Laserfiche WebLink
© Gensler <br />Date Description <br />Project Name <br />Project Number <br />Description <br />Scale <br />Seal / Signature <br />2021 <br />Tel 949.863.9434 <br />Fax 949-553-1676 <br />4675 MacArthur Court <br />Suite 100 <br />Newport Beach, CA <br />92600 <br />USA <br />EXP: 12/31/2025 <br />6/14/2024 1:40:46 AM <br />BIM 360://007.3757.000 - Caribou Industries - 3rd & Broadway/228011-04_3RD-B_MECH_R20.rvt <br />R2.M0.6 <br />ENERGY CALCULATIONS <br />228011-04 <br />3rd & Broadway Residential <br />Tower Tenant Interiors <br />1103 North Broadway <br />Santa Ana, CA 92701 <br />1 <br />06.13.2022 ISSUE FOR PLAN CHECK <br />1 06.17.2024 REVISION TO PERMIT <br />STATE OF CALIFORNIA <br />Mechanical Systems <br />NRCC-MCH-E CALIFORNIA ENERGY COMMISSION <br />CERTIFICATE OF COMPLIANCE NRCC-MCH-E <br />Project Name: 3rd & Broadway West Building Report Page: (Page 10 of 26) <br />Project Address: Date Prepared: 2024-06-14T02:27:10-04:00 <br />Registration Number:Generated Date/Time:Documentation Software: Energy Code Ace <br />CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003 <br />Schema Version: rev 20200601 <br />Compliance ID: 206053 <br />Report Generated: 2024-06-13 23:27:15 <br />J. VENTILATION AND INDOOR AIR QUALITY <br />Level 6 - <br />Conference <br />Room R06F16 <br />Conference/ meeting 244 8 122 <br />DCV <br />NA: Area < 150ft2 or <br />design occupancy < <br />10 people <br />Occ Sensor <br />NA: System < 2kW <br />demand + manual <br />shutoff per <br />§120.2(e)3  exception <br />17 Total System Required Min OA CFM 122 18 Ventilation for this System Complies?Yes <br />04 05 06 07 <br />System Name ACCU-R06, IDU-L06-04 System Design OA CFM <br />Airflow1 450 System Design <br />Transfer Air CFM 0 <br />Air Filtration per §120.1(c)  and §141.0(b)2 2 <br />Provided per §120.1(c)  (NR and <br />Hotel/Motel)) <br />08 09 10 11 12 13 14 15 16 <br />Space Name <br />ot item Tag <br />Mechanical Ventilation Required per §120.1(c)3 3 Exh. Vent per §120.1(c)4  <br />DCV or Sensor Controls per §120.1(d)3, <br />§120.1(d)5, and §120.1(e)3 6Occupancy Type4 <br />Conditioned <br />Floor Area <br />(ft2) <br /># of Shower <br />heads/ <br />toilets <br /># of <br />people5 <br />Required <br />Min OA <br />CFM <br />Required <br />Min CFM <br />Provided per Design <br />CFM <br />Level 6 - <br />Game Room <br />R06H16 <br />Multipurpose assembly 900 20 450 <br />DCV Provided per <br />§120.1(d)4  <br />Occ Sensor Provided per <br />§120.1(d)5  <br />17 Total System Required Min OA CFM 450 18 Ventilation for this System Complies?Yes <br />04 05 06 07 <br />System Name ACCU-R06, IDU-L06-05 System Design OA CFM <br />Airflow1 480 System Design <br />Transfer Air CFM 0 <br />Air Filtration per §120.1(c)  and §141.0(b)2 2 <br />Provided per §120.1(c)  (NR and <br />Hotel/Motel)) <br />08 09 10 11 12 13 14 15 16 <br />STATE OF CALIFORNIA <br />Mechanical Systems <br />NRCC-MCH-E CALIFORNIA ENERGY COMMISSION <br />CERTIFICATE OF COMPLIANCE NRCC-MCH-E <br />Project Name: 3rd & Broadway West Building Report Page: (Page 11 of 26) <br />Project Address: Date Prepared: 2024-06-14T02:27:10-04:00 <br />Registration Number:Generated Date/Time:Documentation Software: Energy Code Ace <br />CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003 <br />Schema Version: rev 20200601 <br />Compliance ID: 206053 <br />Report Generated: 2024-06-13 23:27:15 <br />J. VENTILATION AND INDOOR AIR QUALITY <br />Space Name <br />ot item Tag <br />Mechanical Ventilation Required per §120.1(c)3 3 Exh. Vent per §120.1(c)4  <br />DCV or Sensor Controls per §120.1(d)3, <br />§120.1(d)5, and §120.1(e)3 6Occupancy Type4 <br />Conditioned <br />Floor Area <br />(ft2) <br /># of Shower <br />heads/ <br />toilets <br /># of <br />people5 <br />Required <br />Min OA <br />CFM <br />Required <br />Min CFM <br />Provided per Design <br />CFM <br />Level 6 - Multi <br />Function <br />Assembly <br />R06G14 <br />Multipurpose assembly 954 30 477 <br />DCV Provided per <br />§120.1(d)4  <br />Occ Sensor Provided per <br />§120.1(d)5  <br />17 Total System Required Min OA CFM 477 18 Ventilation for this System Complies?Yes <br />04 05 06 07 <br />System Name ACCU-R06, IDU-L06-03 System Design OA CFM <br />Airflow1 95 System Design <br />Transfer Air CFM 0 <br />Air Filtration per §120.1(c)  and §141.0(b)2 2 <br />Provided per §120.1(c)  (NR and <br />Hotel/Motel)) <br />08 09 10 11 12 13 14 15 16 <br />Space Name <br />ot item Tag <br />Mechanical Ventilation Required per §120.1(c)3 3 Exh. Vent per §120.1(c)4  <br />DCV or Sensor Controls per §120.1(d)3, <br />§120.1(d)5, and §120.1(e)3 6Occupancy Type4 <br />Conditioned <br />Floor Area <br />(ft2) <br /># of Shower <br />heads/ <br />toilets <br /># of <br />people5 <br />Required <br />Min OA <br />CFM <br />Required <br />Min CFM <br />Provided per Design <br />CFM <br />Level 6 - <br />Business <br />center <br />R06G16 <br />Office space 630 6 94.5 <br />DCV <br />NA: Area < 150ft2 or <br />design occupancy < <br />10 people <br />Occ Sensor Provided per <br />§120.1(d)5  <br />17 Total System Required Min OA CFM 94.5 18 Ventilation for this System Complies?Yes <br />04 05 06 07 <br />System Name ACCU-R06, IDU-L06-C01 & C02 System Design OA CFM <br />Airflow1 245 System Design <br />Transfer Air CFM 0 <br />Air Filtration per §120.1(c)  and §141.0(b)2 2 <br />Provided per §120.1(c)  (NR and <br />Hotel/Motel)) <br />08 09 10 11 12 13 14 15 16 <br />STATE OF CALIFORNIA <br />Mechanical Systems <br />NRCC-MCH-E CALIFORNIA ENERGY COMMISSION <br />CERTIFICATE OF COMPLIANCE NRCC-MCH-E <br />Project Name: 3rd & Broadway West Building Report Page: (Page 12 of 26) <br />Project Address: Date Prepared: 2024-06-14T02:27:10-04:00 <br />Registration Number:Generated Date/Time:Documentation Software: Energy Code Ace <br />CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003 <br />Schema Version: rev 20200601 <br />Compliance ID: 206053 <br />Report Generated: 2024-06-13 23:27:15 <br />J. VENTILATION AND INDOOR AIR QUALITY <br />Space Name <br />ot item Tag <br />Mechanical Ventilation Required per §120.1(c)3 3 Exh. Vent per §120.1(c)4  <br />DCV or Sensor Controls per §120.1(d)3, <br />§120.1(d)5, and §120.1(e)3 6Occupancy Type4 <br />Conditioned <br />Floor Area <br />(ft2) <br /># of Shower <br />heads/ <br />toilets <br /># of <br />people5 <br />Required <br />Min OA <br />CFM <br />Required <br />Min CFM <br />Provided per Design <br />CFM <br />Level 6 - <br />Corridor <br />R06G16 <br />Corridor 1382 5 207.3 <br />DCV <br />NA: Area < 150ft2 or <br />design occupancy < <br />10 people <br />Occ Sensor NA: Not required <br />space type <br />17 Total System Required Min OA CFM 207.3 18 Ventilation for this System Complies?Yes <br />04 05 06 07 <br />System Name ACCU-R07B, IDU-L07-A03 System Design OA CFM <br />Airflow1 45 System Design <br />Transfer Air CFM 0 <br />Air Filtration per §120.1(c)  and §141.0(b)2 2 <br />Provided per §120.1(c)  (NR and <br />Hotel/Motel)) <br />08 09 10 11 12 13 14 15 16 <br />Space Name <br />ot item Tag <br />Mechanical Ventilation Required per §120.1(c)3 3 Exh. Vent per §120.1(c)4  <br />DCV or Sensor Controls per §120.1(d)3, <br />§120.1(d)5, and §120.1(e)3 6Occupancy Type4 <br />Conditioned <br />Floor Area <br />(ft2) <br /># of Shower <br />heads/ <br />toilets <br /># of <br />people5 <br />Required <br />Min OA <br />CFM <br />Required <br />Min CFM <br />Provided per Design <br />CFM <br />Level 7 - <br />Corridor <br />R07H12 & <br />R07J11A <br />Corridor 300 2 45 <br />DCV <br />NA: Area < 150ft2 or <br />design occupancy < <br />10 people <br />Occ Sensor <br />NA: System < 2kW <br />demand + manual <br />shutoff per <br />§120.2(e)3  exception <br />17 Total System Required Min OA CFM 45 18 Ventilation for this System Complies?Yes <br />STATE OF CALIFORNIA <br />Mechanical Systems <br />NRCC-MCH-E CALIFORNIA ENERGY COMMISSION <br />CERTIFICATE OF COMPLIANCE NRCC-MCH-E <br />Project Name: 3rd & Broadway West Building Report Page: (Page 13 of 26) <br />Project Address: Date Prepared: 2024-06-14T02:27:10-04:00 <br />Registration Number:Generated Date/Time:Documentation Software: Energy Code Ace <br />CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003 <br />Schema Version: rev 20200601 <br />Compliance ID: 206053 <br />Report Generated: 2024-06-13 23:27:15 <br />J. VENTILATION AND INDOOR AIR QUALITY <br />04 05 06 07 <br />System Name ACCU-R07B, IDU-L07-A04 System Design OA CFM <br />Airflow1 315 System Design <br />Transfer Air CFM 0 <br />Air Filtration per §120.1(c)  and §141.0(b)2 2 <br />Provided per §120.1(c)  (NR and <br />Hotel/Motel)) <br />08 09 10 11 12 13 14 15 16 <br />Space Name <br />ot item Tag <br />Mechanical Ventilation Required per §120.1(c)3 3 Exh. Vent per §120.1(c)4  <br />DCV or Sensor Controls per §120.1(d)3, <br />§120.1(d)5, and §120.1(e)3 6Occupancy Type4 <br />Conditioned <br />Floor Area <br />(ft2) <br /># of Shower <br />heads/ <br />toilets <br /># of <br />people5 <br />Required <br />Min OA <br />CFM <br />Required <br />Min CFM <br />Provided per Design <br />CFM <br />Level 7 - Club <br />House <br />R07J11B <br />Office space 1157 20 300 <br />DCV <br />NA: Area < 150ft2 or <br />design occupancy < <br />10 people <br />Occ Sensor NA: Not required <br />space type <br />17 Total System Required Min OA CFM 300 18 Ventilation for this System Complies?Yes <br />04 05 06 07 <br />System Name ACCU-R07A, IDU-L07-A01 System Design OA CFM <br />Airflow1 235 System Design <br />Transfer Air CFM 0 <br />Air Filtration per §120.1(c)  and §141.0(b)2 2 <br />Provided per §120.1(c)  (NR and <br />Hotel/Motel)) <br />08 09 10 11 12 13 14 15 16 <br />Space Name <br />ot item Tag <br />Mechanical Ventilation Required per §120.1(c)3 3 Exh. Vent per §120.1(c)4  <br />DCV or Sensor Controls per §120.1(d)3, <br />§120.1(d)5, and §120.1(e)3 6Occupancy Type4 <br />Conditioned <br />Floor Area <br />(ft2) <br /># of Shower <br />heads/ <br />toilets <br /># of <br />people5 <br />Required <br />Min OA <br />CFM <br />Required <br />Min CFM <br />Provided per Design <br />CFM <br />Level 7 - Yoga <br />Studio <br />R07H13 <br />Gym/ sports arena (play area)470 10 235 235 235 <br />DCV <br />NA: Area < 150ft2 or <br />design occupancy < <br />10 people <br />Occ Sensor Provided per <br />§120.1(d)5  <br />STATE OF CALIFORNIA <br />Mechanical Systems <br />NRCC-MCH-E CALIFORNIA ENERGY COMMISSION <br />CERTIFICATE OF COMPLIANCE NRCC-MCH-E <br />Project Name: 3rd & Broadway West Building Report Page: (Page 14 of 26) <br />Project Address: Date Prepared: 2024-06-14T02:27:10-04:00 <br />Registration Number:Generated Date/Time:Documentation Software: Energy Code Ace <br />CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003 <br />Schema Version: rev 20200601 <br />Compliance ID: 206053 <br />Report Generated: 2024-06-13 23:27:15 <br />J. VENTILATION AND INDOOR AIR QUALITY <br />17 Total System Required Min OA CFM 235 18 Ventilation for this System Complies?Yes <br />04 05 06 07 <br />System Name ACCU-R07A, IDU-L07-A02A & A02B System Design OA CFM <br />Airflow1 470 System Design <br />Transfer Air CFM 0 <br />Air Filtration per §120.1(c)  and §141.0(b)2 2 <br />Provided per §120.1(c)  (NR and <br />Hotel/Motel)) <br />08 09 10 11 12 13 14 15 16 <br />Space Name <br />ot item Tag <br />Mechanical Ventilation Required per §120.1(c)3 3 Exh. Vent per §120.1(c)4  <br />DCV or Sensor Controls per §120.1(d)3, <br />§120.1(d)5, and §120.1(e)3 6Occupancy Type4 <br />Conditioned <br />Floor Area <br />(ft2) <br /># of Shower <br />heads/ <br />toilets <br /># of <br />people5 <br />Required <br />Min OA <br />CFM <br />Required <br />Min CFM <br />Provided per Design <br />CFM <br />Level 7 - <br />Fitness Studio <br />R07J13 <br />Gym/ sports arena (play area)935 10 467.5 467.5 470 <br />DCV <br />NA: Area < 150ft2 or <br />design occupancy < <br />10 people <br />Occ Sensor Provided per <br />§120.1(d)5  <br />17 Total System Required Min OA CFM 467.5 18 Ventilation for this System Complies?Yes <br />04 05 06 07 <br />System Name ACCU-R07A & B, IDU-L07-C01 & C02 System Design OA CFM <br />Airflow1 255 System Design <br />Transfer Air CFM 0 <br />Air Filtration per §120.1(c)  and §141.0(b)2 2 <br />Provided per §120.1(c)  (NR and <br />Hotel/Motel)) <br />08 09 10 11 12 13 14 15 16 <br />Space Name <br />ot item Tag <br />Mechanical Ventilation Required per §120.1(c)3 3 Exh. Vent per §120.1(c)4  <br />DCV or Sensor Controls per §120.1(d)3, <br />§120.1(d)5, and §120.1(e)3 6Occupancy Type4 <br />Conditioned <br />Floor Area <br />(ft2) <br /># of Shower <br />heads/ <br />toilets <br /># of <br />people5 <br />Required <br />Min OA <br />CFM <br />Required <br />Min CFM <br />Provided per Design <br />CFM <br />STATE OF CALIFORNIA <br />Mechanical Systems <br />NRCC-MCH-E CALIFORNIA ENERGY COMMISSION <br />CERTIFICATE OF COMPLIANCE NRCC-MCH-E <br />Project Name: 3rd & Broadway West Building Report Page: (Page 15 of 26) <br />Project Address: Date Prepared: 2024-06-14T02:27:10-04:00 <br />Registration Number:Generated Date/Time:Documentation Software: Energy Code Ace <br />CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003 <br />Schema Version: rev 20200601 <br />Compliance ID: 206053 <br />Report Generated: 2024-06-13 23:27:15 <br />J. VENTILATION AND INDOOR AIR QUALITY <br />Level 7 - <br />Circulation <br />R07G13 <br />Corridor 1239 1 185.85 <br />DCV <br />NA: Area < 150ft2 or <br />design occupancy < <br />10 people <br />Occ Sensor NA: Not required <br />space type <br />17 Total System Required Min OA CFM 185.85 18 Ventilation for this System Complies?Yes <br />04 05 06 07 <br />System Name ACCU-R08A & B, IDU-L08-C01 & C02 <br />(Typ. for Flr 8-14) <br />System Design OA CFM <br />Airflow1 255 System Design <br />Transfer Air CFM 0 <br />Air Filtration per §120.1(c)  and §141.0(b)2 2 <br />Provided per §120.1(c)  (NR and <br />Hotel/Motel)) <br />08 09 10 11 12 13 14 15 16 <br />Space Name <br />ot item Tag <br />Mechanical Ventilation Required per §120.1(c)3 3 Exh. Vent per §120.1(c)4  <br />DCV or Sensor Controls per §120.1(d)3, <br />§120.1(d)5, and §120.1(e)3 6Occupancy Type4 <br />Conditioned <br />Floor Area <br />(ft2) <br /># of Shower <br />heads/ <br />toilets <br /># of <br />people5 <br />Required <br />Min OA <br />CFM <br />Required <br />Min CFM <br />Provided per Design <br />CFM <br />Level 08-14 <br />Circulation Corridor 1362 1 204.3 <br />DCV <br />NA: Area < 150ft2 or <br />design occupancy < <br />10 people <br />Occ Sensor NA: Not required <br />space type <br />17 Total System Required Min OA CFM 204.3 18 Ventilation for this System Complies?Yes <br />04 05 06 07 <br />System Name ACCU-R15A & B, IDU-L15-C01,C02A <br />& C02B <br />System Design OA CFM <br />Airflow1 320 System Design <br />Transfer Air CFM 0 <br />Air Filtration per §120.1(c)  and §141.0(b)2 2 <br />Provided per §120.1(c)  (NR and <br />Hotel/Motel)) <br />08 09 10 11 12 13 14 15 16 <br />STATE OF CALIFORNIA <br />Mechanical Systems <br />NRCC-MCH-E CALIFORNIA ENERGY COMMISSION <br />CERTIFICATE OF COMPLIANCE NRCC-MCH-E <br />Project Name: 3rd & Broadway West Building Report Page: (Page 16 of 26) <br />Project Address: Date Prepared: 2024-06-14T02:27:10-04:00 <br />Registration Number:Generated Date/Time:Documentation Software: Energy Code Ace <br />CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003 <br />Schema Version: rev 20200601 <br />Compliance ID: 206053 <br />Report Generated: 2024-06-13 23:27:15 <br />J. VENTILATION AND INDOOR AIR QUALITY <br />Space Name <br />ot item Tag <br />Mechanical Ventilation Required per §120.1(c)3 3 Exh. Vent per §120.1(c)4  <br />DCV or Sensor Controls per §120.1(d)3, <br />§120.1(d)5, and §120.1(e)3 6Occupancy Type4 <br />Conditioned <br />Floor Area <br />(ft2) <br /># of Shower <br />heads/ <br />toilets <br /># of <br />people5 <br />Required <br />Min OA <br />CFM <br />Required <br />Min CFM <br />Provided per Design <br />CFM <br />Level 15 - <br />Circulation Corridor 1700 2 255 <br />DCV <br />NA: Area < 150ft2 or <br />design occupancy < <br />10 people <br />Occ Sensor NA: Not required <br />space type <br />17 Total System Required Min OA CFM 255 18 Ventilation for this System Complies?Yes <br />1 FOOTNOTES: System CFM should include both mechanical and natural ventilation for the zone/system <br />2 Air filtration requirements apply to the following three system types per §120.1(c)1A : space conditioning systems utilizing ducts to supply air to occupiable space; supply-only <br />ventilation systems providing outside air to occupiable space; supply side of balanced ventilation systems including heat recovery and energy recovery ventilation systems providing <br />outside air to occupiable space. <br />3 Uniform Mechanical Code may have more stringent ventilation requirements; the most stringent code requirement takes precedence. <br />4 See Standards Tables 120.1-A and 120.1-B. <br />5 For lecture halls with fixed seating, the expected number of occupants shall be shall be determined in accordance with the California Building Code. <br />6 §120.2(e)3  requires systems serving rooms that are required by §130.1(c)  to have lighting occupancy sensing controls to also have occupancy sensing zone controls for ventilation. <br />Examples of spaces which require lighting occupancy sensors include offices 250ft2 or smaller, multipurpose rooms less than 1,000 ft2, classrooms, conference rooms, restrooms, aisles <br />and open areas in warehouses, library book stack aisles, corridors, stairwells, parking garages, and loading and unloading zones, unless excepted by §130.1(c). <br />High-rise Residential Dwelling Unit Ventilation Systems <br />Check the box if the system is using continuous ventilation to meet the ventilation requirements per §120.1(b)2Aivb  <br />19 20 21 22 23 24 25 26 27 <br />Space Name <br />or Item Tag <br />Mechanical Ventilation Required per §120.1(b) Ventilation per <br />Design <br />Local Exhaust Air Filtration per §120.1(b) 3Conditioned <br />Floor Area <br />(ft2) <br /># of Bedrooms # of Dwelling <br />Units <br />Required <br />Min OA <br />CFM1 <br />Supply Air <br />CFM <br />Exhaust <br />CFM <br />STATE OF CALIFORNIA <br />Mechanical Systems <br />NRCC-MCH-E CALIFORNIA ENERGY COMMISSION <br />CERTIFICATE OF COMPLIANCE NRCC-MCH-E <br />Project Name: 3rd & Broadway West Building Report Page: (Page 17 of 26) <br />Project Address: Date Prepared: 2024-06-14T02:27:10-04:00 <br />Registration Number:Generated Date/Time:Documentation Software: Energy Code Ace <br />CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003 <br />Schema Version: rev 20200601 <br />Compliance ID: 206053 <br />Report Generated: 2024-06-13 23:27:15 <br />J. VENTILATION AND INDOOR AIR QUALITY <br />Studio Units <br />ST_1 ( Flr 7 - <br />14) <br />480 0 1 21.9 355 50 <br />Bathroom IAQ <br />Provided per §120.1(b) Bathroom IAQ and Vent. <br />Kitchen Range Hood2 <br />Studio Units <br />ST_1 Flr 15 480 0 1 21.9 530 50 <br />Bathroom IAQ <br />Provided per §120.1(b) Bathroom IAQ and Vent. <br />Kitchen Range Hood2 <br />1 Bed Room <br />Units 1BR_1 ( <br />Flr 7 - 14) <br />1047 1 1 46.41 675 50 <br />Bathroom IAQ <br />Provided per §120.1(b) Bathroom IAQ and Vent. <br />Kitchen Range Hood2 <br />1 Bed Room <br />Units 1BR_2 ( <br />Flr 7 - 14) <br />1054 1 1 46.62 705 50 <br />Bathroom IAQ <br />Provided per §120.1(b) Bathroom IAQ and Vent. <br />Kitchen Range Hood2 <br />2 Bed Room <br />Units 2BR_1 <br />(Flr 7) <br />1533 2 1 68.49 845 100 <br />Bathroom IAQ <br />Provided per §120.1(b) Bathroom IAQ and Vent. <br />Kitchen Range Hood2 <br />2 Bed Room <br />Units 2BR_2 <br />(Flr 7-14) <br />1041 2 1 53.73 1690 100 <br />Bathroom IAQ <br />Provided per §120.1(b) Bathroom IAQ and Vent. <br />Kitchen Range Hood2 <br />2 Bed Room <br />Units 2BR_1 <br />(Flr 15) <br />1494 2 1 67.32 1030 100 <br />Bathroom IAQ <br />Provided per §120.1(b) Bathroom IAQ and Vent. <br />Kitchen Range Hood2 <br />2 Bed Room <br />Units 2BR_2 <br />(Flr 15) <br />1038 2 1 53.64 2520 100 <br />Bathroom IAQ <br />Provided per §120.1(b) Bathroom IAQ and Vent. <br />Kitchen Range Hood2 <br />1 Bed Room <br />Units 1BR_1 <br />(Flr 15) <br />1446 1 1 58.38 1030 50 <br />Bathroom IAQ <br />Provided per §120.1(b) Bathroom IAQ and Vent. <br />Kitchen Range Hood2 <br />STATE OF CALIFORNIA <br />Mechanical Systems <br />NRCC-MCH-E CALIFORNIA ENERGY COMMISSION <br />CERTIFICATE OF COMPLIANCE NRCC-MCH-E <br />Project Name: 3rd & Broadway West Building Report Page: (Page 18 of 26) <br />Project Address: Date Prepared: 2024-06-14T02:27:10-04:00 <br />Registration Number:Generated Date/Time:Documentation Software: Energy Code Ace <br />CA Building Energy Efficiency Standards - 2019 Nonresidential Compliance Report Version: 2019.1.003 <br />Schema Version: rev 20200601 <br />Compliance ID: 206053 <br />Report Generated: 2024-06-13 23:27:15 <br />J. VENTILATION AND INDOOR AIR QUALITY <br />28 Is this a balanced system4 29 Meeting Outside Air Requirements?Yes <br />1 FOOTNOTES: Uniform Mechanical Code may have more stringent ventilation requirements; the most stringent code requirement takes precedence. <br />2 Kitchen range hood will be verified per NA7.18.1 to confirm model is rated by HVI. <br />3 Air filtration requirements apply to the following three system types per §120.1(c)1A : space conditioning systems utilizing ducts to supply air to occupiable space; supply-only <br />ventilation systems providing outside air to occupiable space; supply side of balanced ventilation systems including heat recovery and energy recovery ventilation systems providing <br />outside air to occupiable space. <br />4 A balanced ventilation system provides ventilation airflow to each dwelling-unit at a rate equal to or greater than the required minimum rate, but not more than twenty percent. <br />K. TERMINAL BOX CONTROLS <br />This section does not apply to this project. <br />L. DISTRIBUTION (DUCTWORK and PIPING) <br />This table is used to show compliance with mandatory pipe insulation requirements found in §120.3  and prescriptive requirements found in §140.4(l)  for duct leakage testing. <br />Duct Leakage Sealing <br />The answers to the questions below apply to the following duct systems:SUPPLY & RETURN AIR DUCT <br />- SA & RA Duct leakage testing triggered for these systems?No <br />11 No The scope of the project includes only duct systems serving healthcare facilities <br />12 Yes Duct system provides conditioned air to an occupiable space for a constant volume, single zone, space-conditioning system. <br />13 Yes The space conditioning system serves less than 5,000 ft2 of conditioned floor area. <br />14 No The combined surface area of the ducts in the following locations is more than 25% of the total surface area of the entire duct system: <br />Outdoors <br />In a space directly under a roof that has a U-factor greater than the u-factor of the ceiling, or if the roof does not meet the <br />requirements of §140.3(a)1B  or if the roof has fixed vents or openings to the outside/ unconditioned spaces <br />In an unconditioned crawl space <br />In other unconditioned spaces <br />15 No The scope of the project includes extending an existing duct system, which is constructed, insulated or sealed with asbestos. <br />16 No The scope of the project includes an existing duct system that is documented to have been previously sealed as confirmed through field verification <br />and diagnostic testing in accordance with procedures in the Reference Nonresidential Appendix NA2. <br />17 Duct system shall be sealed in acordance with the California Mechanical Code <br />1/15/2025