My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />62 <br />Final Initial Compaction <br />Any subsequent surface treatment or overlay of the recycled pavement shall not be <br />placed until the relative compaction of the recycled pavement layer is not less than 95 <br />percent or greater than 100 percent of the maximum density determined by a test strip <br />conducted on the recycled pavement after curing but prior to surface seal or overlay. <br />The Contractor shall be responsible for protecting and maintaining the recycled <br />pavement material layer until the final surface seal is placed. Any repairs required <br />shall be at the Contractor’s expense. Any damage or defects in the layer shall be <br />repaired immediately. An even and uniform surface shall be maintained. <br />Smoothness <br />The finished surface of the recycled material cross slope shall be checked regularly <br />during placement using a level. The smoothness shall not vary more than 3/8-inch <br />from a 10-foot straight edge placed on the surface. Areas of the completed surface <br />that do not meet the specified surface tolerances shall be brought within tolerance by <br />a method chosen by the Contractor and approved by the Engineer. <br />1.23 ASPHALT-RUBBER CAPE SEAL <br />This Section shall conform to Section 600 (chiefly, 600-2.7) of the Standard <br />Specifications and these Special Provisions. <br />General <br />The construction sequence of asphalt-rubber cape seal shall be as follows: <br />a) 3/4" asphalt-concrete leveling course shall be constructed; <br />b) Asphalt-rubber shall be applied; <br />c) Cover aggregate shall be placed and rolled and loose material removed; and <br />d) Emulsion-aggregate slurry Type II shall be applied no sooner than 48-hours and <br />no later than 7 days after cover aggregate is applied. <br />Certified volume or weight slips shall be delivered to the Engineer for all materials <br />supplied. <br />Pavement Preparation - The pavement shall be cleaned with a power broom. <br />Asphalt-Rubber <br />Asphalt-rubber shall be Type A or B per Section 600-2. The Contractor shall submit a <br />manufacturer's Certificate of Compliance and test reports for the asphalt and rubber. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.