|
ENG INE CENTERLINE
<br />Esc F1 F2 F3F4 F5F6 F7 F8 F9 F10F11 F12 ºª\1!|"@·# $ &¬/% ()=?¡¿23 4567 89' 0 Q WE€R T YU I O P A S DF G HJ KLÑ ZX C VB N M;,:._-><^[`
<br />*]
<br />+¨´ÇB loqmayúsC ontrol A lt A lt Gr C ontrol
<br />ImprPantP et s isB loqD esplPausaInterRePágAvPágIn ic ioIns ertSupr F inB loqNum /- *+Intro1 234
<br />56
<br />7
<br />89F inAvPágIn ic ioRePágIns
<br />0
<br />Supr
<br />.
<br />NumLock Caps S cr oll LockLocketh
<br />CR
<br />CR
<br />CR
<br />CR
<br />CR
<br />CA
<br />CACA
<br />CA
<br />CACA
<br />CA
<br />CA
<br />CACACA
<br />CA
<br />CACACA
<br />CA
<br />CA
<br />CA
<br />CR CR
<br />L L
<br />L L
<br />L L
<br />CR
<br />CR CR
<br />TENANT:
<br />MCGUFF MEDICAL PRODUCTS
<br />3080 HARBOR BLVD
<br />SANTA ANA, CA 92704
<br />PHONE NUMBER
<br />CONTACT:
<br />INTERIOR ARCHITECT:
<br />H. HENDY ASSOCIATES
<br />4770 CAMPUS DRIVE, SUITE 100
<br />NEWPORT BEACH, CA 92660
<br />(949) 851-3080
<br />CONTACT: CAROLINA WEIDLER/ DAVID KATAOKA
<br />ELECTRICAL ENGINEER:
<br />SALAS O'BRIEN
<br />8825 RESEARCH DRIVE
<br />IRVINE, CA 92618
<br />(949) 753-1553
<br />CONTACT: VICTOR BECCERRA
<br />MECHANICAL ENGINEER:
<br />KMA CONSULTING
<br />151 KALMUS DRIVE. STE. C
<br />COSTA MESA, CA 92626
<br />(714) 66207366
<br />CONTACT: KEITH MATOI
<br />STRUCTURAL ENGINEER:
<br />BRANDOW AND JOHNSTON
<br />3300 IRVINE AVENUE, STE. 105
<br />NEWPORT BEACH, CA 92660
<br />(949) 862-8510
<br />CONTACT: RYAN BISHOFF
<br />GENERAL CONTRACTOR:
<br />KPRS CONSTRUCTION
<br />2850 SATURN STREET
<br />BREA, CA 92821
<br />(714) 672-0800
<br />CONTACT: TIM LINDEN
<br />PLUMBING ENGINEER:
<br />KMA CONSULTING
<br />151 KALMUS DRIVE. STE. C
<br />COSTA MESA, CA 92626
<br />(714) 66207366
<br />CONTACT: KEITH MATOI
<br />PROJECT SHALL CONFORM TO
<br />GOVERNING BUILDING CODE: 2022 CALIFORNIA BUILDING CODE
<br />2022 CALIFORNIA MECHANICAL CODE
<br />2022 CALIFORNIA PLUMBING CODE
<br />2022 CALIFORNIA ELECTRICAL CODE
<br />2022 CALIFORNIA FIRE CODE
<br />2022 CALIFORNIA ENERGY CODE
<br />CITY OF SANTA ANA ORDINANCES & AMENDMENTS.
<br />CONSTRUCTION TYPE: TYPE VB
<br />NUMBER OF STORIES: 2
<br />SPRINKLERS: FULLY SPRINKLERED, FIRE ALARM SYSTEM
<br />OCCUPANCY: B, S-1
<br />PROJECT ADDRESS: 3080 HARBOR BLVD
<br />SANTA ANA, CA
<br />BUILDING AREA:
<br />FIRST FLOOR 23,041 SF
<br />SECOND FLOOR 7,301 SF
<br />AREA OF CONSTRUCTION:
<br />FIRST FLOOR 20,865 SF
<br />SECOND FLOOR 7,301 SF
<br />TOTAL 28,155 SF
<br />PROJECT DESCRIPTION:
<br />RENOVATION OF FIRST AND SECOND FLOORS OF EXISTING WAREHOUSE/ OFFICE BUILDING. RENOVATION INCLUDES:
<br />CONSTRUCTION OF NEW SINGLE OCCUPANT RESTROOMS; CONSTRUCTION OF NEW GENERATOR ENCLOSURE;
<br />CONSTRUCTION OF NEW INTERIOR WALLS, DOORS, AND WINDOWS; INSTALLATION OF NEW ELECTRICAL, PLUMBING AND
<br />HVAC SYSTEMS; AND UPGRADE OF EXISTING LIGHTING.
<br />NOT TO SCALE
<br />GRIDLINE
<br />DETAIL NUMBER
<br />SHEET NUMBER
<br />SECTION NUMBER
<br />SHEET NUMBER
<br />ELEVATION NUMBER
<br />SHEET NUMBER
<br />DOOR NUMBER
<br />KEYNOTE
<br />REVISION LETTER/NUMBER
<br />ROOM NAME
<br />ROOM NUMBER
<br />INSIDE CLEAR DIMENSION
<br />CENTER TO CENTER DIMENSION
<br />ALIGNMENT SYMBOL
<br />ELEVATION DATUM POINT
<br />1
<br />4' - 0"
<br />4' - 0"
<br />℄℄
<br />IA-X.X
<br />X
<br />IA-X.X
<br />X
<br />IA-X.X
<br />X
<br />101
<br />1
<br />1
<br />OFFICE
<br />858
<br />@ AT
<br />ADJ.ADJUSTABLE
<br />A.F.F.ABOVE FINISH FLOOR
<br />BLDG BUILDING
<br />BLDG. STD.BUILDING STANDARD
<br />CENTER LINE
<br />CLG CEILING
<br />CLR CLEAR
<br />CPT CARPET
<br />COL COLUMN
<br />D.F.DRINKING FOUNTAIN
<br />DN DOWN
<br />DTL DETAIL
<br />DW DISHWASHER
<br />EA.EACH
<br />ELEC ELECTRICAL
<br />EQ.EQUAL
<br />EXIST EXISTING
<br />F.F.FINISH FLOOR
<br />F. CLG FINISH CEILING
<br />F.D.FLOOR DRAIN
<br />F.E.FIRE EXTINGUISHER
<br />FEC FIRE EXTINGUISHER CABINET
<br />F.S.FIRE SPRINKLER
<br />G.D.GARBAGE DISPOSAL
<br />GYP. BD.GYPSUM BOARD
<br />HR HOUR
<br />HT HEIGHT
<br />MECH MECHANICAL
<br />MICRO MICROWAVE
<br />MTL METAL
<br />N.I.C.NOT IN CONTRACT
<br />N.T.S.NOT TO SCALE
<br />O.C.ON CENTER
<br />OPP OPPOSITE
<br />REF REFRIGERATOR
<br />REV REVERSED
<br />RM ROOM
<br />SIM SIMILAR
<br />TYP TYPICAL
<br />W/WITH
<br />WC WALLCOVERING
<br />WH WATER HEATER
<br />U.N.O.UNLESS NOTED OTHERWISE
<br />VCT VINYL COMPOSITION TILE
<br />CL
<br />+/-APPROXIMATE DIMENSION
<br />TOTAL OFFICE (B OCCUPANCY): 17,160 SF
<br />TOTAL WAREHOUSE (S-1 OCCUPANCY): 13, 182 SF
<br />PARKING RATIOS:
<br />WAREHOUSE: 1 PER 1,000 SF WITH 30% GROSS AREA AS OFFICE
<br />OFFICE: 3 PER 1,000
<br />WAREHOUSE
<br />13,182 SF/ 1000 = 14 STALLS REQUIRED
<br />30% OF 13,182 = 3,955 SF
<br />3,955 SF /1000 = 4 STALLS REQUIRED
<br />OFFICE
<br />17160 SF - 3,955 SF = 13,195 SF
<br />13.195 X 3 = 40 STALLS REQUIRED
<br />14 + 4 + 40 = 58 STALLS REQUIRED
<br />62 STALLS PROVIDED
<br />ACCESSIBLE STALLS
<br />REQUIRED:
<br />ACCESSIBLE: 3
<br />VAN ACCESIBLE: 1
<br />PROVIDED:
<br />ACCESSIBLE: 3
<br />VAN ACCESSIBLE: 1
<br />TOTAL OFFICE (B OCCUPANCY): 17,160 SF
<br />TOTAL WAREHOUSE (S-1 OCCUPANCY): 13, 182 SF
<br />OCCUPANT LOAD FACTORS
<br />OFFICE (B OCCUPANCY): 150
<br />WAREHOUSE (S-1 OCCUPANCY)
<br />STORAGE: 4000
<br />DISTRIBUTION: 500
<br />OFFICE (B OCCUPANCY)
<br />17,160 SF /150 = 115 OCCUPANTS
<br />WAREHOUSE (S-1 OCCUPANCY)
<br />STORAGE: 11,009 SF/ 4000 = 3 OCCUPANTS
<br />DISTRIBUTION: 2,173 SF/ 500 = 5 OCCUPANTS
<br />TOTAL WAREHOUSE OCCUPANTS: 8
<br />OFFICE (B OCCUPANCY) 115 OCCUPANTS 58 MALE 58 FEMALE
<br />MALE FEMALE
<br />WATER CLOSETS URINALS LAVATORIES WATER CLOSETS LAVATORIES DRINKING FOUNTAINS
<br />2 1 1 4 2 1
<br />WAREHOUSE (S-1 OCCUPANCY) 8 OCCUPANTS 4 MALE 4 FEMALE
<br />MALE FEMALE
<br />WATER CLOSETS URINALS LAVATORIES WATER CLOSETS LAVATORIES DRINKING FOUNTAINS
<br />1 - 1 1 1 1
<br />PROVIDED FIXTURES
<br />MALE FEMALE
<br />WATER CLOSETS URINALS LAVATORIES WATER CLOSETS LAVATORIES DRINKING FOUNTAINS
<br />4 - 4 5 5 2
<br />AREA OF WORK
<br />ARCHITECTURAL
<br />IA-T TITLE SHEET
<br />T-1 LEVEL 1 EXITING PLAN
<br />T-2 LEVEL 2 EXITING PLAN
<br />T-3 ACCESSIBILITY DETAILS
<br />CGN CALIFORNIA GREEN NOTES
<br />IA-G1 GENERAL NOTES
<br />IA-G2 GENERAL NOTES
<br />ST-1D SITE DEMOLITION PLAN
<br />ST-1 SITE PLAN
<br />ST-2 ENLARGED SITE PLANS AND DETAILS
<br />ST-3 ENLARGED PLANS, ELEVATIONS, DETAILS
<br />ST-4 ENCLOSURE ELEVATIONS
<br />IA-1.1D LEVEL 1 DEMOLITION PLAN
<br />IA-1.1 LEVEL 1 PARTITION PLAN
<br />IA-1.2D LEVEL 2 DEMOLITION PLAN
<br />IA-1.2 LEVEL 2 PARTITION PLAN
<br />IA-1.3D ROOF DEMOLITION PLAN
<br />IA-1.3 ROOF PLAN
<br />IA-2.1D LEVEL 1 DEMOLITION CEILING PLAN
<br />IA-2.1 LEVEL 1 REFLECTED CEILING PLAN
<br />IA-2.2D LEVEL 2 DEMOLITION CEILING PLAN
<br />IA-2.2 LEVEL 2 REFLECTED CEILING PLAN
<br />IA-4.1 LEVEL 1 FINISH PLAN
<br />IA-5.1 ENLARGED RESTROOM PLAN(S) & ELEVATIONS
<br />IA-5.2 ELEVATIONS
<br />IA-6.1 WALL SECTIONS & DETAILS
<br />IA-7.1 DETAILS
<br />IA-8.1 DOOR SCHEDULE & DETAILS
<br />ELECTRICAL
<br />IE-0.01 ELECTRICAL COVER SHEET
<br />IE-0.02 TITLE 24 CALCULATIONS
<br />IE-0.03 ELECTRICAL SPECIFICATIONS
<br />IE-0.04 ELECTRICAL SPECIFICATIONS
<br />IE-0.05 LIGHTING FIXTURE SCHEDULE
<br />IE-0.06 MECHANICAL AND PLUMBING EQUIPMENT
<br />CONNECTIONS
<br />IE-0.07 ELECTRICAL DETAILS
<br />IE-0.10 SINGLE LINE DIAGRAM
<br />IE-0.11 SHORT CIRCUIT CALCULATION
<br />IE-0.20 PANEL SCHEDULES
<br />IE-0.21 PANEL SCHEDULES
<br />IE-0.22 PANEL SCHEDULES
<br />IE-0.30 LIGHTING CONTROLS
<br />IE-1.0 ELECTRICAL SITE PLAN
<br />IED-1.1 OVERALL FIRST FLOOR POWER AND SIGNAL
<br />DEMOLITION PLAN
<br />IED-1.2 OVERALL SECOND FLOOR POWER AND SIGNAL
<br />DEMOLITION PLAN
<br />IED-2.1 OVERALL FIRST FLOOR LIGHTING DEMOLITION PLAN
<br />IED-2.2 OVERALL SECOND FLOOR LIGHTING DEMOLITION PLAN
<br />IE1.1 OVERALL FIRST FLOOR POWER AND SIGNAL PLAN
<br />IE1.2 OVERALL SECOND FLOOR POWER AND SIGNAL PLAN
<br />IE1.3 ROOF ELECTRICAL PLAN
<br />IE-2.1 OVERALL FIRST FLOOR LIGHTING PLAN
<br />IE-2.2 OVERALL SECOND FLOOR LIGHTING PLAN
<br />MECHANICAL
<br />M-0.1 MECHANICAL LEGEND, NOTES, SCHEDULES AND SHEET
<br />INDEX
<br />M-0.2 MECHANICAL EQUIPMENT SCHEDULES
<br />M-2.1 LEVEL 1 -PARTITION FLOOR MECHANICAL PLAN
<br />M-3.1 PARTITION MECHANICAL ROOF PLAN
<br />M-5.1 MECHANICAL DETAILS
<br />M-5.2 TITLE 24
<br />M-5.3 TITLE 24
<br />HHENDY.COM
<br />T (949) 851-3080
<br />4770 Campus Dr., Suite 100
<br />Newport Beach, CA 92660
<br />H ndy
<br />ISSUES AND REVISIONS
<br />JOB NUMBER
<br />SCALE
<br />PROJECT
<br />TEAM
<br />All specifications, drawings, concepts, designs, arrangements, intellectual and written material represented herein constitute
<br />unique and unpublished work of H. Hendy Associates and may not be copied, used by or disclosed to others without written
<br />consent of H. Hendy Associates.
<br /> 2023 H.HendyAssociatesc
<br />DATE
<br />As indicated
<br />04463.0000.24
<br />3080 S. HARBOR BLVD.
<br />SANTA ANA, CA 92704
<br />TITLE SHEET
<br />IA-T
<br />MCGUFF
<br />AB/CD
<br />PROJECT TEAM
<br />BUILDING SUMMARY
<br />VICINITY MAPSYMBOLS
<br />ABBREVIATIONS
<br />DRAWING INDEX PARKING CALUCULATION
<br />RESTROOM FIXTURE CALUCULATION
<br />KEY PLANS
<br />LEVEL 1
<br />LEVEL 2
<br />NO. DESCRIPTION DATE
<br />PLAN CHECK SUBMITTAL 3/17/25
<br />PLUMBING
<br />P-0.1 PLUMBING LEAD SHEET
<br />P-0.2 PLUMBING SCHEDULES
<br />P-0.3 PLUMBING SPECIFICATIONS
<br />P-2.1 LEVEL 1 -PARTITION FLOOR PLUMBING PLAN
<br />P-2.2 LEVEL 2 -PARTITION FLOOR PLUMBING PLAN
<br />P-3.1 PARTITION MECHANICAL ROOF PLAN
<br />P-4.1 LEVEL 1 -PARTITION FLOOR PLUMBING PLAN
<br />P-5.1 PLUMBING SCHEDULES
<br />P-5.2 TITLE 24
<br />STRUCTURAL
<br />S-1 STRUCTURAL
<br />DEFERRED SUBMITTALS
<br />1. FIRE SPRINKLERS
<br />2. RACKING
|