My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />ALTERATION PROJECT PROCEDURES 01 3516 - 5 <br />ed. 2023-09-22 <br />Coordinate this whole-Project alteration work program with specific requirements of programs required <br />in other alteration work Sections. <br />1.Dust and Noise Control: Include locations of proposed temporary dust- and noise-control <br />partitions and means of egress from occupied areas coordinated with continuing on-site <br />operations and other known work in progress. <br />2.Debris Hauling: Include plans clearly marked to show debris hauling routes, turning radii, and <br />locations and details of temporary protective barriers. <br />C.Fire-Prevention Plan: Prepare a written plan for preventing fires during the Work, including placement <br />of fire extinguishers, fire blankets, rag buckets, and other fire-control devices during each phase or <br />process. Coordinate plan with Owner's fire-protection equipment and requirements. Include fire-watch <br />personnel's training, duties, and authority to enforce fire safety. <br />D.Safety and Health Standard: Comply with ANSI/ASSE A10.6. <br />1.9 STORAGE AND HANDLING OF SALVAGED MATERIALS <br />A.Salvaged Materials: <br />1.Clean loose dirt and debris from salvaged items unless more extensive cleaning is indicated. <br />2.Pack or crate items after cleaning; cushion against damage during handling. Label contents of <br />containers. <br />3.Store items in a secure area until delivery to Owner. <br />4.Transport items to Owner's storage area on-site. <br />5.Protect items from damage during transport and storage. <br />B.Salvaged Materials for Reinstallation: <br />1.Repair and clean items for reuse as indicated. <br />2.Pack or crate items after cleaning and repairing; cushion against damage during handling. Label <br />contents of containers. <br />3.Protect items from damage during transport and storage. <br />4.Reinstall items in locations indicated. Comply with installation requirements for new materials <br />and equipment unless otherwise indicated. Provide connections, supports, and miscellaneous <br />materials to make items functional for use indicated. <br />C.Existing Materials to Remain: Protect construction indicated to remain against damage and soiling from <br />construction work. Where permitted by Architect, items may be dismantled and taken to a suitable, <br />protected storage location during construction work and reinstalled in their original locations after <br />alteration and other construction work in the vicinity is complete. <br />D.Storage: Catalog and store items within a weathertight enclosure where they are protected from <br />moisture, weather, condensation, and freezing temperatures.
The URL can be used to link to this page
Your browser does not support the video tag.