My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />116 <br />Q. ENCLOSURES <br />Materials for enclosures shall conform to Section 206 and fabrication shall conform <br />to Section 304 of the Standard Specifications. <br />Controller Enclosure: Controller enclosure shall be manufactured of 3/16-inch plate <br />steel and 10-gauge sheet metal, factory primed. Enclosure shall be furnished with <br />break-away base, and a full length stainless steel door hinge hinged on same side as <br />irrigation controller. Enclosure shall be minimum 35 inches high and have sufficient <br />space to mount controller switches, relays, etc. Furnish mounting brackets as <br />required and metal pocket. <br />EXECUTION: <br />5.01.06 WORK PROCEDURE <br />A. PHYSICAL LAYOUT <br />1. Prior to installation, Contractor shall stake out all pressure supply lines, routing, <br />and location of sprinkler heads. <br />2. All layouts shall be approved by Engineer prior to installation. <br />B. WATER SUPPLY <br />1. Connect sprinkler irrigation system to outlets as indicated on drawings. <br />2. Connections shall be made at approximate locations shown on drawings. <br />Contractor is responsible for minor changes caused by actual site conditions. <br />C. ASSEMBLIES <br />1. Routing of sprinkler lines as indicated on drawings is diagrammatic. Install lines <br />(and various assemblies) in such a manner as to conform with details per plans. <br />2. Install NO multiple assemblies on plastic lines. Provide each assembly with its <br />own outlet. <br />3. Install all assemblies specified herein in accordance with respective detail. In <br />absence of drawings or specifications pertaining to specific items required to <br />complete work, perform such work in accordance with best standard practice with <br />prior approval of Engineer. <br />D. LINE CLEARANCE <br />All lines shall have a minimum clearance of six (6) inches from each other and from <br />lines of other trades. Parallel lines shall not be installed directly over one another. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.