Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br /> PROJECT TITLE <br /> <br />12 <br />for conforming to these Special Provisions shall be considered as included in the various items of <br />work involved and no additional compensation will be allowed therefore. <br />The SWPPP shall not be construed to be a waiver of the Contractor’s obligation to review and <br />understand the most current Construction General Permit before submitting a bid. By submitting <br />a bid, the Contractor acknowledges satisfaction as to the requirements of the most current <br />Construction General Permit. <br />The Contractor is hereby notified that specific construction practices in the Standard <br />Specifications, Section 7, “Responsibilities of the Contractor”, are considered to be Best <br />Management Practices (BMPs). Applicable construction practices in the Standard Specifications <br />shall be incorporated into the SWPPP. <br />After award of the contract and prior to the Contractor commencing work, the Contractor shall <br />submit a SWPPP for review by the Engineer. The SWPPP, at a minimum, shall include ALL <br />required items and information outlined in the most current Construction General Permit. The <br />final accepted version of the SWPPP shall be submitted to the AGENCY in both hard copy and <br />electronic copy (Adobe Acrobat PDF file format), with an original signed owner approval and <br />certification page. The Contractor shall not commence work until the SWPPP and all other <br />Permit Registration Documents (PRDs) have been uploaded to the Stormwater Multiple <br />Application and Report Tracking System (SMARTS) and a Notice of Intent (NOI) has been filed <br />and deemed active by the Santa Ana Regional Water Quality Control Board (Regional Board). <br />The Contractor shall have a licensed Qualified SWPPP Developer (QSD) prepare the SWPPP. <br />The AGENCY may link the Contractor’s QSD as a “Data Entry Person” on SMARTS, allowing <br />the Contractor’s QSD to access the project and upload all necessary PRDs. The AGENCY will <br />certify and submit all documents on SMARTS to the Regional Board. <br />The final accepted version of the SWPPP shall be kept at the construction site at all times, for the <br />duration of the contract, and the Contractor shall implement all BMPs as shown in the SWPPP, <br />unless granted approval by the Engineer. Failure to implement BMPs properly may result in <br />enforcement actions taken against the Contractor, by the AGENCY. <br />The Contractor shall update and/or amend the SWPPP, as necessary, following the procedures <br />outlined in the most current Construction general permit. <br />The Contractor shall have a licensed Qualified SWPPP Practitioner (QSP) conduct all necessary <br />inspection and stormwater sampling activities, as outlined in the most current Construction <br />General Permit. <br />The Contractor shall submit an Annual Report, as outlined in the most current Construction <br />General Permit, for the reporting period of July 1st to June 30th. For the previous reporting <br />period, the Contractor must submit the Annual Report no later than August 1st. If construction <br />ends prior to June 30th, the Contractor shall submit the Annual Report within 15 working days <br />of the Notice of Completion date. The Annual Report shall be prepared by the Contractor’s <br />QSD. The Contractor shall submit the Annual Report for approval by the Engineer. <br />505 E Central Ave <br />#B11/6/2024