INSPECTIONS <br />1. OCFA FINAL INSPECTION REQUIRED. PLEASE SCHEDULE ALL FIELD INSPECTIONS AT LEAST 72 HOURS IN <br />ADVANCE. INSPECTIONS CANCELED AFTER 1 P.M. ON THE DAY BEFORE THE SCHEDULED DATE WILL BE <br />SUBJECT TO A REINSPECTION FEE. PHASING OF INSPECTIONS MAY REQUIRE ADDITIONAL FEES, ALSO. <br />CALL OCFA INSPECTION SCHEDULING AT (714) 573-6150. <br />2. BUILDINGS UNDER CONSTRUCTION OR DEMOLITION SHALL CONFORM TO CFC CHAPTER 33. NO <br />SMOKING OR COOKING IS ALLOWED IN STRUCTURES WHERE COMBUSTIBLE MATERIALS ARE EXPOSED <br />OR WITHIN 25' OF COMBUSTIBLE MATERIALS STORAGE AREAS. CUTTING, WELDING, OR OTHER HOT <br />WORK SHALL BE IN CONFORMANCE WITH CFC CHAPTER 35. <br />3. IN BUILDINGS FOUR OR MORE STORIES IN HEIGHT, STANDPIPES SHALL BE PROVIDED DURING <br />CONSTRUCTION WHEN THE HEIGHT REACHES 40 FEET ABOVE THE LOWEST POINT OF FIRE DEPARTMENT <br />ACCESS. A FIRE DEPARTMENT CONNECTION SHALL BE NO MORE THAN 100 FEET FROM AVAILABLE FIRE <br />DEPARTMENT VEHICLE ACCESS ROADWAYS. A HYDRANT SHALL BE LOCATED ALONG THE ACCESS <br />ROADWAY WITHIN 150 FEET OF THE LOCATION(S) THAT THE FDC CAN BE ACCESSED FROM. FC 3310, 3313 <br />4. ADDRESS NUMBERS SHALL BE PROVIDED FOR ALL NEW AND EXISTING BUILDINGS, BE A MINIMUM OF <br />FOUR INCHES HIGH FOR INDIVIDUAL DWELLING UNITS AND SIX INCHES HIGH FOR ALL OTHER <br />INSTALLATIONS AND STRUCTURES, CONTRAST WITH THEIR BACKGROUND, AND BE PLAINLY VISIBLE <br />FROM THE ROADWAY THE BUILDING IS ADDRESSED ON. TEMPORARY ADDRESS NUMBERS SHALL BE <br />PROVIDED ON CONSTRUCTION FENCING OR THE BUILDING UNTIL PERMANENT NUMBERS CAN BE <br />PROVIDED. CBC 501.2, CFC 505.1 <br />5. LOCATIONS AND CLASSIFICATIONS OF EXTINGUISHERS SHALL BE IN ACCORDANCE WITH CFC 906 AND <br />CCR TITLE 19. AT LEAST ONE EXTINGUISHER SHALL BE PROVIDED DURING CONSTRUCTION ON EACH <br />FLOOR AT EACH STAIRWAY, IN EACH STORAGE AND CONSTRUCTION SHED, IN LOCATIONS WHERE <br />FLAMMABLE OR COMBUSTIBLE LIQUIDS ARE STORED OR USED, OR WHERE SIMILAR HAZARDS ARE <br />PRESENT PER CFC 3315.1. BEFORE FINAL OCCUPANCY, AT LEAST ONE 2A:10B:C EXTINGUISHER SHALL <br />BE PROVIDED SO THAT NO POINT IS MORE THAN 75' TRAVEL DISTANCE FROM THE EXTINGUISHER. <br />EXTINGUISHERS SHALL BE LOCATED ALONG THE PATH OF EGRESS TRAVEL AND IN A READILY VISIBLE <br />AND ACCESSIBLE LOCATION, WITH THE BOTTOM OF THE EXTINGUISHER AT LEAST 4”ABOVE THE FLOOR. <br />ADDITIONAL EXTINGUISHERS MAY BE REQUIRED BY OCFA INSPECTORS DEPENDING ON PROJECT OR <br />SITE CONDITIONS AND FINAL PLACEMENT IS SUBJECT TO THEIR APPROVAL. <br />6. WALL, FLOOR AND CEILING FINISHES AND MATERIALS SHALL NOT EXCEED THE FLAME SPREAD <br />CLASSIFICATIONS IN CBC TABLE 803.11. DECORATIVE MATERIALS SHALL BE PROPERLY TREATED BY A <br />PRODUCT OR PROCESS APPROVED BY THE STATE FIRE MARSHAL WITH APPROPRIATE DOCUMENTATION <br />PROVIDED TO THE OCFA. SUCH ITEMS SHALL BE APPROVED AND INSPECTED BY THE OCFA PRIOR TO <br />INSTALLATION. <br />7. KNOX BOXES/KEY CABINETS SHALL BE PROVIDED FOR ALL HIGH-RISE BUILDINGS, POOL ENCLOSURES, <br />GATES IN THE PATH OF FIREFIGHTER TRAVEL TO STRUCTURES, SECURED PARKING LEVELS, DOORS <br />GIVING ACCESS TO ALARM PANELS AND/OR ANNUNCIATORS, AND ANY OTHER STRUCTURES OR AREAS <br />WHERE IMMEDIATE ACCESS IS REQUIRED OR IS UNDULY DIFFICULT. AN OCFA INSPECTOR CAN ASSIST <br />WITH LOCKING GATE KEYS IN KNOX BOXES, CONTACT YOUR LOCAL FIRE STATION TO ARRANGE AN <br />APPOINTMENT TO SECURE MASTER BUILDING KEYS IN THE KNOX BOX. <br />8. APPROVAL OF THESE PLANS SHALL NOT PERMIT THE VIOLATION OF ANY CODE OR LAW. REQUIREMENTS <br />OR FEATURES NOT IDENTIFIED ON THE PLAN MAY APPLY AND OCFA INSPECTORS MAY REQUIRE <br />ADDITIONAL INFORMATION OR ITEMS FROM THOSE SHOWN ON THE PLAN DEPENDING ON ACTUAL OR <br />ANTICIPATED FIELD CONDITIONS. SUCH CHANGES MAY NECESSITATE SUBMITTAL OF REVISED OR AS- <br />BUILT PLANS TO THE OCFA AND THE CITY/COUNTY WHERE THE PROJECT IS LOCATED. <br />GENERAL REQUIREMENTS <br />1. THE PROJECT SHALL COMPLY WITH CALIFORNIA BUILDING CODE, CALIFORNIA FIRE CODE, AND OTHER <br />CURRENTLY ADOPTED CODES, STANDARDS, REGULATIONS AND REQUIREMENTS AS ENFORCED BY <br />THE ORANGE COUNTY FIRE AUTHORITY. <br />2. DUMPSTERS AND TRASH CONTAINERS EXCEEDING 1.5 CUBIC YARDS SHALL NOT BE STORED IN <br />BUILDINGS OR PLACED WITHIN 5 FEET OF COMBUSTIBLE WALLS, OPENINGS OR COMBUSTIBLE ROOF <br />EAVE LINES UNLESS PROTECTED BY AN APPROVED SPRINKLER SYSTEM OR LOCATED IN A TYPE I OR IIA <br />STRUCTURE SEPARATED BY 10 FEET FROM OTHER STRUCTURES. CONTAINERS LARGER THAN 1 CUBIC <br />YARD SHALL BE OF NON-OR LIMITED-COMBUSTIBLE MATERIALS OR SIMILARLY PROTECTED OR <br />SEPARATED. CFC 304.3. <br />3. EXITS, EXIT SIGNS, FIRE ALARM PANELS, HOSE CABINETS, FIRE EXTINGUISHER LOCATIONS, AND <br />STANDPIPE CONNECTIONS SHALL NOT BE CONCEALED BY CURTAINS, MIRRORS, OR OTHER <br />DECORATIVE MATERIAL. <br />4. THE EGRESS PATH SHALL REMAIN FREE AND CLEAR OF ALL OBSTRUCTIONS AT ALL TIMES. NO <br />STORAGE IS PERMITTED IN AISLES. <br />5. EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL <br />KNOWLEDGE OR EFFORT. DOORS SHALL NOT BE PROVIDED WITH THUMB-TURN LOCKS OR <br />DEADBOLTS THAT DO NOT UNLATCH IN TANDEM WITH THE NORMAL OPERATING LEVER. THE OPENING <br />FORCE FOR INTERIOR DOORS WITHOUT CLOSERS SHALL NOT EXCEED 5 POUNDS. THE UNLATCHING <br />AND OPENING FORCE FOR OTHER DOORS, INCLUDING FIRE DOORS, SHALL NOT EXCEED 15 POUNDS. <br />CBC 1010 <br />6. THE EXIT PATH SHALL BE CLEARLY IDENTIFIED WITH EXIT SIGNS CONFORMING TO CBC 1013. <br />ILLUMINATED EXIT SIGNS MUST HAVE 90-MINUTE EMERGENCY POWER BACK-UP. <br />7. TACTILE SIGNS SHALL BE PROVIDED IN COMMERCIAL BUILDINGS, PUBLIC <br />BUILDINGS/ACCOMMODATIONS, AND PUBLICLY FUNDED HOUSING SUBJECT TO CBC CHAPTERS 11A <br />AND B AND CONFORM TO 1143A OR 11B-703.1, -703.2, -703.3, AND 703.5, BE MOUNTED WITH THE BOTTOM <br />OF THE LOWEST LINE OF BRAILLE CHARACTERS AT LEAST 4 FEET ABOVE THE FLOOR BUT THE BOTTOM <br />OF THE HIGHEST LINE OF RAISED TEXT CHARACTERS NO MORE THAN 5 FEET ABOVE THE FLOOR AND, <br />WHENEVER POSSIBLE, ON THE STRIKE SIDE OF THE DOOR. LETTERING SHALL BE BETWEEN 5/8”AND 2” <br />HIGH. CBC 1013.4 <br />8. STAIRS SERVING 4+ STORIES SHALL HAVE STAIRWELL SIGNS CONFORMING TO CBC 1023.9 AND OCFA <br />GUIDELINE E_02. <br />9. THE EXIT PATH SHALL BE ILLUMINATED AT ALL TIMES IN ACCORDANCE WITH CBC 1006. EMERGENCY <br />LIGHTING SHALL BE PROVIDED WITH 90-MINUTE BACK-UP. <br />10. RATED ASSEMBLIES SHALL CONFORM TO APPROVED METHODS AND MATERIALS OF CONSTRUCTION. <br />PENETRATIONS THROUGH RATED WALLS, CEILINGS, OR FLOORS SHALL BE PROTECTED IN AN <br />APPROVED MANNER COMPLYING WITH CBC/CFC CHAPTER 7. <br />11. RATED DOORS SHALL BE SELF-CLOSING AND LATCHING; SUCH DOORS SHALL NOT BE EQUIPPED WITH <br />DOOR STOPS OR OTHERWISE PROPPED OPEN. RATED DOORS SHALL BE EQUIPPED WITH RATED <br />HARDWARE. CFC 703 <br />PROJECT-SPECIFIC REQUIREMENTS <br />ALARM AND MONITORING SYSTEMS <br />1. A FIRE ALARM SYSTEM SHALL BE PROVIDED IN COMPLIANCE WITH CBC/CFC 907 AND NFPA 72. A <br />SEPARATE PLAN SUBMITTAL IS REQUIRED FOR APPROVAL PRIOR TO INSTALLATION OR MODIFICATION. <br />2. AUTOMATIC FIRE SPRINKLER SYSTEM(S) AND ALL CONTROL VALVES, WITH THE EXCEPTION OF THOSE <br />LISTED IN CFC 903.4, SHALL BE MONITORED BY A UL LISTED CENTRAL ALARM STATION. <br />EXTINGUISHING SYSTEMS <br />3. AN AUTOMATIC FIRE SPRINKLER SYSTEM SHALL BE PROVIDED THROUGHOUT THE BUILDING IN <br />COMPLIANCE WITH CFC 903 AND THE APPLICABLE NFPA SPRINKLER STANDARD. REVIEW AND <br />APPROVAL OF A SPRINKLER PLAN IS REQUIRED PRIOR TO INSTALLATION OR MODIFICATION. <br />HAZARDOUS MATERIALS, EQUIPMENT, AND PROCESSES <br />4. STORAGE, DISPENSING, OR USE OF ANY HAZARDOUS MATERIALS SHALL COMPLY WITH CBC 414 AND <br />415 AND CFC REGULATIONS. THE STORAGE AND USE OF HAZARDOUS MATERIALS SHALL BE <br />REVIEWED AND APPROVED BY THE OCFA PRIOR TO SUCH MATERIALS BEING BROUGHT ON SITE. <br />APPROPRIATE HAZARDOUS MATERIALS WARNING SIGNS SHALL BE PROMINENTLY PLACED IN THE <br />VICINITY/ENTRANCES TO AREAS WHERE HAZARDOUS MATERIALS ARE STORED IN QUANTITIES <br />SUFFICIENT TO REQUIRE A CFC PERMIT. <br />1. ENSURE OUTDOOR SMOKING AREAS ARE A MINIMUM OF 25'-0" FROM BUILDING ENTRIES, OUTDOOR AIR <br />INTAKES AND OPERABLE WINDOWS AS REQUIRED BY CALGREEN SECTION 5.504.7. <br />2. RECYCLE OR SALVAGE FOR REUSE A MINIMUM OF 65% OF THE NON-HAZARDOUS CONSTRUCTION AND <br />DEMOLITION WASTE PER CALGREEN SECTION 5.408.1 OR COMPLY WITH THE LOCAL ORDINANCE, <br />WHICHEVER IS MORE STRINGENT. GC SHALL PROVIDE DOCUMENTATION OF CONSTRUCTION WASTE <br />MANAGEMENT PLANS AS REQUIRED TO ENFORCING AGENCIES. <br />3. 3.PROVIDE VERIFICATION THAT UNIVERSAL WASTE ITEMS SUCH AS FLORESCENT LAMPS AND BALLAST <br />AND MERCURY-CONTAINING THERMOSTATS AS WELL AS OTHER CALIFORNIA PROHIBITED UNIVERSAL <br />WASTE MATERIALS ARE DISPOSED OF PROPERLY AND ARE DIVERTED FROM LANDFILLS. <br />4. ALL WALL AND FLOOR ASSEMBLIES SEPARATING TENANTS OR SEPARATING TENANTS FROM PUBLIC <br />SPACES SHALL HAVE A MINIMUM STC RATING OF 40 AS PER CALGREEN SECTION 5.507.4.3. <br />5. ALL PLUMBING FIXTURES IN AREA OF WORK SHALL COMPLY WITH CALGREEN SECTION 5.303.3. <br />6. 6PER CA CIVIL CODE 1101 TO 1105, ALL NON-COMPLIANT PLUMBING FIXTURES WITHIN THE AREA OF <br />WORK SHALL BE REPLACED WITH WATER CONSERVING PLUMBING FIXTURES. BUILDINGS FINALED ON OR <br />AFTER 01/01/1994 ARE EXEMPT. <br />7. PROVIDE HVAC, REFRIGERATION AND FIRE SUPPRESSION SYSTEMS AND EQUIPMENT THAT DO NOT <br />UTILIZE CFC OR HALONS AS PER CALGREEN SECTION 5.508.1. <br />8. PER CALGREEN SECTION 5.410.4.2, A WRITTEN PLAN OF PROCEDURES FOR TESTING AND ADJUSTMENT <br />FOR NEW SYSTEMS SERVING THE AREA OF WORK IS REQUIRED TO BE DEVELOPED FOR THE <br />FOLLOWING SYSTEMS: <br />A.HVAC SYSTEMS AND CONTROLS <br />B.INDOOR LIGHTING AND CONTROLS <br />C.WATER HEATING SYSTEMS <br />9. PERFORM TESTING AND ADJUSTMENT OF REQUIRED SYSTEMS, INCLUDING HVAC BALANCING, AND <br />PROVIDE REPORTS TO BUILDING OWNER AND ENFORCING AGENCIES AS PER CALGREEN SECTION <br />5.410.4.3 AND 5.410.4.4. <br />10. DURING CONSTRUCTION, MINIMIZE USE OF PERMANENT HVAC SYSTEMS. IF SYSTEM IS USED DURING <br />CONSTRUCTION, PROTECT RETURN AIR TRUNK WITH AIR FILTERS WITH AN MINIMUM MERV RATING OF 8. <br />REPLACE ALL FILTERS AT COMPLETION OF CONSTRUCTION. <br />11. ALL DUCT AND OTHER RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH <br />TAPE, PLASTIC, SHEET METAL OR OTHER METHODS TO REDUCE THE AMOUNT OF DUST, WATER AND <br />DEBRIS ENTERING THE SYSTEM FROM THE TIME OF ROUGH INSTALLATION AND DURING STORAGE ON <br />THE CONSTRUCTION SITE UNTIL FINAL START UP. <br />12. ALL FINISH MATERIALS SHALL COMPLY WITH THE VOC LIMITS LISTED IN CALGREEN SECTIONS 5.504.4.1 <br />TO 5.504.4.4. VERIFICATION OF COMPLIANCE SHALL BE PROVIDED TO ENFORCING AGENCIES AS <br />REQUIRED OR REQUESTED. <br />13. ALL COMPOSITE WOOD PRODUCTS SHALL COMPLY WITH THE FORMALDEHYDE LIMITS LISTED IN <br />CALGREEN SECTION 5.504.4.5. VERIFICATION OF COMPLIANCE SHALL BE PROVIDED TO ENFORCING <br />AGENCIES AS REQUIRED OR REQUESTED. <br />14. RESILIENT FLOORING SHALL COMPLY WITH THE REQUIREMENTS OF CALGREEN SECTION 5.504.4.6. <br />VERIFICATION OF COMPLIANCE SHALL BE PROVIDED TO ENFORCING AGENCIES AS REQUIRED OR <br />REQUESTED. <br />15. PROVIDE THE BUILDING OWNER AN OPERATING AND MAINTENANCE (O&M) MANUAL WITH DETAIL <br />OPERATING AND MAINTENANCE INSTRUCTION AND COPIES OF ALL GUARANTEES AND WARRANTIES FOR <br />EACH INSTALLED SYSTEM. THE O&M INSTRUCTIONS SHALL BE CONSISTENT WITH OSHA REQUIREMENTS <br />IN CR, TITLE 8 SECTION 5142 AND OTHER RELATED REGULATIONS. INCLUDE COPIES OF ALL INSPECTIONS <br />AND REPORTS FROM THE TESTING AND ADJUSTMENT PROCEDURES IN THE O&M MANUAL. <br />1. ALL WORK SHALL BE IN ACCORDANCE WITH CURRENT APPLICABLE NATIONAL, STATE, AND LOCAL <br />CODES, LAWS AND ORDINANCES, INCLUDING ACCESS REQUIREMENTS. <br />2. "ARCHITECT" AS USED IN THESE DOCUMENTS REFER TO HENDY, (949) 851-3080. <br />3. GENERAL CONTRACTOR FOR THE PROJECT SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED <br />BUILDING PERMITS. <br />4. EXAMINE ALL CONTRACT DOCUMENTS AND FIELD CONDITIONS AND CONFIRM THAT WORK IS BUILDABLE <br />AS SHOWN. IF THERE ARE QUESTIONS OR DISCREPANCIES, THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR OBTAINING CLARIFICATION FROM HENDY BEFORE PROCEEDING WITH WORK IN QUESTION. <br />5. VERIFY ALL DIMENSIONS ON JOB SITE BEFORE START OF ANY CONSTRUCTION. DO NOT SCALE <br />DRAWINGS. DIMENSIONS SHALL GOVERN. <br />6. LARGE SCALE DRAWINGS TAKE PRECEDENCE OVER SMALL SCALE DRAWINGS. DETAILS GOVERN OVER <br />PLANS. NOTIFY HENDY OF ANY DISCREPANCIES. <br />7. "TYPICAL" AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION IS THE SAME OR <br />REPRESENTATIVE FOR ALL SIMILAR CONDITIONS THROUGHOUT, U.N.O. <br />8. "SIMILAR" MEANS COMPARABLE CHARACTERISTICS FOR THE CONDITIONS NOTED. VERIFY DIMENSIONS <br />AND ORIENTATIONS ON PLANS AND ELEVATIONS. <br />9. DETAILS NOTED "TYPICAL" ARE KEYED ONLY ONCE AND ARE REPRESENTATIVE OF SIMILAR CONDITIONS <br />THROUGHOUT, U.N.O. <br />10. "ALIGN" AS USED IN THESE DOCUMENTS SHALL MEAN TO ACCURATELY LOCATE FINISH FACES IN THE <br />SAME PLANE. <br />11. WHERE NOTED "V.I.F." OR "VERIFY IN FIELD”THE DIMENSIONS SHALL BE CONFIRMED IN THE FIELD BY THE <br />GENERAL CONTRACTOR. NOTIFY HENDY OF DISCREPANCIES GREATER THAN 2 INCHES. <br />12. ALL VERTICAL DIMENSIONS ARE SHOWN FROM FINISH FLOOR, U.N.O. <br />13. MAKE VERTICAL WORK PLUMB AND MAKE HORIZONTAL WORK LEVEL AND WITH ALIGNMENT AS <br />INDICATED. <br />14. MAINTAIN MINIMUM HEADROOM CLEARANCE OF 90 INCHES IN ALL OCCUPIED SPACES AND 84 INCHES IN <br />RESTROOMS. <br />15. ALL WORK NOTED "N.I.C.," "NOT IN CONTRACT," OR BY OTHERS SHALL BE ACCOMPLISHED BY A <br />CONTRACTOR OTHER THAN THE GENERAL CONTRACTOR AND ARE NOT PART OF THE CONSTRUCTION <br />AGREEMENT. THE GENERAL CONTRACTOR SHALL COORDINATE WITH OWNER OR TENANT'S VENDORS <br />AND CONTRACTORS AS REQUIRED BY OWNER, TENANT OR BOTH. <br />16. BEFORE PROCEEDING WITH EACH COMPONENT OF WORK, EXAMINE SUBSTRATES, AREAS AND <br />CONDITIONS, WITH THE INSTALLER OR APPLICATOR PRESENT FOR COMPLIANCE REQUIREMENTS FOR <br />INSTALLATION TOLERANCES AND OTHER CONDITIONS AFFECTING PERFORMANCE. <br />A.EXAMINE ROUGH IN FOR MECHANICAL AND ELECTRICAL SYSTEMS TO VERIFY ACTUAL <br />LOCATIONS OF CONNECTIONS BEFORE EQUIPMENT AND FIXTURE INSTALLATION. <br />B.EXAMINE WALLS, FLOORS, AND CEILINGS FOR SUITABLE CONDITIONS WHERE PRODUCTS AND <br />SYSTEMS ARE TO BE INSTALLED. <br />C.VERIFY COMPATIBILITY WITH AND SUITABILITY OF SUBSTRATES, INCLUDING COMPATIBILITY <br />WITH EXISTING FINISHES OR PRIMERS. <br />D.PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE BEEN <br />CORRECTED. PROCEEDING WITH THE WORK INDICATES ACCEPTANCE OF SURFACES AND <br />CONDITIONS. <br />17. GENERAL CONTRACTOR SHALL PROVIDE RECORD DOCUMENTS TO BUILDING OWNER/TENANT AND <br />HENDY UPON COMPLETION OF TENANT CONSTRUCTION. <br />18. WHERE EXISTING CEMENTITIOUS FIREPROOFING IS MISSING OR REMOVED DUE TO CONSTRUCTION, <br />PROVIDE SPRAY APPLIED CEMENTITIOUS FIREPROOFING FOR CONTINUOUS AND CONSISTENT <br />PROTECTION. <br />19. DELIVER, STORE AND HANDLE PRODUCTS USING MEANS AND METHODS THAT WILL PREVENT DAMAGE, <br />DETERIORATION, AND LOSS, INCLUDING THEFT AND VANDALISM. COMPLY WITH MANUFACTURERS' <br />WRITTEN INSTRUCTIONS. <br />20. PROVIDE PRODUCTS THAT COMPLY WITH THE CONTRACT DOCUMENTS, ARE UNDAMAGED, AND UNLESS <br />OTHERWISE INDICATED, ARE NEW AT THE TIME OF INSTALLATION. <br />21. INSTALL ALL MANUFACTURED ITEMS, MATERIALS AND EQUIPMENT IN STRICT ACCORDANCE WITH THE <br />MANUFACTURER'S SPECIFICATIONS AND WRITTEN INSTRUCTIONS, INCLUDING INSTRUCTIONS FOR <br />TEMPERATURE, HUMIDITY, VENTILATION, AND WEATHER-PROTECTION. <br />22. VERIFY ALL APPLIANCE AND EQUIPMENT REQUIREMENTS WITH MANUFACTURERS. PROVIDE ALL WALL <br />BACKING, ELECTRICAL AND PLUMBING SUPPLIES, FITTINGS AND CONNECTORS TO SUPPORT OR <br />COMPLETE INSTALLATION. SUPPLY CUT-SHEETS FOR APPROVAL. <br />23. COORDINATE BACKING WITH MILLWORKER FOR WALL HUNG UNITS AND FEATURES. <br />24. PROVIDE FINAL PROTECTION AND MAINTAIN CONDITIONS THAT ENSURE INSTALLED WORK IS WITHOUT <br />DAMAGE OR DETERIORATION AT THE TIME OF SUBSTANTIAL COMPLETION. COMPLY WITH <br />MANUFACTURER'S WRITTEN INSTRUCTIONS FOR TEMPERATURE AND RELATIVE HUMIDITY. <br />25. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE GENERAL CLEANING OF A JOB AFTER <br />COMPLETION. CLEANING SHALL INCLUDE INTERIOR OF THE BUILDING AND PATH OF TRAVEL TO THE JOB <br />SITE, THE PARKING LOT, ELEVATORS, STAIRS, LOBBIES & CORRIDORS. <br />26. DIVERT NON-HAZARDOUS CONSTRUCTION, DEMOLITION, AND PACKAGING DEBRIS FROM LANDFILL <br />DISPOSAL. REDIRECT RECYCLABLE, SALVAGEABLE, OR REUSABLE MATERIALS TO APPROPRIATE SITES <br />OR CHARITABLE ORGANIZATIONS, INCLUDING: CARDBOARD, METAL, BRICK, CONCRETE, GLASS, PLASTIC, <br />CLEAN WOOD, GYPSUM WALLBOARD, CARPET, AND INSULATION. <br />1. DURING BID PROCESS IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY TO SITE VERIFY ALL <br />CLEARANCES, INCLUDING IN PLENUM AREA. ADVISE IF MECHANICAL EQUIPMENT, MAIN SPRINKLER LINES, <br />OR OTHER EXISTING ITEMS REQUIRE RELOCATION. <br />2. ANY REQUESTS FOR SUBSTITUTIONS OF ITEMS SPECIFIED SHALL BE SUBMITTED IN WRITING WITH CUT- <br />SHEETS ATTACHED. IT WILL BE CONSIDERED ONLY IF IT HAS A MORE ADVANTAGEOUS DELIVERY DATE, A <br />LOWER PRICE (WITH CREDIT TO THE TENANT) AND WILL BE PROVIDED WITHOUT SACRIFICING QUALITY, <br />APPEARANCE AND FUNCTION. <br />1. REQUESTS FOR SUBSTITUTIONS OF ITEMS SPECIFIED SHALL BE SUBMITTED IN WRITING WITH CUT- <br />SHEETS ATTACHED. CONSIDERATION WILL ONLY BE GIVEN WITH AN ADVANTAGEOUS DELIVERY DATE, A <br />LOWER PRICE (WITH CREDIT TO THE TENANT) AND WILL BE PROVIDED WITHOUT SACRIFICING QUALITY, <br />APPEARANCE AND FUNCTION. <br />2. THE GENERAL CONTRACTOR SHALL SUBMIT CONFIRMATION OF DELIVERY DATES FOR ORDERS OF <br />MATERIALS AND EQUIPMENT HAVING LONG LEAD TIMES TO HENDY AT START OF PROJECT <br />CONSTRUCTION. <br />3. SUBMIT (3) SAMPLES OF ALL MATERIALS TO HENDY FOR APPROVAL PRIOR TO ORDERING OR <br />INSTALLATION. THE CONTRACTOR SHALL BE WHOLLY LIABLE BY FAILING TO DO SO WHETHER ITEMS ARE <br />SPECIFIED CORRECTLY OR INCORRECTLY IN THE CONTRACT DOCUMENTS. SUBMITTALS ITEMS SHALL <br />INCLUDE, BUT ARE NOT LIMITED TO: <br />A.STONEWORK, MILLWORK, METALWORK, DOORS, DOOR HARDWARE, APPLIANCES & <br />EQUIPMENT, FINISH MATERIALS, ACOUSTICAL CEILING TILES, SUSPENSION SYSTEMS, <br />FIXTURES, MECHANICAL DEVICES, AND THE LIKE. <br />B.SUBMITTALS SHALL INCLUDE SHOP DRAWINGS, PRODUCT DATA, SAMPLES AND OTHER <br />ITEMS. <br />C.SHOP DRAWINGS SHALL INCLUDE DETAILED FABRICATION AND INSTALLATION, SETTING <br />DRAWINGS, DIAGRAMMATIC DRAWINGS AND MATERIAL SCHEDULES. LOCATION AND <br />ORIENTATION OF ALL ITEMS SHALL BE CLEARLY INDICATED. BEGIN FABRICATION ONLY <br />AFTER RECEIVING HENDY APPROVAL OF SHOP DRAWINGS. <br />1. REMOVE AND DISPOSE OF ALL ITEMS SHOWN ON PLANS IN A LEGAL MANNER. RECYCLE AS REQUIRED <br />BY LOCAL MUNICIPALITY. <br />2. EXAMINE THE SITE AND ALL CONDITIONS AND LIMITATIONS WHETHER OR NOT THEY ARE <br />SPECIFICALLY SHOWN OR MENTIONED IN ANY OF THE CONTRACT DOCUMENTS AND INCLUDE <br />WHATEVER IS NEEDED TO COMPLETE THE WORK IN EVERY PART SHOWN OR DESCRIBED BY THE <br />CONTRACT. <br />3. CHECK DRAWINGS CAREFULLY AND THOROUGHLY INVESTIGATE EXISTING CONSTRUCTION. FURNISH <br />AND INSTALL SHORING AND BRACING NECESSARY TO POSITIVELY PROTECT THE STRUCTURAL <br />ELEMENTS OF THE BUILDING. REMOVE ALL SHORING AND BRACING WHEN CONSTRUCTION IS SAFELY <br />IN PLACE. <br />4. ALL CORRIDORS, STAIRWAYS AND RATED LOBBIES THAT ARE PART OF THE PATH OF EGRESS SHALL <br />REMAIN OPERATIONAL AND FREE OF DEBRIS. ALL WORK IN THESE AREAS SHALL BE PERFORMED <br />AFTER REGULAR BUSINESS HOURS. <br />5. REMOVED MATERIALS NOT DESIGNATED FOR REUSE AND ALL DEBRIS FROM CONSTRUCTION <br />BECOMES THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE SITE IN A <br />TIMELY MANNER. <br />6. DO NOT ALLOW MATERIALS AND DEBRIS GENERATED BY DEMOLITION ACTIVITIES TO ACCUMULATE. <br />REMOVE DAILY AND DISPOSE OFF SITE IN A LEGAL MANNER. <br />7. REMOVE ALL DOOR ASSEMBLIES SHOWN DASHED. STOCKPILE UNUSED DOOR ASSEMBLIES FOR <br />REUSE WITHIN THE BUILDING AT THE DISCRETION OF BUILDING MANAGEMENT. IDENTIFY ANY DOOR <br />ASSEMBLIES TO BE REUSED, PROVIDE PROTECTION AND STORE AS DIRECTED. <br />8. REMOVE ALL WALLS SHOWN DASHED AND ITEMS LOCATED ON WALLS, INCLUDING BUT NOT LIMITED <br />TO ELEC/TELE/DATA OUTLETS, SWITCHES, TIMERS, ETC. <br />9. ALL EXISTING ELECTRICAL, MECHANICAL AND PLUMBING SYSTEMS NOT REQUIRED FOR PROPOSED <br />CONFIGURATION SHALL BE REMOVED TO THE FURTHEST TERMINATION POINT. ELIMINATE ALL <br />UNUSED WIRING, PLUMBING, DUCTWORK, ETC. COMPLETELY FROM CEILING SPACES OR WALLS. THIS <br />SHALL BE DONE TO THE SATISFACTION OF THE BUILDING INSPECTORS (UNLESS NOTED OTHERWISE). <br />10. A 24-HOUR FIRE WATCH SHALL BE MAINTAINED DURING ANY WORK THAT COMPROMISES THE RATING <br />AND/OR OBSTRUCTS THE EXITING OF ANY AND ALL CORRIDORS, STAIRWAYS OR RATED LOBBIES. <br />11. ABANDONED CABLING SHALL BE REMOVED. COORDINATE WITH TENANT REQUIREMENTS FOR <br />PROPOSED WORK AND PROTECT EXISTING CABLING TO REMAIN IN PLACE. <br />12. EXERCISE THE GREATEST POSSIBLE CARE WHEN REMOVING ITEMS SCHEDULED FOR REUSE. USE <br />ONLY CONTRACTORS SKILLED IN THE APPROPRIATE TRADES. PROVIDE PROTECTION AND STORE AS <br />DIRECTED IN CONTRACT DOCUMENTS. <br />13. EXISTING ITEMS NOTED TO REMAIN, BUT WHICH REQUIRE REMOVAL TO COMPLETE THE WORK, SHALL <br />BE PROTECTED, CAREFULLY REMOVED AND REPLACED UPON COMPLETION. THE REPLACED WORK <br />SHALL MATCH ITS CONDITION AT THE START OF THE WORK. <br />14. LEAVE ALL SPACES BROOM CLEAN WITH ALL LEDGES AND CORNERS PROPERLY CLEANED. <br />15. WHERE CUT OPENINGS ARE OVERSIZED OR AT IMPROPER LOCATION, MATERIAL SHALL BE REPLACED <br />AT NO EXTRA COST TO THE OWNER/TENANT. <br />16. PROVIDE TEMPORARY SUPPORT OF WORK TO BE CUT. PROTECT IN PLACE CONSTRUCTION DURING <br />CUTTING AND REMOVAL TO PREVENT DAMAGE TO ADJACENT SURFACES. <br />17. CUT OR DRILL FROM THE EXPOSED OR FINISHED SIDE OF MATERIALS TO REMAIN. <br />18. DO NOT CUT STRUCTURAL ELEMENTS IN A MANNER THAT COULD CHANGE THEIR LOAD-CARRYING <br />CAPACITY OR LOAD-DEFLECTION RATIO. <br />19. DO NOT CUT OPERATING ELEMENTS TO REMAIN OR THEIR RELATED COMPONENTS IN A MANNER THAT <br />RESULTS IN REDUCING THEIR CAPACITY TO PERFORM AS INTENDED OR THAT RESULTS IN INCREASED <br />MAINTENANCE OR DECREASED OPERATIONAL LIFE OR SAFETY. <br />1. IN AREAS WHERE DEMOLITION (REMOVAL OF TILE, CARPETING, PARTITIONS, ETC) CAUSES DIVOTS OR <br />UNEVENNESS IN SLAB, THE CONTRACTOR SHALL PATCH TO LEVEL THE SLAB TO RECEIVE FINISHES. <br />2. WHERE REQUIRED FOR FLOOR LEVELING, PROVIDE CEMENT-BASED, POLYMER-MODIFIED, SELF-LEVELING <br />PRODUCT THAT CAN BE APPLIED IN UNIFORM THICKNESS FROM 1/8" AND THAT CAN BE FEATHERED AT <br />EDGES TO MATCH ADJACENT FLOOR ELEVATIONS. COMPRESSIVE STRENGTH SHALL NOT BE LESS THAN <br />4100 PSI AT 29 DAYS. <br />3. DO NOT PATCH CONSTRUCTION IN A MANNER THAT RESULTS IN VISUAL EVIDENCE OF CUTTING AND <br />PATCHING. REMOVE AND REPLACE CONSTRUCTION THAT HAS BEEN CUT AND PATCHED IN A VISUALLY <br />UNSATISFACTORY MANNER, OR THAT, IN THE ARCHITECT'S OPINION, REDUCES THE BUILDING'S AESTHETIC <br />QUALITIES. <br />1. COLUMN CENTERLINES (ALSO REFERRED TO AS GRID LINES) ARE SHOWN FOR REFERENCE. <br />2. DIMENSIONS ARE TO FINISH FACE OF WALL, U.N.O. <br />3. DOOR OPENINGS WHICH ARE NOT DIMENSIONED SHALL BE LOCATED WITHIN 4 INCHES OF ADJOINING <br />PARTITIONS. <br />4. HENDY SHALL REVIEW AND APPROVE ALL CHALK LINES PRIOR TO INSTALLATION OF TRACK. HENDY <br />WILL BE NOTIFIED OF ANY DEVIATIONS FROM CONSTRUCTION DIMENSIONS OR CLEARANCE IDENTIFIED <br />ON PLAN OR ANY CONSTRUCTION CONFLICTS. <br />5. USE 5/8”MOISTURE RESISTANT "GREEN BOARD" GYPSUM BOARD ON ALL WET WALLS. <br />6. PROVIDE AND INSTALL 16 GAUGE GALVANIZED METAL WALL BACKING AT ALL BUILT-IN MILLWORK <br />LOCATIONS, HANGING WALL EQUIPMENT, ETC. COORDINATE EXACT LOCATIONS. <br />7. ALL INTERIOR WALLS AND PARTITIONS SHALL BE CONSTRUCTED TO RESIST ALL LOADS TO WHICH THEY <br />ARE SUBJECTED BUT NOT LESS THAN A FORCE OF FIVE POUNDS PER SQUARE FOOT APPLIED <br />PERPENDICULAR TO THE WALLS. <br />8. ALL INTERIOR PARTITIONS SHALL MEET THE "AWCI RECOMMENDED LEVELS" FOR A LEVEL 4 FINISH, <br />U.N.O. WHERE DEEP TONE PAINT IS SCHEDULED, SKIM COAT FULL SURFACE OF SUBSTRATE TO LEVEL 5 <br />FINISH. <br />9. PROVIDE A "LEVEL-5" FINISH AT GYP. BD. CEILINGS AND SOFFITS. <br />10. PROVIDE MINIMUM FURRING AT ALL UNFURRED INTERIOR COLUMNS & RATED WALLS TO 6 INCHES <br />ABOVE CEILING, OR TO STRUCTURE ABOVE AT EXPOSED CEILINGS, U.N.O. <br />11. PROVIDE GYP. BD. FURRING AT ALL EXPOSED PERIMETER BULKHEAD CONDITIONS AND ABOVE ALL <br />EXPOSED PERIMETER WINDOW HEAD CONDITIONS TO 6 INCHES ABOVE SUSPENDED CEILING, OR TO <br />STRUCTURE AT EXPOSED CEILINGS, U.N.O. <br />12. PREPARE EXISTING SURFACES FOR FINISHES. ALL SURFACES SHALL BE PROPERLY PREPARED FREE <br />FROM ADHESIVE, BUMPS, CRACKS, ETC. <br />13. ALL PENETRATIONS AT ONE OR TWO HOUR PARTITIONS AND FLOORS SHALL BE PROTECTED BY FIRE <br />RATED ASSEMBLIES TO MAINTAIN RATING <br />14. AT STC-RATED ASSEMBLES, SEAL CONSTRUCTION AT PERIMETERS, BEHIND CONTROL JOINTS, AND AT <br />OPENINGS AND PENETRATIONS WITH A CONTINUOUS BEAD OF ACOUSTICAL SEALANT. INSTALL <br />ACOUSTICAL SEALANT AT BOTH FACES OF PARTITIONS AND PERIMETERS AND THROUGH <br />PENETRATIONS. COMPLY WITH ASTM C 919 AND WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS <br />FOR LOCATING EDGE TRIM AND CLOSING OFF SOUND FLANKING PATHS AROUND OR THROUGH <br />ASSEMBLIES INCLUDING SEALING PARTITIONS ABOVE ACOUSTICAL CEILINGS. <br />15. CONTRACTOR SHALL VERIFY LOCATIONS OF ALL FIRE EXTINGUISHERS. FINAL LOCATION OF FIRE <br />EXTINGUISHERS SHALL BE REVIEWED BY HENDY PRIOR TO INSTALLATION. <br />16. USE 3-5/8" MINIMUM METAL STUDS AT ALL PLUMBING WALLS. <br />17. PENETRATIONS OF FIRE-RESISTIVE WALLS AND FLOORS/CEILINGS SHALL BE PROTECTED AS REQUIRED <br />IN CBC 710, 711, 712 AND 713. <br />18. NOTIFY HENDY WHEN ACCESS PANELS ARE REQUIRED FOR MECHANICAL, ELECTRICAL, OR PLUMBING <br />INSTALLATIONS PER BUILDING CODES. THE STYLE AND LOCATIONS OF REQUIRED ACCESS PANELS <br />SHALL BE COORDINATED WITH ARCHITECT PRIOR TO INSTALLATION. <br />1. FOR INTERIOR FRAMES, COORDINATE WITH DOOR HARDWARE AND GLAZING <br />2. AT FIRE RATED ASSEMBLIES PROVIDE FRAME ASSEMBLIES COMPLYING WITH NFPA 80 AND LISTED AND <br />LABELED BY A QUALIFIED TESTING AGENCY ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION FOR <br />FIRE PROTECTION RATINGS AND TEMPERATURE-RISE LIMITS INDICATED. <br />3. WHERE HOLLOW METAL FRAMES ARE FABRICATED IN SECTIONS BECAUSE OF SHIPPING OR HANDLING <br />LIMITATIONS, FIELD SPLICE AT APPROVED LOCATIONS BY WELDING FACE JOINT CONTINUOUSLY, GRIND, <br />FILL, DRESS, AND MAKE SPLICE SMOOTH, FLUSH AND INVISIBLE ON EXPOSED FACES. <br />4. CHECK PLUMB, SQUARE, AND TWIST OF FRAMES AS WALLS ARE CONSTRUCTED. SHIM AS NECESSARY <br />TO COMPLY WITH INSTALLATION TOLERANCES. <br />5. CLEAN EXPOSED FRAME SURFACES PROMPTLY AFTER INSTALLATION, USING CLEANING METHODS <br />RECOMMENDED BY FRAME MANUFACTURER AND ACCORDING TO AAMA 609 AND 610. TOUCH UP <br />MARRED FRAME SURFACES SO TOUCH UP IS NOT VISIBLE FROM A DISTANCE OF 48 INCHES. REMOVE <br />AND REPLACE ALUMINUM FRAMES WITH DAMAGED FINISH THAT CANNOT BE SATISFACTORILY <br />REPAIRED. <br />1. ALL GLAZING SHALL BE INSTALLED PER CBC CHAPTER 24 <br />2. FIELD MEASURE FOR ALL GLAZING AND MILLWORK CONDITIONS PRIOR TO MANUFACTURING. <br />3. GLAZING AREAS LARGER THAN A SINGLE PANE OF GLASS SHALL HAVE EQUAL SIZED PANES OF GLASS <br />AS LARGE AS POSSIBLE WITH A MAXIMUM WIDTH OF 5 FEET EACH, U.N.O. <br />4. UNLESS NOTED OTHERWISE, PROVIDE MINIMUM GLAZING THICKNESS AS FOLLOWS: <br />A.1/4" AT ALL FRAMED SIDELIGHTS AND GLAZING LESS THAN 5' X 9' SUPPORTED ON 3 <br />SIDES OR AS REVIEWED BY STRUCTURAL ENGINEER <br />B.3/8" AT TOP AND BOTTOM FRAMED, BUTT-JOINED CORNERS <br />C.1/2" AT SIDELIGHTS AND GLAZING WITH SEISMIC CLIPS W HERE UNSUPPORTED ON TWO <br />OR MORE SIDES <br />D.5/8" AT SIDELIGHTS AND GLAZING WHERE UNSUPPORTED ON TWO OR MORE SIDES <br />E.5/8" AT FRAMELESS DOOR AND SIDELIGHT CONDITIONS AND WHERE UNSUPPORTED ON <br />TWO OR MORE SIDES WITHOUT SEISMIC CLIPS <br />5.COORDINATE GLAZING CHANNEL DIMENSIONS TO PROVIDE NECESSARY BITE ON GLASS, MINIMUM <br />EDGE AND FACE CLEARANCES AND ADEQUATE SEALANT THICKNESS, WITH REASONABLE TOLERANCES. <br />6.CLEAN GLAZING CHANNELS AND OTHER FRAMING MEMBERS RECEIVING GLASS IMMEDIATELY BEFORE <br />GLAZING. REMOVE COATINGS NOT FIRMLY BONDED TO SUBSTRATES. EXAMINE GLAZING UNITS TO <br />LOCATE INTERIOR AND EXTERIOR SURFACES. LABEL OR MARK UNITS AS NEEDED SO THAT EXTERIOR <br />AND INTERIOR SURFACES ARE READILY IDENTIFIABLE. DO NOT USE MATERIALS THAT LEAVE VISIBLE <br />MARKS ON THE COMPLETED WORK. <br />7.PROVIDE EDGE BLOCKING WHERE INDICATED OR NEEDED TO PREVENT GLASS LITES FROM MOVING <br />SIDEWAYS IN GLAZING CHANNEL, AS RECOMMENDED IN WRITING BY GLASS MANUFACTURER AND <br />ACCORDING TO REQUIREMENTS IN REFERENCE GLAZING PUBLICATIONS. <br />1. THE CONTRACTOR SHALL FURNISH AND INSTALL REQUIRED DOOR AND FRAME ASSEMBLIES AS <br />SPECIFIED IN THE DRAWINGS, U.N.O. <br />2. PROVIDE DOORS MADE WITH ADHESIVES AND COMPOSITE WOOD PRODUCTS THAT DO NOT <br />CONTAIN UREA-FORMALDEHYDE RESINS. <br />3. FINISH DOORS AT FACTORY THAT ARE INDICATED TO RECEIVE TRANSPARENT FINISH. <br />4. ALL HOLLOW METAL DOOR FRAMES SHALL BE STEEL FRAMES WHETHER OR NOT THEY ARE SHOWN <br />ON APPROVED SET OF DRAWINGS. <br />5. DOOR SHALL BE INSTALLED IN FRAME WITH 1/8" MAX. TOLERANCE AT HEAD HINGES, AND STRIKE <br />JAMB. <br />6. THE CONTRACTOR SHALL VERIFY AND COORDINATE THE THICKNESS OF FLOOR FINISH WITH <br />UNDERCUT DIMENSION AT DOOR. <br />7. EXISTING DOORS, CLOSET DOORS, RESTROOM DOORS, ETC. IN A ONE-HOUR CORRIDOR SHALL BE <br />20 MINUTE RATED DOORS. <br />8. A SINGLE LEAF OF A SWINGING DOOR SHALL NOT EXCEED FOUR FEET IN WIDTH. THE MINIMUM <br />CLEAR WIDTH SHALL BE 32 INCHES (CBC 1010.1.1.) <br />9. EXIT DOORS SHALL SWING IN THE DIRECTION OF EXIT TRAVEL WHEN SERVING ANY HAZARDOUS <br />AREA OR WHEN SERVING AN AREA HAVING AN OCCUPANT LOAD OF 50 OR MORE. (CBC 1010.1.2.1) <br />10. THE FORCE FOR PUSHING OR PULLING OPEN INTERIOR SWINGING EGRESS DOORS, OTHER THAN <br />FIRE DOORS, SHALL NOT EXCEED 5 POUNDS. FORCES SHALL BE APPLIED TO THE LATCH SIDE OF <br />THE DOOR. (CBC 1010.1.3) <br />11. ALL DOORS SHALL BE ACCESSIBLE BY DISABLED PERSONS, COMPLYING WITH CBC 1010.1, 1010.2 <br />AND 11B-404. INCLUDING LEVER TYPE HARDWARE. <br />12. EXIT DOORS SHALL BE OPENABLE FROM INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL <br />KNOWLEDGE OR EFFORT. (CBC 1010.2) <br />13. MAIN EXTERIOR EXIT DOORS WHICH OBVIOUSLY AND CLEARLY ARE IDENTIFIABLE AS EXITS NEED <br />NOT BE SIGNED WHEN APPROVED BY THE BUILDING OFFICIAL. (CBC 1013.1) <br />14. DOORWAYS SHALL BE LEVEL: 60 INCHES DEEP LEVEL AREA SHALL BE PROVIDED IN THE DIRECTION <br />OF DOOR SWING. 44 INCHES DEEP LEVEL AREA WHEN DOOR SWINGS AWAY FROM APPROACH. (CBC <br />11B-404.2.4) THE WIDTH OF THE LEVEL AREA SHALL EXTEND 24 INCHES PAST THE STRIKE EDGE ON <br />THE SIDE TO SWINGS ON EXTERIOR DOORS AND 18 INCHES PAST THE STRIKE EDGE ON INTERIOR <br />DOORS. (CBC TABLE 11B-404.2.4.1) <br />15. THE BOTTOM 10 INCHES OF ALL DOORS EXCEPT AUTOMATIC AND SLIDING SHALL HAVE A SMOOTH <br />UNINTERRUPTED SURFACE TO ALLOW THE DOOR TO BE OPENED BY A WHEELCHAIR FOOTREST <br />WITHOUT CREATING A TRAP OR HAZARDOUS CONDITION. WHERE NARROW FRAME DOORS ARE <br />USED, A 10 INCHES HIGH SMOOTH PANEL SHALL BE INSTALLED ON THE PUSH SIDE OF THE DOOR, <br />WHICH WILL ALLOW THE DOOR TO BE OPENED BY A WHEELCHAIR FOOT-REST WITHOUT CREATING <br />A TRAP OR HAZARDOUS CONDITION. (CBC 11B-404.2.10) <br />16. DOOR ASSEMBLIES OFTEN PROVIDE ACCESSIBILITY, LIFE SAFETY AND SECURITY FUNCTIONS WHICH <br />CAN INCREASE THEIR COMPLEXITY DRAMATICALLY. DOOR INSTALLERS SHALL LOOK AT THE <br />CRITERIA FOR INSPECTING. SEE SECTION 5.2.4 OF NFPA 80. NFPA 80 DOES NOT REQUIRE THE <br />INSPECTIONS TO BE PERFORMED BY THIRD-PARTY INSPECTION, NOR DOES IT REQUIRE <br />PROFESSIONAL CERTIFICATION FOR THE INSPECTORS, ONLY THAT THE INSPECTORS ARE <br />KNOWLEDGEABLE ABOUT THE TYPES OF OPENINGS BEING INSPECTED. <br />1. ALL LOCKSETS SHALL BE CODED AND/OR KEYED IN ACCORDANCE WITH OWNER'S REQUIREMENTS. CODES <br />AND/OR KEYS SHALL BE DELIVERED TO OWNER PROPERLY TESTED AND/OR TAGGED. THE NUMBER OF <br />MASTER AND PASS KEYS SHALL BE COORDINATED WITH OWNER. <br />2. HARDWARE SUPPLIER SHALL PROVIDE GRANDMASTER KEY, MASTER KEY, KEY-ALIKE AND/OR KEY- <br />DIFFERENT ALL LOCKS IN ACCORDANCE WITH KEYING SCHEDULE AS PROVIDE BY OWNER. <br />3. THE ATTACHED HARDWARE SCHEDULE IS INTENDED TO COVER ALL DOORS IN THE PROJECT AND <br />ESTABLISH A TYPE AND STANDARD OF QUALITY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO <br />FURNISH AND INSTALL A COMPLETE AND OPERATIONAL SYSTEM OF DOOR FINISH HARDWARE ITEMS <br />ENCOMPASSING ALL OPENINGS WITHIN THE PROJECT AREA. <br />4. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL HARDWARE AS REQUIRED TO MEET CODE AND <br />FUNCTIONAL REQUIREMENTS. THE OUTLINE HARDWARE SPECIFICATION IS PROVIDED AS A BASIS FOR A <br />COMPLETE SUBMITTAL BY THE DETAILED HARDWARE LIST WHICH INDICATES THE QUANTITY, TYPE, <br />CATALOG NUMBER, MANUFACTURER, AND AND LOCATION OF EACH ARTICLE OF HARDWARE REQUIRED. <br />HARDWARE LIST SHALL BE SUBMITTED NO LATER THAN 30 DAYS BEFORE THE ORDER DATE NECESSARY TO <br />MEET THE PROJECT SCHEDULE. HENDY REVIEW OF THE HARDWARE LIST SHALL NOT REPRESENT <br />CERTIFICATION THAT THE LIST IS COMPLETE AND DOES NOT RELIEVE THE CONTRACTOR FROM PROVIDING <br />A COMPLETE PROJECT. <br />5. ALL HARDWARE SHALL BE OF LEVER TYPE TO COMPLY WITH ACCESSIBILITY REQUIREMENTS. IT IS THE <br />RESPONSIBILITY OF THE CONTRACTOR TO REPLACE ALL DOOR HARDWARE ITEMS NOT IN COMPLIANCE <br />WITH APPLICABLE ACCESSIBILITY REQUIREMENTS TO THE SATISFACTION OF THE BUILDING AUTHORITY. <br />6. 6EACH ARTICLE OF HARDWARE SHALL BE INDIVIDUALLY PACKAGED IN ITS ORIGINAL MANUFACTURER'S <br />CONTAINER AND PROPERLY MARKED OR LABELED IN CONFORMANCE WITH THE APPROVED HARDWARE <br />LIST. <br />7. ALL FASTENERS SHALL MATCH THE HARDWARE MATERIAL AND FINISH. <br />8. ALL HARDWARE APPLIED TO METAL DOORS OR JAMBS SHALL BE MADE TO TEMPLATE AND SECURED BY <br />MACHINE SCREWS. FURNISH (3) BUTT HINGES FOR DOORS UP TO 7'-0" HIGH AND (1) HINGE FOR EACH <br />ADDITIONAL 2'-6". <br />9. PROVIDE STANDARD STRIKE PLATE WITH EXTENDED LIP WHERE REQUIRED TO PROTECT TRIM FROM BEING <br />MARRED OR DAMAGED BY THE LATCH BOLT. <br />10. PROVIDE DUST COVERS AT ALL STRIKE PLATES. <br />11. LATCHING & LOCKING DOORS THAT ARE HAND ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL BE <br />OPERABLE WITH A SINGLE EFFORT BY LEVER TYPE HARDWARE, PANIC BARS, PUSH-PULL ACTIVATING BARS, <br />OR OTHER HARDWARE DESIGNED TO PROVIDE PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE <br />OPENING HARDWARE. HARDWARE SHALL BE CENTERED BETWEEN 34 INCHES AND 44 INCHES MAX. ABOVE <br />THE FLOOR (CBC 11B-404) <br />12. MAIN EXTERIOR DOORS IN A GROUP B OCCUPANCY ARE PERMITTED TO BE EQUIPPED WITH KEY-OPERATED <br />LOCKING DEVICE PROVIDED. THERE IS A VISIBLE, DURABLE SIGN ON OR ADJACENT TO THE DOOR STATING <br />"THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED." THE LETTERS SHALL NOT BE LESS THAN <br />1 INCH ON A CONTRASTING BACKGROUND. THE LOCKING DEVICE MUST BE A TYPE THAT WILL BE READILY <br />DISTINGUISHABLE AS LOCKED. (CBC 1010.2.4(3)) <br />13. WHERE EGRESS DOORS ARE USED IN PAIRS, APPROVED AUTOMATIC FLUSH BOLTS SHALL BE PERMITTED <br />TO BE USED, PROVIDED THAT THE DOOR LEAF HAVING THE AUTOMATIC FLUSH BOLTS HAS NO DOOR KNOBS <br />OR SURFACE-MOUNTED HARDWARE. (CBC 1010.2.4(4)) <br />14. MANUALLY OPERATED FLUSH BOLTS OR SURFACE BOLTS ARE PERMITTED WHERE A PAIR OF DOORS <br />SERVES AN OCCUPANT LOAD OF LESS THAN 50 PERSONS IN A GROUP B, F OR S OCCUPANCY. MANUALLY <br />OPERATED EDGE-OR SURFACE-MOUNTED BOLTS ARE PERMITTED THE INACTIVE LEAF. THE INACTIVE LEAF <br />SHALL CONTAIN NO DOOR KNOBS, PANIC BARS OR SIMILAR OPERATING HARDWARE. (CBC 1010.2.4(4)) <br />15. PANIC & FIRE HARDWARE, WHEN INSTALLED, SHALL COMPLY WITH THE REQUIREMENTS OF CBC 1010.2.9 <br />AS FOLLOWING: <br />A.THE ACTUATING PORTION OF THE RELEASING DEVICE SHALL EXTEND AT LEAST ONE HALF OF THE <br />LEAF WIDTH. <br />B.THE MAXIMUM UNLATCHING FORCE SHALL NOT EXCEED 15 POUNDS (67N) <br />16. EXIT DOOR HARDWARE SHALL BE OF AN APPROVED TYPE AND TESTED IN ACCORDANCE WITH <br />PROCEDURES ESTABLISHED IN CBC SECTION 715 AND CBC CHAPTER 11B. <br />17. THRESHOLD HEIGHT AT DOOR WAYS SHALL BE 1/2" HIGH MAXIMUM (CBC 11B-404.2.5). CHANGES IN LEVEL AT <br />DOORWAYS BETWEEN 1/4" AND 1/2" SHALL BE BEVELED WITH SLOPE NO STEEPER THAN 1:2. (CBC 11B-303.3). <br />1. THE USE OF A CARD READER WILL NOT DELAY EGRESS OF OCCUPANTS LEAVING THE BUILDING. ACCESS- <br />CONTROLLED EGRESS DOORS SHALL FULLY COMPLY WITH CBC 1010.2.11. <br />2. THE CONTRACTOR SHALL VERIFY AND COORDINATE ELECTRICAL AND SECURITY REQUIREMENTS AT <br />CARD READERS. TENANT'S SECURITY VENDOR SHALL PROVIDE ALL CARD READER EQUIPMENT AND <br />WIRING. CONDUITS AND BOXES SHALL BE PROVIDED BY GENERAL CONTRACTOR. THIS WORK SHALL BE <br />COORDINATED BETWEEN CONTRACTOR AND TENANT'S SECURITY VENDOR. <br />HHENDY.COM <br />T (949) 851-3080 <br />4770 Campus Dr., Suite 100 <br />Newport Beach, CA 92660 <br />H ndy <br />ISSUES AND REVISIONS <br />JOB NUMBER <br />SCALE <br />PROJECT <br />TEAM <br />All specifications, drawings, concepts, designs, arrangements, intellectual and written material represented herein constitute <br />unique and unpublished work of H. Hendy Associates and may not be copied, used by or disclosed to others without written <br />consent of H. Hendy Associates. <br /> 2023 H.HendyAssociatesc <br />DATE <br />04463.0000.24 <br />3080 S. HARBOR BLVD. <br />SANTA ANA, CA 92704 <br />GENERAL NOTES <br />IA-G1 <br />MCGUFF <br />AB/CD <br />ORANGE COUNTY FIRE AUTHORITY CAL GREEN NOTES <br />GENERAL NOTES <br />BIDDING <br />SUBMITTALS <br />DEMOLITION <br />PATCHING & PREPPING <br />FRAMING & DRYWALL <br />DOOR & WINDOW FRAMES <br />GLASS & GLAZING SYSTEMS <br />DOORS <br />DOOR HARDWARE <br />ACCESS CONTROL <br />NONE <br />NO. DESCRIPTION DATE <br />PLAN CHECK SUBMITTAL 3/17/25