INSPECTIONS
<br />1. OCFA FINAL INSPECTION REQUIRED. PLEASE SCHEDULE ALL FIELD INSPECTIONS AT LEAST 72 HOURS IN
<br />ADVANCE. INSPECTIONS CANCELED AFTER 1 P.M. ON THE DAY BEFORE THE SCHEDULED DATE WILL BE
<br />SUBJECT TO A REINSPECTION FEE. PHASING OF INSPECTIONS MAY REQUIRE ADDITIONAL FEES, ALSO.
<br />CALL OCFA INSPECTION SCHEDULING AT (714) 573-6150.
<br />2. BUILDINGS UNDER CONSTRUCTION OR DEMOLITION SHALL CONFORM TO CFC CHAPTER 33. NO
<br />SMOKING OR COOKING IS ALLOWED IN STRUCTURES WHERE COMBUSTIBLE MATERIALS ARE EXPOSED
<br />OR WITHIN 25' OF COMBUSTIBLE MATERIALS STORAGE AREAS. CUTTING, WELDING, OR OTHER HOT
<br />WORK SHALL BE IN CONFORMANCE WITH CFC CHAPTER 35.
<br />3. IN BUILDINGS FOUR OR MORE STORIES IN HEIGHT, STANDPIPES SHALL BE PROVIDED DURING
<br />CONSTRUCTION WHEN THE HEIGHT REACHES 40 FEET ABOVE THE LOWEST POINT OF FIRE DEPARTMENT
<br />ACCESS. A FIRE DEPARTMENT CONNECTION SHALL BE NO MORE THAN 100 FEET FROM AVAILABLE FIRE
<br />DEPARTMENT VEHICLE ACCESS ROADWAYS. A HYDRANT SHALL BE LOCATED ALONG THE ACCESS
<br />ROADWAY WITHIN 150 FEET OF THE LOCATION(S) THAT THE FDC CAN BE ACCESSED FROM. FC 3310, 3313
<br />4. ADDRESS NUMBERS SHALL BE PROVIDED FOR ALL NEW AND EXISTING BUILDINGS, BE A MINIMUM OF
<br />FOUR INCHES HIGH FOR INDIVIDUAL DWELLING UNITS AND SIX INCHES HIGH FOR ALL OTHER
<br />INSTALLATIONS AND STRUCTURES, CONTRAST WITH THEIR BACKGROUND, AND BE PLAINLY VISIBLE
<br />FROM THE ROADWAY THE BUILDING IS ADDRESSED ON. TEMPORARY ADDRESS NUMBERS SHALL BE
<br />PROVIDED ON CONSTRUCTION FENCING OR THE BUILDING UNTIL PERMANENT NUMBERS CAN BE
<br />PROVIDED. CBC 501.2, CFC 505.1
<br />5. LOCATIONS AND CLASSIFICATIONS OF EXTINGUISHERS SHALL BE IN ACCORDANCE WITH CFC 906 AND
<br />CCR TITLE 19. AT LEAST ONE EXTINGUISHER SHALL BE PROVIDED DURING CONSTRUCTION ON EACH
<br />FLOOR AT EACH STAIRWAY, IN EACH STORAGE AND CONSTRUCTION SHED, IN LOCATIONS WHERE
<br />FLAMMABLE OR COMBUSTIBLE LIQUIDS ARE STORED OR USED, OR WHERE SIMILAR HAZARDS ARE
<br />PRESENT PER CFC 3315.1. BEFORE FINAL OCCUPANCY, AT LEAST ONE 2A:10B:C EXTINGUISHER SHALL
<br />BE PROVIDED SO THAT NO POINT IS MORE THAN 75' TRAVEL DISTANCE FROM THE EXTINGUISHER.
<br />EXTINGUISHERS SHALL BE LOCATED ALONG THE PATH OF EGRESS TRAVEL AND IN A READILY VISIBLE
<br />AND ACCESSIBLE LOCATION, WITH THE BOTTOM OF THE EXTINGUISHER AT LEAST 4”ABOVE THE FLOOR.
<br />ADDITIONAL EXTINGUISHERS MAY BE REQUIRED BY OCFA INSPECTORS DEPENDING ON PROJECT OR
<br />SITE CONDITIONS AND FINAL PLACEMENT IS SUBJECT TO THEIR APPROVAL.
<br />6. WALL, FLOOR AND CEILING FINISHES AND MATERIALS SHALL NOT EXCEED THE FLAME SPREAD
<br />CLASSIFICATIONS IN CBC TABLE 803.11. DECORATIVE MATERIALS SHALL BE PROPERLY TREATED BY A
<br />PRODUCT OR PROCESS APPROVED BY THE STATE FIRE MARSHAL WITH APPROPRIATE DOCUMENTATION
<br />PROVIDED TO THE OCFA. SUCH ITEMS SHALL BE APPROVED AND INSPECTED BY THE OCFA PRIOR TO
<br />INSTALLATION.
<br />7. KNOX BOXES/KEY CABINETS SHALL BE PROVIDED FOR ALL HIGH-RISE BUILDINGS, POOL ENCLOSURES,
<br />GATES IN THE PATH OF FIREFIGHTER TRAVEL TO STRUCTURES, SECURED PARKING LEVELS, DOORS
<br />GIVING ACCESS TO ALARM PANELS AND/OR ANNUNCIATORS, AND ANY OTHER STRUCTURES OR AREAS
<br />WHERE IMMEDIATE ACCESS IS REQUIRED OR IS UNDULY DIFFICULT. AN OCFA INSPECTOR CAN ASSIST
<br />WITH LOCKING GATE KEYS IN KNOX BOXES, CONTACT YOUR LOCAL FIRE STATION TO ARRANGE AN
<br />APPOINTMENT TO SECURE MASTER BUILDING KEYS IN THE KNOX BOX.
<br />8. APPROVAL OF THESE PLANS SHALL NOT PERMIT THE VIOLATION OF ANY CODE OR LAW. REQUIREMENTS
<br />OR FEATURES NOT IDENTIFIED ON THE PLAN MAY APPLY AND OCFA INSPECTORS MAY REQUIRE
<br />ADDITIONAL INFORMATION OR ITEMS FROM THOSE SHOWN ON THE PLAN DEPENDING ON ACTUAL OR
<br />ANTICIPATED FIELD CONDITIONS. SUCH CHANGES MAY NECESSITATE SUBMITTAL OF REVISED OR AS-
<br />BUILT PLANS TO THE OCFA AND THE CITY/COUNTY WHERE THE PROJECT IS LOCATED.
<br />GENERAL REQUIREMENTS
<br />1. THE PROJECT SHALL COMPLY WITH CALIFORNIA BUILDING CODE, CALIFORNIA FIRE CODE, AND OTHER
<br />CURRENTLY ADOPTED CODES, STANDARDS, REGULATIONS AND REQUIREMENTS AS ENFORCED BY
<br />THE ORANGE COUNTY FIRE AUTHORITY.
<br />2. DUMPSTERS AND TRASH CONTAINERS EXCEEDING 1.5 CUBIC YARDS SHALL NOT BE STORED IN
<br />BUILDINGS OR PLACED WITHIN 5 FEET OF COMBUSTIBLE WALLS, OPENINGS OR COMBUSTIBLE ROOF
<br />EAVE LINES UNLESS PROTECTED BY AN APPROVED SPRINKLER SYSTEM OR LOCATED IN A TYPE I OR IIA
<br />STRUCTURE SEPARATED BY 10 FEET FROM OTHER STRUCTURES. CONTAINERS LARGER THAN 1 CUBIC
<br />YARD SHALL BE OF NON-OR LIMITED-COMBUSTIBLE MATERIALS OR SIMILARLY PROTECTED OR
<br />SEPARATED. CFC 304.3.
<br />3. EXITS, EXIT SIGNS, FIRE ALARM PANELS, HOSE CABINETS, FIRE EXTINGUISHER LOCATIONS, AND
<br />STANDPIPE CONNECTIONS SHALL NOT BE CONCEALED BY CURTAINS, MIRRORS, OR OTHER
<br />DECORATIVE MATERIAL.
<br />4. THE EGRESS PATH SHALL REMAIN FREE AND CLEAR OF ALL OBSTRUCTIONS AT ALL TIMES. NO
<br />STORAGE IS PERMITTED IN AISLES.
<br />5. EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL
<br />KNOWLEDGE OR EFFORT. DOORS SHALL NOT BE PROVIDED WITH THUMB-TURN LOCKS OR
<br />DEADBOLTS THAT DO NOT UNLATCH IN TANDEM WITH THE NORMAL OPERATING LEVER. THE OPENING
<br />FORCE FOR INTERIOR DOORS WITHOUT CLOSERS SHALL NOT EXCEED 5 POUNDS. THE UNLATCHING
<br />AND OPENING FORCE FOR OTHER DOORS, INCLUDING FIRE DOORS, SHALL NOT EXCEED 15 POUNDS.
<br />CBC 1010
<br />6. THE EXIT PATH SHALL BE CLEARLY IDENTIFIED WITH EXIT SIGNS CONFORMING TO CBC 1013.
<br />ILLUMINATED EXIT SIGNS MUST HAVE 90-MINUTE EMERGENCY POWER BACK-UP.
<br />7. TACTILE SIGNS SHALL BE PROVIDED IN COMMERCIAL BUILDINGS, PUBLIC
<br />BUILDINGS/ACCOMMODATIONS, AND PUBLICLY FUNDED HOUSING SUBJECT TO CBC CHAPTERS 11A
<br />AND B AND CONFORM TO 1143A OR 11B-703.1, -703.2, -703.3, AND 703.5, BE MOUNTED WITH THE BOTTOM
<br />OF THE LOWEST LINE OF BRAILLE CHARACTERS AT LEAST 4 FEET ABOVE THE FLOOR BUT THE BOTTOM
<br />OF THE HIGHEST LINE OF RAISED TEXT CHARACTERS NO MORE THAN 5 FEET ABOVE THE FLOOR AND,
<br />WHENEVER POSSIBLE, ON THE STRIKE SIDE OF THE DOOR. LETTERING SHALL BE BETWEEN 5/8”AND 2”
<br />HIGH. CBC 1013.4
<br />8. STAIRS SERVING 4+ STORIES SHALL HAVE STAIRWELL SIGNS CONFORMING TO CBC 1023.9 AND OCFA
<br />GUIDELINE E_02.
<br />9. THE EXIT PATH SHALL BE ILLUMINATED AT ALL TIMES IN ACCORDANCE WITH CBC 1006. EMERGENCY
<br />LIGHTING SHALL BE PROVIDED WITH 90-MINUTE BACK-UP.
<br />10. RATED ASSEMBLIES SHALL CONFORM TO APPROVED METHODS AND MATERIALS OF CONSTRUCTION.
<br />PENETRATIONS THROUGH RATED WALLS, CEILINGS, OR FLOORS SHALL BE PROTECTED IN AN
<br />APPROVED MANNER COMPLYING WITH CBC/CFC CHAPTER 7.
<br />11. RATED DOORS SHALL BE SELF-CLOSING AND LATCHING; SUCH DOORS SHALL NOT BE EQUIPPED WITH
<br />DOOR STOPS OR OTHERWISE PROPPED OPEN. RATED DOORS SHALL BE EQUIPPED WITH RATED
<br />HARDWARE. CFC 703
<br />PROJECT-SPECIFIC REQUIREMENTS
<br />ALARM AND MONITORING SYSTEMS
<br />1. A FIRE ALARM SYSTEM SHALL BE PROVIDED IN COMPLIANCE WITH CBC/CFC 907 AND NFPA 72. A
<br />SEPARATE PLAN SUBMITTAL IS REQUIRED FOR APPROVAL PRIOR TO INSTALLATION OR MODIFICATION.
<br />2. AUTOMATIC FIRE SPRINKLER SYSTEM(S) AND ALL CONTROL VALVES, WITH THE EXCEPTION OF THOSE
<br />LISTED IN CFC 903.4, SHALL BE MONITORED BY A UL LISTED CENTRAL ALARM STATION.
<br />EXTINGUISHING SYSTEMS
<br />3. AN AUTOMATIC FIRE SPRINKLER SYSTEM SHALL BE PROVIDED THROUGHOUT THE BUILDING IN
<br />COMPLIANCE WITH CFC 903 AND THE APPLICABLE NFPA SPRINKLER STANDARD. REVIEW AND
<br />APPROVAL OF A SPRINKLER PLAN IS REQUIRED PRIOR TO INSTALLATION OR MODIFICATION.
<br />HAZARDOUS MATERIALS, EQUIPMENT, AND PROCESSES
<br />4. STORAGE, DISPENSING, OR USE OF ANY HAZARDOUS MATERIALS SHALL COMPLY WITH CBC 414 AND
<br />415 AND CFC REGULATIONS. THE STORAGE AND USE OF HAZARDOUS MATERIALS SHALL BE
<br />REVIEWED AND APPROVED BY THE OCFA PRIOR TO SUCH MATERIALS BEING BROUGHT ON SITE.
<br />APPROPRIATE HAZARDOUS MATERIALS WARNING SIGNS SHALL BE PROMINENTLY PLACED IN THE
<br />VICINITY/ENTRANCES TO AREAS WHERE HAZARDOUS MATERIALS ARE STORED IN QUANTITIES
<br />SUFFICIENT TO REQUIRE A CFC PERMIT.
<br />1. ENSURE OUTDOOR SMOKING AREAS ARE A MINIMUM OF 25'-0" FROM BUILDING ENTRIES, OUTDOOR AIR
<br />INTAKES AND OPERABLE WINDOWS AS REQUIRED BY CALGREEN SECTION 5.504.7.
<br />2. RECYCLE OR SALVAGE FOR REUSE A MINIMUM OF 65% OF THE NON-HAZARDOUS CONSTRUCTION AND
<br />DEMOLITION WASTE PER CALGREEN SECTION 5.408.1 OR COMPLY WITH THE LOCAL ORDINANCE,
<br />WHICHEVER IS MORE STRINGENT. GC SHALL PROVIDE DOCUMENTATION OF CONSTRUCTION WASTE
<br />MANAGEMENT PLANS AS REQUIRED TO ENFORCING AGENCIES.
<br />3. 3.PROVIDE VERIFICATION THAT UNIVERSAL WASTE ITEMS SUCH AS FLORESCENT LAMPS AND BALLAST
<br />AND MERCURY-CONTAINING THERMOSTATS AS WELL AS OTHER CALIFORNIA PROHIBITED UNIVERSAL
<br />WASTE MATERIALS ARE DISPOSED OF PROPERLY AND ARE DIVERTED FROM LANDFILLS.
<br />4. ALL WALL AND FLOOR ASSEMBLIES SEPARATING TENANTS OR SEPARATING TENANTS FROM PUBLIC
<br />SPACES SHALL HAVE A MINIMUM STC RATING OF 40 AS PER CALGREEN SECTION 5.507.4.3.
<br />5. ALL PLUMBING FIXTURES IN AREA OF WORK SHALL COMPLY WITH CALGREEN SECTION 5.303.3.
<br />6. 6PER CA CIVIL CODE 1101 TO 1105, ALL NON-COMPLIANT PLUMBING FIXTURES WITHIN THE AREA OF
<br />WORK SHALL BE REPLACED WITH WATER CONSERVING PLUMBING FIXTURES. BUILDINGS FINALED ON OR
<br />AFTER 01/01/1994 ARE EXEMPT.
<br />7. PROVIDE HVAC, REFRIGERATION AND FIRE SUPPRESSION SYSTEMS AND EQUIPMENT THAT DO NOT
<br />UTILIZE CFC OR HALONS AS PER CALGREEN SECTION 5.508.1.
<br />8. PER CALGREEN SECTION 5.410.4.2, A WRITTEN PLAN OF PROCEDURES FOR TESTING AND ADJUSTMENT
<br />FOR NEW SYSTEMS SERVING THE AREA OF WORK IS REQUIRED TO BE DEVELOPED FOR THE
<br />FOLLOWING SYSTEMS:
<br />A.HVAC SYSTEMS AND CONTROLS
<br />B.INDOOR LIGHTING AND CONTROLS
<br />C.WATER HEATING SYSTEMS
<br />9. PERFORM TESTING AND ADJUSTMENT OF REQUIRED SYSTEMS, INCLUDING HVAC BALANCING, AND
<br />PROVIDE REPORTS TO BUILDING OWNER AND ENFORCING AGENCIES AS PER CALGREEN SECTION
<br />5.410.4.3 AND 5.410.4.4.
<br />10. DURING CONSTRUCTION, MINIMIZE USE OF PERMANENT HVAC SYSTEMS. IF SYSTEM IS USED DURING
<br />CONSTRUCTION, PROTECT RETURN AIR TRUNK WITH AIR FILTERS WITH AN MINIMUM MERV RATING OF 8.
<br />REPLACE ALL FILTERS AT COMPLETION OF CONSTRUCTION.
<br />11. ALL DUCT AND OTHER RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH
<br />TAPE, PLASTIC, SHEET METAL OR OTHER METHODS TO REDUCE THE AMOUNT OF DUST, WATER AND
<br />DEBRIS ENTERING THE SYSTEM FROM THE TIME OF ROUGH INSTALLATION AND DURING STORAGE ON
<br />THE CONSTRUCTION SITE UNTIL FINAL START UP.
<br />12. ALL FINISH MATERIALS SHALL COMPLY WITH THE VOC LIMITS LISTED IN CALGREEN SECTIONS 5.504.4.1
<br />TO 5.504.4.4. VERIFICATION OF COMPLIANCE SHALL BE PROVIDED TO ENFORCING AGENCIES AS
<br />REQUIRED OR REQUESTED.
<br />13. ALL COMPOSITE WOOD PRODUCTS SHALL COMPLY WITH THE FORMALDEHYDE LIMITS LISTED IN
<br />CALGREEN SECTION 5.504.4.5. VERIFICATION OF COMPLIANCE SHALL BE PROVIDED TO ENFORCING
<br />AGENCIES AS REQUIRED OR REQUESTED.
<br />14. RESILIENT FLOORING SHALL COMPLY WITH THE REQUIREMENTS OF CALGREEN SECTION 5.504.4.6.
<br />VERIFICATION OF COMPLIANCE SHALL BE PROVIDED TO ENFORCING AGENCIES AS REQUIRED OR
<br />REQUESTED.
<br />15. PROVIDE THE BUILDING OWNER AN OPERATING AND MAINTENANCE (O&M) MANUAL WITH DETAIL
<br />OPERATING AND MAINTENANCE INSTRUCTION AND COPIES OF ALL GUARANTEES AND WARRANTIES FOR
<br />EACH INSTALLED SYSTEM. THE O&M INSTRUCTIONS SHALL BE CONSISTENT WITH OSHA REQUIREMENTS
<br />IN CR, TITLE 8 SECTION 5142 AND OTHER RELATED REGULATIONS. INCLUDE COPIES OF ALL INSPECTIONS
<br />AND REPORTS FROM THE TESTING AND ADJUSTMENT PROCEDURES IN THE O&M MANUAL.
<br />1. ALL WORK SHALL BE IN ACCORDANCE WITH CURRENT APPLICABLE NATIONAL, STATE, AND LOCAL
<br />CODES, LAWS AND ORDINANCES, INCLUDING ACCESS REQUIREMENTS.
<br />2. "ARCHITECT" AS USED IN THESE DOCUMENTS REFER TO HENDY, (949) 851-3080.
<br />3. GENERAL CONTRACTOR FOR THE PROJECT SHALL BE RESPONSIBLE FOR OBTAINING ALL REQUIRED
<br />BUILDING PERMITS.
<br />4. EXAMINE ALL CONTRACT DOCUMENTS AND FIELD CONDITIONS AND CONFIRM THAT WORK IS BUILDABLE
<br />AS SHOWN. IF THERE ARE QUESTIONS OR DISCREPANCIES, THE CONTRACTOR SHALL BE RESPONSIBLE
<br />FOR OBTAINING CLARIFICATION FROM HENDY BEFORE PROCEEDING WITH WORK IN QUESTION.
<br />5. VERIFY ALL DIMENSIONS ON JOB SITE BEFORE START OF ANY CONSTRUCTION. DO NOT SCALE
<br />DRAWINGS. DIMENSIONS SHALL GOVERN.
<br />6. LARGE SCALE DRAWINGS TAKE PRECEDENCE OVER SMALL SCALE DRAWINGS. DETAILS GOVERN OVER
<br />PLANS. NOTIFY HENDY OF ANY DISCREPANCIES.
<br />7. "TYPICAL" AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION IS THE SAME OR
<br />REPRESENTATIVE FOR ALL SIMILAR CONDITIONS THROUGHOUT, U.N.O.
<br />8. "SIMILAR" MEANS COMPARABLE CHARACTERISTICS FOR THE CONDITIONS NOTED. VERIFY DIMENSIONS
<br />AND ORIENTATIONS ON PLANS AND ELEVATIONS.
<br />9. DETAILS NOTED "TYPICAL" ARE KEYED ONLY ONCE AND ARE REPRESENTATIVE OF SIMILAR CONDITIONS
<br />THROUGHOUT, U.N.O.
<br />10. "ALIGN" AS USED IN THESE DOCUMENTS SHALL MEAN TO ACCURATELY LOCATE FINISH FACES IN THE
<br />SAME PLANE.
<br />11. WHERE NOTED "V.I.F." OR "VERIFY IN FIELD”THE DIMENSIONS SHALL BE CONFIRMED IN THE FIELD BY THE
<br />GENERAL CONTRACTOR. NOTIFY HENDY OF DISCREPANCIES GREATER THAN 2 INCHES.
<br />12. ALL VERTICAL DIMENSIONS ARE SHOWN FROM FINISH FLOOR, U.N.O.
<br />13. MAKE VERTICAL WORK PLUMB AND MAKE HORIZONTAL WORK LEVEL AND WITH ALIGNMENT AS
<br />INDICATED.
<br />14. MAINTAIN MINIMUM HEADROOM CLEARANCE OF 90 INCHES IN ALL OCCUPIED SPACES AND 84 INCHES IN
<br />RESTROOMS.
<br />15. ALL WORK NOTED "N.I.C.," "NOT IN CONTRACT," OR BY OTHERS SHALL BE ACCOMPLISHED BY A
<br />CONTRACTOR OTHER THAN THE GENERAL CONTRACTOR AND ARE NOT PART OF THE CONSTRUCTION
<br />AGREEMENT. THE GENERAL CONTRACTOR SHALL COORDINATE WITH OWNER OR TENANT'S VENDORS
<br />AND CONTRACTORS AS REQUIRED BY OWNER, TENANT OR BOTH.
<br />16. BEFORE PROCEEDING WITH EACH COMPONENT OF WORK, EXAMINE SUBSTRATES, AREAS AND
<br />CONDITIONS, WITH THE INSTALLER OR APPLICATOR PRESENT FOR COMPLIANCE REQUIREMENTS FOR
<br />INSTALLATION TOLERANCES AND OTHER CONDITIONS AFFECTING PERFORMANCE.
<br />A.EXAMINE ROUGH IN FOR MECHANICAL AND ELECTRICAL SYSTEMS TO VERIFY ACTUAL
<br />LOCATIONS OF CONNECTIONS BEFORE EQUIPMENT AND FIXTURE INSTALLATION.
<br />B.EXAMINE WALLS, FLOORS, AND CEILINGS FOR SUITABLE CONDITIONS WHERE PRODUCTS AND
<br />SYSTEMS ARE TO BE INSTALLED.
<br />C.VERIFY COMPATIBILITY WITH AND SUITABILITY OF SUBSTRATES, INCLUDING COMPATIBILITY
<br />WITH EXISTING FINISHES OR PRIMERS.
<br />D.PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE BEEN
<br />CORRECTED. PROCEEDING WITH THE WORK INDICATES ACCEPTANCE OF SURFACES AND
<br />CONDITIONS.
<br />17. GENERAL CONTRACTOR SHALL PROVIDE RECORD DOCUMENTS TO BUILDING OWNER/TENANT AND
<br />HENDY UPON COMPLETION OF TENANT CONSTRUCTION.
<br />18. WHERE EXISTING CEMENTITIOUS FIREPROOFING IS MISSING OR REMOVED DUE TO CONSTRUCTION,
<br />PROVIDE SPRAY APPLIED CEMENTITIOUS FIREPROOFING FOR CONTINUOUS AND CONSISTENT
<br />PROTECTION.
<br />19. DELIVER, STORE AND HANDLE PRODUCTS USING MEANS AND METHODS THAT WILL PREVENT DAMAGE,
<br />DETERIORATION, AND LOSS, INCLUDING THEFT AND VANDALISM. COMPLY WITH MANUFACTURERS'
<br />WRITTEN INSTRUCTIONS.
<br />20. PROVIDE PRODUCTS THAT COMPLY WITH THE CONTRACT DOCUMENTS, ARE UNDAMAGED, AND UNLESS
<br />OTHERWISE INDICATED, ARE NEW AT THE TIME OF INSTALLATION.
<br />21. INSTALL ALL MANUFACTURED ITEMS, MATERIALS AND EQUIPMENT IN STRICT ACCORDANCE WITH THE
<br />MANUFACTURER'S SPECIFICATIONS AND WRITTEN INSTRUCTIONS, INCLUDING INSTRUCTIONS FOR
<br />TEMPERATURE, HUMIDITY, VENTILATION, AND WEATHER-PROTECTION.
<br />22. VERIFY ALL APPLIANCE AND EQUIPMENT REQUIREMENTS WITH MANUFACTURERS. PROVIDE ALL WALL
<br />BACKING, ELECTRICAL AND PLUMBING SUPPLIES, FITTINGS AND CONNECTORS TO SUPPORT OR
<br />COMPLETE INSTALLATION. SUPPLY CUT-SHEETS FOR APPROVAL.
<br />23. COORDINATE BACKING WITH MILLWORKER FOR WALL HUNG UNITS AND FEATURES.
<br />24. PROVIDE FINAL PROTECTION AND MAINTAIN CONDITIONS THAT ENSURE INSTALLED WORK IS WITHOUT
<br />DAMAGE OR DETERIORATION AT THE TIME OF SUBSTANTIAL COMPLETION. COMPLY WITH
<br />MANUFACTURER'S WRITTEN INSTRUCTIONS FOR TEMPERATURE AND RELATIVE HUMIDITY.
<br />25. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE GENERAL CLEANING OF A JOB AFTER
<br />COMPLETION. CLEANING SHALL INCLUDE INTERIOR OF THE BUILDING AND PATH OF TRAVEL TO THE JOB
<br />SITE, THE PARKING LOT, ELEVATORS, STAIRS, LOBBIES & CORRIDORS.
<br />26. DIVERT NON-HAZARDOUS CONSTRUCTION, DEMOLITION, AND PACKAGING DEBRIS FROM LANDFILL
<br />DISPOSAL. REDIRECT RECYCLABLE, SALVAGEABLE, OR REUSABLE MATERIALS TO APPROPRIATE SITES
<br />OR CHARITABLE ORGANIZATIONS, INCLUDING: CARDBOARD, METAL, BRICK, CONCRETE, GLASS, PLASTIC,
<br />CLEAN WOOD, GYPSUM WALLBOARD, CARPET, AND INSULATION.
<br />1. DURING BID PROCESS IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY TO SITE VERIFY ALL
<br />CLEARANCES, INCLUDING IN PLENUM AREA. ADVISE IF MECHANICAL EQUIPMENT, MAIN SPRINKLER LINES,
<br />OR OTHER EXISTING ITEMS REQUIRE RELOCATION.
<br />2. ANY REQUESTS FOR SUBSTITUTIONS OF ITEMS SPECIFIED SHALL BE SUBMITTED IN WRITING WITH CUT-
<br />SHEETS ATTACHED. IT WILL BE CONSIDERED ONLY IF IT HAS A MORE ADVANTAGEOUS DELIVERY DATE, A
<br />LOWER PRICE (WITH CREDIT TO THE TENANT) AND WILL BE PROVIDED WITHOUT SACRIFICING QUALITY,
<br />APPEARANCE AND FUNCTION.
<br />1. REQUESTS FOR SUBSTITUTIONS OF ITEMS SPECIFIED SHALL BE SUBMITTED IN WRITING WITH CUT-
<br />SHEETS ATTACHED. CONSIDERATION WILL ONLY BE GIVEN WITH AN ADVANTAGEOUS DELIVERY DATE, A
<br />LOWER PRICE (WITH CREDIT TO THE TENANT) AND WILL BE PROVIDED WITHOUT SACRIFICING QUALITY,
<br />APPEARANCE AND FUNCTION.
<br />2. THE GENERAL CONTRACTOR SHALL SUBMIT CONFIRMATION OF DELIVERY DATES FOR ORDERS OF
<br />MATERIALS AND EQUIPMENT HAVING LONG LEAD TIMES TO HENDY AT START OF PROJECT
<br />CONSTRUCTION.
<br />3. SUBMIT (3) SAMPLES OF ALL MATERIALS TO HENDY FOR APPROVAL PRIOR TO ORDERING OR
<br />INSTALLATION. THE CONTRACTOR SHALL BE WHOLLY LIABLE BY FAILING TO DO SO WHETHER ITEMS ARE
<br />SPECIFIED CORRECTLY OR INCORRECTLY IN THE CONTRACT DOCUMENTS. SUBMITTALS ITEMS SHALL
<br />INCLUDE, BUT ARE NOT LIMITED TO:
<br />A.STONEWORK, MILLWORK, METALWORK, DOORS, DOOR HARDWARE, APPLIANCES &
<br />EQUIPMENT, FINISH MATERIALS, ACOUSTICAL CEILING TILES, SUSPENSION SYSTEMS,
<br />FIXTURES, MECHANICAL DEVICES, AND THE LIKE.
<br />B.SUBMITTALS SHALL INCLUDE SHOP DRAWINGS, PRODUCT DATA, SAMPLES AND OTHER
<br />ITEMS.
<br />C.SHOP DRAWINGS SHALL INCLUDE DETAILED FABRICATION AND INSTALLATION, SETTING
<br />DRAWINGS, DIAGRAMMATIC DRAWINGS AND MATERIAL SCHEDULES. LOCATION AND
<br />ORIENTATION OF ALL ITEMS SHALL BE CLEARLY INDICATED. BEGIN FABRICATION ONLY
<br />AFTER RECEIVING HENDY APPROVAL OF SHOP DRAWINGS.
<br />1. REMOVE AND DISPOSE OF ALL ITEMS SHOWN ON PLANS IN A LEGAL MANNER. RECYCLE AS REQUIRED
<br />BY LOCAL MUNICIPALITY.
<br />2. EXAMINE THE SITE AND ALL CONDITIONS AND LIMITATIONS WHETHER OR NOT THEY ARE
<br />SPECIFICALLY SHOWN OR MENTIONED IN ANY OF THE CONTRACT DOCUMENTS AND INCLUDE
<br />WHATEVER IS NEEDED TO COMPLETE THE WORK IN EVERY PART SHOWN OR DESCRIBED BY THE
<br />CONTRACT.
<br />3. CHECK DRAWINGS CAREFULLY AND THOROUGHLY INVESTIGATE EXISTING CONSTRUCTION. FURNISH
<br />AND INSTALL SHORING AND BRACING NECESSARY TO POSITIVELY PROTECT THE STRUCTURAL
<br />ELEMENTS OF THE BUILDING. REMOVE ALL SHORING AND BRACING WHEN CONSTRUCTION IS SAFELY
<br />IN PLACE.
<br />4. ALL CORRIDORS, STAIRWAYS AND RATED LOBBIES THAT ARE PART OF THE PATH OF EGRESS SHALL
<br />REMAIN OPERATIONAL AND FREE OF DEBRIS. ALL WORK IN THESE AREAS SHALL BE PERFORMED
<br />AFTER REGULAR BUSINESS HOURS.
<br />5. REMOVED MATERIALS NOT DESIGNATED FOR REUSE AND ALL DEBRIS FROM CONSTRUCTION
<br />BECOMES THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE SITE IN A
<br />TIMELY MANNER.
<br />6. DO NOT ALLOW MATERIALS AND DEBRIS GENERATED BY DEMOLITION ACTIVITIES TO ACCUMULATE.
<br />REMOVE DAILY AND DISPOSE OFF SITE IN A LEGAL MANNER.
<br />7. REMOVE ALL DOOR ASSEMBLIES SHOWN DASHED. STOCKPILE UNUSED DOOR ASSEMBLIES FOR
<br />REUSE WITHIN THE BUILDING AT THE DISCRETION OF BUILDING MANAGEMENT. IDENTIFY ANY DOOR
<br />ASSEMBLIES TO BE REUSED, PROVIDE PROTECTION AND STORE AS DIRECTED.
<br />8. REMOVE ALL WALLS SHOWN DASHED AND ITEMS LOCATED ON WALLS, INCLUDING BUT NOT LIMITED
<br />TO ELEC/TELE/DATA OUTLETS, SWITCHES, TIMERS, ETC.
<br />9. ALL EXISTING ELECTRICAL, MECHANICAL AND PLUMBING SYSTEMS NOT REQUIRED FOR PROPOSED
<br />CONFIGURATION SHALL BE REMOVED TO THE FURTHEST TERMINATION POINT. ELIMINATE ALL
<br />UNUSED WIRING, PLUMBING, DUCTWORK, ETC. COMPLETELY FROM CEILING SPACES OR WALLS. THIS
<br />SHALL BE DONE TO THE SATISFACTION OF THE BUILDING INSPECTORS (UNLESS NOTED OTHERWISE).
<br />10. A 24-HOUR FIRE WATCH SHALL BE MAINTAINED DURING ANY WORK THAT COMPROMISES THE RATING
<br />AND/OR OBSTRUCTS THE EXITING OF ANY AND ALL CORRIDORS, STAIRWAYS OR RATED LOBBIES.
<br />11. ABANDONED CABLING SHALL BE REMOVED. COORDINATE WITH TENANT REQUIREMENTS FOR
<br />PROPOSED WORK AND PROTECT EXISTING CABLING TO REMAIN IN PLACE.
<br />12. EXERCISE THE GREATEST POSSIBLE CARE WHEN REMOVING ITEMS SCHEDULED FOR REUSE. USE
<br />ONLY CONTRACTORS SKILLED IN THE APPROPRIATE TRADES. PROVIDE PROTECTION AND STORE AS
<br />DIRECTED IN CONTRACT DOCUMENTS.
<br />13. EXISTING ITEMS NOTED TO REMAIN, BUT WHICH REQUIRE REMOVAL TO COMPLETE THE WORK, SHALL
<br />BE PROTECTED, CAREFULLY REMOVED AND REPLACED UPON COMPLETION. THE REPLACED WORK
<br />SHALL MATCH ITS CONDITION AT THE START OF THE WORK.
<br />14. LEAVE ALL SPACES BROOM CLEAN WITH ALL LEDGES AND CORNERS PROPERLY CLEANED.
<br />15. WHERE CUT OPENINGS ARE OVERSIZED OR AT IMPROPER LOCATION, MATERIAL SHALL BE REPLACED
<br />AT NO EXTRA COST TO THE OWNER/TENANT.
<br />16. PROVIDE TEMPORARY SUPPORT OF WORK TO BE CUT. PROTECT IN PLACE CONSTRUCTION DURING
<br />CUTTING AND REMOVAL TO PREVENT DAMAGE TO ADJACENT SURFACES.
<br />17. CUT OR DRILL FROM THE EXPOSED OR FINISHED SIDE OF MATERIALS TO REMAIN.
<br />18. DO NOT CUT STRUCTURAL ELEMENTS IN A MANNER THAT COULD CHANGE THEIR LOAD-CARRYING
<br />CAPACITY OR LOAD-DEFLECTION RATIO.
<br />19. DO NOT CUT OPERATING ELEMENTS TO REMAIN OR THEIR RELATED COMPONENTS IN A MANNER THAT
<br />RESULTS IN REDUCING THEIR CAPACITY TO PERFORM AS INTENDED OR THAT RESULTS IN INCREASED
<br />MAINTENANCE OR DECREASED OPERATIONAL LIFE OR SAFETY.
<br />1. IN AREAS WHERE DEMOLITION (REMOVAL OF TILE, CARPETING, PARTITIONS, ETC) CAUSES DIVOTS OR
<br />UNEVENNESS IN SLAB, THE CONTRACTOR SHALL PATCH TO LEVEL THE SLAB TO RECEIVE FINISHES.
<br />2. WHERE REQUIRED FOR FLOOR LEVELING, PROVIDE CEMENT-BASED, POLYMER-MODIFIED, SELF-LEVELING
<br />PRODUCT THAT CAN BE APPLIED IN UNIFORM THICKNESS FROM 1/8" AND THAT CAN BE FEATHERED AT
<br />EDGES TO MATCH ADJACENT FLOOR ELEVATIONS. COMPRESSIVE STRENGTH SHALL NOT BE LESS THAN
<br />4100 PSI AT 29 DAYS.
<br />3. DO NOT PATCH CONSTRUCTION IN A MANNER THAT RESULTS IN VISUAL EVIDENCE OF CUTTING AND
<br />PATCHING. REMOVE AND REPLACE CONSTRUCTION THAT HAS BEEN CUT AND PATCHED IN A VISUALLY
<br />UNSATISFACTORY MANNER, OR THAT, IN THE ARCHITECT'S OPINION, REDUCES THE BUILDING'S AESTHETIC
<br />QUALITIES.
<br />1. COLUMN CENTERLINES (ALSO REFERRED TO AS GRID LINES) ARE SHOWN FOR REFERENCE.
<br />2. DIMENSIONS ARE TO FINISH FACE OF WALL, U.N.O.
<br />3. DOOR OPENINGS WHICH ARE NOT DIMENSIONED SHALL BE LOCATED WITHIN 4 INCHES OF ADJOINING
<br />PARTITIONS.
<br />4. HENDY SHALL REVIEW AND APPROVE ALL CHALK LINES PRIOR TO INSTALLATION OF TRACK. HENDY
<br />WILL BE NOTIFIED OF ANY DEVIATIONS FROM CONSTRUCTION DIMENSIONS OR CLEARANCE IDENTIFIED
<br />ON PLAN OR ANY CONSTRUCTION CONFLICTS.
<br />5. USE 5/8”MOISTURE RESISTANT "GREEN BOARD" GYPSUM BOARD ON ALL WET WALLS.
<br />6. PROVIDE AND INSTALL 16 GAUGE GALVANIZED METAL WALL BACKING AT ALL BUILT-IN MILLWORK
<br />LOCATIONS, HANGING WALL EQUIPMENT, ETC. COORDINATE EXACT LOCATIONS.
<br />7. ALL INTERIOR WALLS AND PARTITIONS SHALL BE CONSTRUCTED TO RESIST ALL LOADS TO WHICH THEY
<br />ARE SUBJECTED BUT NOT LESS THAN A FORCE OF FIVE POUNDS PER SQUARE FOOT APPLIED
<br />PERPENDICULAR TO THE WALLS.
<br />8. ALL INTERIOR PARTITIONS SHALL MEET THE "AWCI RECOMMENDED LEVELS" FOR A LEVEL 4 FINISH,
<br />U.N.O. WHERE DEEP TONE PAINT IS SCHEDULED, SKIM COAT FULL SURFACE OF SUBSTRATE TO LEVEL 5
<br />FINISH.
<br />9. PROVIDE A "LEVEL-5" FINISH AT GYP. BD. CEILINGS AND SOFFITS.
<br />10. PROVIDE MINIMUM FURRING AT ALL UNFURRED INTERIOR COLUMNS & RATED WALLS TO 6 INCHES
<br />ABOVE CEILING, OR TO STRUCTURE ABOVE AT EXPOSED CEILINGS, U.N.O.
<br />11. PROVIDE GYP. BD. FURRING AT ALL EXPOSED PERIMETER BULKHEAD CONDITIONS AND ABOVE ALL
<br />EXPOSED PERIMETER WINDOW HEAD CONDITIONS TO 6 INCHES ABOVE SUSPENDED CEILING, OR TO
<br />STRUCTURE AT EXPOSED CEILINGS, U.N.O.
<br />12. PREPARE EXISTING SURFACES FOR FINISHES. ALL SURFACES SHALL BE PROPERLY PREPARED FREE
<br />FROM ADHESIVE, BUMPS, CRACKS, ETC.
<br />13. ALL PENETRATIONS AT ONE OR TWO HOUR PARTITIONS AND FLOORS SHALL BE PROTECTED BY FIRE
<br />RATED ASSEMBLIES TO MAINTAIN RATING
<br />14. AT STC-RATED ASSEMBLES, SEAL CONSTRUCTION AT PERIMETERS, BEHIND CONTROL JOINTS, AND AT
<br />OPENINGS AND PENETRATIONS WITH A CONTINUOUS BEAD OF ACOUSTICAL SEALANT. INSTALL
<br />ACOUSTICAL SEALANT AT BOTH FACES OF PARTITIONS AND PERIMETERS AND THROUGH
<br />PENETRATIONS. COMPLY WITH ASTM C 919 AND WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS
<br />FOR LOCATING EDGE TRIM AND CLOSING OFF SOUND FLANKING PATHS AROUND OR THROUGH
<br />ASSEMBLIES INCLUDING SEALING PARTITIONS ABOVE ACOUSTICAL CEILINGS.
<br />15. CONTRACTOR SHALL VERIFY LOCATIONS OF ALL FIRE EXTINGUISHERS. FINAL LOCATION OF FIRE
<br />EXTINGUISHERS SHALL BE REVIEWED BY HENDY PRIOR TO INSTALLATION.
<br />16. USE 3-5/8" MINIMUM METAL STUDS AT ALL PLUMBING WALLS.
<br />17. PENETRATIONS OF FIRE-RESISTIVE WALLS AND FLOORS/CEILINGS SHALL BE PROTECTED AS REQUIRED
<br />IN CBC 710, 711, 712 AND 713.
<br />18. NOTIFY HENDY WHEN ACCESS PANELS ARE REQUIRED FOR MECHANICAL, ELECTRICAL, OR PLUMBING
<br />INSTALLATIONS PER BUILDING CODES. THE STYLE AND LOCATIONS OF REQUIRED ACCESS PANELS
<br />SHALL BE COORDINATED WITH ARCHITECT PRIOR TO INSTALLATION.
<br />1. FOR INTERIOR FRAMES, COORDINATE WITH DOOR HARDWARE AND GLAZING
<br />2. AT FIRE RATED ASSEMBLIES PROVIDE FRAME ASSEMBLIES COMPLYING WITH NFPA 80 AND LISTED AND
<br />LABELED BY A QUALIFIED TESTING AGENCY ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION FOR
<br />FIRE PROTECTION RATINGS AND TEMPERATURE-RISE LIMITS INDICATED.
<br />3. WHERE HOLLOW METAL FRAMES ARE FABRICATED IN SECTIONS BECAUSE OF SHIPPING OR HANDLING
<br />LIMITATIONS, FIELD SPLICE AT APPROVED LOCATIONS BY WELDING FACE JOINT CONTINUOUSLY, GRIND,
<br />FILL, DRESS, AND MAKE SPLICE SMOOTH, FLUSH AND INVISIBLE ON EXPOSED FACES.
<br />4. CHECK PLUMB, SQUARE, AND TWIST OF FRAMES AS WALLS ARE CONSTRUCTED. SHIM AS NECESSARY
<br />TO COMPLY WITH INSTALLATION TOLERANCES.
<br />5. CLEAN EXPOSED FRAME SURFACES PROMPTLY AFTER INSTALLATION, USING CLEANING METHODS
<br />RECOMMENDED BY FRAME MANUFACTURER AND ACCORDING TO AAMA 609 AND 610. TOUCH UP
<br />MARRED FRAME SURFACES SO TOUCH UP IS NOT VISIBLE FROM A DISTANCE OF 48 INCHES. REMOVE
<br />AND REPLACE ALUMINUM FRAMES WITH DAMAGED FINISH THAT CANNOT BE SATISFACTORILY
<br />REPAIRED.
<br />1. ALL GLAZING SHALL BE INSTALLED PER CBC CHAPTER 24
<br />2. FIELD MEASURE FOR ALL GLAZING AND MILLWORK CONDITIONS PRIOR TO MANUFACTURING.
<br />3. GLAZING AREAS LARGER THAN A SINGLE PANE OF GLASS SHALL HAVE EQUAL SIZED PANES OF GLASS
<br />AS LARGE AS POSSIBLE WITH A MAXIMUM WIDTH OF 5 FEET EACH, U.N.O.
<br />4. UNLESS NOTED OTHERWISE, PROVIDE MINIMUM GLAZING THICKNESS AS FOLLOWS:
<br />A.1/4" AT ALL FRAMED SIDELIGHTS AND GLAZING LESS THAN 5' X 9' SUPPORTED ON 3
<br />SIDES OR AS REVIEWED BY STRUCTURAL ENGINEER
<br />B.3/8" AT TOP AND BOTTOM FRAMED, BUTT-JOINED CORNERS
<br />C.1/2" AT SIDELIGHTS AND GLAZING WITH SEISMIC CLIPS W HERE UNSUPPORTED ON TWO
<br />OR MORE SIDES
<br />D.5/8" AT SIDELIGHTS AND GLAZING WHERE UNSUPPORTED ON TWO OR MORE SIDES
<br />E.5/8" AT FRAMELESS DOOR AND SIDELIGHT CONDITIONS AND WHERE UNSUPPORTED ON
<br />TWO OR MORE SIDES WITHOUT SEISMIC CLIPS
<br />5.COORDINATE GLAZING CHANNEL DIMENSIONS TO PROVIDE NECESSARY BITE ON GLASS, MINIMUM
<br />EDGE AND FACE CLEARANCES AND ADEQUATE SEALANT THICKNESS, WITH REASONABLE TOLERANCES.
<br />6.CLEAN GLAZING CHANNELS AND OTHER FRAMING MEMBERS RECEIVING GLASS IMMEDIATELY BEFORE
<br />GLAZING. REMOVE COATINGS NOT FIRMLY BONDED TO SUBSTRATES. EXAMINE GLAZING UNITS TO
<br />LOCATE INTERIOR AND EXTERIOR SURFACES. LABEL OR MARK UNITS AS NEEDED SO THAT EXTERIOR
<br />AND INTERIOR SURFACES ARE READILY IDENTIFIABLE. DO NOT USE MATERIALS THAT LEAVE VISIBLE
<br />MARKS ON THE COMPLETED WORK.
<br />7.PROVIDE EDGE BLOCKING WHERE INDICATED OR NEEDED TO PREVENT GLASS LITES FROM MOVING
<br />SIDEWAYS IN GLAZING CHANNEL, AS RECOMMENDED IN WRITING BY GLASS MANUFACTURER AND
<br />ACCORDING TO REQUIREMENTS IN REFERENCE GLAZING PUBLICATIONS.
<br />1. THE CONTRACTOR SHALL FURNISH AND INSTALL REQUIRED DOOR AND FRAME ASSEMBLIES AS
<br />SPECIFIED IN THE DRAWINGS, U.N.O.
<br />2. PROVIDE DOORS MADE WITH ADHESIVES AND COMPOSITE WOOD PRODUCTS THAT DO NOT
<br />CONTAIN UREA-FORMALDEHYDE RESINS.
<br />3. FINISH DOORS AT FACTORY THAT ARE INDICATED TO RECEIVE TRANSPARENT FINISH.
<br />4. ALL HOLLOW METAL DOOR FRAMES SHALL BE STEEL FRAMES WHETHER OR NOT THEY ARE SHOWN
<br />ON APPROVED SET OF DRAWINGS.
<br />5. DOOR SHALL BE INSTALLED IN FRAME WITH 1/8" MAX. TOLERANCE AT HEAD HINGES, AND STRIKE
<br />JAMB.
<br />6. THE CONTRACTOR SHALL VERIFY AND COORDINATE THE THICKNESS OF FLOOR FINISH WITH
<br />UNDERCUT DIMENSION AT DOOR.
<br />7. EXISTING DOORS, CLOSET DOORS, RESTROOM DOORS, ETC. IN A ONE-HOUR CORRIDOR SHALL BE
<br />20 MINUTE RATED DOORS.
<br />8. A SINGLE LEAF OF A SWINGING DOOR SHALL NOT EXCEED FOUR FEET IN WIDTH. THE MINIMUM
<br />CLEAR WIDTH SHALL BE 32 INCHES (CBC 1010.1.1.)
<br />9. EXIT DOORS SHALL SWING IN THE DIRECTION OF EXIT TRAVEL WHEN SERVING ANY HAZARDOUS
<br />AREA OR WHEN SERVING AN AREA HAVING AN OCCUPANT LOAD OF 50 OR MORE. (CBC 1010.1.2.1)
<br />10. THE FORCE FOR PUSHING OR PULLING OPEN INTERIOR SWINGING EGRESS DOORS, OTHER THAN
<br />FIRE DOORS, SHALL NOT EXCEED 5 POUNDS. FORCES SHALL BE APPLIED TO THE LATCH SIDE OF
<br />THE DOOR. (CBC 1010.1.3)
<br />11. ALL DOORS SHALL BE ACCESSIBLE BY DISABLED PERSONS, COMPLYING WITH CBC 1010.1, 1010.2
<br />AND 11B-404. INCLUDING LEVER TYPE HARDWARE.
<br />12. EXIT DOORS SHALL BE OPENABLE FROM INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL
<br />KNOWLEDGE OR EFFORT. (CBC 1010.2)
<br />13. MAIN EXTERIOR EXIT DOORS WHICH OBVIOUSLY AND CLEARLY ARE IDENTIFIABLE AS EXITS NEED
<br />NOT BE SIGNED WHEN APPROVED BY THE BUILDING OFFICIAL. (CBC 1013.1)
<br />14. DOORWAYS SHALL BE LEVEL: 60 INCHES DEEP LEVEL AREA SHALL BE PROVIDED IN THE DIRECTION
<br />OF DOOR SWING. 44 INCHES DEEP LEVEL AREA WHEN DOOR SWINGS AWAY FROM APPROACH. (CBC
<br />11B-404.2.4) THE WIDTH OF THE LEVEL AREA SHALL EXTEND 24 INCHES PAST THE STRIKE EDGE ON
<br />THE SIDE TO SWINGS ON EXTERIOR DOORS AND 18 INCHES PAST THE STRIKE EDGE ON INTERIOR
<br />DOORS. (CBC TABLE 11B-404.2.4.1)
<br />15. THE BOTTOM 10 INCHES OF ALL DOORS EXCEPT AUTOMATIC AND SLIDING SHALL HAVE A SMOOTH
<br />UNINTERRUPTED SURFACE TO ALLOW THE DOOR TO BE OPENED BY A WHEELCHAIR FOOTREST
<br />WITHOUT CREATING A TRAP OR HAZARDOUS CONDITION. WHERE NARROW FRAME DOORS ARE
<br />USED, A 10 INCHES HIGH SMOOTH PANEL SHALL BE INSTALLED ON THE PUSH SIDE OF THE DOOR,
<br />WHICH WILL ALLOW THE DOOR TO BE OPENED BY A WHEELCHAIR FOOT-REST WITHOUT CREATING
<br />A TRAP OR HAZARDOUS CONDITION. (CBC 11B-404.2.10)
<br />16. DOOR ASSEMBLIES OFTEN PROVIDE ACCESSIBILITY, LIFE SAFETY AND SECURITY FUNCTIONS WHICH
<br />CAN INCREASE THEIR COMPLEXITY DRAMATICALLY. DOOR INSTALLERS SHALL LOOK AT THE
<br />CRITERIA FOR INSPECTING. SEE SECTION 5.2.4 OF NFPA 80. NFPA 80 DOES NOT REQUIRE THE
<br />INSPECTIONS TO BE PERFORMED BY THIRD-PARTY INSPECTION, NOR DOES IT REQUIRE
<br />PROFESSIONAL CERTIFICATION FOR THE INSPECTORS, ONLY THAT THE INSPECTORS ARE
<br />KNOWLEDGEABLE ABOUT THE TYPES OF OPENINGS BEING INSPECTED.
<br />1. ALL LOCKSETS SHALL BE CODED AND/OR KEYED IN ACCORDANCE WITH OWNER'S REQUIREMENTS. CODES
<br />AND/OR KEYS SHALL BE DELIVERED TO OWNER PROPERLY TESTED AND/OR TAGGED. THE NUMBER OF
<br />MASTER AND PASS KEYS SHALL BE COORDINATED WITH OWNER.
<br />2. HARDWARE SUPPLIER SHALL PROVIDE GRANDMASTER KEY, MASTER KEY, KEY-ALIKE AND/OR KEY-
<br />DIFFERENT ALL LOCKS IN ACCORDANCE WITH KEYING SCHEDULE AS PROVIDE BY OWNER.
<br />3. THE ATTACHED HARDWARE SCHEDULE IS INTENDED TO COVER ALL DOORS IN THE PROJECT AND
<br />ESTABLISH A TYPE AND STANDARD OF QUALITY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
<br />FURNISH AND INSTALL A COMPLETE AND OPERATIONAL SYSTEM OF DOOR FINISH HARDWARE ITEMS
<br />ENCOMPASSING ALL OPENINGS WITHIN THE PROJECT AREA.
<br />4. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL HARDWARE AS REQUIRED TO MEET CODE AND
<br />FUNCTIONAL REQUIREMENTS. THE OUTLINE HARDWARE SPECIFICATION IS PROVIDED AS A BASIS FOR A
<br />COMPLETE SUBMITTAL BY THE DETAILED HARDWARE LIST WHICH INDICATES THE QUANTITY, TYPE,
<br />CATALOG NUMBER, MANUFACTURER, AND AND LOCATION OF EACH ARTICLE OF HARDWARE REQUIRED.
<br />HARDWARE LIST SHALL BE SUBMITTED NO LATER THAN 30 DAYS BEFORE THE ORDER DATE NECESSARY TO
<br />MEET THE PROJECT SCHEDULE. HENDY REVIEW OF THE HARDWARE LIST SHALL NOT REPRESENT
<br />CERTIFICATION THAT THE LIST IS COMPLETE AND DOES NOT RELIEVE THE CONTRACTOR FROM PROVIDING
<br />A COMPLETE PROJECT.
<br />5. ALL HARDWARE SHALL BE OF LEVER TYPE TO COMPLY WITH ACCESSIBILITY REQUIREMENTS. IT IS THE
<br />RESPONSIBILITY OF THE CONTRACTOR TO REPLACE ALL DOOR HARDWARE ITEMS NOT IN COMPLIANCE
<br />WITH APPLICABLE ACCESSIBILITY REQUIREMENTS TO THE SATISFACTION OF THE BUILDING AUTHORITY.
<br />6. 6EACH ARTICLE OF HARDWARE SHALL BE INDIVIDUALLY PACKAGED IN ITS ORIGINAL MANUFACTURER'S
<br />CONTAINER AND PROPERLY MARKED OR LABELED IN CONFORMANCE WITH THE APPROVED HARDWARE
<br />LIST.
<br />7. ALL FASTENERS SHALL MATCH THE HARDWARE MATERIAL AND FINISH.
<br />8. ALL HARDWARE APPLIED TO METAL DOORS OR JAMBS SHALL BE MADE TO TEMPLATE AND SECURED BY
<br />MACHINE SCREWS. FURNISH (3) BUTT HINGES FOR DOORS UP TO 7'-0" HIGH AND (1) HINGE FOR EACH
<br />ADDITIONAL 2'-6".
<br />9. PROVIDE STANDARD STRIKE PLATE WITH EXTENDED LIP WHERE REQUIRED TO PROTECT TRIM FROM BEING
<br />MARRED OR DAMAGED BY THE LATCH BOLT.
<br />10. PROVIDE DUST COVERS AT ALL STRIKE PLATES.
<br />11. LATCHING & LOCKING DOORS THAT ARE HAND ACTIVATED AND WHICH ARE IN A PATH OF TRAVEL SHALL BE
<br />OPERABLE WITH A SINGLE EFFORT BY LEVER TYPE HARDWARE, PANIC BARS, PUSH-PULL ACTIVATING BARS,
<br />OR OTHER HARDWARE DESIGNED TO PROVIDE PASSAGE WITHOUT REQUIRING THE ABILITY TO GRASP THE
<br />OPENING HARDWARE. HARDWARE SHALL BE CENTERED BETWEEN 34 INCHES AND 44 INCHES MAX. ABOVE
<br />THE FLOOR (CBC 11B-404)
<br />12. MAIN EXTERIOR DOORS IN A GROUP B OCCUPANCY ARE PERMITTED TO BE EQUIPPED WITH KEY-OPERATED
<br />LOCKING DEVICE PROVIDED. THERE IS A VISIBLE, DURABLE SIGN ON OR ADJACENT TO THE DOOR STATING
<br />"THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED." THE LETTERS SHALL NOT BE LESS THAN
<br />1 INCH ON A CONTRASTING BACKGROUND. THE LOCKING DEVICE MUST BE A TYPE THAT WILL BE READILY
<br />DISTINGUISHABLE AS LOCKED. (CBC 1010.2.4(3))
<br />13. WHERE EGRESS DOORS ARE USED IN PAIRS, APPROVED AUTOMATIC FLUSH BOLTS SHALL BE PERMITTED
<br />TO BE USED, PROVIDED THAT THE DOOR LEAF HAVING THE AUTOMATIC FLUSH BOLTS HAS NO DOOR KNOBS
<br />OR SURFACE-MOUNTED HARDWARE. (CBC 1010.2.4(4))
<br />14. MANUALLY OPERATED FLUSH BOLTS OR SURFACE BOLTS ARE PERMITTED WHERE A PAIR OF DOORS
<br />SERVES AN OCCUPANT LOAD OF LESS THAN 50 PERSONS IN A GROUP B, F OR S OCCUPANCY. MANUALLY
<br />OPERATED EDGE-OR SURFACE-MOUNTED BOLTS ARE PERMITTED THE INACTIVE LEAF. THE INACTIVE LEAF
<br />SHALL CONTAIN NO DOOR KNOBS, PANIC BARS OR SIMILAR OPERATING HARDWARE. (CBC 1010.2.4(4))
<br />15. PANIC & FIRE HARDWARE, WHEN INSTALLED, SHALL COMPLY WITH THE REQUIREMENTS OF CBC 1010.2.9
<br />AS FOLLOWING:
<br />A.THE ACTUATING PORTION OF THE RELEASING DEVICE SHALL EXTEND AT LEAST ONE HALF OF THE
<br />LEAF WIDTH.
<br />B.THE MAXIMUM UNLATCHING FORCE SHALL NOT EXCEED 15 POUNDS (67N)
<br />16. EXIT DOOR HARDWARE SHALL BE OF AN APPROVED TYPE AND TESTED IN ACCORDANCE WITH
<br />PROCEDURES ESTABLISHED IN CBC SECTION 715 AND CBC CHAPTER 11B.
<br />17. THRESHOLD HEIGHT AT DOOR WAYS SHALL BE 1/2" HIGH MAXIMUM (CBC 11B-404.2.5). CHANGES IN LEVEL AT
<br />DOORWAYS BETWEEN 1/4" AND 1/2" SHALL BE BEVELED WITH SLOPE NO STEEPER THAN 1:2. (CBC 11B-303.3).
<br />1. THE USE OF A CARD READER WILL NOT DELAY EGRESS OF OCCUPANTS LEAVING THE BUILDING. ACCESS-
<br />CONTROLLED EGRESS DOORS SHALL FULLY COMPLY WITH CBC 1010.2.11.
<br />2. THE CONTRACTOR SHALL VERIFY AND COORDINATE ELECTRICAL AND SECURITY REQUIREMENTS AT
<br />CARD READERS. TENANT'S SECURITY VENDOR SHALL PROVIDE ALL CARD READER EQUIPMENT AND
<br />WIRING. CONDUITS AND BOXES SHALL BE PROVIDED BY GENERAL CONTRACTOR. THIS WORK SHALL BE
<br />COORDINATED BETWEEN CONTRACTOR AND TENANT'S SECURITY VENDOR.
<br />HHENDY.COM
<br />T (949) 851-3080
<br />4770 Campus Dr., Suite 100
<br />Newport Beach, CA 92660
<br />H ndy
<br />ISSUES AND REVISIONS
<br />JOB NUMBER
<br />SCALE
<br />PROJECT
<br />TEAM
<br />All specifications, drawings, concepts, designs, arrangements, intellectual and written material represented herein constitute
<br />unique and unpublished work of H. Hendy Associates and may not be copied, used by or disclosed to others without written
<br />consent of H. Hendy Associates.
<br /> 2023 H.HendyAssociatesc
<br />DATE
<br />04463.0000.24
<br />3080 S. HARBOR BLVD.
<br />SANTA ANA, CA 92704
<br />GENERAL NOTES
<br />IA-G1
<br />MCGUFF
<br />AB/CD
<br />ORANGE COUNTY FIRE AUTHORITY CAL GREEN NOTES
<br />GENERAL NOTES
<br />BIDDING
<br />SUBMITTALS
<br />DEMOLITION
<br />PATCHING & PREPPING
<br />FRAMING & DRYWALL
<br />DOOR & WINDOW FRAMES
<br />GLASS & GLAZING SYSTEMS
<br />DOORS
<br />DOOR HARDWARE
<br />ACCESS CONTROL
<br />NONE
<br />NO. DESCRIPTION DATE
<br />PLAN CHECK SUBMITTAL 3/17/25
|