PLUMBING GENERAL NOTESFIRE PROTECTION NOTESPLAN CHECK NOTES
<br />1. ALL FIRE PROTECTION WORK SHALL BE IN STRICT ACCORDANCE WITH CURRENT CALIFORNIA FIRE
<br />CODES, NFPA 13, 14, 24, 54, 70, 72, 75, 96, 101, AND 110, CURRENT CALIFORNIA BUILDING CODES, AND
<br />SHALL CONFORM TO ALL OTHER APPLICABLE REGULATIONS AND MEET REQUIREMENTS OF INSPECTING
<br />AUTHORITIES.
<br />2. THE FIRE PROTECTION SYSTEM IS A DESIGN AND BUILD RESPONSIBILITY BY A STATE LICENSED C16
<br />CONTRACTOR, AND FIRE ALARM SYSTEM BY A STATE LICENSED UL LISTED CONTRACTOR.
<br />3. ALL UNDERGROUND FIRE PROTECTION PIPING WITHIN THE BUILDING PERIMETER SHALL BE PROVIDED
<br />WITH APPROVED PIPE SLEEVES.
<br />4. COMPLY TO ALL SECTIONS OF THE FIRE PROTECTION SPECIFICATIONS.
<br />5. SUBMIT COORDINATED SHOP DRAWINGS, CALCULATIONS AND PRODUCT DATA TO THE ARCHITECT FOR
<br />REVIEW PRIOR TO INSTALLATION. EXACT LOCATION SHALL BE COORDINATED WITH ALL TRADES,
<br />ARCHITECTURAL DRAWINGS AND GENERAL CONSTRUCTION. OBTAIN FROM THE AUTHORITIES HAVING
<br />JURISDICTION AND LOCAL FIRE MARSHAL FOR THE STAMP AND APPROVAL PRIOR TO ANY INSTALLATION.
<br />6. SUBMISSION OF A PROPOSAL SHALL BE EVIDENCE THAT A CAREFUL EXAMINATION OF THE SITE,
<br />DRAWINGS & SPECIFICATIONS HAS BEEN MADE AND THE CONTRACTOR IS FAMILIAR WITH THOSE ITEMS
<br />AND AREAS THAT WILL PRESENT DIFFICULTY TO THE PERFORMANCE OF THIS CONTRACT. LATER CLAIMS
<br />SHALL NOT BE MADE FOR LABOR, EQUIPMENT, ETC NECESSARY TO COMPLETE ALL WORK AS A RESULT
<br />OF DIFFICULTIES ENCOUNTERED WHICH COULD HAVE BEEN FORESEEN.
<br />7. THE CONTRACTOR SHALL PAY FEES, GIVE NOTICE, FILE NECESSARY DRAWINGS AND OBTAIN PERMITS
<br />AND CERTIFICATES OF APPROVAL REQUIRED IN CONNECTION WITH WORK UNDER THIS CONTRACT. THE
<br />CONTRACTOR SHALL COMPLY WITH LOCAL LAWS, ORDINANCES, "STATE" OFFICIAL COMPILATION OF
<br />CODES, RULES AND REGULATIONS.
<br />8. ALL APPLICABLE CODES, LAWS AND REGULATIONS GOVERNING OR RELATING TO ANY PORTION OF THIS
<br />WORK ARE HEREBY INCORPORATED INTO AND MADE A PART OF THESE SPECIFICATIONS, AND THEIR
<br />PROVISIONS SHALL BE CARRIED OUT BY THE CONTRACTOR WHO SHALL INFORM THE OWNER, PRIOR TO
<br />SUBMITTING A PROPOSAL, OF ANY WORK OR MATERIALS WHICH VIOLATE ANY OF THE ABOVE LAWS AND
<br />REGULATIONS. ANY WORK DONE BY THE CONTRACTOR CAUSING SUCH VIOLATION SHALL BE
<br />CORRECTED BY THE CONTRACTOR.
<br />9. SPRINKLER HEADS LOCATED IN ACOUSTICAL TILE CEILINGS SHALL BE INSTALLED IN THE CENTER OF THE
<br />TILE.
<br />10. OBTAIN THE APPROVAL FROM THE ARCHITECT FOR FINAL LOCATION AND TYPE OF SPRINKLER HEADS
<br />PRIOR TO REVIEW BY ENGINEER.
<br />11. ALL MATERIALS SHALL BE U.L. LISTED FOR FIRE PROTECTION USE.
<br />12. SPRINKLER HEADS SHALL BE UL LISTED AND FM APPROVED. PROVIDE QUICK-RESPONSE TYPE WHERE
<br />ALLOWED BY AUTHORITIES HAVING JURISDICTION:
<br />(A) GYPSUM BOARD CEILING AREAS: SUBMIT, SUPPLY AND INSTALL PRODUCT, FULLY CONCEALED
<br />HEADS WITH FACTORY FINISHED COVERPLATE, SELECTED BY ARCHITECT, TO MATCH ADJACENT
<br />CEILING SURFACE FINISH PAINT.
<br />(B) ACOUSTICAL TILE CEILING AREAS: SUBMIT, SUPPLY AND INSTALL PRODUCT, FULLY CONCEALED
<br />HEADS WITH FACTORY FINISHED COVERPLATE, SELECTED BY ARCHITECT, TO MATCH ADJACENT
<br />CEILING SURFACE FINISH PAINT. INSTALL AT CENTER OF TILE.
<br />(C) EXPOSED CEILING AREAS: SUPPLY AND INSTALL BUILDING STANDARD, PENDENT OR UPRIGHT
<br />HEADS; ARCHITECT TO SELECT FINISH.
<br />(D) PROVIDE HIGH TEMPERATURE SPRINKLER HEADS IN ALL MACHINE ROOMS AND MECHANICAL
<br />ROOMS PER NFPA 13 STANDARDS.
<br />13. ALL BUILDING AREAS SHALL BE FULLY SPRINKLERED INCLUDING CANOPIES, WALKWAYS, UNDER
<br />EXPOSED MECHANICAL DUCTWORK OR ANY BUILDING PROJECTIONS OVER 48" THAT ARE ATTACHED OR
<br />DETACHED FROM THE BUILDING PER NFPA-13 REQUIREMENTS.
<br />14. THE ENTIRE FIRE PROTECTION SYSTEM SHALL BE HYDRAULICALLY CALCULATED.
<br />15. FIRE PROTECTION PIPING PENETRATING FIRE RATED WALLS AND FLOORS SHALL BE PROVIDED WITH
<br />STEEL SLEEVES AND CAULKED WITH SEALANT MATERIAL OF THE SAME FIRE RATING OF THE WALL EQUAL
<br />TO 3M FIRE BARRIER CONFORMING TO AUTHORITIES HAVING JURISDICTION REQUIREMENTS.
<br />16. COORDINATE WORK WITH ALL OTHER TRADES AND COORDINATE SPRINKLER HEAD LOCATIONS AND
<br />PIPING WITH LIGHTING FIXTURES, SPEAKERS AND DIFFUSERS, HVAC DUCTWORK, ETC. SEE
<br />ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF PARTITIONS, SUSPENDED CEILINGS, SOFFITS
<br />AND ILLUMINOUS CEILINGS.
<br />17. COORDINATE ALL FIRE PROTECTION TAMPER & FLOW SWITCH, FIRE ALARM BELL LOCATIONS AND
<br />CONNECTION WITH ELECTRICAL CONTRACTOR AND BUILDING FIRE ALARM MASTER SYSTEM.
<br />18. SPRINKLER DRAINS SHALL BE DRAINED INTO APPROVED RECEPTORS. COORDINATE DRAIN
<br />TERMINATIONS WITH PLUMBING CONTRACTOR PRIOR TO START OF WORK.
<br />19. COORDINATE ALL STRUCTURAL PENETRATIONS WHERE REQUIRED WITH THE STRUCTURAL ENGINEER.
<br />20. THE INSTALLATION OF SEISMIC BRACING FOR THE FIRE SPRINKLER SYSTEM SHALL BE SUBJECT TO THE
<br />APPROVAL OF THE LOCAL FIRE MARSHALL AND THE AUTHORITIES HAVING JURISDICTION. SUPPORT ALL
<br />FIRE PROTECTION WORK AND PIPING FROM BUILDING STRUCTURE AND/OR FRAMING IN AN APPROVED
<br />MANNER. WHERE OVERHEAD CONSTRUCTION DOES NOT PERMIT FASTENING OF SUPPORTS FOR
<br />EQUIPMENT, FURNISH ADDITIONAL STEEL FRAMING.
<br />21. ALL SYSTEM COMPONENTS AND HARDWARE SHALL COMPLY WITH NFPA STANDARDS AND SHALL BE
<br />APPROVED BY THE AUTHORITIES HAVING JURISDICTION.
<br />22. FIRE SPRINKLER INSTALLATION SHALL COMPLY WITH LOCAL AUTHORITIES' RECOMMENDED STANDARDS
<br />FOR SUSPENDED CEILING ASSEMBLIES. SPRINKLER HEADS AND OTHER PENETRATIONS THROUGH
<br />CEILING TILES SHALL HAVE 2" OVERSIZE RING, SLEEVE OR ADAPTOR TO ALLOW FREE MOVEMENT OF AT
<br />LEAST 1" IN ALL HORIZONTAL DIRECTIONS. ALTERNATE: TO USE UL LISTED FLEXIBLE PIPING FOR FIRE
<br />SPRINKLER USE THAT CAN ACCOMMODATE 1" OF CEILING MOVEMENT IN ALL HORIZONTAL DIRECTIONS
<br />TO BE PROVIDED AT THE TOP OF THE SPRINKLER HEAD EXTENSION.
<br />23. ALL VALVES AND FIRE DEPARTMENT CONNECTIONS SHALL HAVE PERMANENTLY AFFIXED SIGNS,
<br />INDICATING THEIR FUNCTION.
<br />24. SYSTEM SHALL BE DESIGNED TO MEET OWNER'S INSURANCE UNDERWRITER COMPANY STANDARDS AS
<br />APPLICABLE. IF THE DESIGN CRITERIA BY THE LOCAL INSURANCE UNDERWRITER IS MORE STRINGENT,
<br />THEN IT SHALL BE ADHERED TO.
<br />FOR FUTURE RESTAURANTS AND KITCHENS:
<br />1. FOOD OR DRINK SHALL NOT BE STORED, PREPARED, OR DISPLAYED BENEATH
<br />SOIL OR DRAIN PIPES, UNLESS THOSE AREAS ARE PROTECTED AGAINST
<br />LEAKAGE OR CONDENSATION FROM SUCH PIPES REACHING THE FOOD OR
<br />DRINK AS DESCRIBED BELOW. WHERE BUILDING DESIGN REQUIRES THAT SOIL
<br />OR DRAIN PIPES BE LOCATED OVER SUCH AREAS, THE INSTALLATION SHALL BE
<br />MADE WITH THE LEAST POSSIBLE NUMBER OF JOINTS AND SHALL BE INSTALLED
<br />TO CONNECT TO THE NEAREST ADEQUATELY SIZED VERTICAL STACK WITH THE
<br />PROVISIONS AS FOLLOWS:
<br />A) OPENINGS THROUGH FLOORS OVER SUCH AREAS SHALL BE SEALED
<br />WATERTIGHT TO THE FLOOR CONSTRUCTION.
<br />B) FLOOR AND SHOWER DRAINS INSTALLED ABOVE SUCH AREAS SHALL BE
<br />EQUIPPED WITH INTEGRAL SEEPAGE PANS.
<br />C) SOIL OR DRAIN PIPES SHALL BE OF AN APPROVED MATERIAL AS LISTED IN
<br />TABLE 701.1 AND SECTION 701.2. MATERIALS SHALL COMPLY WITH
<br />ESTABLISHED STANDARDS. CLEANOUTS SHALL BE EXTENDED THROUGH
<br />THE FLOOR CONSTRUCTION ABOVE.
<br />D) PIPING SUBJECT TO OPERATION AT TEMPERATURES THAT WILL FORM
<br />CONDENSATION ON THE EXTERIOR OF THE PIPE SHALL BE THERMALLY
<br />INSULATED.
<br />2. WHERE PIPES ARE INSTALLED IN CEILINGS ABOVE SUCH AREAS, THE CEILING
<br />SHALL BE OF THE REMOVABLE TYPE OR SHALL BE PROVIDED WITH ACCESS
<br />PANELS TO FORM A READY ACCESS FOR INSPECTION OF PIPING. 2019 CPC SEC.
<br />317.1. PLEASE ADDRESS THE DRAINAGE PIPING INSTALLATION SHOWN LOCATED
<br />OVER THE RESTAURANT SPACE (R01B12) ON PLAN PAGE R1-P2.101 TO COMPLY
<br />WITH THE ABOVE CPC SECTION WITH DETAILS OR NOTES.
<br />1. PRIOR TO BIDDING, CONTRACTOR TO VISIT SITE AND VERIFY FIELD CONDITIONS, DIMENSIONS, SPACING
<br />AND ROUTING OF ALL PLUMBING PIPING. ANY DISCREPANCIES WITH FIELD CONDITIONS AND THESE
<br />DOCUMENTS ARE TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT FOR IMMEDIATE RESOLUTION.
<br />COORDINATE WITH OTHER TRADES FOR CLEARANCES AND TIMELY FINISH.
<br />2. ALL WORK SHALL COMPLY WITH CURRENT CALIFORNIA PLUMBING CODES, CALIFORNIA STATE FIRE
<br />MARSHAL, CURRENT CALIFORNIA BUILDING CODES, CURRENT CALIFORNIA GREEN BUILDING STANDARDS
<br />CODES, CURRENT CALIFORNIA ADMINISTRATIVE CODE TITLES 17,20,24 AND AUTHORITIES HAVING
<br />JURISDICTION'S CODE AMENDMENTS. CONTRACTOR SHALL COMPLY WITH ALL SAFETY REQUIREMENTS
<br />SET FORTH BY THE LOCAL AUTHORITIES HAVING JURISDICTION.
<br />3. 8-1/2X11 PROJECT MANUALS, INCLUDING SPECIFICATIONS, EQUIPMENT AND FIXTURES AND BUILDING
<br />STANDARDS SHALL BE A PART OF THIS WORK.
<br />4. ALL SYMBOLS SHOWN ON SYMBOLS LIST ARE NOT NECESSARILY USED ON THIS PROJECT.
<br />5. ALL EQUIPMENT, FIXTURES AND MATERIALS SHOWN ON PLANS SHALL BE NEW, BEST OF THEIR
<br />RESPECTIVE KIND, FREE FROM DEFECTS, IN GOOD CONDITIONS, OF THE MAKE AND QUALITY SPECIFIED,
<br />AND SHALL CONFORM TO ALL LOCAL APPLICABLE CODES AND REGULATIONS.
<br />6. BEFORE STARTING ANY WORK, CONTRACTOR SHALL PREPARE COORDINATED SHOP DRAWINGS PER
<br />SPECIFICATIONS AND SUBMIT FOR ENGINEER’S REVIEW. THIS INCLUDES EXAMINING THE COMPLETE SET
<br />OF DRAWINGS FOR ALL TRADES, INCLUDING ARCHITECTURAL, STRUCTURAL, CIVIL, MECHANICAL, AND
<br />ELECTRICAL. VERIFY ALL DIMENSIONS, SPACE REQUIREMENTS, AND POINTS OF CONNECTION TO ALL
<br />FIXTURES AND EQUIPMENT. MAKE ALL REQUIRED ADJUSTMENTS NECESSARY TO AVOID CONFLICTS WITH
<br />THE BUILDING STRUCTURE AND THE WORK OF OTHER TRADES AND TO PROVIDE A COMPLETE
<br />INSTALLATION.
<br />7. SUBMIT COORDINATED SHOP DRAWINGS AND PRODUCT DATA. PROVIDE COMPLETE AND UPDATED
<br />AS-BUILT DRAWINGS PRIOR TO COMPLETION OF PROJECT FOR REVIEW BY THE ARCHITECT/ENGINEER.
<br />PROVIDE AS-BUILT DRAWINGS VIA ELECTRONIC FORMAT (ON CD OR VIA E-MAIL) IN AUTOCAD 2010 OR
<br />LATEST VERSION.
<br />8. SUBMISSION OF A PROPOSAL SHALL BE EVIDENCE THAT A CAREFUL EXAMINATION OF THE SITE,
<br />DRAWINGS & SPECIFICATIONS HAVE BEEN MADE AND THE CONTRACTOR IS FAMILIAR WITH THOSE ITEMS
<br />AND AREAS THAT WILL PRESENT DIFFICULTY TO THE PERFORMANCE OF THIS CONTRACT. LATER CLAIMS
<br />SHALL NOT BE MADE FOR LABOR, EQUIPMENT, ETC. NECESSARY TO COMPLETE ALL WORK AS A RESULT
<br />OF DIFFICULTIES ENCOUNTERED WHICH COULD HAVE BEEN FORESEEN. CONTRACTOR TO VERIFY THE
<br />EXISTING CONDITIONS BEFORE CONSTRUCTION; CONFIRMING SIZES AND LOCATIONS OF ALL EXISTING
<br />PIPING PRIOR TO START OF WORK. ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED
<br />AND VERIFIED BY THE CONTRACTOR AT THE SITE BEFORE PROCEEDING WITH ANY WORK. PRIOR TO
<br />STARTING DEMOLITION, DETERMINE LOCATIONS AND EXISTING CONDITIONS.
<br />9. PROVIDE ALL REQUIRED LABOR, MATERIALS, EQUIPMENT, AND SERVICES NECESSARY FOR A COMPLETE
<br />AND SAFE INSTALLATION OF PLUMBING AND FIRE PROTECTION IN FULL CONFORMITY WITH
<br />REQUIREMENTS OF ALL AUTHORITIES HAVING JURISDICTION; ALL AS INDICATED ON DRAWINGS AND/OR
<br />HEREIN SPECIFIED FOR THE SYSTEMS INCLUDED. WORK SHALL BE INSTALLED IN A NEAT, WORKMANLIKE
<br />MANNER. INCLUDE ALL COSTS FOR PERMITS, LICENSES, CERTIFICATES, FILING AND INSPECTIONS
<br />REQUIRED BY AUTHORITIES HAVING JURISDICTION.
<br />10. PLUMBING DRAWINGS AND LAYOUTS ARE DIAGRAMMATIC TO SHOW DESIGN INTENT, TO CONVEY SCOPE
<br />AND GENERAL ARRANGEMENT ONLY. DUE TO STRUCTURAL, MECHANICAL DUCT OR PIPING
<br />INTERFERENCE, RETAINED EXISTING FACILITIES, OR FOR OTHER REASONS, THE CONTRACTOR MAY
<br />DESIRE TO INSTALL THE WORK IN A MANNER DIFFERENT FROM THAT SHOWN. SUCH CHANGES SHALL BE
<br />PRESENTED TO THE OWNER'S REPRESENTATIVE FOR APPROVAL BEFORE PROCEEDING, AND THE
<br />RECORD DRAWINGS SHALL BE ACCURATELY REVISED TO SHOW THE CHANGES AS COMPLETED. DO NOT
<br />SCALE FOR MATERIAL QUANTITIES. ALL SCALING SHOULD BE REFERENCED TO ARCHITECTURAL PLANS
<br />ONLY.
<br />11. IF ANY EQUIPMENT SUBMITTED BY THE CONTRACTOR IS DIFFERENT FROM THAT SPECIFIED, OR
<br />REQUIRES CHANGES IN MATERIAL OR LABOR FROM THAT REQUIRED IN THE CONTRACT DOCUMENTS
<br />AFFECTING THIS AND/OR OTHER TRADES, SUCH CHANGES SHALL BE SUBMITTED AS SHOP DRAWINGS.
<br />SUBMITTALS SHALL INDICATE CREDIT DUE TO OWNER. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR
<br />PAYMENT OF ALL CHARGES RESULTING FROM ADDITIONS OR CHANGES IN THE WORK OF OTHER TRADES
<br />NECESSARY TO ACCOMMODATE THE REQUESTED MODIFICATION. ALL CHANGES SHALL BE SHOWN ON
<br />CONTRACTOR'S RECORD AND AS-BUILT DRAWINGS. ALL REVISED EQUIPMENT SHALL BE APPROVED BY
<br />CITY INSPECTOR AND A.H.J. PRIOR TO START OF WORK.
<br />12. UNLESS INSTRUCTED OTHERWISE, THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS,
<br />LICENSES, INSPECTIONS, AND FEES REQUIRED FOR INSTALLATION OF ALL THE WORK AND ALL OTHER
<br />AGENCIES HAVING JURISDICTION OVER SERVICES TO THIS BUILDING. FURNISH FINAL CERTIFICATE OF
<br />INSPECTION OR WRITTEN EVIDENCE OF ACCEPTANCE BY INSPECTION AUTHORITIES FOR ALL WORK
<br />INSTALLED.
<br />13. REFER TO ARCHITECTURAL DRAWINGS FOR EXTENT OF DEMOLITION AND NEW CONSTRUCTION, FOR
<br />EXACT PLUMBING FIXTURE LOCATIONS AND QUANTITIES, EQUIPMENT, DEVICES, ETC.
<br />14. ALL PLUMBING EQUIPMENT STATUS (ON, OFF, FAIL/ALARM) SHALL BE MONITORED BY LOCAL/BUILDING
<br />BMS. THESE INCLUDE WATER HEATERS, PUMPS, WATER SOFTENERS, HEAT EXCHANGERS, FLOOD
<br />SENSORS, ETC. COORDINATE BMS MONITORING WITH BMS CONTRACTOR PRIOR TO START OF WORK.
<br />15. PROVIDE A COMPLETE PLUMBING SYSTEM FOR ALL AREAS IN SCOPE OF WORK INCLUDING PLUMBING
<br />FIXTURE ROUGH-INS AND ALL UTILITY PIPING. PROVIDE ROUGH-INS, EXTEND ALL PIPING (WASTE, VENT,
<br />COLD WATER, HOT WATER, ETC.) TO ALL FIXTURES AND APPLIANCES AS INDICATED ON THE
<br />ARCHITECTURAL DRAWINGS. PROVIDE ACCESSIBLE ISOLATION VALVES FOR CW AND HW AT EACH
<br />INDIVIDUAL PLUMBING FIXTURE (INCLUDING CHROME PLATED ANGLE STOPS AND P-TRAPS) AND
<br />EQUIPMENT.
<br />16. SHUT OFF VALVES, WATER CONTROL DEVICES, ETC. SHALL BE THE SAME SIZE AS PIPING SERVED,
<br />UNLESS NOTED OTHERWISE. ALL BRANCH LINES FOR DOMESTIC HOT AND COLD WATER SHALL BE
<br />PROVIDED WITH LINE SIZED ISOLATION VALVE WITH ACCESS DOOR.
<br />17. ALL CHROME PLATED ANGLE STOPS AT CW AND HW SUPPLY LINES SHALL BE INSTALLED AS CLOSE TO
<br />THE WALL AS POSSIBLE WITH CHROME PLATED ESCUTCHEON. ANY EXPOSED COPPER PIPING
<br />UPSTREAM OF ANGLE STOP SHALL HAVE CHROME FINISH.
<br />18. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONAL LAYOUTS AND EXACT LOCATIONS OF
<br />PLUMBING FIXTURES, FLOOR DRAINS, DOWNSPOUT NOZZLES, AREA DRAINS, ETC. WHERE DIMENSIONS
<br />ARE NOT GIVEN CENTERLINE FIXTURE PLACEMENT, MOUNTING HEIGHTS, SPOUT HEIGHTS, ETC., SHALL
<br />BE IN COMPLIANCE WITH THE FEDERAL ADA REQUIREMENTS AND THE CURRENT BUILDING AND
<br />PLUMBING CODES.
<br />19. ALL PLUMBING SYSTEM SHALL BE LISTED FOR ITS INTENDED USE AND SHALL COMPLY WITH THE
<br />REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION.
<br />20. UNLESS OTHERWISE SPECIFIED, ALL PLUMBING ITEMS SHALL BE THE PRODUCT OF MANUFACTURERS
<br />REGULARLY ENGAGED IN THEIR MANUFACTURE. ALL ITEMS OF A GIVEN TYPE SHALL BE THE PRODUCTS
<br />OF THE SAME MANUFACTURER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING CURRENT
<br />REQUIREMENTS WITH THE MANUFACTURER OF THE PRODUCTS USED ON THE PROJECT AND NOTIFY THE
<br />OWNER'S REPRESENTATIVE IF ANY DISCREPANCIES ARE FOUND BEFORE THE PURCHASE OF THE
<br />PRODUCT AND PRIOR TO INSTALLATION WORK OF ANY OWNER-FURNISHED PRODUCTS.
<br />21. PROVIDE FULL PORT TYPE BALL VALVE FOR DOMESTIC WATER SYSTEM. BUTTERFLY VALVES SHALL NOT
<br />BE ALLOWED.
<br />22. FURNISH EQUIPMENT AND ACCESSORIES NEW AND FREE FROM DEFECTS.
<br />23. PLUMBING SYSTEM COMPONENTS, EQUIPMENT AND APPURTENANCES SHALL BE INSTALLED IN STRICT
<br />ACCORDANCE WITH MANUFACTURERS' INSTRUCTIONS, RECOMMENDATIONS CONTRACT DOCUMENTS,
<br />AND APPLICABLE CODES AND REGULATIONS. PROVIDE ALL FITTINGS, TRANSITIONS, VALVES, AND ALL
<br />ACCESSORIES AND DEVICES REQUIRED FOR A COMPLETE OPTIMUM WORKABLE INSTALLATION.
<br />24. PROVIDE MINIMUM 18" X 18" ACCESS PANELS IN WALLS FOR SHUT-OFF VALVES, TRAP PRIMERS, AND
<br />WATER HAMMER ARRESTORS, OR LOCATE ABOVE ACCESSIBLE CEILINGS. LOCATIONS SHALL BE
<br />COORDINATED WITH ARCHITECT PRIOR TO INSTALLATION. ALL ITEMS REQUIRING ACCESS SHALL NOT BE
<br />LOCATED ABOVE THE AREAS OF GYPSUM BOARD CEILINGS WITHOUT PERMISSION OF THE ARCHITECT.
<br />ALL REQUIRED SHUT-OFF AND CONTROL VALVES SHALL BE ACCESSIBLE. REFER TO ARCHITECTURAL
<br />SPECIFICATIONS AND DRAWINGS FOR ACCESS PANEL TYPE , AND LOCATION. ACCESS PANEL SIZE SHALL
<br />BE BASED ON CODE AND MANUFACTURER’S REQUIREMENTS.
<br />25. PROVIDE SERVICE CLEARANCE FOR ALL VALVES, AND EQUIPMENTS PER MANUFACTURER'S
<br />RECOMMENDATIONS. ALL VALVES INCLUDING BEHIND ACCESS DOORS SHALL BE WITHIN 24" REACHABLE
<br />DISTANCE.
<br />26. BARRIER FREE PLUMBING FIXTURES SHALL BE MOUNTED AT REQUIRED HEIGHTS AND INSTALLED WITH
<br />ALL RELATED ACCESSORIES AND SPACES AS REQUIRED BY THE AUTHORITIES HAVING JURISDICTION AND
<br />AMERICANS WITH DISABILITIES ACT (ADA). ALL FIXTURE TRAPS, PIPING AND VALVES UNDER THE FIXTURE
<br />SHALL BE INSULATED WITH A FACTORY PREFORMED INSULATION IN COMPLIANCE WITH ASTM E 84.
<br />REFER TO DIVISION 22 PLUMBING SPECIFICATIONS FOR ADDITIONAL INFORMATION.
<br />27. ALL DOMESTIC HOT WATER PIPING SHALL BE INSULATED AS REQUIRED BY AUTHORITIES HAVING
<br />JURISDICTION. INSULATE ALL FITTINGS, VALVES, STRAINERS, ETC., BY EITHER PREFABRICATION OR BY
<br />FABRICATING FITTINGS FROM METERED SEGMENTS OF PIPE INSULATION TO AN EQUAL THICKNESS OF
<br />ADJOINING PIPE INSULATION. ABOVE GROUND PIPING INSULATION SHALL CONSIST OF 3 LB. DENSITY
<br />FIBERGLASS, ONE PIECE MOLDED SECTIONAL PIPE-COVERING COMPLYING WITH ASTM C547-95, TYPE 1,
<br />WITH A MAXIMUM K FACTOR OF 0.23 AT 75°F MEAN TEMPERATURE, AND FLAMESPREAD RATING OF 25
<br />MAX. AND SMOKE DEVELOPED RATING OF 50 MAX., WITH A LAMINATE OF WHITE KRAFT PAPER FACING,
<br />GLASS SCRIM REINFORCING AND ALUMINUM FOIL WITH A SELF SEALING LAP.
<br />28. ALL CONDENSATE DRAIN PIPING (INCLUDING CNDS AND FOCD) SHALL BE INSULATED SIMILAR TO HOT
<br />WATER PIPING INSULATION'S MATERIALS AND THICKNESS.
<br />29. INSULATE INDIRECT DRAIN LINES FROM REFRIGERATORS, FREEZERS, ICE BINS, ETC., TO PREVENT
<br />CONDENSATION. INSULATE ALL WASTE PIPING RECEIVING CONDENSATE DRAIN INCLUDING THE
<br />RECEPTOR DRAIN BODY. INSULATION SHALL BE SIMILAR TO HOT WATER PIPING INSULATION'S
<br />MATERIALS AND THICKNESS.
<br />30. ALL FIRST HORIZONTAL LINES OR FIRST FORTY FEET OF STORM AND OVERFLOW DRAIN PIPING ABOVE
<br />GRADE (WHICHEVER IS GREATER), WITHIN BUILDING RECEIVING RAINWATER SHALL BE INSULATED WITH
<br />1/2" THICK INSULATION.
<br />31. EACH DOMESTIC WATER PIPING CONNECTION TO KITCHEN/PANTRY EQUIPMENTS AND APPLIANCES
<br />INCLUDING ICE MAKERS, REFRIGERATORS, COFFEE MAKERS, WATER DISPENSERS, ETC., SHALL BE
<br />PROVIDED WITH APPROVED DOUBLE CHECK VALVE AND ISOLATION VALVE.
<br />32. PROVIDE PIPING ISOLATION ON STUD WALL USING 1/4" FELT OR NEOPRENE ISOLATION, OR APPROVED
<br />SMWF ISOLATOR.
<br />33. CIRCULATING HOT WATER SYSTEMS SHALL BE PROVIDED WITH CIRCULATING PUMP(S) AND CONTROLS
<br />EQUIPPED WITH A CONTROL (AQUASTAT) CAPABLE OF AUTOMATICALLY TURNING OFF THE CIRCULATING
<br />PUMP(S) WHEN HOT WATER TEMPERATURES ARE ACHIEVED. CIRCULATING PUMPS SHALL BE
<br />AUTOMATICALLY TURNED OFF DURING NON BUSINESS HOURS (TIME CLOCK).
<br />34. ENSURE ALL ACCESSIBLE WATER CLOSET TRIP LEVERS SHALL BE MOUNTED ON THE WIDE SIDE.
<br />35. SHOWER VALVES SHALL BE PRESSURE BALANCED TYPE AND ADA COMPLIANT AS CALLED OUT IN THE
<br />ARCHITECTURAL PLANS. SHOWER VALVES SHALL EACH HAVE HOT AND COLD WATER CHECK STOPS AND
<br />MAXIMUM TEMPERATURE LIMIT STOPS.
<br />36. HORIZONTAL SOIL, WASTE, AND TRAP PRIMER PIPING WITHIN THE BUILDING SHALL BE INSTALLED
<br />CONCEALED WITHIN WALLS, BELOW FINISH FLOOR, OR BELOW FINISH SLAB AS APPLICABLE UNLESS
<br />NOTED OTHERWISE. ALL OTHER HORIZONTAL PIPING WITHIN THE BUILDING SHALL BE INSTALLED
<br />CONCEALED ABOVE CEILING OR WITHIN WALLS AS APPLICABLE UNLESS NOTED OTHERWISE. ALL
<br />VERTICAL PIPING SHALL BE INSTALLED CONCEALED WITHIN WALLS UNLESS NOTED OTHERWISE. NO
<br />PIPING SHALL BE INSTALLED IN EXPOSED LOCATIONS UNLESS SPECIFICALLY NOTED AS SUCH ON PLANS.
<br />37. NEW OR REPAIRED POTABLE WATER SYSTEMS SHALL BE DISINFECTED PRIOR TO USE ACCORDING TO
<br />THE METHOD REQUIRED BY CURRENT CALIFORNIA PLUMBING CODE, DIVISION 22 AND AUTHORITIES
<br />HAVING JURISDICTION.
<br />38. ALL VENTS THRU ROOF SHALL BE MINIMUM OF THREE FEET VERTICALLY AND TEN FEET HORIZONTALLY
<br />FROM AIR CONDITIONING EQUIPMENT FRESH AIR INTAKES, WINDOWS, DOORS OR OTHER OPENINGS, AND
<br />SHALL COMPLY WITH AUTHORITIES HAVING JURISDICTION'S REQUIREMENTS.
<br />39. COORDINATE ALL EQUIPMENT WITH ELECTRICAL SECTION PRIOR TO START OF WORK FOR AVAILABLE
<br />VOLTAGES AT EQUIPMENT LOCATIONS.
<br />40. PROVIDE PIPE SLEEVES TO ALL PIPING PASSING THROUGH NEW MASONRY, CONCRETE, STRUCTURAL
<br />WALL. PROVIDE FIRE RATED CAULKING OF SAME RATING AS THE WALL AND SHALL HAVE AUTHORITY
<br />HAVING JURISDICTION APPROVALS.
<br />41. A MINIMUM 1/2" CLEARANCE SHALL BE PROVIDED AROUND PIPES AT ALL PENETRATIONS THROUGH
<br />WALLS AND ROOF. THE GAP SHALL BE PACKED TIGHTLY WITH LOOSE, LIGHTWEIGHT INSULATION
<br />THROUGH NON RATED WALLS, AND APPROVED U.L. LISTED FIRE SAFING MATERIAL FOR RATED WALLS
<br />AND FLOORS. WALL/FLOOR PENETRATIONS SYSTEMS SHALL MATCH OR EXCEED THE RATING OF THE
<br />WALL/FLOOR.
<br />42. CONTRACTOR TO PROVIDE APPROVED WATER TIGHT SEAL AROUND ALL NEW PENETRATIONS THRU
<br />ROOF. REFER TO ARCHITECTURAL DWGS. FOR DETAILS OF ALL PENETRATIONS THRU ROOF.
<br />43. PROVIDE AND INSTALL WATER HAMMER ARRESTORS WITH ACCESS PANELS OF REQUIRED SIZE NEAR ALL
<br />QUICK CLOSING VALVES, MANUFACTURER AND MODEL NUMBER SHALL BE PER SPECIFICATIONS AND
<br />SIZES PER MANUFACTURER REQUIREMENTS.
<br />44. ALL CLEANOUTS SHALL BE ACCESSIBLE. CLEANOUTS SHALL BE INSTALLED PER CURRENT CPC AND
<br />AUTHORITIES HAVING JURISDICTION'S REQUIREMENTS. PROVIDE WALL CLEANOUT ACCESS COVERS
<br />SIMILAR TO JR SMITH 4700 SERIES. COORDINATE COLOR AND FINISH WITH ARCHITECT. PROVIDE A
<br />CLEANOUT FOR EVERY FIXTURE IN RESTROOM, AT EACH URINAL VENT ABOVE SANITARY TEE
<br />CONNECTION, AT START OF SANITARY SEWER RUN, AT EACH END OF SANITARY LINE SERVING PLUMBING
<br />FIXTURES. ON THE HORIZONTAL RUN OF WASTE PIPING, PROVIDE CLEANOUTS AT EVERY 75 FEET, OR
<br />FRACTION THEROF.
<br />45. ALL SANITARY DRAINAGE PIPING SHALL BE SLOPED NOT LESS THAN 2% UNLESS OTHERWISE APPROVED
<br />BY THE AUTHORITY HAVING JURISDICTION.
<br />46. ALL HOSE BIBBS, WALL HYDRANTS AND JANITORIAL SERVICE SINKS SHALL BE EQUIPPED WITH
<br />APPROVED, PERMANENTLY INSTALLED ATMOSPHERIC TYPE VACUUM BREAKER. HOSE BIBB SHALL BE
<br />INSTALLED 18" ABOVE FINISH FLOOR OR GRADE, UNLESS OTHERWISE NOTED.
<br />47. PROVIDE APPROVED ACCESSIBLE SHUT OFF VALVE UPSTREAM OF EACH HOSE BIBB AND WALL HYDRANT.
<br />48. ALL PIPING AND EQUIPMENT SUPPORT AND SEISMIC BRACING SHALL BE A CONTRACTOR'S DESIGN AND
<br />BUILD RESPONSIBILITY IN ACCORDANCE WITH STANDARDS ACCEPTABLE TO
<br />AUTHORITIES-HAVING-JURISDICTION, GUIDELINES FOR SEISMIC RESTRAINTS OF PLUMBING SYSTEMS
<br />PER SMACNA CURRENT EDITION, IPC CURRENT EDITION. DESIGN SUPPORTS FOR MULTIPLE PIPES,
<br />INCLUDING PIPE STANDS, CAPABLE OF SUPPORTING COMBINED WEIGHT OF SUPPORTED SYSTEMS,
<br />SYSTEM CONTENTS, AND TEST WATER. DESIGN EQUIPMENT SUPPORTS CAPABLE OF SUPPORTING
<br />COMBINED OPERATING WEIGHT OF SUPPORTED EQUIPMENT AND CONNECTED SYSTEMS AND
<br />COMPONENTS. DESIGN SEISMIC-RESTRAINT HANGERS AND SUPPORTS FOR ALL PIPING AND EQUIPMENT
<br />AND OBTAIN APPROVAL FROM AUTHORITIES HAVING JURISDICTION. PROVIDE PIPE SUPPORT TO ALL
<br />UNDER-SLAB ABOVE GROUND P-TRAPS.
<br />49. SUPPORT ALL PLUMBING WORK AND PIPING FROM BUILDING STRUCTURE AND/OR FRAMING IN AN
<br />APPROVED MANNER UTILIZING PIPE SUPPORTS ETC. WHERE OVERHEAD CONSTRUCTION DOES NOT
<br />PERMIT FASTENING OF SUPPORTS FOR EQUIPMENT, FURNISH ADDITIONAL STEEL FRAMING.
<br />50. ALL PIPING ON THE ROOF SHALL BE PROVIDED WITH PIPE SUPPORT EQUAL TO MIRO MODEL 2.5-CS-7
<br />ROOFTOP SUPPORT WITH GALVANIZED CHANNEL AND CLAMP. COMPLY WITH MANUFACTURER'S
<br />RECOMMENDATIONS FOR ALL INSTALLATION.
<br />51. PROVIDE FURRED-OUT GYPSUM BOARD WALL ENCLOSURE FOR PLUMBING AND PIPING OTHERWISE
<br />EXPOSED TO VIEW IN FINISHED SPACES.
<br />52. ALL FLOOR DRAINS AND FLOOR SINKS SHALL BE PROVIDED WITH CODE-APPROVED ACCESSIBLE TRAP
<br />PRIMERS. CONCEALED TRAP PRIMER VALVES SHALL BE PROVIDED WITH ACCESS PANELS.
<br />53. DURING CONSTRUCTION, PROVIDE MECHANICAL PLUGS IN OPEN DRAINS TO PREVENT DAMAGE TO
<br />LOWER FLOORS. ALL WATER PIPING LOCATED ABOVE CEILING, REQUIRING TEMPORARY OR PERMANENT
<br />CAPPED CONNECTIONS, SHALL BE PROVIDED WITH LINE-SIZE SHUT-OFF VALVES.
<br />54. STORM AND OVERFLOW DRAINS AND PIPING SHALL BE SIZED BASED ON 4 INCHES RAINFALL INTENSITY
<br />PER HOUR PER AUTHORITIES HAVING JURISDICTION STANDARD, AND SHALL BE TESTED IN ACCORDANCE
<br />WITH THE PROVISIONS OF CURRENT CPC.
<br />55. NO PIPING, LEAK PROTECTION APPARATUS, OR OTHER FOREIGN EQUIPMENT ARE ALLOWED INSIDE DATA
<br />AND TELECOMMUNICATION ROOMS, ELECTRICAL ROOM AND OVER THE ELECTRICAL EQUIPMENT PER
<br />NEC. ONLY SPRINKLER HEADS AND PIPING SERVING THE ELECTRICAL AND DATA ROOM IN ACCORDANCE
<br />WITH NFPA STANDARDS ARE ACCEPTED INSIDE.
<br />56. PROVIDE STAINLESS STEEL DRAIN PAN WITH 1" DRAIN PIPING UNDERNEATH ANY EXISTING PLUMBING
<br />PIPING RUNNING OVER AND THROUGH NEW ELECTRICAL AND I.T. ROOMS. TERMINATE DRAIN PIPING AT 1"
<br />BELOW CEILING AT GENERAL AREA AS DIRECTED BY ARCHITECT. PROVIDE DECORATIVE ESCUTCHEON
<br />WITH COLOR FINISH AS INSTRUCTED BY ARCHITECT.
<br />57. NO PIPING, DUCTS, LEAK PROTECTION APPARATUS, OR OTHER FOREIGN EQUIPMENT ARE ALLOWED
<br />INSIDE THE ELEVATOR MACHINE ROOM AND ELEVATOR SHAFT PER ASME A17.1A RULE 102. ONLY
<br />SPRINKLER HEADS AND PIPING SERVING THESE ROOMS IN ACCORDANCE WITH NFPA STANDARDS ARE
<br />ACCEPTED INSIDE. REROUTE PLUMBING, FIRE MAIN LINES AND OTHER PIPING OUTSIDE THESE AREAS.
<br />58. ROOMS CONTAINING FIRE PUMPS SHALL BE FREE FROM STORAGE AND PENETRATIONS NOT ESSENTIAL
<br />TO THE OPERATION PER CURRENT NFPA 20 EDITION THAT IS APPLICABLE TO THIS PROJECT.
<br />59. NO PLUMBING EQUIPMENT, SYSTEM, PIPING, DRAINS OR VENTS THAT DO NOT SERVE THE EXIT STAIR
<br />ENCLOSURE, EXIT STAIR VESTIBULE ENCLOSURE, OR EXIT PASSAGEWAY CAN BE ROUTED THROUGH, OR
<br />IN (INCLUDING THE WALLS) OF THE EXIT STAIR ENCLOSURE, STAIR VESTIBULE ENCLOSURE, AND EXIT
<br />PASSAGEWAYS PER CURRENT CALIFORNIA BUILDING CODE EDITION, EXCEPT FOR THOSE SERVING THE
<br />EXIT PASSAGEWAY SUCH AS FIRE SPRINKLER PIPING, AND STANDPIPES IN ACCORDANCE WITH CURRENT
<br />NFPA STANDARDS.
<br />60. ALL BACKFLOW DEVICES SHALL BE TESTED BY A CERTIFIED BACKFLOW TESTING TECHNICIAN WITH THE
<br />RESULTS DOCUMENTED ON FORMS PROVIDED BY THE DEPT. OF HEALTH SERVICES CROSS CONNECTION
<br />CONTROL DIVISION. THE FORMS SHALL BE REGISTERED WITH THE ABOVE AGENCY AND COPIES OF THE
<br />FORMS SHALL BE PRESENTED TO THE CITY BUILDING INSPECTOR PRIOR TO FINAL APPROVAL.
<br />61. CONTRACTOR TO BALANCE THE WHOLE ENTIRE HOT WATER RETURN SYSTEM OF THE BUILDING TO
<br />ENSURE ADEQUATE HOT WATER TEMPERATURE AT EVERY HOT WATER RETURN LOOP.
<br />62. TESTING AND COMMISSIONING CONTRACTOR SHALL BE INDEPENDENT OF THE INSTALLING
<br />CONTRACTORS WITH AT LAST THREE YEARS OF EXPERIENCE. TEST NEW EQUIPMENT CONTROLS FOR
<br />OPTIMUM PERFORMANCE AND MAKE NECESSARY ADJUSTMENTS IN THE PRESENCE OF A
<br />FACTORY-AUTHORIZED REPRESENTATIVE OF THE EQUIPMENT MANUFACTURER. PERFORM ANY
<br />ADDITIONAL TESTS REQUIRED TO OBTAIN OPTIMUM WORKING PLUMBING SYSTEM PERFORMANCE. ALL
<br />TESTS ON THE PLUMBING SYSTEM SHALL BE PERFORMED TO THE SATISFACTION OF THE LOCAL
<br />PLUMBING INSPECTOR AND THE OWNER'S REPRESENTATIVE. SUBMIT TESTING REPORTS FOR RECORD.
<br />63. ALL PIPING SHALL BE PROVIDED WITH SEISMIC JOINTS OR SEISMIC LOOP CONNECTIONS WHEN
<br />CROSSING STRUCTURAL SEISMIC JOINT. SEISMIC JOINTS SHALL BE ICBO LISTED AND OR APPROVED BY
<br />THE AUTHORITIES HAVING JURISDICTION.
<br />64. ALL EMERGENCY SHOWERS AND EYE WASH SHALL COMPLY WITH CALIFORNIA CODE OF REGULATIONS,
<br />TITLE 8, SECTION 5162.
<br />65. PROVIDE WEATHER-PROOF PAINTING FOR ALL EXPOSED EXTERIOR PIPING WITH PRIMER AND
<br />WEATHER-PROOF EXTERIOR PAINT PER ANSI A13.1, AND AS REQUIRED BY
<br />AUTHORITIES-HAVING-JURISDICTION. PAINT SHALL BE COMPATIBLE WITH METAL PIPING FOR GAS, AND
<br />COPPER FOR DOMESTIC WATER AND CONDENSATE DRAIN. COORDINATE PAINTING WITH ARCHITECT.
<br />66. DOMESTIC WATER PIPING, FITTINGS, VALVES, AND APPURTENANCES SHALL BE LEAD-FREE IN
<br />COMPLIANCE WITH STATE AND A.H.J. REQUIREMENTS.
<br />67. PROVIDE AND COORDINATE WITH GENERAL CONSTRUCTION FOR THE PROVISION OF TEMPORARY
<br />RESTROOM FACILITY AS REQUIRED BY OWNER.
<br />68. COORDINATE ALL POINTS-OF-CONNECTION TO MECHANICAL EQUIPMENT WITH MECHANICAL
<br />CONTRACTOR.
<br />69. ALL PUBLIC LAVATORY FAUCETS SHALL BE SELF-CLOSING OR METERED TYPE APPROVED BY
<br />AUTHORITIES HAVING JURISDICTION.
<br />70. LAVATORIES SHALL HAVE A WATER TEMPERING DEVICE THAT COMPLIES WITH ASSE 1070 OR CSA B125.3.
<br />WATER HEATER THERMOSTAT SHALL NOT BE CONSIDERED A CONTROL TO MEET THIS PROVISION.
<br />71. PROVIDE A FIRE FLOW TEST REPORT, PERFORMED BY THE CITY OF SANTA ANA WATER DEPARTMENT
<br />PRIOR TO START OF WORK.
<br />72. ANY DISCREPANCIES BETWEEN THE DRAWINGS, SPECIFICATIONS, RISER DIAGRAMS, FLOOR PLANS,
<br />CODES AND ORDINANCES, THE MORE STRINGENT, LARGER SIZE, AND THE HIGHEST STANDARD SHALL
<br />APPLY.
<br />73. REFER TO ACOUSTICAL CONSULTANT'S GUIDELINES FOR ADDITIONAL INSTRUCTIONS AND LOCATIONS OF
<br />ACOUSTICALLY SENSITIVE ROOMS.
<br />© Gensler
<br />Date Description
<br />Project Name
<br />Project Number
<br />Description
<br />Scale
<br />Seal / Signature
<br />2015
<br />NOT FOR
<br />CONSTRUCTION
<br />Tel 949.863.9434
<br />Fax 949-553-1676
<br />4675 MacArthur Court
<br />Suite 100
<br />Newport Beach, CA
<br />92600
<br />USA
<br />Job No.:
<br />Contact:
<br />www.glumac.com
<br />18200 Von Karman Ave., Suite 100
<br />Irvine, CA 92612
<br />T. 949.833.8190
<br />6/12/2024 7:39:07 PM
<br />BIM 360://007.3757.000 - Caribou Industries - 3rd & Broadway/3RD-B_MEP_WEST_R20.rvt
<br />R1-P0.1
<br />PLUMBING GENERAL NOTES
<br />21US00608
<br />3rd & Broadway West
<br />1103 North Broadway
<br />Santa Ana, CA 92701
<br />21US00608
<br />TG
<br />1 9/21/2021 REISSUE FOR PLAN CHECK
<br />2 01/18/2022 REISSUE FOR PLAN CHECK
<br />4 06/17/2024 REVISION TO PERMIT
<br />EOR: SEAN AGUON
<br />LIC#: M41274
<br />10/11/2024
|