Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />87 <br />pole caps, hand hole covers and other hardware shall comply with the Caltrans Standard <br />Specifications, Caltrans Standard Plans, these Special Provisions, and the Plans. <br />4.15 CONDUIT <br />Traffic signal, interconnect communications, and roadway lighting conduit shall conform <br />to the provisions in Section 86-1.02B, “Conduit and Accessories,” and Section 87-1.03B, <br />“Conduit Installation,” of the Caltrans Standard Specifications and these Special <br />Provisions. <br />Traffic signal conduit shall be schedule 80 PVC unless shown otherwise on the plans. <br />SCE service conduit shall be Schedule 40 PVC unless otherwise noted. Insulated bonding <br />bushings will be required. <br />All conduits, excluding SCE service conduits, shall be installed at the depth not less than <br />42” below finished grade. Only when conduits are to be installed between adjacent pull <br />boxes, from traffic signal pole to pull box or pull box to cabinet where the in -between <br />distance is too short to meet the 42” depth and the 45-degree sweep requirements, the <br />conduit may be installed at lower depth but not less than 18” below finished grade. <br />Unless shown otherwise on the plans, the minimum size of conduit shall be: <br />1. 2” between an electrolier and the adjacent pull box <br />2. 2” between a pedestrian push button post and the adjacent pull box <br />3. 2” between a 1A signal standard <br />4. 3” between signal standard with mastarm and the adjacent pull box <br />5. 2-4” between a controller cabinet and the adjacent pull box <br />6. 2” for advanced inductive loop detector runs <br />7. 2” between an overhead sign and the adjacent pull box <br />8. 3” for street crossings containing traffic signal conductors <br />9. 3” for traffic signal interconnect cable (SIC) only <br />10. 3” between pull boxes not otherwise specified <br />Curb terminations shall be as shown on Caltrans Standard Plan ES-5E, Type A, except <br />that conduit shown in Caltrans Standard Plan ES-5E, Type A shall be 2” (53 mm). <br />A Bull-Line pull tape or equivalent with a minimum tensile strength of 500 pounds shall <br />be installed in all conduits. <br />The ends of conduit and conduit fittings shall be provided with insulated and galvanized <br />bonding bushings. After conductors have been installed, the ends of conduits shall be <br />sealed with industry grade sealing compound. <br />Conduit installation by “Trenching in Pavement Method” shall not be allowed within the <br />traveled way of any public street without prior written authorization by the Engineer. <br />505 E Central Ave <br />#B11/6/2024