My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br /> PROJECT TITLE <br /> <br />12 <br />for conforming to these Special Provisions shall be considered as included in the various items of <br />work involved and no additional compensation will be allowed therefore. <br />The SWPPP shall not be construed to be a waiver of the Contractor’s obligation to review and <br />understand the most current Construction General Permit before submitting a bid. By submitting <br />a bid, the Contractor acknowledges satisfaction as to the requirements of the most current <br />Construction General Permit. <br />The Contractor is hereby notified that specific construction practices in the Standard <br />Specifications, Section 7, “Responsibilities of the Contractor”, are considered to be Best <br />Management Practices (BMPs). Applicable construction practices in the Standard Specifications <br />shall be incorporated into the SWPPP. <br />After award of the contract and prior to the Contractor commencing work, the Contractor shall <br />submit a SWPPP for review by the Engineer. The SWPPP, at a minimum, shall include ALL <br />required items and information outlined in the most current Construction General Permit. The <br />final accepted version of the SWPPP shall be submitted to the AGENCY in both hard copy and <br />electronic copy (Adobe Acrobat PDF file format), with an original signed owner approval and <br />certification page. The Contractor shall not commence work until the SWPPP and all other <br />Permit Registration Documents (PRDs) have been uploaded to the Stormwater Multiple <br />Application and Report Tracking System (SMARTS) and a Notice of Intent (NOI) has been filed <br />and deemed active by the Santa Ana Regional Water Quality Control Board (Regional Board). <br />The Contractor shall have a licensed Qualified SWPPP Developer (QSD) prepare the SWPPP. <br />The AGENCY may link the Contractor’s QSD as a “Data Entry Person” on SMARTS, allowing <br />the Contractor’s QSD to access the project and upload all necessary PRDs. The AGENCY will <br />certify and submit all documents on SMARTS to the Regional Board. <br />The final accepted version of the SWPPP shall be kept at the construction site at all times, for the <br />duration of the contract, and the Contractor shall implement all BMPs as shown in the SWPPP, <br />unless granted approval by the Engineer. Failure to implement BMPs properly may result in <br />enforcement actions taken against the Contractor, by the AGENCY. <br />The Contractor shall update and/or amend the SWPPP, as necessary, following the procedures <br />outlined in the most current Construction general permit. <br />The Contractor shall have a licensed Qualified SWPPP Practitioner (QSP) conduct all necessary <br />inspection and stormwater sampling activities, as outlined in the most current Construction <br />General Permit. <br />The Contractor shall submit an Annual Report, as outlined in the most current Construction <br />General Permit, for the reporting period of July 1st to June 30th. For the previous reporting <br />period, the Contractor must submit the Annual Report no later than August 1st. If construction <br />ends prior to June 30th, the Contractor shall submit the Annual Report within 15 working days <br />of the Notice of Completion date. The Annual Report shall be prepared by the Contractor’s <br />QSD. The Contractor shall submit the Annual Report for approval by the Engineer. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.