My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />54 <br />recycled paving techniques. The training class shall be conducted at a project field <br />location convenient for both the Contractor and the Engineer. The JITT class shall be <br />completed not more than five (5) days, not including Saturdays, Sundays and <br />AGENCY’s holidays, prior to the start of cold recycling operations. The class shall <br />be held during normal working hours. The JITT instructor shall be provided by the <br />Contractor. The instructor shall be experienced in the construction methods, <br />materials, and test methods associated with construction of cold recycling projects. A <br />copy of the course syllabus, handouts, and presentation material shall be submitted to <br />the Engineer at least seven (7) days before the day of the training. The Contractor <br />and the Engineer shall mutually agree to the course instructor, course content, and <br />training site. JITT shall not relieve the Contractor of responsibility under the contract <br />for the successful completion of the work in conformance with the requirements of <br />the plans and specifications. JITT may be cancelled at the discretion of the Engineer. <br />B. SURFACE PREPARATION <br />Before any recycling work begins, the Contractor shall prepare the existing roadway <br />by: <br />1. Removing from the roadway dirt, vegetation, standing water, combustible <br />materials, oils, raised roadway markings, and other objectionable materials by <br />sweeping, blading, or other approved method; <br />2. Adjusting affected utilities down or accommodating for utilities prior to recycling <br />in some other means to the satisfaction of the Engineer. <br />3. Accurately referencing the profile and cross slope as shown on the plans for the <br />finished surface of the recycled pavement material; <br />C. MATERIALS <br />Cold Milled Asphalt Concrete <br />Existing asphalt concrete pavement shall be cold milled, crushed and screened to <br />conform to the following gradation before mixing with liquid asphalt: <br />Sieve Sizes Percentage passing <br />1-inch 100 <br />Graded millings shall uniformly be incorporated into the recycled pavement mixture <br />and oversized or deleterious material shall be disposed of. <br />Asphalt <br />The type of liquid asphalt to be used shall be determined by the mix design. A <br />representative from the liquid asphalt supplier and/or the Contractor shall be at the <br />job site at the beginning of the project to monitor the characteristics and performance <br />of the recycling emulsion. Throughout the job, adjustments shall be made to the <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.