Laserfiche WebLink
J <br />J <br />J <br />J <br />1 2 3 <br />D <br />E <br />F <br />G <br />H <br />J <br />N3 <br />N1 <br />N4 <br />N5N6 <br />N2 <br />NA NAANBNCNDNENF <br />L10 <br />X10 <br />H6 (EX) <br />LA (EX) <br />H1 (EX.) <br />DOCK ADDITION <br />131 <br />TEMPORARY <br />TENT <br />133NOTE 1A <br />NOTE 1B <br />NOTE 1B <br />GFCI <br />GFCI <br />GFCI <br />L10-3 <br />L10-5 <br />L10-7 <br />NOTE 2 <br />NOTE 1A <br />NOTE 1C <br />NOTE 1 <br />H1 (EX.)-31,33,35 <br />NOTE 4 <br />NOTE 5 <br />NOTE 6 <br />NOTE 5, 7 <br />EXISTING <br />ELECTRICAL <br />ROOM <br />101 <br />EXISTING <br />COOLER <br />102 <br />EXISTING <br />FREEZER <br />103 <br />NOTE 8NOTE 8 <br />F <br />FA <br />NOTE 9 <br />DRAWN BY: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />CHECKED BY: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />SHEET ISSUE DATE: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />SHEET NUMBER <br />THE INFORMATION CONTAINED ON THIS AND ANY <br />RELATED DOCUMENT SHALL NOT BE USED FOR <br />ANY PURPOSE OTHER THAN THE CONVEYANCE <br />OF INFORMATION FOR THE STATED CLIENT AND <br />PROJECT WITHOUT THE EXPRESS WRITTEN <br />CONSENT OF THE ENGINEER. <br />ANY INFORMATION TRANSFERRED OR UTILIZED <br />IN AUTOCAD .DWG FORMAT SHALL BE USED FOR <br />REFERENCE ONLY <br />WEBBER/SMITH Associates, Inc. <br />20 Wright Avenue <br />Lititz, Pennsylvania 17543 <br />Phone: 717.625.4140 <br />Email:info@webbersmith.com <br />SHEET TITLE: <br />FOR <br />DRAWING STATUS <br />FINAL <br />PROJECT NUMBER <br />www.webbersmith.com <br />SEAL <br />EP102-1 <br />DLJ <br />SEL <br />04/02/2024 <br />FLOOR PLAN <br />POWER <br />2350 Pullman WSS OCTA Aspire <br />Bakeries <br />2350 Pullman Street <br />Santa Ana, CA 92705 <br />CA <br />5387 <br />© 2024 WEBBER/SMITH Associates, Inc., All Rights Reserved <br />2350 <br />Pullman,LLC <br /> 1/8" = 1'-0"EP102-1 <br />1 FLOOR PLAN POWER - PHASE 1 <br />NOTES: <br />1. PROJECT CONSTRUCTION WILL INVOLVE BOTH THE INSTALLATION AND REMOVAL OF A TEMPORARY TENT DURING CONSTRUCTION. REFER <br />TO NOTES 1A, 1B, 1C, AND 1D BELOW. VERIFY TEMPORARY TENT REQUIREMENTS AND COORDINATE ALL ELECTRICAL WORK, ELECTRICAL <br />DEMOLITION, AND SCHEDULING INVOLVED. <br />1A. TEMPORARY RECEPTACLES. INSTALL TOTAL OF 6 TEMPORARY RECEPTACLES AND EXTEND (2) 20A/120V RECEPTACLE CIRCUITS FROM <br />EXISTING PANEL "LA" IN ELECTRICAL ROOM. CONNECT 3 TEMPORARY RECEPTACLES TO EACH EXTENDED CIRCUIT. DISCONNECT AND REMOVE <br />TEMPORARY RECEPTACLES AND ASSOCIATED BRANCH CIRCUITING DURING TENT REMOVAL. <br />1B. TEMPORARY VENTILATION/CIRCULATION FANS. VENTILATION/CIRCULATION FANS AND MEANS OF DISCONNECT WILL BE PROVIDED BY TENT <br />SUPPLIER. INSTALL (2) 20A/120V BREAKERS IN EXISTING PANEL "LA". VERIFY (2) POINTS OF CONNECTION IN TENT. EXTEND (2) 20A/120V <br />CIRCUITS FROM NEW BREAKERS AND CONNECT. DISCONNECT AND REMOVE TEMPORARY CIRCUITS DURING TENT REMOVAL. <br />1C. TRASH COMPACTOR TO BE RELOCATED. RELOCATE ELECTRICAL SUPPORT (BRANCH CIRCUIT, DISCONNECT, CONTROL EQUIPMENT) <br />ASSOCIATED WITH TRASH COMPACTOR. VERIFY EXISTING CONDITIONS, TEMPORARY LOCATIONS, FINAL LOCATIONS AND SCHEDULING <br />INVOLVED. <br />1D. NOT USED. <br /> <br />2. GATE CONTROLLER TO REMAIN IN OPERATION AND CALL BOX TO BE RELOCATED. RELOCATE ELECTRICAL SUPPORT (BRANCH CIRCUIT, <br />DISCONNECT, CONTROL EQUIPMENT) ASSOCIATED WITH CALL BOX AND GATE CONTROLLER. VERIFY EXISTING , TEMPORARY, AND FINAL <br />LOCATIONS AND SCHEDULING INVOLVED. <br />3. NOT USED. <br />4. NEW DOCK DOOR/DOCK LEVELER SYSTEM. INSTALL NEW BREAKER IN PANEL "H1". PROVIDE DISCONNECT AND NEW CIRCUIT FROM <br />BREAKER TO DISCONNECT. REFER TO RELATED DETAILS ON SHEET E401. <br />5. INSTALL NEW 70A/3P BREAKER IN EXISTING PANEL "H1". INSTALL 45 KVA FLOOR MOUNTED TRANSFORMER (X10). INSTALL PRIMARY FEEDER <br />(1 1/4"C - 3#4AWG, #8G) FROM NEW BREAKER IN PANEL H1 TO TRANSFORMER "X10". INSTALL 100A/3P SECONDARY FEEDER (1 1/4"C - 4#3, #8G) <br />FROM TRANSFORMER "X10" TO PANEL "L10". <br />6. INSTALL 100A, 3PHASE, 42 POLE, 208/120V, 3P, 4W PANEL WITH 100A/3P MAIN CIRCUIT BREAKER TO SERVE NEW ADDITION AREA. <br />7. UPDATE PANEL DIRECTORY REGARDING TWO 60A/3P BREAKERS PREVIOUSLY SERVING DEMOLISHED REFRIGERATION UNIT. PROVIDE NEW <br />PANEL BOARD DIRECTORY WITH COMPLETE PROJECT UPDATED INFORMATION AND THESE TWO BREAKERS INDICATED AS "SPARE". <br />8. PROVIDE CONDUIT EXPANSION SLEEVES BETWEEN THE EXISTING BUILDING STRUCTURE AND THE EXPANSION AREAS (REFER TO <br />ELECTRICAL SPECIFICATIONS). <br />9.DESIGN, FURNISH AND INSTALL FIRE ALARM SYSTEM MODIFICATIONS TO ACCOMMODATE BUILDING EXPANSION. SYMBOLS LOCATED ON THIS <br />DRAWINGS ARE TO MAKE CONTRACTOR AWARE OF AREAS NEEDING UPGRADE. REFER TO SPECIFICATIONS. <br />NO.DATE DESCRIPTION <br />A 04/02/2024 ISSUED FOR PERMIT AND <br />CONSTRUCTION <br />REGISTERED PROFESSIONAL ENGINEER24467 <br />STEPHEN E LASLO <br />STATE OF CALIFORNIA <br />4/2/24 <br />2350 S Pullman St - <br />Phase I3/4/2025