Laserfiche WebLink
ENG INE CENTERLINE <br />Esc F1 F2 F3F4 F5F6 F7 F8 F9 F10F11 F12 ºª\1!|"@·# $ &¬/% ()=?¡¿23 4567 89' 0 Q WE€R T YU I O P A S DF G HJ KLÑ ZX C VB N M;,:._-><^[` <br />*] <br />+¨´ÇB loqmayúsC ontrol A lt A lt Gr C ontrol <br />ImprPantP et s isB loqD esplPausaInterRePágAvPágIn ic ioIns ertSupr F inB loqNum /- *+Intro1 234 <br />56 <br />7 <br />89F inAvPágIn ic ioRePágIns <br />0 <br />Supr <br />. <br />NumLock Caps S cr oll LockLocketh <br />CR <br />CR <br />CR <br />CR <br />CR <br />CA <br />CACA <br />CA <br />CACA <br />CA <br />CA <br />CACACA <br />CA <br />CACACA <br />CA <br />CA <br />CA <br />CR CR <br />L L <br />L L <br />L L <br />CR <br />CR CR <br />TENANT: <br />MCGUFF MEDICAL PRODUCTS <br />3080 HARBOR BLVD <br />SANTA ANA, CA 92704 <br />PHONE NUMBER <br />CONTACT: <br />INTERIOR ARCHITECT: <br />H. HENDY ASSOCIATES <br />4770 CAMPUS DRIVE, SUITE 100 <br />NEWPORT BEACH, CA 92660 <br />(949) 851-3080 <br />CONTACT: CAROLINA WEIDLER/ DAVID KATAOKA <br />ELECTRICAL ENGINEER: <br />SALAS O'BRIEN <br />8825 RESEARCH DRIVE <br />IRVINE, CA 92618 <br />(949) 753-1553 <br />CONTACT: VICTOR BECCERRA <br />MECHANICAL ENGINEER: <br />KMA CONSULTING <br />151 KALMUS DRIVE. STE. C <br />COSTA MESA, CA 92626 <br />(714) 66207366 <br />CONTACT: KEITH MATOI <br />STRUCTURAL ENGINEER: <br />BRANDOW AND JOHNSTON <br />3300 IRVINE AVENUE, STE. 105 <br />NEWPORT BEACH, CA 92660 <br />(949) 862-8510 <br />CONTACT: RYAN BISHOFF <br />GENERAL CONTRACTOR: <br />KPRS CONSTRUCTION <br />2850 SATURN STREET <br />BREA, CA 92821 <br />(714) 672-0800 <br />CONTACT: TIM LINDEN <br />PLUMBING ENGINEER: <br />KMA CONSULTING <br />151 KALMUS DRIVE. STE. C <br />COSTA MESA, CA 92626 <br />(714) 66207366 <br />CONTACT: KEITH MATOI <br />PROJECT SHALL CONFORM TO <br />GOVERNING BUILDING CODE: 2022 CALIFORNIA BUILDING CODE <br />2022 CALIFORNIA MECHANICAL CODE <br />2022 CALIFORNIA PLUMBING CODE <br />2022 CALIFORNIA ELECTRICAL CODE <br />2022 CALIFORNIA FIRE CODE <br />2022 CALIFORNIA ENERGY CODE <br />CITY OF SANTA ANA ORDINANCES & AMENDMENTS. <br />CONSTRUCTION TYPE: TYPE VB <br />NUMBER OF STORIES: 2 <br />SPRINKLERS: FULLY SPRINKLERED, FIRE ALARM SYSTEM <br />OCCUPANCY: B, S-1 <br />PROJECT ADDRESS: 3080 HARBOR BLVD <br />SANTA ANA, CA <br />BUILDING AREA: <br />FIRST FLOOR 23,041 SF <br />SECOND FLOOR 7,301 SF <br />AREA OF CONSTRUCTION: <br />FIRST FLOOR 20,865 SF <br />SECOND FLOOR 7,301 SF <br />TOTAL 28,155 SF <br />PROJECT DESCRIPTION: <br />RENOVATION OF FIRST AND SECOND FLOORS OF EXISTING WAREHOUSE/ OFFICE BUILDING. RENOVATION INCLUDES: <br />CONSTRUCTION OF NEW SINGLE OCCUPANT RESTROOMS; CONSTRUCTION OF NEW GENERATOR ENCLOSURE; <br />CONSTRUCTION OF NEW INTERIOR WALLS, DOORS, AND WINDOWS; INSTALLATION OF NEW ELECTRICAL, PLUMBING AND <br />HVAC SYSTEMS; AND UPGRADE OF EXISTING LIGHTING. <br />NOT TO SCALE <br />GRIDLINE <br />DETAIL NUMBER <br />SHEET NUMBER <br />SECTION NUMBER <br />SHEET NUMBER <br />ELEVATION NUMBER <br />SHEET NUMBER <br />DOOR NUMBER <br />KEYNOTE <br />REVISION LETTER/NUMBER <br />ROOM NAME <br />ROOM NUMBER <br />INSIDE CLEAR DIMENSION <br />CENTER TO CENTER DIMENSION <br />ALIGNMENT SYMBOL <br />ELEVATION DATUM POINT <br />1 <br />4' - 0" <br />4' - 0" <br />℄℄ <br />IA-X.X <br />X <br />IA-X.X <br />X <br />IA-X.X <br />X <br />101 <br />1 <br />1 <br />OFFICE <br />858 <br />@ AT <br />ADJ.ADJUSTABLE <br />A.F.F.ABOVE FINISH FLOOR <br />BLDG BUILDING <br />BLDG. STD.BUILDING STANDARD <br />CENTER LINE <br />CLG CEILING <br />CLR CLEAR <br />CPT CARPET <br />COL COLUMN <br />D.F.DRINKING FOUNTAIN <br />DN DOWN <br />DTL DETAIL <br />DW DISHWASHER <br />EA.EACH <br />ELEC ELECTRICAL <br />EQ.EQUAL <br />EXIST EXISTING <br />F.F.FINISH FLOOR <br />F. CLG FINISH CEILING <br />F.D.FLOOR DRAIN <br />F.E.FIRE EXTINGUISHER <br />FEC FIRE EXTINGUISHER CABINET <br />F.S.FIRE SPRINKLER <br />G.D.GARBAGE DISPOSAL <br />GYP. BD.GYPSUM BOARD <br />HR HOUR <br />HT HEIGHT <br />MECH MECHANICAL <br />MICRO MICROWAVE <br />MTL METAL <br />N.I.C.NOT IN CONTRACT <br />N.T.S.NOT TO SCALE <br />O.C.ON CENTER <br />OPP OPPOSITE <br />REF REFRIGERATOR <br />REV REVERSED <br />RM ROOM <br />SIM SIMILAR <br />TYP TYPICAL <br />W/WITH <br />WC WALLCOVERING <br />WH WATER HEATER <br />U.N.O.UNLESS NOTED OTHERWISE <br />VCT VINYL COMPOSITION TILE <br />CL <br />+/-APPROXIMATE DIMENSION <br />TOTAL OFFICE (B OCCUPANCY): 17,160 SF <br />TOTAL WAREHOUSE (S-1 OCCUPANCY): 13, 182 SF <br />PARKING RATIOS: <br />WAREHOUSE: 1 PER 1,000 SF WITH 30% GROSS AREA AS OFFICE <br />OFFICE: 3 PER 1,000 <br />WAREHOUSE <br />13,182 SF/ 1000 = 14 STALLS REQUIRED <br />30% OF 13,182 = 3,955 SF <br />3,955 SF /1000 = 4 STALLS REQUIRED <br />OFFICE <br />17160 SF - 3,955 SF = 13,195 SF <br />13.195 X 3 = 40 STALLS REQUIRED <br />14 + 4 + 40 = 58 STALLS REQUIRED <br />62 STALLS PROVIDED <br />ACCESSIBLE STALLS <br />REQUIRED: <br />ACCESSIBLE: 3 <br />VAN ACCESIBLE: 1 <br />PROVIDED: <br />ACCESSIBLE: 3 <br />VAN ACCESSIBLE: 1 <br />TOTAL OFFICE (B OCCUPANCY): 17,160 SF <br />TOTAL WAREHOUSE (S-1 OCCUPANCY): 13, 182 SF <br />OCCUPANT LOAD FACTORS <br />OFFICE (B OCCUPANCY): 150 <br />WAREHOUSE (S-1 OCCUPANCY) <br />STORAGE: 4000 <br />DISTRIBUTION: 500 <br />OFFICE (B OCCUPANCY) <br />17,160 SF /150 = 115 OCCUPANTS <br />WAREHOUSE (S-1 OCCUPANCY) <br />STORAGE: 11,009 SF/ 4000 = 3 OCCUPANTS <br />DISTRIBUTION: 2,173 SF/ 500 = 5 OCCUPANTS <br />TOTAL WAREHOUSE OCCUPANTS: 8 <br />OFFICE (B OCCUPANCY) 115 OCCUPANTS 58 MALE 58 FEMALE <br />MALE FEMALE <br />WATER CLOSETS URINALS LAVATORIES WATER CLOSETS LAVATORIES DRINKING FOUNTAINS <br />2 1 1 4 2 1 <br />WAREHOUSE (S-1 OCCUPANCY) 8 OCCUPANTS 4 MALE 4 FEMALE <br />MALE FEMALE <br />WATER CLOSETS URINALS LAVATORIES WATER CLOSETS LAVATORIES DRINKING FOUNTAINS <br />1 - 1 1 1 1 <br />PROVIDED FIXTURES <br />MALE FEMALE <br />WATER CLOSETS URINALS LAVATORIES WATER CLOSETS LAVATORIES DRINKING FOUNTAINS <br />4 - 4 5 5 2 <br />AREA OF WORK <br />ARCHITECTURAL <br />IA-T TITLE SHEET <br />T-1 LEVEL 1 EXITING PLAN <br />T-2 LEVEL 2 EXITING PLAN <br />T-3 ACCESSIBILITY DETAILS <br />CGN CALIFORNIA GREEN NOTES <br />IA-G1 GENERAL NOTES <br />IA-G2 GENERAL NOTES <br />ST-1D SITE DEMOLITION PLAN <br />ST-1 SITE PLAN <br />ST-2 ENLARGED SITE PLANS AND DETAILS <br />ST-3 ENLARGED PLANS, ELEVATIONS, DETAILS <br />ST-4 ENCLOSURE ELEVATIONS <br />IA-1.1D LEVEL 1 DEMOLITION PLAN <br />IA-1.1 LEVEL 1 PARTITION PLAN <br />IA-1.2D LEVEL 2 DEMOLITION PLAN <br />IA-1.2 LEVEL 2 PARTITION PLAN <br />IA-1.3D ROOF DEMOLITION PLAN <br />IA-1.3 ROOF PLAN <br />IA-2.1D LEVEL 1 DEMOLITION CEILING PLAN <br />IA-2.1 LEVEL 1 REFLECTED CEILING PLAN <br />IA-2.2D LEVEL 2 DEMOLITION CEILING PLAN <br />IA-2.2 LEVEL 2 REFLECTED CEILING PLAN <br />IA-4.1 LEVEL 1 FINISH PLAN <br />IA-5.1 ENLARGED RESTROOM PLAN(S) & ELEVATIONS <br />IA-5.2 ELEVATIONS <br />IA-6.1 WALL SECTIONS & DETAILS <br />IA-7.1 DETAILS <br />IA-8.1 DOOR SCHEDULE & DETAILS <br />ELECTRICAL <br />IE-0.01 ELECTRICAL COVER SHEET <br />IE-0.02 TITLE 24 CALCULATIONS <br />IE-0.03 ELECTRICAL SPECIFICATIONS <br />IE-0.04 ELECTRICAL SPECIFICATIONS <br />IE-0.05 LIGHTING FIXTURE SCHEDULE <br />IE-0.06 MECHANICAL AND PLUMBING EQUIPMENT <br />CONNECTIONS <br />IE-0.07 ELECTRICAL DETAILS <br />IE-0.10 SINGLE LINE DIAGRAM <br />IE-0.11 SHORT CIRCUIT CALCULATION <br />IE-0.20 PANEL SCHEDULES <br />IE-0.21 PANEL SCHEDULES <br />IE-0.22 PANEL SCHEDULES <br />IE-0.30 LIGHTING CONTROLS <br />IE-1.0 ELECTRICAL SITE PLAN <br />IED-1.1 OVERALL FIRST FLOOR POWER AND SIGNAL <br />DEMOLITION PLAN <br />IED-1.2 OVERALL SECOND FLOOR POWER AND SIGNAL <br />DEMOLITION PLAN <br />IED-2.1 OVERALL FIRST FLOOR LIGHTING DEMOLITION PLAN <br />IED-2.2 OVERALL SECOND FLOOR LIGHTING DEMOLITION PLAN <br />IE1.1 OVERALL FIRST FLOOR POWER AND SIGNAL PLAN <br />IE1.2 OVERALL SECOND FLOOR POWER AND SIGNAL PLAN <br />IE1.3 ROOF ELECTRICAL PLAN <br />IE-2.1 OVERALL FIRST FLOOR LIGHTING PLAN <br />IE-2.2 OVERALL SECOND FLOOR LIGHTING PLAN <br />MECHANICAL <br />M-0.1 MECHANICAL LEGEND, NOTES, SCHEDULES AND SHEET <br />INDEX <br />M-0.2 MECHANICAL EQUIPMENT SCHEDULES <br />M-2.1 LEVEL 1 -PARTITION FLOOR MECHANICAL PLAN <br />M-3.1 PARTITION MECHANICAL ROOF PLAN <br />M-5.1 MECHANICAL DETAILS <br />M-5.2 TITLE 24 <br />M-5.3 TITLE 24 <br />HHENDY.COM <br />T (949) 851-3080 <br />4770 Campus Dr., Suite 100 <br />Newport Beach, CA 92660 <br />H ndy <br />ISSUES AND REVISIONS <br />JOB NUMBER <br />SCALE <br />PROJECT <br />TEAM <br />All specifications, drawings, concepts, designs, arrangements, intellectual and written material represented herein constitute <br />unique and unpublished work of H. Hendy Associates and may not be copied, used by or disclosed to others without written <br />consent of H. Hendy Associates. <br /> 2023 H.HendyAssociatesc <br />DATE <br />As indicated <br />04463.0000.24 <br />3080 S. HARBOR BLVD. <br />SANTA ANA, CA 92704 <br />TITLE SHEET <br />IA-T <br />MCGUFF <br />AB/CD <br />PROJECT TEAM <br />BUILDING SUMMARY <br />VICINITY MAPSYMBOLS <br />ABBREVIATIONS <br />DRAWING INDEX PARKING CALUCULATION <br />RESTROOM FIXTURE CALUCULATION <br />KEY PLANS <br />LEVEL 1 <br />LEVEL 2 <br />NO. DESCRIPTION DATE <br />PLAN CHECK SUBMITTAL 3/17/25 <br />PLUMBING <br />P-0.1 PLUMBING LEAD SHEET <br />P-0.2 PLUMBING SCHEDULES <br />P-0.3 PLUMBING SPECIFICATIONS <br />P-2.1 LEVEL 1 -PARTITION FLOOR PLUMBING PLAN <br />P-2.2 LEVEL 2 -PARTITION FLOOR PLUMBING PLAN <br />P-3.1 PARTITION MECHANICAL ROOF PLAN <br />P-4.1 LEVEL 1 -PARTITION FLOOR PLUMBING PLAN <br />P-5.1 PLUMBING SCHEDULES <br />P-5.2 TITLE 24 <br />STRUCTURAL <br />S-1 STRUCTURAL <br />DEFERRED SUBMITTALS <br />1. FIRE SPRINKLERS <br />2. RACKING