My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
505 E Central Ave #B - DEF 1 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Central Ave
>
505 E Central Ave Unit# B
>
505 E Central Ave #B - DEF 1 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2026 5:01:47 AM
Creation date
2/24/2026 5:00:42 AM
Metadata
Fields
Template:
Plan
Permit Number
20181754
30146722
40138703
101117766
101124090
Full Address
505 E Central Ave Unit# B
Street Number
505
Street Direction
E
Street Name
Central
Street Suffix
Ave
Unit Number
B
Document Relationships
101117766 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
101124090 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
20181754 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
30146722 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
40138703 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Central Ave\505 E Central Ave Unit# B
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
994
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: XX-XXXX <br />PROJECT TITLE <br /> <br />160 <br />Pipe shall be installed in compliance with ASTM D2321. Bedding material shall provide <br />adequate and uniform support under the pipe. <br />Underground conduit construction shall conform to all applicable Subsections of Section <br />306 of the Standard Specifications, the Standard Plans and these Special Provisions. <br />There shall be no pipe joints from the sewer lateral cleanout connection to 20 feet into <br />street right away. No pipe joints shall be allowed in the parkway. <br />Pipe joints shall not be deflected at any joint, either vertically or horizontally, beyond the <br />limits specified by the manufacturer. <br />Construction of sewer lateral and cleanout shall be done in accordance with City of Santa <br />Ana Standard Plan No. 1204, the contract plans and these Special Provisions. <br />A “Y” Branch fitting shall be installed on the sewer main at each lateral connection per <br />City of Santa Ana Standard Plan No. 1204. In the case where the lat eral is to be <br />connected to a sewer main that has been lined, a “Y” Saddle fitting shall be installed. The <br />connection shall conform to the size and shape of the inside diameter of the new <br />connection. Service connection openings shall be free from rough edges or protrusions. <br />CORING OF NEW SEWER MAIN TO ACCOMMODATE LATERAL <br />CONNECTION SHALL NOT BE ALLOWED. <br />At all locations where more than one (1) lateral serves a single parcel, Contractor shall <br />expose existing lateral connection to the existing sewer main and verify that the lateral is <br />active by CCTV inspection. In addition, the Contractor shall insert a push camera with <br />sounder/locator up the lateral from the main (insertion pit) to mark and locate the point of <br />connection at the property line. <br />If CCTV investigation is inconclusive, lateral shall be treated as active and shall be <br />constructed per plan. If lateral is determined to be dead, lateral shall be plugged and <br />abandoned in place. <br />The Contractor shall connect to the new sewer main and to the existing sewer lateral pipe <br />at the property line. The existing sewer lateral shall be depicted on the construction plans <br />based on the best information available. It is the Contractor’s responsibility to “locate <br />all points of connection for each new sewer lateral at b oth ends: the wye at the <br />public sewer main and the private connection point at property line where lateral <br />cleanout will be constructed.” The Contractor shall insert a push camera with <br />sounder/locator up the lateral from the main (insertion pit) to mark and locate the point of <br />connection at the property line. All locations points shall be marked in the field prior to <br />installation and construction of new sewer lateral. <br />The Contractor shall perform pipeline testing as directed by the Engineer in accordance <br />with the applicable provisions of Subsection 306-1.4 of the Standard Specifications. <br /> <br />505 E Central Ave <br />#B11/6/2024
The URL can be used to link to this page
Your browser does not support the video tag.