Laserfiche WebLink
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />124 <br />F. CERTIFICATES <br />1. Submit certificates for the following items upon delivery to the job site: <br />a. Quantity of commercial fertilizer and organic fertilizer. <br />b. Quantity of soil amendments. <br />c. Quantity of sodded turf. <br />d. Quantity of other soil additives per agronomic soils test report. <br />e. Submit Certificate of Delivery of container or bulk materials. <br />f. Submit written certificate of soil balance. <br />g. Submit written certification of quantity and quality of plant materials. <br />G. ROOT CONTROL BARRIERS <br />1. Within 35 days of award of contract, submit one 24-inch by 24-inch sample with <br />joining strip and two copies of manufacturer's technical data for approval. <br />H. PRE-INSTALLATION CONFERENCE <br />1. Provide a written projected planting schedule noting the estimated completion <br />date, number of working days required, and special coordination requirements. <br />5.02.06 QUALITY ASSURANCE <br />A. Provide for all inspections and permits required by authorities in furnishing, <br />transporting, and installing materials. <br />B. Test soil samples after grading operations are complete, at Contractor's expense. <br />C. Materials shall conform to the requirements of this Section. <br />5.02.07 DELIVERY, STORAGE, AND HANDLING <br />A. Handling Plants: Handle plants in a manner to avoid any damage to the plant. Protect <br />plants from sun or drying winds. Plants that cannot be planted immediately on <br />delivery shall be kept in the shade, well protected, and adequately watered. <br />B. Delivery Certification: Furnish a Certificate of Delivery slip with each delivery of <br />material in containers or in bulk. Certificate shall state source, quantity, or weight, <br />type and analysis, and date of delivery. <br />505 E Central Ave <br />#B11/6/2024