BOARD CEMENT PANELS <br />B.PAINTED <br />WOOD / EXTERIOR MILLWORK <br />TRIM <br />A. DOUGLAS FIR <br />B.EXTERIOR GRADE PAINT <br />RAFTER TAILS <br />A. DOUGLAS FIR <br />B.EXTERIOR GRADE PAINT <br />SAMPLES AND MOCK-UPS OF ALL EXTERIOR MATERIALS TO BE SUBMITTED FOR <br />ARCHITECT REVIEW AND OWNER APPROVAL PRIOR TO FABRICATION AND <br />INSTALLATION. <br />EXTERIOR FINISH MATERIALS <br />LEVEL 1 SUB <br />(N) T.O. PLATE <br />8' - 0 1/2"1 <br />8 <br />FINISH GRADE <br />LEVEL 2 SUB <br />1 <br />A-6.1 <br />103 <br />(E) <br />(E) <br />(E) <br />23' - 10 1/2" <br />MATCH EXISTING <br />CASING ON ALL (N) <br />WINDOWS <br />WOOD FENCE <br />ENCLOSURE FOR HVAC <br />CONDENSER. MATCH <br />EXISTING FENCES ON <br />SITE. <br />307 304306 303 <br />203 202 <br />LEVEL 1 SUB <br />(N) T.O. PLATE <br />1 <br />8 <br />FINISH GRADE <br />PR <br />O <br />P <br />E <br />R <br />T <br />Y <br /> <br />L <br />I <br />N <br />E <br />AD <br />U <br /> <br />S <br />E <br />T <br />B <br />A <br />C <br />K <br />4' - 0" <br />LEVEL 2 SUB <br />101 <br />101 102 <br />2 <br />A-6.1 <br />8' - 0 1/2" <br />12 <br />7 EGRESS EGRESS <br />(E)302 <br />LEVEL 1 SUB <br />(N) T.O. PLATE <br />8' - 0 1/2" <br />LEVEL 2 SUB <br />8' - 0 1/2" <br />23' - 10 1/2" <br />307 <br />203 202 <br />306 <br />304 303(E) <br />(E) <br />LEVEL 1 SUB <br />(N) T.O. PLATE <br />8' - 0 1/2" <br />LEVEL 2 SUB <br />PR <br />O <br />P <br />E <br />R <br />T <br />Y <br /> <br />L <br />I <br />N <br />E <br />AD <br />U <br /> <br />S <br />E <br />T <br />B <br />A <br />C <br />K <br />4' - 0" <br />302 <br />A <br /> <br />R <br /> <br /> <br />C <br /> <br /> <br />H <br /> <br /> <br />I <br /> <br /> <br />T <br /> <br /> <br />E <br /> <br /> <br />C <br /> <br /> <br />T <br /> <br /> <br />U <br /> <br /> <br />R <br /> <br /> <br />E <br />D <br /> <br />I <br /> <br /> <br />A <br /> <br /> <br />L <br /> <br /> <br />E <br /> <br /> <br />C <br /> <br /> <br />T <br /> <br /> <br />I <br /> <br /> <br />C <br /> <br />80 <br />1 <br /> <br />S <br />O <br />U <br />T <br />H <br /> <br />H <br />O <br />P <br />E <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br />, <br /> <br /> <br />S <br />U <br />I <br />T <br />E <br /> <br />9 <br />1 <br />7 <br /> <br />| <br /> <br />L <br />O <br />S <br /> <br />A <br />N <br />G <br />E <br />L <br />E <br />S <br />, <br /> <br />C <br />A <br />L <br />I <br />F <br />O <br />R <br />N <br />I <br />A <br /> <br />9 <br />0 <br />0 <br />1 <br />7 <br />62 <br />6 <br />. <br />3 <br />7 <br />5 <br />. <br />2 <br />8 <br />7 <br />3 <br /> <br />| <br /> <br />W <br />W <br />W <br />. <br />D <br />I <br />A <br />L <br />E <br />C <br />T <br />I <br />C <br />A <br />R <br />C <br />H <br />. <br />C <br />O <br />M <br /> <br />| <br /> <br /> <br />D <br />I <br />A <br />L <br />E <br />C <br />T <br />I <br />C <br />A <br />R <br />C <br />H <br />@ <br />G <br />M <br />A <br />I <br />L <br />. <br />C <br />O <br />M <br />REVISIONS <br />ISSUE DATE: <br />PROJECT #: <br />DRAWN BY: <br />CHECKED BY: <br />SCALE: <br />DIGITAL STAMP <br />As indicated <br />PI <br />N <br />E <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br /> <br />A <br />D <br />U <br /> <br />2 <br />A-6.0 <br />ELEVATIONS <br />Checker <br />2401.00 <br />VF <br />03.12.2025 <br />PERMIT SET <br />42 <br />3 <br /> <br />E <br /> <br />P <br />I <br />N <br />E <br /> <br />S <br />T <br /> <br />& <br /> <br />4 <br />2 <br />3 <br /> <br />P <br />I <br />N <br />E <br /> <br />S <br />T <br />. <br /> <br />UN <br />I <br />T <br /> <br /># <br />E <br /> <br />, <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />1 <br />SCALE: 1/4" = 1'-0"EAST ELEVATION 2 <br />SCALE: 1/4" = 1'-0"NORTH ELEVATION 1 <br />SCALE: 1/4" = 1'-0"(E) EAST ELEVATION 4 <br />SCALE: 1/4" = 1'-0"(E) NORTH ELEVATION 3