My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2677 3%4 N Main Unit#WCC01 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2677 N Main St
>
2677 3%4 N Main Unit#WCC01 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:10 AM
Creation date
2/13/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
101123169
101123170
Full Address
2677 N Main St
2677 3/4 N Main Unit# WCC01
Street Number
2677
Partial
3/4
Street Direction
N
Street Name
Main
Unit Number
WCC01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project No. VP-6214-01 <br />Verizon Wireless — Fisher Floral <br />Earthquake Magnitude <br />Slip Rate (mm/year) <br />Risk Category <br />Seismic Design Category <br />Design Values <br />CITY OF SANTA ANA <br />Planning and Building Agency <br />Approved <br />FOR PERMIT ISSUANCE <br />7.1 MW <br />NlOer ID: <br />Date: <br />Representative values were selected from the test data and other sources for design and is <br />tabulated below: <br />Field Density 120 pcf <br />Expansion Index 10 <br />Angle of Internal Friction (Ult/Peak) 33/34 deg. <br />Cohesion (Ult/Peak) 300/400 psf <br />Subgrade K-Value 100 pci <br />Statement <br />It is our professional opinion that the proposed construction will not be subject to <br />geologic hazard from settlement, slippage, or landslide, provided the recommendations of <br />this report are incorporated into the proposed construction. It is also our opinion that the <br />proposed construction will not adversely affect the geologic stability of the site or <br />adjacent properties provided the recommendations contained in this report are <br />incorporated into the proposed construction. <br />Conclusions and Recommendations <br />Based upon the findings of this investigation, it is concluded that the development of the <br />project is feasible from a geotechnical engineering point of view. The development of the <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.