My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />52 <br />Rolling shall commence at a time interval following the millin g, mixing, and <br />spreading of the recycled pavement mixture as determined by the mix design or <br />directed by the Contractor. Time intervals shall be based on ambient temperatures, <br />weather, and type of emulsified recycling agent. When possible, rolling shall not be <br />started or stopped on uncompacted material. <br />Compacting of the recycled pavement mixture shall be completed using rollers <br />meeting the requirements of these special provisions. The rolling pattern shall be <br />changed and a new rolling pattern shall be established when: <br /> Relative compaction cannot meet the requirements of these specifications. <br /> There are changes in recycled pavement mixture or proportions. <br /> There are changes in placement equipment or procedures. <br /> There is a significant change in temperature or weather conditions or <br />controlling factor. <br /> There is major displacement and/or cracking of the recycled pavement <br />mixture. <br />The final compacted surface of the recycled pavement mixture shall be free of ruts, <br />bumps, indentations, raveling, irregularities, or segregation and shall meet the <br />smoothness requirements of these specifications. Cold recycled asphalt concrete that <br />does not conform to these special provisions shall be reworked, re-compacted, or <br />removed and replaced at the Contractor's expense. <br />Initial Compaction <br />After compaction but prior to opening the roadway to traffic, the average in -place <br />density shall be determined based upon nuclear gage readings at random locations. <br />During in-place density testing of the compacted recycled pavement, the nuclear <br />gauge shall be set to the recycled section thickness. The average in -place density <br />shall be used to calculate the relative compaction for each lot. The relative <br />compaction shall be not less than 95 percent or greater than 105 percent of the <br />maximum density obtained in the test strip as required in these special provisions. If <br />additional rolling does not achieve relative compaction, a new rolling pattern shall be <br />established such that a new maximum density is determined. However, care should <br />be taken not to over-roll the mat based on visual observations of check cracking or <br />shoving. <br />After initial compaction has been achieved, and prior to opening the recycled <br />pavement mixture to traffic, the Contractor shall apply a fog seal of dilute (1:1) SS-1h <br />emulsion, dilute emulsified recycling agent or equivalent at a rate of 0.08 to 0.12 <br />gallon per square yard to all areas opened to traffic. Immediately following <br />application of the fog seal, the cold in-place recycled pavement surface shall be <br />covered with sand at a rate of 1.0 to 2.0 pounds per square yard. The exact rate will <br />be determined by the Contractor. Excess sand shall be removed from the pavement <br />surface by sweeping. Sand shall be free from clay or organic material. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.