My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />124 <br />F. CERTIFICATES <br />1. Submit certificates for the following items upon delivery to the job site: <br />a. Quantity of commercial fertilizer and organic fertilizer. <br />b. Quantity of soil amendments. <br />c. Quantity of sodded turf. <br />d. Quantity of other soil additives per agronomic soils test report. <br />e. Submit Certificate of Delivery of container or bulk materials. <br />f. Submit written certificate of soil balance. <br />g. Submit written certification of quantity and quality of plant materials. <br />G. ROOT CONTROL BARRIERS <br />1. Within 35 days of award of contract, submit one 24-inch by 24-inch sample with <br />joining strip and two copies of manufacturer's technical data for approval. <br />H. PRE-INSTALLATION CONFERENCE <br />1. Provide a written projected planting schedule noting the estimated completion <br />date, number of working days required, and special coordination requirements. <br />5.02.06 QUALITY ASSURANCE <br />A. Provide for all inspections and permits required by authorities in furnishing, <br />transporting, and installing materials. <br />B. Test soil samples after grading operations are complete, at Contractor's expense. <br />C. Materials shall conform to the requirements of this Section. <br />5.02.07 DELIVERY, STORAGE, AND HANDLING <br />A. Handling Plants: Handle plants in a manner to avoid any damage to the plant. Protect <br />plants from sun or drying winds. Plants that cannot be planted immediately on <br />delivery shall be kept in the shade, well protected, and adequately watered. <br />B. Delivery Certification: Furnish a Certificate of Delivery slip with each delivery of <br />material in containers or in bulk. Certificate shall state source, quantity, or weight, <br />type and analysis, and date of delivery. <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.